TECHNICAL WORKING GROUP ~lorking Group 1100, 6/8/79

13
•• TECHNICAL WORKING GROUP 1100 6/12/79 1. Agenda, 6/12/79 Technical Working Group 2. Radioactive Releases and RCS Profile 3. Top Priorities List 4. Action Items Technical Group 1100, 6/8/79 5. Task Lists

Transcript of TECHNICAL WORKING GROUP ~lorking Group 1100, 6/8/79

•••

TECHNICAL WORKING GROUP

1100 6/12/79

1. Agenda, 6/12/79 Technical Working Group

2. Radioactive Releases and RCS Profile

3. Top Priorities List

4. Action Items Technical ~lorking Group 1100, 6/8/79

5. Task Lists

(

- - - -------

~Q.!.!!l!!

TECHNICAL WORtit;G CROUP

1100 6/12/79

1. Radioactive Releases

a. 748. Auxiliary Building Fans

b. Point Sources - Compressors

c. Dome Monitor - Containment Survey (14" Penetration)

2. Plant Status

a. RCS Profile

b. Containment Water Level (Rcad~ng Discrepancy)

· Reactor Building Pressure

Elect Checks - Critical Equip/Decision Heights

c. Plant Operations Schedule

Pressurizer Solid Operation

Sample Results - CL Confirmation

Demineralizer Water System - Contamination

"A" Leak. Teat

3. Analysis

4.

5.

a. Re-evaluation of axisting recommendation to draw a.bubble vs. solid operation.

b. Reduction to 300 psig - Increase in loss of pressure pro­tection?

c. Re-evaluate the curve supplied for throttling steac bypass based upon present temperature and pressure conditions.

Pre-operational Testing Esttcated Completion

a. .J fi . / . ./ '

VI<IK_,-~..-- - ~~_, ._. ....... ~---,v.:. h~~~ /

OTSG 11811 Long-term Cooling c.&- r...:T 6./19 ~ .J' • (Readiness to operate) : .~ •• p- . ,J "'- .;..,-/.~~~ :.-- "¥- ......

I -, ,

EPICOR (CAP-GUN II) ,. . ._ 4 •. : .;__ 7/20 (not before) , . ./ •-1- ., . -r-=-~~ . , ~,._ ·', , .'.....:~ we c. r , • • ·~- ,.

Tank Farm

b.

c.

Construction Status

a.

b.

RCS Pressure/Volume Control Turnover for testing

Alternate Decay Heat Removal System Tie-Ins {, ~-~.t.. .;. ....

. .... .... --. .. _ ....... -... - -·-

RELEASES 0500 6l8l79 ~ 0500 6l9l79 0500 6l10l79

748 -8 2.93 X 10 8.67 X 10-g 4.31 X 10-g

219 -- ---Inlet 4.90 X 10-10 5.0 X 10-10 5.1 X 10-10

Trainll 2.23 X 10-12 3.16 X 10-lJ 2.3 X 10-12

Train 12· 2.79 X 10-l2 3.16 X 10-12 3.04 x 10-12

Train 13 2.70 X 10-l2 2.62 X 10-12 1.4 X 10-12

Train 14 6.37 X 10-13 2.0 X 10-13 .< 3. 2 X 10-13

REACTOR COOLANT SYSTEM PROFILE

PLANT STATUS

0500 6l8l79 0500 6l9/79 0500 6l10l79

A B A B A B

Th 160.0 161.3 160.6 161.7 162. 0 162.9

Tc 150. 2 104.9 150.5 117.7 151. 4 105.5

A. T 9.8 56.4 10.1 44.0 10.6 57.4

Tstm 147.2 128. 8 147. 5 131.9 149. 3 131.2

PZR Level Cal. SOLID SOLID SOLID DVM

R.C. Press. 346 343 341

S/G Level 407" 96% 416" 96% Turb. B/P 45% Closed 45% Closed 38% Closed t . C. T. High 280 .0 279.7 281.7

Kin. 143.5 144.7 144.7 M. U. Temp. 130 131 134

·' n r, -:- 23?

1'-1 J I

RELEASi:S 0500 6£11£79 0500 6£12£79

748 3.27 X 10-9 -9 , 1.95 X ~

219 1.02 X 10-ll ?~ Inlet 3.6 X 10-10 4.30 X 10-10

Train 11 1.8 X 10-12 1.86 X 10-12

Train 12 1.9 X 10-12 1.67 X 10-l2

Train 13 1.9 X 10-l2 7 .23 X 10-lJ

Train 14 ( 3.4 X 10-13 (. 3. 35 X 10'""13

REACTOR COOLANT SYSTEM PROFILE

PLANt' STATUS

0500 6£11£79 0500 6/ 12£79

A B A B

Th 161.5 163. 1 160.7 162.6

Tc 1:;2.4 105.9 151.5 107.3 --= AT 9.1 57.2 9.2 55.3

Tstm 149. 1 128.8 148.1 127.9

Level Cal. SOLID SOLID

DVM

R.C . Press . Heise - -DVM - 345 346

S/C Level 418" 96% 430" 96%

Turb. B/P 38% Closed 38% CLOSED

I.C.T. High 279.3 278.8

Hln. 145.0 144.3

H.U. !ump. 141.6 138.6 •' ( \('I 7~0

m PRIORITIES

Develop~ent of plan for manngement of radioactivity in Auxiliary and Containment Buildings.

Identify and isolate sources of iodine leakage

Complete tank farm in Unit 2 spent fuel pool

Completion of EPICOR (CAP-GUN II) System

Development of plan for treatment of Auxiliary Building liquid waste

Complete "B" OTSG cooling and modification (long-term)

Development of alternate system for pressure/volume control system

Complete external valve pit for ADHR Syst~

CATEGORY

6/12/79

A-1 ·

A-1 A-1

A-2

B- t

C-1

C-1

C-2

A Control (i.e., containment) of radioactivity in Auxiliary and Containment Buildings

B

c

Recovery of Auxiliary Building to near normal opt-rations.

Place the plant in a cold condition suitable for depressurization with long-term pressure/ volume control.

~

ACTION IT£115

TECHNICAL WORKING CROUP

1100 6/5/79

1. Prepare recommendation as to operation of door (Aux./P.H. Bldg.) in conjunction with supply fans and coordinate test requirements.

2. Investigate the causes of the increase in radiation levels ns water was transferred from the Aux. Bldg. Sump to the concentrate waste tank. Should this be expected in future waste management liquid movements?

3. Confirm discrepancies in containcent water level for action directive on use of coolers for negative reactor building pressure.

4. Leave RR coolers secured until containQent water level is confirmed.

5. Provide assessment of integrated reactor building equipment list as to priority and frequency of meggar readings.

6. Provide decision heights based on electrical equipment list and critical components and systems.

7. Verify chloride - readings in "A" Bleed Tank Sample of 6/7.

8. Recommendation and action as to increasing PH based on sample results and B&W recommendation.

9 . Conduct review of piping systems interfacing between the r~s and various support systems to identify positive methods of determining transfer of highly contaminated RCS to lesser contaminated or clean systems.

10. Redo Steam By-Pass Valve position curve over time to indicate "%Demand Signal vs . Time" . No further valve action is to be taken until new curve is published.

11. Proceed with transfer of approximately 300 gallon from lower to upper tanks in Tank Farm.

6/12/79

ACTION

Hirst/ Rusche

Rusche

Arnold/ Her be in/ Wilson/ Rusche

Her be in

Wilson

Wilson

B&W

Wilson/ B&W/ Herbein

Wilson

Wilson/ Herbein

Hirst

••&• .&. UJ.. A. 0/UI'.J

PLANT OPERATIO~ STAFF •

Ex;h~c:tcd '):"a!:k Tas\: Descri]!t:Son Priority Cor.!) let ion StatU!: Coord. .

. Plant Status A-1 On-going Solid at upprox 350 psig.

. C~t reco~en~ntior. on running C-1 . Op. instr • to b O!SG "B" .. provided by B&R.

2

for pWIIp & demi . ops.

3 . Obtain RCS s~~plc (Primary c-1 On-going lletri.c:k latdown). Obtain PZR sacple, and bleed On-going "A" Bleed 6/15 . tank · samt~les.

. Isolate Unit ~1 and 12 sample 6/11 See Plant Mods • Limroth/ stations. •IcGoey

. E~cct high radiation doors in 4 fabricated, Shovlin A~~iliary nuilding. installation in

progress.

~3 Su::p Level A-1 Revised gauge Revie~ing calcu Kundcr installation lac ions. complete.

. Provide frequency of DH-\'2 A-1 On-&oing Obtaining daily Bensel ~o:or cegsering. cotor megger ..

readings/sw-box . reading.

3 . Current lenk rate A-1 6{4. 120Q.; ,49.5 gpm

r, r• .... I t\) I '

.

. .

P.ase, 1 of 1

PLANT HODIFICATIO~S •

~:G-1

WG-2 (L-1)

UG-6 (L-2)

llG-11

WG-12

TS-JC

TS-6B

TS-14

TS-15

t.IC-19

Description

Install AB-FIIB Filter System.

Decon. water in AB using EPICOR io~ exchange process.

ln~tall storage vessels in Fuel Pool "A". ·

tl3ter Chemistry Lab for use with C.t\P-ctm (WG-2) •

Ventilation filtration systec ror dec3y he~t pits.

Develop complete package for lon~::-t~m cooling OTSG "B".

RCS pre~sure control system.

Shielding for decay h~<1t pump.

tlestinghouse ADHR.. . .

Ne11 Sample Sink-Unit 2

Er..,ected Priority Co~:>letion

A-1

A-1

A-1

A-l

A-1

~-1

C-1

C-2

. C-1

Punch list items to be co~leted.

Punch list items to be c.o-..pleted.

Tur:t over to be 6/15.

Punch list items to be com~leted.

Punch list ite::s to b~ co::plctcd.

Co::?lete by 6/8.

Turnover for test 7/15.

Turnover for test 7/UJ.

Start work 6/14

Statu!:

Systc:l opera­tional 5/ll.

Turned over for test 5/23.

Turned over for test 5/23.

6/J.Z79

l'.ask Coord.

Shubert

Lncy/ Fricke

Gibson

Tolle/ Rao

Turned over for Shubert test 5/26.

Co:pleted 5/23.

Turnover to test 6/8.

.Jordan/ L:ln~:~.

Miller/ Lilly

Turned over for Lieberman test. S/28 •

See' Yestinghous schedule-

EQI' s on bold for re-eval. of criteria­long-tero in­stend. of short­t-er::l use.

De•~on codel roo:::1 6/13.

S-l.S

'Westinghouse

· Description

.u>:ms Installation

~estinghouse Engineering Design Co::~plete

Valve 2it Desi6n Co:plet~ (3!.R)

Assemble ADHa Skid

Assemble CCW Skid

Receive Control Trailer

Install Paneb :;. UCC in Trailer

I :\3tall Isolatioa Eo~;

Co~c Boring (12 holes)

Co~plete Installation of Pipe Pc~ctratio~ Ass~blies

Cut 12" Header and Weld Ueldolet

Cut 10" Header and t·~eld Uddolet Channel A

Cu: 10" lleader and Ueld l:c!ldolet

C:>~;>letc Fit Up and tTdding of Inside Pipin& (Total of 42 Field Uelds)

Co:Ji)lcte Fit Up & t:eldtns of Outside Pipin3 (Total of 15 Field Held~)

Pdoritv

C-1

.. II

"

..

II

II

II

. II

II

"

" II

II

Ex;>ected Cor:-.? let~

7/15

6/25. (AS :EUILTS)

Cocplete . 6/30

6/30

6/3(1

.\ctual 5/20

6/3 .. -

6/1~

6/24 - 6/29

6/25

Open

6/12/79

Statu::;

Turnov~r slipped 20 days •

951. Cocplete

~vieu · . Complete

Mech.lOO% Co~lete. Elect 85% ·eompl.eta.

lJecll... · 100% Complete,· Elect 85% Complete.

0~-Site

Co:!!plete

Complete :

. . 90% complete except 'grouting

On Hold

On P.old

On Hold

In progress

Excavat"ion and support struc­ture col:lp. (Dependent upon vatve pit const •

';OlS\:. Coord.

I. I

l

£ "•• .&. u~ ..

~-1 Design. install~tion, and ope~ation of EPICOR for Unit 2.

!.-2

·I.-10

!.-14

~-36

L-47

See Plant Modifications (HG-2)

Des~n. installation~ and operation of e:argency surge tanks (tank farm) in Unit 2 "A" Fue1. Pool.

See Plant Modifications (WG-6)

Pursue aceivities on processing Unit: 2 w.ter through CAP-GUN to insure availabel freeboard for U:tit 2.

E1:al~t«.. waste gas vent header lcakclze problems and recoll':lend fixes dcpendinz on results.

Investigate the effects which th~ . operations ass~ciated 'Uith r.!ector plan~. lonc;-tern cooldolm wlll have on dlscr.arge to the u~ste systems. Related . to L-6.

Resolve sample lab requir~ents versus capabilities to support £~LCO~ I and II operations.

Chan&e out An/fHB HVAC vent filter train charcoal bed.

t: ~RC cont01ct

B-1

B-1

A-1

A-1

C-1

B-1

A-1

• " I (\ '"1

. ·:

"">A o' I ,

ll"orc.al. process- Garaa.n/ ing- Unit: 1 Weller li:U ts remaia. as is.

liorkinz pe-::-.J. Seelinger's waste za:: plan. of 4/17/79.

In progress.

Lab require.c:ent defined; ·proce­~ures and equip ~::ent in place · or on order. Lab procedures bein;;· develo?ed. by b:i Con. Eng

"A" t. ".B" trai of the AB fil­ters and "A" train of Flm filters recoved and replaced. units back in service. FRB "n': train in ch.:mge-out:

t-tcConn!!l1 Ar.thur/ *Eland.

~IcCoP...;/ Ross/ I:Coll.Uts

Kraft

Me Co nne: Eduards. ~tlel1er

scheduled for Spent {l 5/17. Deluge t~a:y rc:::t systc::~s secured to ::tor.:t< on all rene'Ued cornplcrct Ciltcr trains.1'

. . . tl~TE MANAGEHE'iT CP.OUP

:.ssk. De!:criotion Prior it'.'' Ex?ectcd C'l~!J lee ion

L-27 Devclo? sn=~ling plan to a~~css AS uaste for tran!:uranic

B-2

conte:tt. Insure that Het-Ed . O?s. coordinate sac~le require- . oent!: \lith Ort!:L to insure ~ati!:factory analysis results.

.

L-29 Investigate rep~rtcd uater B-2 collection in the "a" fuel pool obtain aaoples and make plans for dispostion. Also investi-gate the preo~eration condition of the fuel pool fro~ a lea~ge standpoint.

L-35 Inve:otigatc the naed for a s-2 design and construction task to erect a barrier betueen the Unit l and Uni t 2 Fuel Handllng n l tlg . tO Cn3ble unit l o~era-t!on:o ~tith Unit 2 in processing Ho:i~.

. . . c- :,o Reactor Purge Systea Charcoal A-2

Filter Saaple. . ·- . . . .

. G-41 Davelop filter C3nagement B-:2

strategy.

11 ~me co:\tact .

. . .

Status·

Prelicinary S:&::l['le results obtained fro= OiU:L. Futher study involving need !or addi-tional. samples is undenray.

l-rater fro= Unit 2 canst. Sample needed.

. Alternate design Unit: I. side to be sub.iitted 4/27/79.

. RB purge filter saaple all. ready for analysis • Scheduled wek of 5/20 •

. Standard. prqce-dures to saople. charcoal systec.s in review •

' "' !"1. r.., 7A7

.

'J'ask. Coord.

D. Uitti R. WUl:i S. Kraft *.J. Coll

tlil J :facs *Barret 1:

.

Me Con ne 1a.c

t lUl.l

*Barret

.

1-fcConn i~Col.l

e: ins

~rcConn e:

tiASTE HAUACEHENT CP.O:IP. -E;:~~cted Task D.?scriptfon PrioritY Co:,?l~ticn

c -42 Develop a progr~ to assess B-2 and c:mitor I release sources.

. . .

. .

. . .

.

.

L-11 In~estigate/develop proce~s for B-3 -. elt=inating Unit 2 water in -.. ·: RCBT/s. Process planning for . Units 1 ~nd 2. Design . (con-ceptually) a vaste ?recessing . . s~stea for Unit: 2 High Level Liquid tlastes. .

L-20 O~t3in a level ceasurecent and B-3 4l si!:Dple of llllt!!r fro:n the RB . su~p and base~ent.

t-30 Develop plan for radiation B-3 survey in Auxiliary and Fuel Handling Bldg.

S-4 Hic;h level solid waste dispo:oal B-2 investigation.

,., l\"r.C contact ,...,

.

:

Statu:

Four-part: . approach:

l.. E!.R to co::z.-plete revie\J of relea.sa candidates.

2.- Pursue a tracer progrecz. to find l.eak-

3. Pursue aa. air moa.itor-ing progl:&:L

lri.th SA:!/ EPIU to pl.ot X levels.

4: E.evie"' local vent:ilati.oa conditions to verify flo"' distri.-butio:l.S.

Pro~osal to be recei.ved froa cbea-~uj:l.e.ar 5/4/79. .

Musuremut using Heise Gauge beU\g ~lor.ed.

In prog-ress.

(\ "'1. '1~:\ I l ~

.

Task Coord.

. lfcConnel l:'.r:.Coey t Nontgo~ SAI:

Cl.ine I Pel it 1::

g Volle

Sa..idcr I *tlel1er

.

. &;,~si

~Cual.

~en/ *Stod

Pas to r . Edwa

*Uelle *Coll

n!. r

in

. . . \lAST£ tlANACEllEN'T CROUP • ..

·=

I Er.,ected Ta~k D~scription Priority Co~l'let.i.on Status

5 Temp. on site storage for DeMin. B-2 Final storage In progress. Liners - De!lign. proposal by CA •

·-Being assessed by·lt-f..\. ..

lligh level solid waste B-2 In progress. disposal investigation. . .

. .5 Ex;>and S:)lid Haste Disposal B-2 Fit;.;~l storage

Study to include the design proposal. pre-of a te=~ora-ry on-site storage sented by CAI.. facility for de=ineralizer Data. to be l iners Yhile a~aiting casks. assessed

·-

b:r l-:MA •

. .

. . r- ., (\ .., 7\!f . . . .

. . .

. n :;ac contact

.

.

. .

Task Coo-rd.

. Pastor/ Ed.tJards/ *Ueller/ *Colli

M.K. Pas C.E. Ed ~ .

ll· t ·

*R.. lle *.:I. Col

..

.