Technical Specification

6 PANELFIXING 76.1 General 76.2 FastenerDurability 76.3 Fastener—Type,SizeandLayout 76.4 PanelLayout 8

7 JOINTING 87.1 General 87.2 VerticalJoint 87.3 HorizontalJoint 97.4 ExternalCorner 97.5 InternalCorner 97.6 FlashingMaterialDurability 9

8 FINISHING 98.1 Preparation 98.2 FlexibleSealants 9

9 STORAGEANDHANDLING 9

10 MAINTENANCE 10

11 PRODUCTINFORMATION 1011.1 ManufacturingandClassification 1011.2 ProductMass 1011.3 Durability 10

12 SAFEWORKINGPRACTICES 11

13 PRODUCTSIZESANDACCESSORIES 13

14 DETAILS 15

PRODUCTWARRANTY 47

1 APPLICATIONANDSCOPE 31.1 Application 31.2 Scope 31.3 Details 31.4 SpecificDesign 3

2 DESIGN 32.1 Compliance 32.2 Responsibility 32.3 SiteandFoundation 32.4 SurfaceClearances 42.5 MoistureManagement 42.6 Structure 42.7 Bracing 42.8 FireRatedWalls 42.9 EnergyEfficiency 4

3 FRAMING 53.1 General 53.2 TimberFraming 53.3 SteelFraming 53.4 ConstructionMethods 53.5 Tolerances 5

4 PREPARATION 54.1 BuildingUnderlayorHomeRABPre-Cladding 54.2 RigidAirBarrier 54.3 VentStrip 54.4 Flashings 64.5 JunctionsandPenetrations 6

5 BATTENINSTALLATION 65.1 CLDStructuralCavityBattens 65.2 BattenLayout 65.3 IntermediateSupport 65.4 BattenFasteners 6

Contents

THISTECHNICALSPECIFICATIONISFORAXON®PANELDIRECT

FIXEDANDFIXEDTOCLD®STRUCTURALCAVITYBATTEN.

WEVALUEYOURFEEDBACKTocontinuewiththedevelopmentofourproductsandsystems,wevalueyourinput.Pleasesendanysuggestions,includingyourname,contactdetails,andrelevantsketchesto:

Ask James HardieTM [email protected]

Axon®PanelTechnical Specification July 2015NewZealand3

1.3 DETAILSVariousAxonPanelfiguresareprovidedintheDetailssectionofthisdocument.Alldimensionsshownareinmillimetresunlessnotedotherwise.ThisspecificationanddetailsinCADfilearealsoavailablefordownloadatwww.jameshardie.co.nz.

1.4 SPECIFIC DESIGNForuseofAxonPaneloutsidethispublishedscope,thearchitect,designerorengineermustundertakespecificdesign.

Foradviceondesignsoutsidethescopeofthisspecification,AskJamesHardieon0800808868.

2 Design2.1 COMPLIANCEAxonPanelcomplieswithE2oftheNZBCasanalternatesolution.

AxonPanelcladdinghasbeentestedasperE2/VM1oftheNZBCanditpassesthetestperformancerequirements.AxonPanelalsocomplieswithdurabilityrequirementsof‘B2’clauseoftheNZBC.

2.2 RESPONSIBILITYThespecifierorotherpartyresponsiblefortheprojectmustrunthroughariskmatrixanalysistodeterminewhichconstructionmethodistobeused.Thedesignermustalsoensurethatthefigurespublishedinthisspecificationareappropriatefortheintendedapplicationandthatadditionaldetailingisperformedforspecificdesignoranyareasthatfalloutsidethescopeofthisspecification.ThedesignersshouldensurethattheintentoftheirdesignmeetstherequirementsoftheNZBC.

AllNewZealandStandardsreferencedinthismanualarecurrenteditionandmustbecompliedwith.

JamesHardieconductsstringentqualitycheckstoensurethatanyproductmanufacturedfallswithinourqualityspectrum.Itistheresponsibilityofthebuildertoensurethattheproductmeetsaestheticrequirementsbeforeinstallation.JamesHardiewillnotberesponsibleforrectifyingobviousaestheticsurfacevariationsfollowinginstallation.

2.3 SITE AND FOUNDATIONThesiteonwhichthebuildingissituatedmustcomplywiththeNZBCAcceptableSolutionE1/AS1‘SurfaceWater’.

FoundationsdesignmustcomplywiththerequirementsofNZS3604‘Timber-framedBuildings’orbeasperspecificengineeringdesign.

ThegradeofadjacentfinishedgroundmustslopeawayfromthebuildingtoavoidanypossibilityofwateraccumulationinaccordancewiththeNZBCrequirements.

1 Application and scope

1.1 APPLICATIONAxon®PanelismanufacturedinNewZealandbyJamesHardieusinganadvancedlightweightcementcomposite.Basecompositionisportlandcement,groundsand,cellulosefibreandwater.AxonPanelhasverticalgroovesalongthepanel.Itisclassifiedaslightweightwallcladdingsuitableforresidentialandlightcommercialbuildingsusingtimberframing.

•AxonPanelisidealforachievingfeaturewallsinareassuchasgableendsandentranceways.

•AxonPanelisprimedonthefacetotakeasuitablepaintfinishinanycolour.

•AxonPanel133Smooth-thegroovesonthefacepanelarenominal10mmwidex2.25mmdeepandspacedat133mmcentres.

•AxonPanel133Grained-thegroovesonthefacepanelarenominal10mmwidex2.25mmdeepandspacedat133mmcentres.Betweenthegroovesisalookoftraditionalwood-graintexture.

•AxonPanel400Smooth-thegroovesonthefacepanelarenominal10mmwidex2.25mmdeepandspacedat400mmcentres.

If you are a specifier Orotherresponsiblepartyforaproject,ensurethattheinformationinthisdocumentisappropriatefortheapplicationyouareplanningandthatyouundertakespecificdesignanddetailingforareaswhichfalloutsidethescopeofthesespecifications.

If you are an installer Ensurethatyoufollowthedesign,moisturemanagementprinciples,associateddetailsandmaterialselectionprovidedbythedesigner.Allofthedetailsprovidedinthisdocumentmustbereadinconjunctionwiththisspecification.

Make sure your information is up to dateWhenspecifyingorinstallingJamesHardieproducts,ensureyouhavethecurrentmanual.Ifyou’renotsureyoudo,oryouneedmoreinformation,visitwww.jameshardie.co.nzorAskJamesHardie™on0800808868.

1.2 SCOPEThescopeofthisspecificationfortheuseofAxonPanelislimitedtobuildingswhichfallwithinthescopelimitationsof‘AcceptableSolutionE2/AS1paragraph1.1’oftheNewZealandBuildingCode(NZBC).

Thisdocumentisintendedforusebyarchitects,designersandspecifierswhomaybeinvolvedwiththespecificationofAxonPanel.

ThismanualcoverstheuseofAxonPanelforbothconstructionmethodsi.e.directfixedtoframingorcavityconstruction,usedinexternalwallsoftimberframedbuildingsupto2.5kPa.

PleaserefertoE2/AS1forfurtherinformationregardingtheselectionofconstructionmethodstobeusedforfixingcladdings.

4Axon®PanelTechnical Specification July 2015NewZealand

2.4 SURFACE CLEARANCESTheclearancebetweenthebottomedgeofcladdingandpaved/unpavedgroundmustcomplywithsection9.1.3ofE2/AS1.ThefinishedfloorlevelmustalsocomplywiththeserequirementsTheseclearancesmustbemaintainedthroughoutthelifeofthebuilding.

AxonPanelmustoverhangthebottomplateonaconcreteslabbyaminimumof50mmasrequiredbyNZS3604.

AxonPanelmusthaveaminimumclearanceof100mmfrompavedground,and175mmfromunpavedground.Ontheroofsanddecks,theminimumclearancemustbe50mm.

Donotinstallexternalcladdingsuchthatitmayremainincontactwithwaterorground.ReferFigures3and18.

2.5 MOISTURE MANAGEMENTItistheresponsibilityofthespecifiertoidentifymoisturerelatedrisksassociatedwithanyparticularbuildingdesign.

Wallconstructiondesignmusteffectivelymanagemoisture,consideringboththeinteriorandexteriorenvironmentsofthebuilding,particularlyinbuildingsthathaveahigherriskofwinddrivenrainpenetrationorthatareartificiallyheatedorcooled.

WallsshallincludethoseprovisionsasrequiredbytheNZBCAcceptableSolutionE2/AS1‘ExternalMoisture’.Inadditionallwallopenings,penetrations,junctions,connections,windowsills,headsandjambsmustincorporateappropriateflashingsforwaterproofing.Theothermaterials,componentsandinstallationmethodsusedtomanagemoistureinexternalwalls,mustcomplywiththerequirementsofrelevantstandardsandtheNZBC.

2.6 STRUCTURE2.6.1 Timber framingTimber-framedbuildingsmustbedesignedinaccordancewithNZS3604(Timber-framedBuildings).Whentheframingisprovidedasperthespecificengineeringdesign,theframingstiffnessmustbeeitherequivalenttoormorethanthestiffnessrequirementsofNZS3604.

Fortimberframewallslongerthan12mitisbestpraticetoallowforconstructionjointstoaccommodatemovementsgeneratedduetotimbershrinkageordeflectionsetc.

2.6.2 Wind loadingAxonPanelissuitableforuseinallwindzonesinNewZealanduptoandincludingEHasdefinedinNZS3604.

AspecificdesignisrequiredforallsituationswherethebuildingsfallsoutsidethescopeofNZS3604andE2/AS1.

2.7 BRACINGAxonPaneldirectfixedcanbeusedtoachievestructuralbracingwhenfixedwithstainlesssteelHardieFlex™nails.ForfurtherinformationrefertotheJamesHardieBracingDesignManual.

AxonPanelinstalledtoCLDStructuralCavityBattensasperthisspecificationhasnotbeentestedandthereforecannotbeused

toachievestructuralbracing.However,bracingcanbeachievedbyusingJamesHardierigidairbarrierboardinstalleddirecttoframinginsteadofabuildingunderlayorbyusingVillaboard®Liningbracingsystemontheinternalface.

2.8 FIRE RATED WALLSAxonPanelwhendirectfixedwithHardieFlexnailstoexternalwallscanachievefireratingsupto60/60/60tocomplywithC/AS1oftheNZBCwhenthewallsareconstructedinaccordancewiththecurrentJamesHardie‘FireandAcousticDesignManual’.

WhenusingAxonPanelfixedtoCLDStructuralCavityBattens,afireratingofupto60minutescanbeachievedusingRAB®BoardinconjunctionwiththefireratedsystemrequirementsasspecifiedintheJamesHardie‘FireandAcousticDesignManual’.AskJamesHardieon0800808868forfurtherinformation.

AxonPanelisclassifiedasanon-combustiblematerialsuitableforuseonwallsclosetoboundary.

2.9 ENERGY EFFICIENCY ExternalwallsconstructedusingAxonPanel,bulkinsulation,wheretheareaofglazingis30%orlessofthetotalwallareaandconstructedasperthistechnicalspecificationcomplywiththerequirementsforwallsintheNZBCAcceptableSolutionH1/AS1(NZBCClauseH1EnergyEfficiency),ReplacementTable1.Tomeetthermalinsulationrequirementsfortheconstruction,thebulkinsulationasspecifiedinTable-1mustbeused.ThisinsulationmaybesubstitutedwithinsulationshavinghigherR-values.Thethermalinsulationofawallgetsaffectedwhenthedepthofthetimberframingisincreasedordecreased.ThecalculationusedinTable1isbasedonatimberframingsize90x45mmandusinganinternalliningmaterialsuchasJamesHardieVillaboard®Liningora10mmplasterboard.

Table1Insulationcapability

Climate Zone

Construction R‑Value Requirement

Minimum R‑Value of Insulation Required

1and2 1.9m2ºC/W #R2.0

3 2.0m2ºC/W #R2.2

TotalconstructionR-Valuedependsontheinsulationmaterialusedandtheframingratio.TheinsulationmaterialR-Valuesspecifiedinthistableareforstudsspacedat600mmc/candnogsspacedat800mmc/c.

#ToachievehigherR-ValuesofconstructionthewallinsulationmaterialmustbereplacedwithaninsulationmaterialhavinghigherR-Valuestosuittherequirements.

Forfurtherguidanceoninsulationrequirementsrefertothecurrenteditionof‘HouseInsulationGuide’publishedbyBRANZ.

Axon®PanelTechnical Specification July 2015NewZealand5

3.4 CONSTRUCTION METHODS3.4.1 Direct fixed Fordirectfixedconstructionmethodthefollowingframingisrequired:

•Studsat600mmc/cmaximum

•Aminimum45mmstudwidthisrequiredatverticalpaneljoints

•Nogs/dwangsarerequiredat1200mmc/cmaximum.

3.4.2 CLD Structural Cavity BattenForcavityconstructionmethodthefollowingframingisrequired:

•Whenstudsarespacedat600mmcentresmaximum,thenogs/dwangsmustbeprovidedat800mmcentresmaximum

•Whenstudsarespacedat400mmcentresthenthenogs/dwangsmaybeprovidedat1200mmcentres

•Anextrastudisrequiredininternalcorners.RefertoFigure21.

3.5 TOLERANCESInordertoachievetherequiredperformanceandanacceptablewallfinish,itisimperativethatframingisstraightandtrue.

FramingtolerancesmustcomplywiththerequirementsofNZS3604.Allframingshallbemadeflush.

4 Preparation4.1 BUILDING UNDERLAY OR

HOMERAB PRE-CLADDINGBuildingunderlayorHomeRAB®Pre-CladdingmustbeprovidedaspertherequirementsoftheNZBCAcceptableSolutionE2/AS1‘ExternalMoisture’andNZS3604.ThebuildingunderlaymustcomplywithTable23ofE2/AS1andAS/NZS4200.1.ThebuildingunderlaymustbefixedinaccordancewithE2/AS1,NZS3604andAS/NZS4200.2andtheunderlaymanufacturer’srecommendations.

Wallswhicharenotlinedontheinsidefacee.g.garagewallsorgableendsmustincludearigidsheathingoranairbarrierbehindthecladdingwhichcomplieswiththerequirementsoftheNZBCAcceptableSolutionE2/AS1Table23.HomeRABPre-Claddingissuitableforuseintheseapplications.ItmustbeinstalledinaccordancewiththeJamesHardieRigidAirBarriersinstallationmanual.

4.2 RIGID AIR BARRIERForEHwindzoneorSpecificEngineeringDesignprojectswherethewindpressuresarehigherthan1.5kPa(ULS),RABBoard(6mm)mustbeused.RefertotheJamesHardierigidairbarriersinstallationmanualforinformationregardingitsinstallation.ForbuildingswithinthescopeNZS3604HomeRABPre-CladdingLining(4.5mm)orbuildingunderlayscanbeused.

3 Framing

3.1 GENERALThisAxonPaneltechnicalspecificationisonlysuitablefortimber-framedbuildings.Otherframingmaterialsaresubjecttoaspecificengineeringdesign.

3.2 TIMBER FRAMING3.2.1 DimensionsAminimum45mmwidestudisrequired.

3.2.2 Structural gradeMinimumtimbergraderequirementisNo.1framinggradeorMSG6asperNZS3604.ThegradingoftimbermustcomplywiththeAS/NZS1748andNZS3631requirements.

3.2.3 DurabilityTheexternalframingmustbetreatedtoaminimumH1.2treatment.RefertotheNZBCAcceptableSolutionB2/AS1‘Durability’forfurtherinformationaboutthedurabilityrequirements.

FortimbertreatmentandallowablemoisturecontentinformationrefertoNZS3602(TimberandWood-BasedProductsforuseinBuildings)andNZS3640(ChemicalPreservationofRoundSawnTimber)forminimumtimbertreatmentselectionandtreatmentrequirements.

Alsorefertotheframingmanufacturer’sliteratureforfurtherguidanceontimberselection.Framingmustbeprotectedfrommoistureatsiteinaccordancewiththerecommendationoftheframingmanufacturers.

3.2.4 Frame constructionTheframingmustfullysupportallpaneledges.Theframingmustberigidandnotrelyonthecladdingpanelforstability.

Timberframingsizesanditsset-outmustcomplywithNZS3604andasspecifiedinthisspecification.

Incaseofgableendtrussessittingontopplatesoftheexternalwallframe,theframesizemustcomplywiththeminimumtimbersizesstipulatedforwallframesinSection8oftheNZS3604.

3.3 STEEL FRAMING3.3.1 Dimensions and gaugeA38mmminimumstudwidthisrequired.Framingmembersmustbe0.55mmminimumto1.6mmmaximumBMT(BaseMetalThickness).

3.3.2 DurabilityThesteelframingmusthavetheappropriatelevelofcoatingtopreventcorrosionandtocomplywiththedurabilityrequirementsoftheNZBC.

3.3.3 Frame constructionSteelframingmustcomplywithNASHhandbook/guidelinesStudandbattenspacingmustnotbemorethanwhathasbeenspecifiedinthisspecification.Refertoframingmanufacturer’sspecificationsandalsotoNASHforfurtherguidanceonsteelframeinstallation.

ForfurtherinformationregardingtheinstallationofJamesHardieCladdings,referto‘SteelFrameTechnicalSupplement’publishedbyJamesHardie.

6Axon®PanelTechnical Specification July 2015NewZealand

4.3 VENT STRIPTheJamesHardieuPVCcavityventstripmustbeinstalledatthebottomofallwallsconstructedusingthedrainedandventilatedcavityconstructionmethod.Itisimportantthattheopeningsintheventstriparekeptclearandunobstructedtoallowfreedrainageandventilationofcavities.JamesHardieuPVCventstriphasanopeningareaof1000mm²/mlength.

4.4 FLASHINGAllwallopenings,penetrations,intersections,connections,windowsills,headsandjambsmustbeflashedpriortopanelinstallation.PleaserefertomoisturemanagementrequirementsinClause2.5.ThebuildingunderlayorRABBoardmustbeappropriatelytapedaroundthepenetrationsandlapped/tapedtoflashings.Materialsmustbelappedinsuchawaythatwatertracksdowntotheexteriorofabuilding.JamesHardiewillassumenoresponsibilityforwaterinfiltrationwithinthewallduetopoorinstallationofflashingsorbuildingunderlays.TheselectedflashingmaterialsmustcomplywiththedurabilityrequirementsoftheNZBC.ForinformationrefertoTable20ofclauseE2oftheNZBC.

WhenusingaJamesHardierigidairbarrierboardtheentireframingaroundwindowopeningmustbesealedwithaflashingtape.ThetapemustbefinishedoverthefaceofJamesHariderigidairbarrierboard.TheflashingtapeslikeSUPER-STICKBuildingTape®byMarshallInnovationsor3M™AllWeatherFlashingTape8067by3M™arerecommendedforusewithJamesHardierigidairbarrierboard.Refertothetapemanufacturer’sliteratureforfurtherinformationregardingtheirinstallation.

4.5 JUNCTIONS AND PENETRATIONSRefertoClause2.5ofthisspecificationformoisturemanagementrequirements.Allwindowsanddoorsmustbedetailedaspertherequirementsofthisspecification.JamesHardiehasdevelopedthewindowdetailsforAxonPanelwhichmeettherequirementsofE2‘ExternalMoisture’,anapproveddocumentoftheNZBC.RefertoFigures8to10and24to26.

5 Batten installation

Note:Thisspecificationisnotfortimbercavitybattens.RefertoseparatetechnicalspecificationfromJamesHardie.

5.1 CLD STRUCTURAL CAVITY BATTENSBuildingswithariskscoreof7-20calculatedinaccordancewithTable2ofAcceptableSolutionE2/AS1oftheNZBC,requireAxonPaneltobeinstalledonacavity.CLDStructuralCavityBattensprovideairspacebetweentheframeandthepanelandareusedtofixcladdingintothem.

CLDStructuralCavityBattensaremadeofalowdensityfibrecementformulationwhichenablesthemtohaveextrastrengthanddurability.CLDStructuralCavityBattenissealedonallsidesandissuitabletofixAxonPanelinstalledasperthistechnicalspecification,anditcanwithstandthedesignwindpressuresexertedonacladdingwithinthescopeofNZS3604.

TheCLDStructuralCavityBattensaremade2450mmlongand19mmthick.Thebattensarefullysealedonallsides.

5.2 BATTEN LAYOUTCLDStructuralCavityBattensmustbefixedtothewallframingoverbuildingunderlayorJamesHardierigidairbarrier.Thesmootherfaceofbattenshouldfacetowardsthecladding.

CLDStructuralCavityBattensaresuitabletowithstandwindpressuresupto2.5kPa(ULS).Forbattenfixing,refertosection5.4.EnsurethebattensarestraightandprovideaflatsurfacetofixAxonPanelto.SitecutendsofbattensmustbesealedonsitewithDulux®Acraprime501/1sealerorReseneQuickDry.

Thebattensareruncontinuouslyoverthestudsbuttheymustnotberuncontinuouslyoverthefloorjoists.Theremustbea15mmgapbetweenthebattensatfloorjoistleveltoallowforstructuralshrinkagesanddeflections.RefertoFigure27.

CLDStructuralCavityBattenscanbebuttjointedoverthestudswithinthefloorheight.Thebattenendsmustbecutbetween20ºto45ºandbeinstalledinawaythatthebuttjointdeflectsthemoisturetotheexterior.Theendsmustbesealedandjointedwiththeadhesivesealantbeforebuttingthemtogether.RefertoFigure23.

ThedesignermustensurethattheCLDStructuralCavityBattensarenotusedinsituationswheredesignwindpressuresareabove2.5kPa(ULS).

CLDStructuralCavityBattensmustalwaysbeatleast300mminlength.

5.3 INTERMEDIATE SUPPORTWherestudsareat600mmcentresanintermediatemeansofrestrainingthebuildingunderlayandinsulationfrombulgingintothecavityshallbeinstalled.Anacceptablemethodtoachievethisisusinga:

•75mmgalvanisedmesh

•polypropylenetapeat300mmcentresfixedhorizontallyanddrawntaut.

Nointermediatesupportsarerequired:

•whenstudsarespacedat400mmcentres

•whenRABBoardinsteadofbuildingunderlaysareused.

5.4 BATTEN FASTENERSTheCLDStructuralCavityBattenmustbefixedtotheframingasspecifiedinTable2.Thefastenersmustbedrivenataminimumdistanceof50mmfromthebattenends.

Axon®PanelTechnical Specification July 2015NewZealand7

Table2Battenfixing

Fixing Type

Framing Basic Wind Pressure kPa (ULS)

Batten centres max. (mm)

Fixings centres max. (mm)

65mmx2.8mmRounDriveringshanknailhotdipgalv./s.steel

Timber Upto1.5(UptoandincludingVHwindzone)

600 250

Upto2.5(>VHwindzone)

400 200

50mmx9-10gCountersunkheadsteelscrewclass3/4

*Steel0.55to1.6mmBMT

Upto1.5(UptoandincludingVHwindzone)

600 250

Upto2.5(>VHwindzone)

400 200

*WhenfixingCLDStructuralCavityBattensoversteelframe,providea10mmthickHDPbattenunderthewraporRABBoardtoachieveathermalbreak.

*Ensureaminimum15mmpenetrationofscrewintosteelframe.

Whenusingarigidairbarrierboardthebattenfixingmustbeincreasedbyminimumthicknessofrigidairbarrierboard.

Forfastenerdurabilityinformation,refertoClause6.2ofthisdocument.

CLDStructuralCavityBattenslessthan400mminheightmusthavefixingsatmaximum150mmcentres.

Battensmustbefixedoverstuds.

6 Panel fixing6.1 GENERALAxonPanelmustbekeptdryandundercoverwhilstinstorageorduringtheinstallation.Everyendeavourmustbemadetokeepframingdryoncepanelfixingcommences.Allsite-cutpaneledgesmustbesealedpriortoinstallation.

•Theshiplapjointingofpanelsisonlysuitableforverticalfixingofpanels.

•DonotfixinthegrooveofAxonPanel.

•Ensurethesheetsarefromthesamebatch.

•Itisrecommendedtofixfromthecentreofthepanelandworkoutwards.

•Donotoverdrivefasteners.

•Fixingsmustbefinishedflushwiththepanelsurface.

6.2 FASTENER DURABILITYFastenersmustmeettheminimumdurabilityrequirementsoftheNZBC.NZS3604specifiestherequirementsforfixingmaterialtobeusedinrelationtoexposureconditionsandaresummarisedinTable3.

Table3ExposureconditionsandnailselectionprescribedbyNZS3604

NAIL MATERIAL

ZoneD* ZoneC*outsideseasprayzone,ZoneBandGeothermalhotspots

Bracing—AllZones

Grade316Stainless

Hot-dippedgalvanisedorGrade316stainless

Grade316Stainless

*(ZoneCareaswherelocalknowledgedictatesthatincreaseddurabilityisrequired,appropriateselectionshallbemade).MicroclimateconditionsasdetailedinNZS3604,paragraph4.2.4requireSED.

AlsorefertotheNZBCAcceptableSolutionE2/AS1Table20and21forinformationregardingtheselectionofsuitablefixingmaterialsandtheircompatibilitywithothermaterials.

6.3 FASTENER — TYPE, SIZE AND LAYOUT

6.3.1 Direct fixAxonPanelmustbefixedtoframingusingthefixingsasspecifiedinTable4belowandfollowtheedgedistancerequiredfornailsasshowninthedetails.RefertoFigures2and4.

Table4Panelfixing

DIRECT FIXED TO FRAME USING HARDIEFLEX NAILS

40x2.8mmHardieFlexnails.

Fix@200mmcentrestoallframing.Studwidth45mmmin.requiredatverticaljoint.

DIRECT FIXED TO FRAME USING BRAD NAIL

ND50stainlesssteelstraightbradnail

Upto1.5kPa(UptoandincludingVHwindzone)

Fix150mmc/conpaneledgesandintermediateframing

Notes:

1.Bradnailfixingmethodisonlysuitableuptoveryhighwindspeedzones.DonotusethismethodforEHwindzonesdescribedinNZS3604orSEDprojects.

2.Nailsmustbefinishedflushwithpanelsurface.

3.Specialfixingarrangementsarerequiredforbracingandfire-resistanceratedwallsystems.

FormoreinformationAskJamesHardieon0800808868.

Whenfixingthepanelsusingnailguns,refertothenailgunmanufacturerforinformationaboutnailsandthetypeofnailguntobeused.

Note:Donotuse‘D’headnails.

8Axon®PanelTechnical Specification July 2015NewZealand

6.3.2 CLD Structural Cavity Batten MethodThispanelfixingmethodcanbeusedupto2.5kPawindpressure.AxonPanelisonlyfixedintotheCLDStructuralCavityBattenasperthismethod.

Adhesive sealantApolyurethaneadhesivesealantSealNFlex-1manufacturedbyBostikorSikaFlex11FCbySikaarerecommendedforuseintheinstallationoftheseproducts.Applya6mmcontinuousbeadofthisadhesivesealantoverthefaceoftheCLDStructuralCavityBattenbeforefixingtheAxonPanel.RefertoFigure19,20and21.

Whenusingexternalboxcornerflashing,usea10mmthickbeadofadhesiveoverthealuminiumboxcornerflanges.RefertoFigure22.

Note:Donotuseexcessiveadhesive.

6.3.3 Cavity construction using timber cavity battensWhenfixingAxonPanelusingtimbercavitybattens,thesedetailsareavailableatwww.jameshardie.co.nzorAskJamesHardieon0800808868.

6.4 PANEL LAYOUTAllpaneledgesmustbesupportedbytheframing.Theshiplapjointmustbeformedvertically.Theframingcentersmustbecheckedbeforethepanelinstallation.

FixAxonPaneltoCLDStructuralCavityBattensusingoneofthefollowingfixingsspecifiedinTable5.Theedgedistanceatpanelcornermustbeminimum75mmverticallyfrompanelcorners.ReferFigure17.

Table5AxonPanelFixing

Types of fixings to be used with adhesive sealants

Suitable up to Basic Wind Pressure kPa (ULS)

Fixing to CLD Structural Cavity Battens c/c (mm)

C-25straight‘T’-Headstainlesssteelbradnail

1.5(UptoandincludingVHwindzone)

150

25x2.5mmannularthreadedfibrecementnail

2.5(>VHwindzone)

200

25mmx10gcountersunkscrewclass3/4orstainlesssteel

2.5(>VHwindzone)

200

Notes:

1.Bradnailfixingmethodisonlysuitableupto1.5kPa.

2.Nailsmustbefinishedflushwithpanelsurface.

7 Jointing7.1 GENERALAxonPanelsarefixedtoformashiplapjointatverticaledges.Thepanelshavefactory-madeedgestosuitthisjointing.

7.2 VERTICAL JOINTDirect fixedAxonPanelsareshiplapjointedkeepingagapof1-2mmbetweenthepanels.A50mmwide3259Insealsealingtapeisusedunderthejointoverthefaceofthetimberstudwheredirectfixedconstructionmethodisused.Aflexiblesealantmustbeappliedtothefulllengthoftheshiplapjointbeforethepanelsarejointed.TheedgedistanceforaHardieFlexnailmustbe18mmmin.RefertoFigure4.

Cavity constructionFixtheCLDStructuralCavityBattenoverthestudsanditrunsbehindtheentirelengthoftheshiplapjointwitha50mmoverhangbelowthebottomplateandfinishesflushwiththebottomedgeofpanel.RefertoFigures16and17.Theverticalshiplapjointisformedalongthecentrelineofthebatten.AbeadofsealantisappliedtotheverticaledgeoftheAxonPaneltosealtheshiplapjointbeforefixingthepanels.RefertoFigure19.Theedgedistanceforabradnailmustbe16mmand18mm.ReferFigures14and19.

Brad nail

www.jameshardie.co.nz

James HardieAxon™ Panel and CLD® Structural Cavity BattenFIGURE 15: BRAD NAIL FIXING5 March 2008

1:2

n_zl-axoncld-015.dwg

Bradnail

Brad nail

www.jameshardie.co.nz

James Hardie Axon™ Panel and CLD® Structural Cavity BattenFIGURE 15: BRAD NAIL FIXING 5 March 2008

1:2

n_zl-axoncld-015.dwg

Brad nail

www.jameshardie.co.nz

James HardieAxon™ Panel and CLD® Structural Cavity BattenFIGURE 15: BRAD NAIL FIXING5 March 2008

1:2

n_zl-axoncld-015.dwgBradnail

Brad nail

www.jameshardie.co.nz

James Hardie Axon™ Panel and CLD® Structural Cavity BattenFIGURE 15: BRAD NAIL FIXING 5 March 2008

1:2

n_zl-axoncld-015.dwg

Brad nail

www.jameshardie.co.nz

James HardieAxon™ Panel and CLD® Structural Cavity BattenFIGURE 15: BRAD NAIL FIXING5 March 2008

1:2

n_zl-axoncld-015.dwg

Bradnail

Brad nail

www.jameshardie.co.nz

James Hardie Axon™ Panel and CLD® Structural Cavity BattenFIGURE 15: BRAD NAIL FIXING 5 March 2008

1:2

n_zl-axoncld-015.dwg

Axon®PanelTechnical Specification July 2015NewZealand9

8 Finishing

7.3 HORIZONTAL JOINTAtfloorjoistlevelsahorizontaljointmustbeprovidedtoaccommodatethemovementresultingfromtimberjoistshrinkageandsettlement.AJH9mmpanelaluminiumhorizontal‘h’mouldisusedtoformahorizontaljoint.Usethealuminium‘h’mouldjointertocoveroverthebuttjointof‘h’mould.Apurposemademetal‘Z’flashingoraJamesHardieuPVCflashingcouldalsobeusedtoflashthehorizontaljoint.RefertoFigures11,12and27.

7.4 EXTERNAL CORNERAJH9mmpanelaluminiumboxcornermouldisusedtoformtheexternalboxcorner.Thesite-cutsheetedgesmustbesealedbeforebuttingthemintotheboxcorner.RefertoFigure7.

Donotruntheboxcornerflashingcontinuouslyoverthefloorjoist.Onatwostoreyconstructionthealuminiumboxcornerisfinishedunderthealuminium‘h’mould.AuPVCcornerunderflashingmustbeusedundertheboxcornerwheninthissituation.RefertoFigure12.

ForCLDStructuralCavityBattenexternalcornerrefertoFigure22.

Thebeadofadhesivemustbe10mmthicktoaccommodateforthethicknessofthealuminium.

7.5 INTERNAL CORNERDirectfixedinternalcornerisformedusingauPVCcornerunderflashingoran80mmwideInsealsealingstripbehindthepaneledges.Thejointisfilledwiththeflexiblesealant.RefertoFigure6.

ForCLDStructuralCavityBatteninternalcornerjointdetailrefertoFigure21.

7.6 FLASHING MATERIAL DURABILITYPleaserefertoTable20ofE2/AS1oftheNZBCregardingthedurabilityrequirementsofvariousflashingmaterials.

8.1 PREPARATIONPaintingofAxonPanelismandatorytomeetthedurabilityrequirementsoftheNZBCand15yearJamesHardieproductwarranties.AxonPanelmustbedryandfreeofanydustorgrimebeforepainting.Thepanelsmustbepaintedwithin90daysoftheirinstallation.ThereisnorestrictionontheLRVofpainttobeappliedontheAxonPanel.

WhenusinguPVCflashings,darkcoloursshouldbeavoidedasitwillaffectthedurabilityofuPVCflashing.TheLRVofpaintmustbeabove40%whenusinguPVCflashings.

Darkpaintscanbeusedwhenusingthealuminiumflashings.

Panelsarepre-primedandaresuitableforsiteappliedacrylicpaints.Pre-finishedpanelscanalsobeinstalledusingexposedheadfasteners.

Inordertosealcutedgesorsandedpatches,DuluxPrimacryl,Resenequickdryorasimilarproductshouldbeapplied.Theprimershouldbecompatiblewiththepainttobeused.

Wherepanelsarefixedwithbradnails,thenailheadsmustbefinishedflushwithpanelsurface.Thenailgunshouldbesettonail“proud”ofthepanelsurfaceandnailheadstobemanuallyfinishedflushwithsurface.Thenailheadscanbeskimmedoverwithanexteriorgrade2partbuildersfillifrequired.Theskimmedareamustbeprimedpriortosite-appliedfinishing.

Forsite-appliedfinisheswherebradnailsareused.JamesHardierecommendsanundercoatandaminimumoftwocoatsofacrylicpaint.Followthepaintmanufacturer’srecommendationstopreparethesurfaceandtoadequatelycoverandconcealthepanelfixings.

8.2 FLEXIBLE SEALANTAllsealantsusedmustcomplywiththerelevantrequirementsoftheNZBC.Theirapplicationandusagemustbeinaccordancewithmanufacturer’sinstructions.Checkwithsealantmanufacturerpriortocoatingoversealants.Somesealantmanufacturersdonotrecommendcoatingovertheirproducts.

9 Storage and handling

WhenstoringAxonPanel,boardsmustbelaidflatonasmoothlevelsurface.Edgesandcornersmustbeprotectedfromchipping.

Toensureoptimumperformance,storepanelsundercoverandkeepdrypriortofixing.Ifthepanelsbecomewet,allowthemtodrythoroughlybeforefixing.

Donotcarrypanelsontheflat,carryintheverticalpositiontoavoidexcessivebending.

10Axon®PanelTechnical Specification July 2015NewZealand

10 Maintenance 11 Product information

11.1 MANUFACTURING AND CLASSIFICATION

AxonPanelisanadvancedlightweightcementcompositebuildingproduct.Thebasiccompositionisportlandcement,groundsand,cellulosefibreandwater.Thepanelsareeasilyidentifiedbythename‘AxonPanel’printedatregularintervalsonthebackfaceofpanel.

CLDStructuralCavityBattensaremanufacturedusingalowdensityfibrecementformulation.ThebasiccompositionisPortlandcement,groundsand,cellulosefibreandwaterandproprietaryadditives.Thebattensaresealedonallsides.

AxonPanelismanufacturedtoAS/NZS2908.2‘Cellulose-CementProductsPart2:FlatSheets’(ISO8336’FibreCementFlatPanels’)standardsinNewZealand.JamesHardieNewZealandisanISO9001‘Telarc’certifiedmanufacturer.

AxonPanelisclassifiedTypeA,Category3inaccordancewithAS/NZS2908.2“Cellulose-CementProducts”.

ForSafetyDataSheets(SDS)visitwww.jameshardie.co.nzorAskJamesHardieon0800808868.

11.2 PRODUCT MASSAxonPanelismanufacturedin9.0mmthicknessandhasamassof12.1kg/m2atEMC.

AxonPanelcladdingisdefinedasaLightWeightWallCladding(notexceeding30kg/m2)asperNZS3604.

11.3 DURABILITY11.3.1 GeneralAxonPanelinstalledasperthistechnicalspecificationwillmeetthedurabilityrequirementsforcladdingsasrequiredunderclause‘B2-Durability’oftheNZBC.

11.3.2 Resistance to moisture/rottingAxonPanelhasdemonstratedresistancetopermanentmoistureinduceddeterioration(rotting)andhaspassedthefollowingtestsinaccordancewithAS/NZS2908.2:

•WaterPermeability(Clause8.2.2).•WarmWater(Clause8.2.4).•HeatRain(Clause6.5).•SoakDry(Clause8.2.5).

11.3.3 Control of External Fire SpreadAxon Panel is tested as per Appendix C C7.1.1 and is classified as ‘Non-Combustible Material’ which is suitable for use as external wall cladding and complies with requirements of Paragraph 5.4 of the NZBC Acceptable Solution C/AS1 and Paragraph 5.8.1 of Acceptable Soluations C/AS2 to C/AS6 of the NZBC.

11.3.4 Alpine regionsInregionssubjecttofreeze/thawconditions,AxonPanelmustnotbeindirectcontactwithsnoworicebuildupforextendedperiods,e.g.externalwallsinalpineregionsmustbeprotectedwheresnowdriftsoverwinterareexpected.

TheAxonPanelhasbeentestedinaccordancewithAS/NZS2908.2Clause8.2.3.

Theextentandnatureofmaintenancewilldependonthegeographicallocationandexposureofthebuilding.Asaguide,itisrecommendedthatbasicnormalmaintenancetasksshallincludebutnotbelimitedto:

•Washingdownexteriorsurfacesevery6-12months*

•Re-applyingofexteriorprotectivefinishesifnecessary**

•Maintainingtheexteriorenvelopeandconnectionsincludingjoints,penetrations,flashingsandsealantsthatmayprovideameansofmoistureentrybeyondtheexteriorcladding.

•Cleaningoutgutters,blockedpipesandoverflowsasrequired

•Pruningbackvegetationthatisclosetoortouchingthebuilding

•TheclearancebetweenthebottomedgeofAxonPanelandthefinishedgroundmustalwaysbemaintained.

*Donotuseawaterblastertowashdownthecladding.

*In extreme coastal conditions or sea spray zones, wash every 3-4 months.

**Refertoyourpaintmanufacturerforwashingdownandrecoatingrequirementsrelatedtopaintperformance.

Axon®PanelTechnical Specification July 2015NewZealand11

12 Safe working practices

WARNING — AVOID BREATHING SILICA DUSTJamesHardieproductscontainsand,asourceofrespirablecrystallinesilicawhichisconsideredbyrelevantgovernmentauthoritiestobeacauseofcancerfromsomeoccupationalsources.Breathingexcessiveamountsofrespirablesilicadustcanalsocauseadisablingandpotentiallyfatallungdiseasecalledsilicosis,andhasbeenlinkedwithotherdiseases.Somestudiessuggestsmokingmayincreasetheserisks.Duringinstallationorhandling:(1)workinoutdoorareaswithampleventilation;(2)minimisedustwhencuttingbyusingeither‘ScoreandSnap’knife,fibrecementshearsor,wherenotfeasible,useaHardieBlade™SawBladeanddust-reducingcircularsawattachedtoaHEPAvacuum;(3)warnothersintheimmediateareatoavoidbreathingdust;(4)wearaproperly-fitted,approveddustmaskorrespirator(e.g.P1orP2)inaccordancewithapplicablegovernmentregulationsandmanufacturer’sinstructionstofurtherlimitrespirablesilicaexposures.Duringclean-up,useHEPAvacuumsorwetcleanupmethods—neverdrysweep.Forfurtherinformation,refertoourinstallationinstructionsandSafetyDataSheetavailableatwww.jameshardie.co.nz

FAILURE TO ADHERE TO OUR WARNINGS, SAFETY DATA SHEETS, AND INSTALLATION INSTRUCTIONS MAY LEAD TO SERIOUS PERSONAL INJURY OR DEATH.

JamesHardierecommendedsafeworkingpractices

CUTTING OUTDOORS

1. Positioncuttingstationsowindwillblowdustawayfromtheuserorothersinworkingarea.

2. Useoneofthefollowingmethodsbasedontherequiredcuttingrate:

BEST

• DustreducingcircularsawequippedwithHardieBlade™SawBladeandHEPAvacuumextraction.

GOOD

•DustreducingcircularsawwithHardieBlade™SawBlade.

SANDING/REBATING/DRILLING/OTHER MACHINING

Whensanding,rebating,drillingormachiningyoushouldalwayswearaP1orP2dustmaskandwarnothersintheimmediatearea.

IMPORTANT NOTES

1. Formaximumprotection(lowestrespirabledustproduction),JamesHardierecommendsalwaysusing“Best”—levelcuttingmethodswherefeasible.

2. NEVERuseapowersawindoors.

3. NEVERuseacircularsawbladethatdoesnotcarrytheHardieBlade™logo.

4. NEVERdrysweep—UsewetsuppressionorHEPAvacuum.

5. NEVERusegrinders.

6. ALWAYSfollowtoolmanufacturers’safetyrecommendations.

P1orP2respiratorsshouldbeusedinconjunctionwithabovecuttingpracticestofurtherreducedustexposures.Additionalexposureinformationisavailableatwww.jameshardie.co.nztohelpyoudeterminethemostappropriatecuttingmethodforyourjobrequirements.Ifconcernstillexistsaboutexposurelevelsoryoudonotcomplywiththeabovepractices,youshouldalwaysconsultaqualifiedindustrialhygienistorcontactJamesHardieforfurtherinformation.

12Axon®PanelTechnical Specification July 2015NewZealand

Working instructionsRefertorecommendedSafeWorkingPracticesbeforestartinganycuttingormachiningofproduct.

HardieBlade™ Saw BladeTheHardieBlade™SawBladeusedwithadust-reducingsawconnectedtoaHEPAvacuumisidealforfast,cleancuttingofJamesHardiefibrecementproducts.Adust-reducingsawusesadustdeflectororadustcollectorconnectedtoavacuumsystem.Whensawing,clampastraight-edgetothesheetasaguideandrunthesawbaseplatealongthestraightedgewhenmakingthecut.

Hole‑formingFor smooth clean cut circular holes:Markthecentreoftheholeonthesheet.

Pre-drillapilothole.

Usingthepilotholeasaguide,cuttheholetotheappropriatediameterwithaholesawfittedtoaheavydutyelectricdrill.

For irregular holes:Smallrectangularorcircularholescanbecutbydrillingaseriesofsmallholesaroundtheperimeteroftheholethentappingoutthewastepiecefromthesheetface.

Tapcarefullytoavoiddamagetosheets,ensuringthatthesheetedgesareproperlysupported.

Storage and handlingAllJamesHardiebuildingproductsshouldbestoredtoavoiddamage,withedgesandcornersofthesheetsprotectedfromchipping.

JamesHardiebuildingproductsmustbeinstalledinadrystateandbeprotectedfromrainduringtransportandstorage.Theproductmustbelaidflatundercoveronasmoothlevelsurfaceclearofthegroundtoavoidexposuretowaterormoisture,etc.

QualityJamesHardieconductsstringentqualitycheckstoensurethatanyproductmanufacturedfallswithinourqualityspectrum.Itistheresponsibilityofthebuildertoensurethattheproductmeetsaestheticrequirementsbeforeinstallation.JamesHardiewillnotberesponsibleforrectifyingobviousaestheticsurfacevariationsfollowinginstallation.

Axon®PanelTechnical Specification July 2015NewZealand13

13 Product sizes and accessories

Table7AxonPanelinformation

Product Description Thickness SizeProduct CodeAxon Panel 133 Smooth

Isashiplapjointedpaneltohidethepaneljoints.Thepanelisfaceprimed.Thepanelhasgroovesat133mmcentres.Thepanelmustbeinstalledvertically.Nom.PanelMass:12.1kg/m2

9

Length Width

2450 1200 403780

2750 1200 403781

3000 1200 403782Axon Panel 133 GrainedIsashiplapjointedpaneltohidethepaneljoints.Thepanelisfaceprimed.Thepanelhasgroovesat133mmcentres.Thepanelmustbeinstalledvertically.Nom.PanelMass:12.1kg/m2

9

2450 1200 404510

2750 1200 404511

3000 1200 404512

Axon Panel 400 SmoothIsashiplapjointedpaneltohidethepaneljoints.Thepanelisfaceprimed.Thepanelhasgroovesat400mmcentres.Thepanelmustbeinstalledvertically.Nom.PanelMass:12.1kg/m2

9

2450 1200 404414

2750 1200 404415

3000 1200 404416

Table8Accessories/toolssuppliedbyJamesHardie

Note:Theactualwidthofthepanelis1203mm.Alldimensionsandmassesprovidedareapproximateonlyandsubjecttomanufacturingtolerances.

Accessories Description Quantity/Size (approx) Code

CLD Structural Cavity Batten19mmthickfibrecementcavitybatteninstalledoverRABBoardorabuildingunderlay.AxonPanelsarefixedtothebattens.

19x70mm,2450mmlong 403870

JH 9mm Panel Aluminium External Box CornerAboxcornermouldtoformtheexternaljoints.9mmetchprimed.

2450mmlong

2750mmlong

3000mmlong

4000mmlong

304509

304510

305150

305808

JH 9mm Panel Aluminium Horizontal ‘h’ MouldAhorizontalflashingtoflashthehorizontaljoints.9mmetchprimed.

3000mmlong 304508

Aluminium ‘h’ Mould JointerAjointertocoverthebuttjointof‘h’mould.

100mmlong 304512

uPVC Corner Under Flashing A50x50mmcornerunderflashingforinternalandexternaljoints.

3000mmlong 303745

uPVC Vent StripUsedtoprovideprotectionfromverminenteringcavityspace.

3000mmlong 302490

Annular Threaded Nail 25x2.5mmnail.

500gm 300390

INSEAL® 3259 TapeBlack50mmtapetobeusedundertheverticalshiplapjoint.Black80mmtapetobeusedatcorners.

50mroll

300767

300769

CLD Batten Corner Flashing AluminiumUsedatinternalcornersealantjointsatfloorjoistlevel.

304652

Tools

HardieBlade™ Saw BladeDiamondtip184mmdiameterfibrecementcircularsawblade.Spacersnotincluded.

Each 300660

NOTE:uPVC‘h’mouldandjointeraccessoriesarealsoavailablefromJamesHardie.

14Axon®PanelTechnical Specification July 2015NewZealand

Table9Accessories/toolsnotsuppliedbyJamesHardie

JamesHardierecommendsthefollowingproductsforuseinconjunctionwithAxonPanel.JamesHardiedoesnotsupplytheseproductsanddoesnotprovideawarrantyfortheiruse.Pleasecontactcomponentmanufacturerforinformationontheirwarrantiesandfurtherinformationontheirproducts.

Accessories Description

Building UnderlayTocomplywithTable23ofE2/AS1.

Flexible TapeAflexibleself-adhesivetapeusedinpreparationofawindow.RefertotheWindowinstallationsectioninthismanualformoreinformation.e.g.Tyvek®,ProtectoorThermakraftorsimilar.

Joint SealantPaintableflexiblesealantsarerecommendedforfillingthejoints.RefertoSection7.2forinformation.e.g.SikaSilaflexMS,SikaATFaçade,BostikSealNFlex-1orsimilar

Head FlashingRequiredoverwindowheadstobesuppliedbywindowinstaller.MaterialmustcomplywithTable20and21ofE2/AS1.

Flashing Material as per Table 20, ‘E2/AS1’

HardieFlex™ Hot Dip Galv and Stainless Steel 316 nailsForfixingpanelsdirecttoframing.40x2.8mm

C‑25 Stainless Steel Brad Nails304SSbradnailsusedtoinstallAxonPanelstotheCLDStructuralCavityBattensusedinastraightbradder.Paslode:(09)4773000

ND 50 Stainless Steel Brad NailsUsedtoinstallAxonPaneldirectfixtotimberframing.Usedinastraightbradder.

65 x 2.87mm RounDrive Ring Shank Nail

For fixing CLD Structural Cavity Battens to the framing.

Paslode: (09) 477 3000

Bostik Seal N Flex‑1‘SealNFlex-1’PolyurethaneadhesivesealantmanufacturedbyBOSTIKforapplyingbetweenthepanelsandbattens,Refertosection5formoreinformation.BOSTIK:ALK:(09)5796253,WGTN:(04)5675119,CHCH:(03)3662583.

Sika Sikaflex 11FCSika:0800SIKANZ(0800745269)

200mm wide Polypropylene DPCProductusedoverbuildingunderlayatexternalandinternalcorners.ie.SuperCourse500

Sealant

Adhesive

Adhesive

Axon®PanelTechnical Specification July 2015NewZealand15

14 Details

Thefollowinggenericdetailshavebeenprovidedinthisdocumentforbothdirectfixedandcavityconstructionmethods.

Table10

Details

DescriptionDirect Fixed

CLD Structural Cavity Batten Construction

Figure No. Page No. Figure No. Page No.

Typical framing setout Figure1 16 Figure15 25

Typical panel nail fixing setoutFigure2 17

Figure17 27Figure13 24

Foundation detail Figure3 18 Figure18 28

Vertical shiplap jointFigure4 18

Figure19 29Figure14 25

Soffit detail Figure5 19 Figure29 37

Internal corner detail Figure6 19 Figure21 30

External corner detail Figure7 20 Figure22 31

Section at sill Figure8 20 Figure24 33

Window jamb Figure9 21 Figure25 34

Window head Figure10 21 Figure26 34

Horizontal joint detail Figure11 22Figure27 35

Figure28 36

Corner at ‘h’ mould joint detail Figure12 23

Battenfixingsetout Figure16 26

Intermediate stud fixing Figure20 30

Jointing of CLD Structural Cavity Batten Figure23 32

Externalcorner Figure30 38

Cavitypipepenetration Figure31 38

Internalcorner Figure32 39

Aluminium‘h’mouldjoiner Figure33 40

Onepieceapronflashingjoint Figure34 41

Drained flashing joint at floor joist Figure35 42

Meterboxatsill Figure36 43

Meterboxatjamb Figure37 43

Meterboxathead Figure38 44

JunctionbetweenAxonPanelandfasciaboard Figure39 45

Enclosedrooftowallintersection Figure40 46

16Axon®PanelTechnical Specification July 2015NewZealand

Figure1:Directfixedtypicalframingsetout

Axon®PanelTechnical Specification July 2015NewZealand17

Figure2:DirectfixedtypicalpanelHardieFlexnailfixingsetout

18Axon®PanelTechnical Specification July 2015NewZealand

Figure3:Directfixedfoundationdetail

Figure4:Verticalshiplapjoint—HardieFlexnail

Axon®PanelTechnical Specification July 2015NewZealand19

Figure5:Soffitdetail

Figure6:Internalcornerdetail

20Axon®PanelTechnical Specification July 2015NewZealand

Figure7:Externalcornerdetail

Figure8:Sectionatsill

Axon®PanelTechnical Specification July 2015NewZealand21

Figure9:Windowjamb

Figure10:Windowhead

22Axon®PanelTechnical Specification July 2015NewZealand

Figure11:Horizontaljointdetail

Axon®PanelTechnical Specification July 2015NewZealand23

Figure12:Cornerat‘h’mouldjointdetail

24Axon®PanelTechnical Specification July 2015NewZealand

Figure13:Directfixedtypicalpanelbradnailfixingsetout

Axon®PanelTechnical Specification July 2015NewZealand25

Figure15:Framingsetout

Figure14:Shiplapjoint—bradnail

26Axon®PanelTechnical Specification July 2015NewZealand

Figure16:Battenfixingsetout

Axon®PanelTechnical Specification July 2015NewZealand27

Figure17:Sheetfixingsetout

28Axon®PanelTechnical Specification July 2015NewZealand

Figure18:Foundationdetail

Axon®PanelTechnical Specification July 2015NewZealand29

Figure19:Verticalshiplapjoint

30Axon®PanelTechnical Specification July 2015NewZealand

Figure20:Intermediatestudfixing

Figure21:Internalcorner

Axon®PanelTechnical Specification July 2015NewZealand31

Figure22:Externalcorner

32Axon®PanelTechnical Specification July 2015NewZealand

Figure23:JointingofCLDStructuralCavityBatten

Axon®PanelTechnical Specification July 2015NewZealand33

Figure24:Windowsill

34Axon®PanelTechnical Specification July 2015NewZealand

Figure25:Windowjamb

Figure26:Windowhead

Axon®PanelTechnical Specification July 2015NewZealand35

Figure27:Horizontaljointatfloorjoist

36Axon®PanelTechnical Specification July 2015NewZealand

Figure28:Horizontaljointatfloorjoist

Axon®PanelTechnical Specification July 2015NewZealand37

Figure29:Soffitdetail

38Axon®PanelTechnical Specification July 2015NewZealand

Figure30:Externalcornerat‘h’mouldjointdetail

Figure31:Cavitypipepenetration

Axon®PanelTechnical Specification July 2015NewZealand39

Figure32:Internalcornerat‘h’mouldjointdetail

40Axon®PanelTechnical Specification July 2015NewZealand

Figure33:Aluminium‘h’mouldjoiner

Axon®PanelTechnical Specification July 2015NewZealand41

Figure34:Onepieceapronflashingjoint

42Axon®PanelTechnical Specification July 2015NewZealand

Figure35:Drainedflashingjointatfloorjoist

Axon®PanelTechnical Specification July 2015NewZealand43

Figure36:Meterboxatsill

Figure37:Meterboxatjamb

44Axon®PanelTechnical Specification July 2015NewZealand

Figure38:Meterboxathead

Axon®PanelTechnical Specification July 2015NewZealand45

Figure39:JunctionbetweenAxonPanelandfasciaboard

46Axon®PanelTechnical Specification July 2015NewZealand

Figure40:Enclosedrooftowallintersection

Ask James HardieTM I Call 0800 808 868 I jameshardie.co.nz

July 2015JamesHardieNewZealand(“JamesHardie”)warrantsforaperiodof15yearsfromthedateofpurchasethattheAxon®PanelandCLDStructuralCavityBattens(the“Product”),willbefreefromdefectsduetodefectivefactoryworkmanshipormaterialsand,subjecttocompliancewiththeconditionsbelow,willberesistanttocracking,rotting,fireanddamagefromtermiteattackstotheextentsetoutinJamesHardie’srelevantpublishedliteraturecurrentatthetimeofinstallation.JamesHardiewarrantsforaperiodof15yearsfromthedateofpurchasethattheaccessoriessuppliedbyJamesHardiewillbefreefromdefectsduetodefectivefactoryworkmanshipormaterials.

NothinginthisdocumentshallexcludeormodifyanylegalrightsacustomermayhaveundertheConsumerGuaranteesActorotherwisewhichcannotbeexcludedormodifiedatlaw.

CONDITIONS OF WARRANTY: Thewarrantyisstrictlysubjecttothefollowingconditions:

a) JamesHardiewillnotbeliableforbreachofwarrantyunlesstheclaimantprovidesproofofpurchaseandmakesawrittenclaimeitherwithin30daysafterthedefectwouldhavebecomereasonablyapparentor,ifthedefectwasreasonablyapparentpriortoinstallation,thentheclaimmustbemadepriortoinstallation.

b) Thiswarrantyisnottransferable.

c) TheProductmustbeinstalledandmaintainedstrictlyinaccordancewiththerelevantJamesHardieliteraturecurrentatthetimeofinstallationandmustbeinstalledinconjunctionwiththecomponentsorproductsspecifiedintheliterature.Further,allotherproducts,includingcoatingandjointingsystems,appliedtoorusedinconjunctionwiththeProductmustbeappliedorinstalledandmaintainedstrictlyinaccordancewiththerelevantmanufacturer’sinstructionsandgoodtradepractice.

d) TheprojectmustbedesignedandconstructedinstrictcompliancewithallrelevantprovisionsofthecurrentNewZealandBuildingCode(“NZBC”),regulationsandstandards.

e) Theclaimant’ssoleremedyforbreachofwarrantyis(atJamesHardie’soption)thatJamesHardiewilleithersupplyreplacementproduct,rectifytheaffectedproductorpayforthecostofthereplacementorrectificationoftheaffectedproduct.

f) JamesHardiewillnotbeliableforanylossesordamages(whetherdirectorindirect)includingpropertydamageorpersonalinjury,consequentialloss,economiclossorlossofprofits,arisingincontractornegligenceorhowsoeverarising.WithoutlimitingtheforegoingJamesHardiewillnotbeliableforanyclaims,damagesordefectsarisingfromorinanywayattributabletopoorworkmanship,poordesignordetailing,settlementorstructuralmovementand/ormovementofmaterialstowhichtheProductisattached,incorrectdesignofthestructure,actsofGodincludingbutnotlimitedtoearthquakes,cyclones,floodsorothersevereweatherconditionsorunusualclimaticconditions,efflorescenceorperformanceofpaint/coatingsappliedtotheProduct,normalwearandtear,growthofmould,mildew,fungi,bacteria,oranyorganismonanyProductsurfaceorProduct(whetherontheexposedorunexposedsurfaces).

g) Allwarranties,conditions,liabilitiesandobligationsotherthanthosespecifiedinthiswarrantyareexcludedtothefullestextentallowedbylaw.

h) Ifmeetingaclaimunderthiswarrantyinvolvesre-coatingofProducts,theremaybeslightcolourdifferencesbetweentheoriginalandreplacementProductsduetotheeffectsofweatheringandvariationsinmaterialsovertime.

Disclaimer: The recommendations in James Hardie’s literature are based on good building practice, but are not an exhaustive statement of all relevant information and are subject to conditions (c), (d), (f) and (g) above. James Hardie has tested the performance of the Axon® Panel when installed in accordance with the Axon® Panel technical specification, in accordance with the standards and verification methods required by the NZBC and those test results demonstrate the product complies with the performance criteria established by the NZBC. However, as the successful performance of the relevant system depends on numerous factors outside the control of James Hardie (e.g. quality of workmanship and design) James Hardie shall not be liable for the recommendations made in its literature and the performance of the relevant system, including its suitability for any purpose or ability to satisfy the relevant provisions of the NZBC, regulations and standards, as it is the responsibility of the building designer to ensure that the details and recommendations provided in the relevant James Hardie installation manual are suitable for the intended project and that specific design is conducted where appropriate.

Copyright July 2015. © James Hardie New Zealand. TM and ® denotes a Trademark or Registered Mark owned by James Hardie Technology Limited.

Except for Tyvek ® and Inseal ® which are Registered Marks owned by their registered owners.

Product Warranty

Ask James HardieTM I Call 0800 808 868 I jameshardie.co.nz