Overview of Industrial Involvement and Localization for Rooppur Nuclear Power Plant
Construction
Technical Meeting on Industrial Involvement and Localization for New Nuclear Power Plant
Construction
Md. Kabir Hossain And
Md. Aliuzzaman Construction of Rooppur Nuclear Power Plant Project
Bangladesh Atomic Energy Commission Email: [email protected]
Background Information;
Status of Rooppur NPP in Bangladesh;
Strategy for National Participation and Localization;
How to Select National Industries;
Survey Programe;
Conclusion;
Outline
Full name: People's Republic of Bangladesh Population: 160 million (8th in world) Area: 143,998 sq km (55,598 sq miles) Population Density: 1034 per sq km (4th in world) Major language: Bengali Educaction Rate: 60% Major Profession: Agriculture, 50% GDP Major religions: Islam Main exports: Garments, fish, jute goods, leather products
Background
Bangladesh has begun its preparations for nuclear power in the 1960s and Rooppur Nuclear Power Plant (Rooppur NPP) Project site was selected in 1963;
The progress never passed the activities related to preparatory stage of construction;
A resolution for immediate establishment of NPP to combat existing power crisis was passed by the National Parliament in 2010 ;
Power System Master Plan 2010 of Bangladesh Government indicates that Bangladesh Government wants to introduce 2000 MWe of nuclear power by 2020;
Background Information
5
An IGA between Bangladesh and Russian Federation on cooperation concerning the construction of Rooppur
Nuclear Power Plant in the territory of Bangladesh was
signed on 02 November 2011.
An Interagency agreement (IAA) between the Russian
Regulatory Body and the MOST on cooperation in the
areas of nuclear safety regulation was signed on 27
February 2012.
Signing of the IGA
on 2nd Nov 2011
Status of Rooppur Nuclear
Power Program
January 15, 2013 the Government of Bangladesh and the Government of Russian Federation signed an agreement on the extension of a state export credit for financing of the preparatory stage of construction of a Nuclear Power Plant – Credit Agreement
At the same time an MOU for the financing of the main stage of construction was also signed
Status of Rooppur Nuclear
Power Program
Rooppur NPP Project Management Office
Bangladesh government has approved a project “Construction of Rooppur Nuclear Power Plant (First Phase)” in 2nd April 2013;
The Project Management Office for Rooppur NPP has been established;
Total Manpower for the Project Management Office would be 130;
Decision has been taken to transform gradually the Project Management Entity to the “Rooppur NPP Operating Organization” during execution of the approved project;
Status of Rooppur Nuclear
Power Program
8
Foundation Laying Ceremony of the Rooppur NPP Project (Phase-1) by the Hon’able Prime Minister at Rooppur Site on 02 October 2013
Russian Survey Base at RNPP Site
Status of Rooppur Nuclear
Power Program
9
Under the State Export Credit Agreement three Contracts have
been signed between BAEC & Atomstroyexport of RF as follows:
Contract #1 (27.06.13): FE, EIA, First-priority engineering surveys and Environmental Studies, development of various documentations, etc.
Contract #2 (02.10.13): Development of the various design and Working documentations, SAR, PSA-1, QA program for design, etc.
Contract #3 (05.06.14): Construction of Pioneer & CE bases and other necessary infrastructures to facilitate main construction, etc.
Status of Rooppur Nuclear
Power Program
9
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Preparation Phase Preparatory Construction
Activities Construction Launch
Regulatory Framework Preparation
Permits & Safety Analysis
Operation Permits & Safety Reports
Pre-Feasibility Study
Pro
ject
Dev
elop
men
t
Site Resource Invest; basic infrastructure dev.
FE, EIA, Site Engineering & Environ. Study
Design document, PSAR, PSA
General Contract
Site supporting infra. Dev.; HRD.; , Site Grading & Excavation
Construction of NPP
Commissioning
Legislative Development in light of International practices, IAEA recommendations
Baseline Radiological Data Gathering, Site safety related Investigations
Site Permit/license
Construction License
Review of Engineering Design; PSAR, PSA
Final Safety Analysis Report (FSAR) for Operating License
Operator Training
Continuous Stakeholder Involvement, Public Information, Human Capital, Industrial & Technological Development
Pro
gra
mm
e &
Reg
ula
tory
D
evel
opm
ent
Proposed National Nuclear Power Programme Implementation Plan
Preparatory stage of Construction
2022
Rooppur NPP Development
Timeline
Preparatory Stage of Construction
Construction and Commissioning
Reports on FE, EIA and Site confirmation for Rooppur NPP
Tech. Docs., Design and Working Docs for Rooppur NPP
Construction and erection works of preparatory stage
Rooppur NPP Acceptance
FE Evaluation, EIA and Site Engineering Survey and Environmental studies
Site License
General Contract for Construction of NPP
Performance of First Priority Construction, erection works
Construction License
Design Approval
Development of Design and Working Docs PSAR, QA
Operational License
Rooppur NPP Main Stage of Construction
Two Stages Rooppur NPP
Construction
Nuclear power, at least in its initial stage, would be considered purely on the basis of meeting energy needs economically, safely and reliably;
Scopes of the participation of the national industry in the project shall be limited to items that do not have safety implications;
If such works undertaken by local parties, shall be coordinated under the supervision and total responsibility of the main contractor;
* Bangladesh Nuclear Power Action Plan 2000 (BANPAP), INIR report
Strategy for National
Participation and Localization
The local construction firms and selected industries will have the option to participate in the implementation of subsequent units of nuclear power plants, depending on the expertise acquired and other qualification for undertaking similar jobs;
Selected companies may be encouraged/ motivated to acquire identified technologies in order to enhance the chances of their participation in the project;
However, Bangladesh shall be responsible for NPP licensing (site, design, construction, commissioning and operation) and the majority of the workforce in the first NPP project would be Bangladeshi nationals; * Bangladesh Nuclear Power Action Plan 2000 (BANPAP), INIR report
Strategy for National
Participation and Localization
14
A committee for the National Industry Involvement in NPP has been formed with specific assignment-
Assessment of national capabilities to supply
components and serves for Rooppur NPP;
Development of short and long term strategy to
encourage national participation at different
implementation phases;
How to Select ?
14
15
Prepare short list based of capabilities;
Prepare recommendations to upgrade industrial
Company competencies in order to meet nuclear
standards
How to Select?
15
16
Identified Possible Fields of
National Participation to NPP
16
A. Civil Construction: Cement, Bolder, Sand, Admixture, MS Rod, Batching plant, Continuous casting facilities, Earthwork machineries, Sanitary fittings, Ceramic tiles, Housing construction, Tower crane facilities etc. B. Mechanical Construction: Crane, Pump, Piping, Welding facilities, Structural work, NDT, HVAC, Destructive test etc. C. Electrical Construction: Transformer, Cable, MCCB, PVC/Metal Conduit, Generator, Motor etc.
17
Identified Possible Fields of
National Participation to NPP
17
D. Electronics & Telecommunications: E. Heavy equipment Transportation: Railway, Road transport and Waterways F. Manpower/services: Civil design & construction, Mechanical construction, Electrical construction, Grid & Sub-station design and construction etc.
Survey Programme
S/N Types of Product
Major Technical Specifications
Monthly Production
Capacity
Compliance with International
Standard
INDUSTRIAL INVOLVEMENT SURVEY FORM [PRODUCTS] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):
Signature with Date and Seal
Product Details
Survey Programme
S/N Types of Services
Major Equipment with Specifications
Technical Personnel with Qualifications & Experiences
Remarks
INDUSTRIAL INVOLVEMENT SURVEY FORM [SERVICE] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):
Signature with Date and Seal
Details of Services
Survey Programme
S/N Types of
Construction
Major Construction Equipment with Specifications
Technical Personnel with Qualifications & Experiences
Remarks
INDUSTRIAL INVOLVEMENT SURVEY FORM [CONSTRUCTIONS] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):
Signature with Date and Seal
Details of Construction Work (Civil/Mechanical/Electrical)
Survey Programme
S/N Types of
Transport
Major Transportation Equipment with Specifications
Max Size & Weight to be
Carried Remarks
INDUSTRIAL INVOLVEMENT SURVEY FORM [TRANSPORTATION] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):
Signature with Date and Seal
Details of Mode of Transportation (Rail/Road/Water/Air)
National Stakeholders
Dhaka University, BUET, GSB, SOB, DoE, BMD, CDMP, IWM etc.,
National Committee;
Technical Committee;
Working Group and Sub Groups;
Coordination Committees etc.;
Bangladesh faces a huge challenge in implementing the Rooppur
NPP and its total nuclear power; Practical steps towards building “Rooppur NPP” by 2021-2022
have been taken;
A preliminary assessment has been chalked out a plan to find out methods that can be applied to find out our gaps and then fill them up;
Bangladesh seeks cooperation from the Russian Federation in the
form assistance package like Industrial localization, National training courses, Seminar/Workshop, Expert Mission/Review and other form of bilateral arrangements in establishing infrastructure for “Rooppur NPP” building;
Conclusions