Overview of Industrial Involvement and Localization for Rooppur Nuclear Power Plant Construction Technical Meeting on Industrial Involvement and Localization for New Nuclear Power Plant Construction Md. Kabir Hossain And Md. Aliuzzaman Construction of Rooppur Nuclear Power Plant Project Bangladesh Atomic Energy Commission Email: [email protected]

Transcript of Technical Meeting on Industrial Involvement and ... · Overview of Industrial Involvement and...

Overview of Industrial Involvement and Localization for Rooppur Nuclear Power Plant

Construction

Technical Meeting on Industrial Involvement and Localization for New Nuclear Power Plant

Construction

Md. Kabir Hossain And

Md. Aliuzzaman Construction of Rooppur Nuclear Power Plant Project

Bangladesh Atomic Energy Commission Email: [email protected]

Background Information;

Status of Rooppur NPP in Bangladesh;

Strategy for National Participation and Localization;

How to Select National Industries;

Survey Programe;

Conclusion;

Outline

Full name: People's Republic of Bangladesh Population: 160 million (8th in world) Area: 143,998 sq km (55,598 sq miles) Population Density: 1034 per sq km (4th in world) Major language: Bengali Educaction Rate: 60% Major Profession: Agriculture, 50% GDP Major religions: Islam Main exports: Garments, fish, jute goods, leather products

Background

Bangladesh has begun its preparations for nuclear power in the 1960s and Rooppur Nuclear Power Plant (Rooppur NPP) Project site was selected in 1963;

The progress never passed the activities related to preparatory stage of construction;

A resolution for immediate establishment of NPP to combat existing power crisis was passed by the National Parliament in 2010 ;

Power System Master Plan 2010 of Bangladesh Government indicates that Bangladesh Government wants to introduce 2000 MWe of nuclear power by 2020;

Background Information

5

An IGA between Bangladesh and Russian Federation on cooperation concerning the construction of Rooppur

Nuclear Power Plant in the territory of Bangladesh was

signed on 02 November 2011.

An Interagency agreement (IAA) between the Russian

Regulatory Body and the MOST on cooperation in the

areas of nuclear safety regulation was signed on 27

February 2012.

Signing of the IGA

on 2nd Nov 2011

Status of Rooppur Nuclear

Power Program

January 15, 2013 the Government of Bangladesh and the Government of Russian Federation signed an agreement on the extension of a state export credit for financing of the preparatory stage of construction of a Nuclear Power Plant – Credit Agreement

At the same time an MOU for the financing of the main stage of construction was also signed

Status of Rooppur Nuclear

Power Program

Rooppur NPP Project Management Office

Bangladesh government has approved a project “Construction of Rooppur Nuclear Power Plant (First Phase)” in 2nd April 2013;

The Project Management Office for Rooppur NPP has been established;

Total Manpower for the Project Management Office would be 130;

Decision has been taken to transform gradually the Project Management Entity to the “Rooppur NPP Operating Organization” during execution of the approved project;

Status of Rooppur Nuclear

Power Program

8

Foundation Laying Ceremony of the Rooppur NPP Project (Phase-1) by the Hon’able Prime Minister at Rooppur Site on 02 October 2013

Russian Survey Base at RNPP Site

Status of Rooppur Nuclear

Power Program

9

Under the State Export Credit Agreement three Contracts have

been signed between BAEC & Atomstroyexport of RF as follows:

Contract #1 (27.06.13): FE, EIA, First-priority engineering surveys and Environmental Studies, development of various documentations, etc.

Contract #2 (02.10.13): Development of the various design and Working documentations, SAR, PSA-1, QA program for design, etc.

Contract #3 (05.06.14): Construction of Pioneer & CE bases and other necessary infrastructures to facilitate main construction, etc.

Status of Rooppur Nuclear

Power Program

9

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

Preparation Phase Preparatory Construction

Activities Construction Launch

Regulatory Framework Preparation

Permits & Safety Analysis

Operation Permits & Safety Reports

Pre-Feasibility Study

Pro

ject

Dev

elop

men

t

Site Resource Invest; basic infrastructure dev.

FE, EIA, Site Engineering & Environ. Study

Design document, PSAR, PSA

General Contract

Site supporting infra. Dev.; HRD.; , Site Grading & Excavation

Construction of NPP

Commissioning

Legislative Development in light of International practices, IAEA recommendations

Baseline Radiological Data Gathering, Site safety related Investigations

Site Permit/license

Construction License

Review of Engineering Design; PSAR, PSA

Final Safety Analysis Report (FSAR) for Operating License

Operator Training

Continuous Stakeholder Involvement, Public Information, Human Capital, Industrial & Technological Development

Pro

gra

mm

e &

Reg

ula

tory

D

evel

opm

ent

Proposed National Nuclear Power Programme Implementation Plan

Preparatory stage of Construction

2022

Rooppur NPP Development

Timeline

Preparatory Stage of Construction

Construction and Commissioning

Reports on FE, EIA and Site confirmation for Rooppur NPP

Tech. Docs., Design and Working Docs for Rooppur NPP

Construction and erection works of preparatory stage

Rooppur NPP Acceptance

FE Evaluation, EIA and Site Engineering Survey and Environmental studies

Site License

General Contract for Construction of NPP

Performance of First Priority Construction, erection works

Construction License

Design Approval

Development of Design and Working Docs PSAR, QA

Operational License

Rooppur NPP Main Stage of Construction

Two Stages Rooppur NPP

Construction

Nuclear power, at least in its initial stage, would be considered purely on the basis of meeting energy needs economically, safely and reliably;

Scopes of the participation of the national industry in the project shall be limited to items that do not have safety implications;

If such works undertaken by local parties, shall be coordinated under the supervision and total responsibility of the main contractor;

* Bangladesh Nuclear Power Action Plan 2000 (BANPAP), INIR report

Strategy for National

Participation and Localization

The local construction firms and selected industries will have the option to participate in the implementation of subsequent units of nuclear power plants, depending on the expertise acquired and other qualification for undertaking similar jobs;

Selected companies may be encouraged/ motivated to acquire identified technologies in order to enhance the chances of their participation in the project;

However, Bangladesh shall be responsible for NPP licensing (site, design, construction, commissioning and operation) and the majority of the workforce in the first NPP project would be Bangladeshi nationals; * Bangladesh Nuclear Power Action Plan 2000 (BANPAP), INIR report

Strategy for National

Participation and Localization

14

A committee for the National Industry Involvement in NPP has been formed with specific assignment-

Assessment of national capabilities to supply

components and serves for Rooppur NPP;

Development of short and long term strategy to

encourage national participation at different

implementation phases;

How to Select ?

14

15

Prepare short list based of capabilities;

Prepare recommendations to upgrade industrial

Company competencies in order to meet nuclear

standards

How to Select?

15

16

Identified Possible Fields of

National Participation to NPP

16

A. Civil Construction: Cement, Bolder, Sand, Admixture, MS Rod, Batching plant, Continuous casting facilities, Earthwork machineries, Sanitary fittings, Ceramic tiles, Housing construction, Tower crane facilities etc. B. Mechanical Construction: Crane, Pump, Piping, Welding facilities, Structural work, NDT, HVAC, Destructive test etc. C. Electrical Construction: Transformer, Cable, MCCB, PVC/Metal Conduit, Generator, Motor etc.

17

Identified Possible Fields of

National Participation to NPP

17

D. Electronics & Telecommunications: E. Heavy equipment Transportation: Railway, Road transport and Waterways F. Manpower/services: Civil design & construction, Mechanical construction, Electrical construction, Grid & Sub-station design and construction etc.

Survey Programme

S/N Types of Product

Major Technical Specifications

Monthly Production

Capacity

Compliance with International

Standard

INDUSTRIAL INVOLVEMENT SURVEY FORM [PRODUCTS] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):

Signature with Date and Seal

Product Details

Survey Programme

S/N Types of Services

Major Equipment with Specifications

Technical Personnel with Qualifications & Experiences

Remarks

INDUSTRIAL INVOLVEMENT SURVEY FORM [SERVICE] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):

Signature with Date and Seal

Details of Services

Survey Programme

S/N Types of

Construction

Major Construction Equipment with Specifications

Technical Personnel with Qualifications & Experiences

Remarks

INDUSTRIAL INVOLVEMENT SURVEY FORM [CONSTRUCTIONS] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):

Signature with Date and Seal

Details of Construction Work (Civil/Mechanical/Electrical)

Survey Programme

S/N Types of

Transport

Major Transportation Equipment with Specifications

Max Size & Weight to be

Carried Remarks

INDUSTRIAL INVOLVEMENT SURVEY FORM [TRANSPORTATION] •Company Name: •Address: •Contact Person: •Phone: Fax: email: Webpage: •Quality Certification (e.g. ISO9001 or other): •Company Profile in brief: •Experience of participation in National/International Project(s):

Signature with Date and Seal

Details of Mode of Transportation (Rail/Road/Water/Air)

National Stakeholders

Dhaka University, BUET, GSB, SOB, DoE, BMD, CDMP, IWM etc.,

National Committee;

Technical Committee;

Working Group and Sub Groups;

Coordination Committees etc.;

Bangladesh faces a huge challenge in implementing the Rooppur

NPP and its total nuclear power; Practical steps towards building “Rooppur NPP” by 2021-2022

have been taken;

A preliminary assessment has been chalked out a plan to find out methods that can be applied to find out our gaps and then fill them up;

Bangladesh seeks cooperation from the Russian Federation in the

form assistance package like Industrial localization, National training courses, Seminar/Workshop, Expert Mission/Review and other form of bilateral arrangements in establishing infrastructure for “Rooppur NPP” building;

Conclusions

24

Thank you for your kind attention !!