TECHNICAL Introduction to Fibre Optics for non-fibre ... · Introduction to Fibre Optics for...
Transcript of TECHNICAL Introduction to Fibre Optics for non-fibre ... · Introduction to Fibre Optics for...
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 2
TECHNICAL - *All Pricing are Exclusive of VAT
Introduction to Fibre Optics for non-fibre Technicians (can also be done on-site)
TARGET AUDIENCE: Admin personnel, Health and Safety, Project Managers, Sales People, Planners, Resource schedulersPRE-REQUISITE: None
Introduction to Fibre Optics for non-fibre Technicians
FIBRE OPTIC OVERVIEW - Concept of Light Overview - Aspect of Fibre Optics- Fibre Optic Cables- Components of an Outside Plant Installation- Planning and Management of Fibre Installations- Planning Tools- Health and Safety associated with fibre Installations • Working at heights • Working in confined spaces • Gas testing • Risk assessment • First Aid • Vehicle management • Stress management
FIBRE OPTIC INSTALLATION - Fibre Connectors- Splicing of Fibre Optics- Hardware/Closures- OTDR Principles and Methods - FTTX / FTTH overview - ISP Connection- Client Services - Project Management and change of Scope
2 days R3 100-00
DURATION COST
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 3
Certified Fibre Optic Technician (Splicing and testing)
TARGET AUDIENCE: Splice technician, Fibre test technician (OTDR)
PRE-REQUISITE: None
Certified Fibre Optic Technician
- Introduction to Fibre Optics - Identify the benefits of optical fibre as a medium of transmission.- Differentiate the types of optical fibre cables and their characteristics.- Understand the Optical Fibre communication system and its components.- Recognise the types of single/multi-mode fibres and identify their characteristics.- Splicing • Cable end preparation • Enclosure preparation • Cable attachment • Buffer tube attachment • Splicing • Fibre coiling • Buffer tube coiling • Tray attachment • Enclosure finishing • Testing- Passive Devices- Optoelectronics- Planning Management issues- Cable Installations Principles- Work safely when carrying out fibre characterisation tasks- Set up an OTDR correctly for optimum performance- OTDR Principles and Methods- Store OTDR traces efficiently with full information and meaningful filenames- Other equipment (VFL, Fibre Identifier Micro Scope)- Certification Principles and Methods- Connector Inspection- FTTH and FTTB Networks
5 days R7950-00
DURATION COST
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 4
Splicing and Fault Finding
TARGET AUDIENCE: Splice technician with experience
PRE-REQUISITE: Minimum 6 month’s full time experience in splicing and ODTR testing
Splicing and Fault Finding
This course is practical orientated to give an understanding of the common errors associated in splicing- How to solve typical splicing errors on machine monitor- How to analyse splice errors with OTDR- Using multiple scenarios to fix splice errors • Core diameters • Identify Cable types- G652, G653, G655 • Mode field diameter of cable types- Selecting the correct fibre protector • 40mm, 60mm, ANT- Type of Splicing machine in use • Core and Cladding alignment
2 days R3100-00
DURATION COST
OTDR TESTING Advanced (Characterization and ATP)
TARGET AUDIENCE: Test technician with experience
PRE-REQUISITE: Minimum 6 month’s full time experience in OTDR testing
- Demonstrate the ability to use the features and functions of OTDR test equipment to perform tests on Optical Fibres. - OTDR used according to manufacturers' specifications. - The light source meter is used according to manufacturers' specifications. - Power meter used according to manufacturer’s specifications. - Set up and creating FASTREPORTER2- Analyse and interpret test equipment results including Bi-directional OLTS and FASTREPORTER2. - Reflectance and ORL Testing Principles and Methods- Insertion loss Principles and Methods (Insert)- The set up and use is within the context of a working environment. - Perform "Do events analysis" on OTDR in accordance with the applicable work instruction. - Perform "Light source" test in accordance with the applicable work instruction and - Perform "power meter" test in accordance with the applicable work instruction and correctly interpret results.
2 days R3100-00
>> CONTINUE
DURATION COST
OTDR TESTING Advanced
OTDR Testing Basic
TARGET AUDIENCE: Technicians how need to tests on Optical Fibres
PRE-REQUISITE: Splicing experience
This course is practical orientated to give an understanding of the common errors associated in splicing- How to solve typical splicing errors on machine monitor- Optical Time Domain Reflector Layout- ToolBox X Shell- Test a Fibre- Event Information- Storage Menu- Bi-directional Analysis- Correctly launch the Bi-directional Analysis Utility A-B B-A- OTDR Report
2 days R3100-00
DURATION COST
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 5
- Propose applicable actions based on test results in terms of set standards. - Record and classify test results in terms of applicable procedures OTDR Bi-Directional OLTS Fast Test results.
DURATION COST
Outside Plant Civil Technician
TARGET AUDIENCE: Cable Installation Technician
PRE-REQUISITE: None
- Wayleave Application • Pre-approval documentation • Pre-build surveying- Trenching • Methods and Standards - Mechanical versus Labour o Manhole and Handhole Positioning o MH and HH numbering- Ducting • Microduct - Direct burial - 110ml sleeve - Connecting duct (Branch-off) - Duct sealing - Duct Numbering
4 days R7550-00
>> CONTINUE
DURATION COST
OTDR Testing Basic
Outside Plant Civil Technician
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 6
- Cable-Hauling • Preparing a route for the hauling of optic cable. • DIT Testing - Sponge Test - Air Tightness Test - Mandrill Test - Pressure Test• Fibre installation requirements and constraints from plan and site inspection. • Duct Fill Ratio • Cable Slack Management • Bend Radius Management • Cable numbering • Overhead route Management • Pole Inspection • Ladder Inspection • Safety Belts Inspection- Health and Safety Issues • Traffic Management Plant • Road signs selection • Barricading and road crossings • Flagging and communication methods • Camp Establishment • Office requirements • Tools and material storage • Water and Sanitation- Environmental Considerations • Nature conservation areas • Water and Air Pollution • Noise and Dust control • Environmental Sensitive Areas • Archaeology and Heritage areas
DURATION COST
Inside Plant Technician
TARGET AUDIENCE: FTTH Installation technicians doing ISP connections (Last mile)
PRE-REQUISITE: Minimum 6 month’s full time experience in splicing and testing
Install an Active Ethernet (AE) or Gigabit Passive Optical network (GPON) service with Optical Network Terminal (ONT) at the customer’s premises.
• Introduction to Fibre to the Home (FTTH) networks • GPON System Overview • GPON Basic Function and Operation of OLT • GPON Basic Function and Operation of ONT • Install and setting up equipment at customer premises
2 days R3100-00
DURATION COST
Inside Plant Technician
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 7
Micro Ducts and Cable Blowing
TARGET AUDIENCE: Installation technicians working with Micro Ducts
PRE-REQUISITE: None
Train the correct method and procedure of installing, connecting, DIT testing and blowing of micro cable ducts.- Jointing of Ducts • Marked out the micro ducts • Cut the ducts- Performing a branch off on the Micro Duct • Marked out the position for the cut • Removing of the sheath • Cutting the micro duct in the correct position • Joined the duct and seal the ducts- Making of a bend in the micro duct • Marked out the position for the cut • Removed the sheath for the correct length • Cut micro duct in the correct position • Joined and sealed the duct- Cable Blowing • Setting up Blowing equipment (various) • Setting up of Compressor • Duct Integrity Testing • Blowing of mandrill • Figure 8 setup • Connecting ducts to blowing equipment
3 days R4350-00
DURATION COST
LINK FAILURE MANAGEMENT
TARGET AUDIENCE: Maintenance Technicians, Quality controllers, Site mangers who need to maintain the fibre linksPRE-REQUISITE: Minimum one year’s full time experience in Fibre Optic Installations
- FTTX network infrastructure- FTTX PON Link Failure Testing- Power Budget - Insertion Loss Testing- Optical Return Loss testing- Reflectance and ORL Testing Principles and Methods- OTDR testing- Other Test Equipment - Which Test When and where
5 days R7950-00
DURATION COST
LINK FAILURE MANAGEMENT
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 8
FIBRE OPTIC PLANNING (Overview)
TARGET AUDIENCE: Any person who need to have a general understanding on how planning is done in a Fibre Optic installation project but no need to do itPRE-REQUISITE: None
People will get an overview on how planning is done in the field as well as the associated job functions - Planning Surveys - Job Management - Planning and design software - As-Built’ Documentation - Planning Principles and Symbols
1 day R2100-00
DURATION COST
FIBRE OPTIC PLANNING Advanced
TARGET AUDIENCE: Fibre Optic PlannersPRE-REQUISITE: Computer literacy Minimum one year full time experience in Fibre Optic Installations
- Network Planning and Inventory • Challenges and constraints during network planning- Network Planning Phases • High-level network planning • fibre concentration points • Detailed network planning • Data • Surveys • Generating the 'to-build' plans • Job Management- The key inputs for accurate network planning- Strategic network planning • FTTX network deployments • Methods, components and technologies used to build the network- Software Tools • Spread sheet calculation • GIS general software • CAD tools- Planning and Design software • Network Assets Inventory Management • Software support • Workflow management • As-Built’ Documentation
5 days
>> CONTINUE
DURATION COST
FIBRE OPTIC PLANNING Advanced
T: +27(0)87 238 0716 | E: [email protected] | W: www.fibreinstitute.co.za PAGE 9
- Planning Principles • Planning Symbols • Planning Symbols and quantity’s on plan • Micro Duct Indication on Plan • Planning with Visio Software • POWER BUDGET, LOSS BUDGET and NET OPTICAL POWER BUDGET • Wayleave Form
DURATION COST