Technical Infrastructure Monitoring (TIM) and CCC

14
TS/CSE – TIM and CCC Technical Infrastructure Monitoring (TIM) and CCC TS Workshop May 4, 2004 P. Sollander, M. Batz – TS/CSE

description

Technical Infrastructure Monitoring (TIM) and CCC. TS Workshop May 4, 2004 P. Sollander, M. Batz – TS/CSE. Outline. Introduction to TIM Architecture Redundancy and availability Integrating TIM in CCC Project status and planning Conclusion. Introduction to TIM. - PowerPoint PPT Presentation

Transcript of Technical Infrastructure Monitoring (TIM) and CCC

Page 1: Technical Infrastructure Monitoring (TIM) and CCC

TS/CSE – TIM and CCC

Technical Infrastructure Monitoring (TIM)

and

CCC

TS WorkshopMay 4, 2004

P. Sollander, M. Batz – TS/CSE

Page 2: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 2

TS/CSE – TIM and CCC

Outline

• Introduction to TIM• Architecture• Redundancy and availability• Integrating TIM in CCC• Project status and planning• Conclusion

Page 3: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 3

TS/CSE – TIM and CCC

Introduction to TIM

• Control system for technical infrastructure– Technical Control Room (TCR)– CERN Control Centre (CCC)

• Replaces current operational Technical Data Server (TDS)

• Standard CERN hardware & software components for cost reduction and support optimization

• Standardized user interfaces for smooth integration in CCC

Page 4: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 4

TS/CSE – TIM and CCC

19711991199420032006

Page 5: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 5

TS/CSE – TIM and CCC

TIM Functionality

• Data acquisition from heterogeneous equipment– TS (electrical distribution, water, safety)– External (magnets, RF, vacuum, cryo…)

• Mimic diagrams– Applications for fast accelerator start-up (GTPM)– Overview diagrams where no specialist view is available– Navigation to proprietary system interfaces

• Alarms– Single alarm list for CCC

• Logging– Archiving data– Display of archived data in histograms

Page 6: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 6

TS/CSE – TIM and CCC

TIM Software Architecture

PLCExt.

sourceScada x 20x 60

Data Processing

TIMmimics

LoggingExt.

client

Conf.DB

LoggingDB

Scadamimics

Alarmsystem

DIP

DIP

DIP/TIM

http

Page 7: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 7

TS/CSE – TIM and CCC

TIM Hardware Architecture

Data processing

cluster

Databasecluster

Dataacquisition

TCR/CCCconsoles

Scada x 20PLC x 60

Office users

Home usersCERN VPN

Gateway

Technical Network

CERN General Network

File servercluster

Page 8: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 8

TS/CSE – TIM and CCC

TIM HP racks

Page 9: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 9

TS/CSE – TIM and CCC

Redundancy & Availability

• Design for 99% availability– Safety Integrity Level (SIL) 1– Development, configuration and maintenance guidelines

• Redundant– Processes– Servers– Disks– Racks– Electrical supplies– Network components

Page 10: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 10

TS/CSE – TIM and CCC

Different control systems in the CCC

TIM AcceleratorControls

Cryogenics Vacuum

Serverhardware

HP ProLiant, Sun fireAB/CO, IT/CO

HP ProLiant,Sun fire

HP ProLiant PC-shop server

Server software

OC4J, SonicMQ, OracleIT/DB, AB/CO, IT/DB

OC4J, SonicMQ,Oracle

PVSS PVSS

Mimics diagrams

JViewsTS/CSE, AB/CO

JViews + own PVSS PVSS

Alarm system

LASERAB/CO

LASER PVSS, LASER PVSS, LASER

Datalogging

LHC/TCRAB/CO, TS/CSE

LHC/TCR PVSS,LHC/TCR PVSS,LHC/TCR

Page 11: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 11

TS/CSE – TIM and CCC

Standardized mimic diagrams

• The future CCC operators will use many user interfaces

• A standardization is absolutely necessary!• Scada Application Support Group (SASG)

– Mandate to unify CERN user interface standards• Layout, colours, symbols, navigation, …

– Includes, TCR, PCR, vacuum and cryo people

• PCR white book– Being written– A compilation of all PCR operator requirements for their

control room (including user interfaces)– No collaboration with TCR and cryo operators (yet!?)

Page 12: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 12

TS/CSE – TIM and CCC

TIM

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2004 2005

Project status & planning

Database Mimics Drivers ADMIN/other

HW installation

GTPM migration

Data processing

TDS driver

PLC driver design + impl.

DIP driver

Configuration design

System configuration

Remaining driver design + impl. (SCADA, PLC, OPC, …)

UMMI migration

System tests

GTPM development

Editor and viewer design

Gen. driver design

Rules design and implement

SonicMQ, OC4j setup

SW setup accounts, file servers system software

LASER alarm integration

GTPM pilot TDS switch off

Tuning

Operation andMaintenance

Page 13: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 13

TS/CSE – TIM and CCC

Conclusion

• Integration in CCC– TIM Hardware and Software architecture choices made in view of

integration– Must be integrated with other systems in CCC

• Safety, access, accelerator, cryogenics and vacuum controls– CCC operator consoles must be agreed by all future operators

• Choice of operating system• User interface standards• AB operations white book

– Successful integration depends on departmental commitment and inter-departmental collaboration

• Availability– System designed for 99% availability, but– Overall availability depends on the connected systems

• Planning– On time, pilot in July and switch off TDS in December

• Budget– 20 % below budget (grouped purchasing and own development)

Page 14: Technical Infrastructure Monitoring (TIM) and CCC

4 May, 2004 P. Sollander, M. Batz TS/CSE 14

TS/CSE – TIM and CCC

More information on TIM

http://ts-project-tim.web.cern.ch/ts-project-tim/