Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9...

14
Technical handbook English version, last updated 2019-08-05

Transcript of Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9...

Page 1: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

1

Technical handbookEnglish version, last updated 2019-08-05

Page 2: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

32

Welcome to the opera! With a unique combination of opera, contemporary dance, musicals and concerts, the Göteborg Opera has created a reputation for itself as a modern opera house with a fresh approach.

Classical works are interpreted in new ways and are fused with contemporary works. Different art forms meet and enrich each other.

Productions of the highest artistic quality created here attract attention even beyond Sweden’s borders.

This handbook is intended primarily for those of you working in our guest production teams.

It provides insight into our work procedures and organisation and will hopefully help you find the right people and locales.

We also hope to clarify the requirements placed on you, and to present the opportunities made available to you by our opera house.

Page 3: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

54

Contents

Drawings can be found at opera.se/teknik Stage, lighting and sound information for the Göteborg Opera’s

Main Stage and Small Stage

WELCOME TO THE OPERA! 3

CONTENTS 5

THE PROJECT DEPARTMENT 6

HOW PRODUCTIONS ARE STAFFED 8

THE ENVIRONMENT 9

STAGE MANAGEMENT, SOUND & WARDROBE 10

COSTUME & MAKE-UP 13

STAGE, LIGHTING & VIDEO 16

WORKSHOPS, CONSTRUCTION & PROPS 20

MODULE DIMENSIONS 22

STANDARD DRAPES 23

TECHNICAL DIRECTIVES FOR REGIONAL TOURS 24

FACILITY MANAGEMENT GROUP 26

Page 4: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

76

Project departmentOnce the repertoire has been determined by the CEO together with the artistic management team, each production is modelled into a project and a project manager is appointed.

The project manager is responsible for implementation, planning, management, budget, work environment and follow-up, and is required to report to the CEO.

Artistic responsibility lies with the production team.

Departmental line managers supply the project with resources in the form of personnel and venues. These resources, in conjunction with the funding provided to the project, are disbursed according to each project’s needs and the house’s total resources.

The project department’s main task is to lead and manage The Göteborg Opera’s productions. The department consists of about a dozen of people, a project manager, a planning manager and project supervisors.

We have a project-oriented approach at The Göteborg Opera. Essentially, this means that everyone employed and working at The Göteborg Opera is included in the line/base, but works on projects.

Projects run in parallel, so in order for them to be managed efficiently meetings are called at specified intervals. Refer to the schedule on the following page. Our department is on the 4th floor above the stage entrance

PROJECT DEPARTMENT

EVENT WHEN WHAT WHO

Project kick-off 18 months before premiere

Project manager (PM) appointed. The team meets the PM and GO’s management. Tour of the house, inspection of drawings, instructions, planning, etc.

Convened by PM

Concept meeting 12 months Presentation of the team’s production idea. Room for discussion should exist to reconcile the production idea with GO’s resources.

PMs, selected line managers, technical coordinators and artistic directors (ADs)

Intermediate meeting 10 months Comparison to ensure that the decisions made at the concept meeting are still applicable and functioning.

Line managers/technical coordinators

Technical collation 8 months The production team shall submit the information needed in full to set up the production.

PMs, line managers/technical coordinators, ADs, project supervisors & specialists

Collation & rehearsal start

2 months Presentation for cast, ensemble and the whole house

PMs, production supervisors, artists etc.

JESSICA FJELKEGÅRDProject and planning [email protected]

MIKAEL BERGGRENProject [email protected]

STINA BERGGRENProject [email protected]

JAN BRATTProject [email protected]

ANNA CEDERBERGProject [email protected]

ANNA HALLGRENProject [email protected]

DANIEL ISAKSONProject [email protected]

EVA LINDBERGProject [email protected]

DAN OFFERLINDProject [email protected]

KRISTOFFER PÅLMANProject manager assistant, System [email protected]

KATARINA QUIST Planning assistant & System manager [email protected]

MARTINA TENGMARKProject manager assistant,[email protected]

Page 5: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

98 98

COSTUME & MAKE-UP1 costume and make-up coordinator 2 costume cutters 1 painting/patination studio 1 headdress studio 1 leather/footwear studio 2 make-up artists

STAGE MANAGER, SOUND & DRESSERS1 stage manager1 sound technician1 dresser

LIGHTING1 lighting director

1 light board operator

1 lighting technician

ATTRIBUTES & PROPS1 prop/attribute maker

1 special effects technician

STAGE1 deputy stage manager

2 production supervisors

6 theatre technicians

WORKSHOPS & CONSTRUCTION1 painter

1 blacksmith

1 carpenter

1 upholsterer

3 constructors

How productions are staffed The season’s productions are staffed by the line departments during technical collation. Production supervisors are appointed from each department as shown below. They are your contacts and partners in the project.

The repertoire concept means that the productions will be performed and produced in parallel throughout the year. This means the house’s resources and spaces are always shared by several productions.

The Göteborg Opera employs a production-bound working method. To ensure good coordination and management during a production’s rehearsal and performance period, we have developed SM*. It consists of an assistant director, deputy stage manager and stage manager who all have work environment responsibilities delegated by the project manager. In dance productions the assistant director is replaced by a rehearsal manager who works with choreographers and with artistic concerns. These three are jointly responsible for the practical implementation of a production with a 2nd unit as back-up. The group’s members belong to their respective line departments but work as a group with the project manager in ”their” production.

*Stage Management Group

Environment The Göteborg Opera works actively with environmental issues and has been doing so for several years. Everything we do makes a difference for future generations, so it’s important for us to act carefully. This means that you, over the course of your project, shall adhere to our environmental policy as a natural part of the process.

In practice this means that all departments endeavour to choose the best alternatives from an environmental perspective. We want to be able to reuse materials to the greatest extent possible, and therefore use recyclable and/or organic materials in all stage scenery, costumes and anything else we make or purchase. Adhesives, paints and other chemicals should be the best in the market from an environmental perspective and suppliers are selected based on the environmental suitability of their products and services, among other factors.

ENVIRONMENTAL POLICYWe shall be economical with finite as well as renewable resources in our business.

We shall comply with laws and other requirements and provide our employees with environmental knowledge.

In our aspiration for sustainable development our work shall be characterised by continuous improvements.

Therefore, we at The Göteborg Opera shall:

• always maintain the environmental impact question as a high priority during planning, purchasing and with regard to decisions within the business.

• always pursue methods and material choices which

• allow for the reuse or recycling of products and material in all manufacturing.

• have a good selection of ecological ingredients in our restaurant kitchen and actively reduce the amount of waste.

• make use of the best paints, adhesives and other chemicals on the market from environmental and work environment perspectives.

• plan trips and transport in such a way that the use of fossil fuels is kept to a minimum.• work consciously to minimise energy consumption.• regularly and openly communicate and follow-up the environmental work.

Page 6: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

1110

Stage management, Sound and Wardrobe

STAGE MANAGERSA stage manager is assigned to each production, and oversees it from technical collation to the final performance.

They supervise the stage rehearsals and ”run” all the performances.

They are also responsible for the on-stage work environment during rehearsals and performances when they are led by a director or conductor.

Working hoursWorking hours are individually planned to suit each production in accordance with established working hours agreements.

What we expect from youThat the entire production team actively cooperates.

What you can expect from usA professional and results-based team whose task, according to prevailing constraints, is to do its utmost to fulfil the production team’s objectives.

SOUND TECHNICIANSSound technicians are production-bound.

A sound technician is assigned to each production from the start of technical collation

There are no defined rules regarding procurement of equipment – except for permanent rigging. Purchases are contingent on budget and are handled by the respective project managers. We are a repertoire theatre, which means that some technical possibilities are limited.

All sound solutions must be clearly communicated in the production team.

Sound is the ultimate means of expression in our business, so sound requirements and issues must be raised early in the process in order to meet our audience’s demands.

Additional personnel can be employed for productions which place a high demand on sound if needed.

Working hoursWorking hours are individually planned to suit each production in accordance with established working hours agreements.

To considerFor budgetary reasons it is important for the ”sound idea” to be communicated during the idea presentation.

Sound designers are included in the production team.

What you can expect from usA professional and results-based team whose task, according to prevailing constraints, is to do its utmost to fulfil the production team’s objectives.

Stage managers and sound technicians are located on the 5th floor.

Sound department locations:

The recording studio is on the 3rd floor just inside the entrance. The stage manager’s cubicle is located in the right proscenium tower (stage left).

TOVE MOLINStage managerTEL. 031-10 81 [email protected]

ARVE SANDBERGStage managerTEL. 031-10 81 [email protected]

JOHAN SÖDERBERGStage managerTEL. 031-10 81 [email protected]

JOACHIM BOHÄLLSound technicianTEL. 031-10 81 73joachim [email protected]

DENNIS BARKEWALLSound technicianTEL. 031- 10 81 [email protected]

ANDREAS RENHORNSound technicianTEL. 031-10 81 [email protected]

CAMILLA BÖRJESSONWardrobe ManagerTEL. 031-10 82 [email protected]

AMI NORDADresserTEL. 031 – 10 82 [email protected]

JANE DOTEVALLDresserTEL. 031-10 82 [email protected]

IRENE TUREGÅRDDresserTEL: 031-10 34 [email protected]

HELENA AVANDERDresserTEL. 031-10 82 [email protected]

SIMON LUNDMARKDresserTEL. 031-10 82 [email protected]

SARA STÅHLDresserTEL. 031-10 82 [email protected]

PER HANSSONDepartment headTEL. 031-10 81 [email protected]

STAGE MANAGEMENT, SOUND AND WARDROBE

Page 7: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

1312 FLOOR 4 & 5

Costume & Make-up

SARA DI BENEDETTOCostume & Make-up department managerTEL. 031-10 82 45

[email protected]

MONICA ANDERSSONCostume cutter, menTEL. 031-10 82 48

[email protected]

ILONA ANDREASSONMake-up artist & wig-makerTEL: 031-10 82 07

[email protected]

TATIANA BJARNEDye, print, patinationTEL. 031-10 82 52

[email protected]

GUNILLA BJERTINMake-up artist & wig-makerTEL: 031-10 82 09

[email protected]

MARIANNE BRYDEWALLCostume cutter, menTEL. 031-10 80 10

[email protected]

ANNA CARLBERGMake-up artist & wig-makerTEL: 031-10 82 25

[email protected]

KERSTIN CARLSSONCostume cutter, womenTEL. 031-10 82 53

[email protected]

LILL DAHLGRENMake-up artist & wig-makerTEL 031-10 82 27

[email protected]

VIKTORIA ERLANDSSONLeatherworkerTEL: 031-10 80 13

[email protected]

BRITTA HEDBERGAdministratorTEL. 031-10 82 47

[email protected]

MARLÈNE JAHNKECostume cutter, menTEL. 031-10 82 57

[email protected]

KARIN JOHANSSONLeatherworkerTEL. 031-10 82 50

[email protected]

MALIN JONSONLeatherworkerTEL. 031-10 80 13

[email protected]

ANNIKA KÅSEMake-up artist & wig-makerTEL. 031-10 82 17

annika.kå[email protected]

EMMA LINDQVISTCostume & Maske-up manager’s assistant.TEL. 031-10 81 66

[email protected]

DESIREE NILSSONCostume cutter, womenTEL. 031-10 82 86

[email protected]

MONICA NORDINCostume cutter assistant. menTEL. 031-10 82 84

[email protected]

KERSTIN OLSENMake-up artist & wig-makerTEL: 031-10 82 27

[email protected]

MIA PERSSONDye, print, patinationTEL. 031-10 82 59

[email protected]

HELÉNE RANDBYMake-up artist & wig-makerTEL: 031-10 82 19

[email protected]

MARIE RÖDSTRÖMCostume cutter, womenTEL. 031-10 82 58

[email protected]

THERESE SCHIMMELSOHNMillinerTEL. 031-10 82 51

therese.schimmelsohn@ opera.se

PERNILLA SWEDBERGMake-up artist & wig-makerTEL: 031-10 82 28

[email protected]

MALIN SVEDESTEDTTechnical production managerTEL. 031-10 82 39

[email protected]

SOFIA YVELLDye, print, patination TEL: 031-10 82 76

[email protected]

LISE-LOTTE WENDTMake-up artist & wig-makerTEL: 031-10 82 76

[email protected]

Our department is on the 6th floor

Page 8: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

1514

GeneralEach production has a coordinator who, after technical collation, coordinates the production. The coordinator also has contact with the costume designer (make-up designer) with regard to departmental visits and internal schedules.

Costume and make-up sketches can be found in the costume studio after technical collation. Any major changes, updates, etc. must first be communicated to the studio manager/coordinator.

Located in the costume studio are costume cutters, tailors, dyers/painters/patinators, people responsible for leather and footwear, as well as those responsible for headdress and jewellery.

In the wardrobe department are dressers and persons responsible for laundry. For productions in which children participate there are dressers responsible for children.

Working hoursThe studios are usually staffed Mon–Thurs from 07:30 to 17:30. Fridays from 07:30 to 14:00. We have flexible hours between 07:00–09:00 in the morning, and 16:00–18:00 in the afternoons.

What we expect from youThat matters regarding costumes, make-up, wigs and wardrobe are discussed in the production team.

That full delivery of all costume sketches including footwear, headdress, etc. is provided at technical collation.

That we, together with costume and make-up designers, decide on fabrics, materials, footwear, headdress, wigs and make-up after technical collation.

Inspiration sketches for the whole character i.e. costume, headdress, footwear, make-up, wigs as well as other details. That you consider whether the production entails the fire-proofing of materials, if flying harnesses are required, or other things that will affect costume models and fabric choices.

Requests for rehearsal clothing.

To considerBudgets are limited and frameworks must always be adhered to.

We request that costume and make-up designers come here to deliver their ideas approx. 1 year before the premiere. And if needed, must attend an intermediate meeting to resolve any issues before technical collation.

Submit sketches (technical collation) approx. 8 months before the premiere.

Participate in (usually) 2 fittings which cover all costumes/make-up (women, men, headdress, footwear) for choruses/musicals/dance ensembles except for solos and participate in costume/make-up stage rehearsals.

In connection with sketch delivery or at another appropriate occasion, a brief presentation of the sketches should be conducted for the studios.

What to expect from usProduction supervisors are assigned to each production. One costume cutter from the men’s studio, one from the women’s studio, one from the make-up studio, one from the painting and patination studio, one from the headdress studio and one from the leather studio.

They shall, in a professional manner, work in the production from the idea stage to the première, to ensure that the production team is satisfied and that the production is as good as possible. During technical collation, discussions are held between all production supervisors and costume designers regarding material, costume models and colours, footwear, headdress and make-up.

One of the production supervisors will also have a coordinating responsibility, which means an overall responsibility for the production insofar as to arrange with the costume designer as to when he/she should be available for fittings, etc.

Clarity and politeness.

COSTUME & MAKE-UP

Page 9: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

1716

Stage, Lighting and Video

JOEL BJÖRBERGStage & Lighting department managerTEL. 031-10 81 [email protected]

MOLLE MOLINTechnical production manager, StageTEL. 031-10 81 [email protected]

HANS ALGELIDOperatorTEL. 031-10 81 [email protected]

NIKLAS ANKARHEMLighting technician/ Tour managerTEL. 031-10 81 [email protected]

JONAS ASKLUNDLighting technicianTEL. 031-10 81 [email protected]

JENS BENGTSSON Theatre [email protected]

MATHIAS BERNTSSON OperatorTEL. 031-10 82 [email protected]

JOHAN BERG Theatre [email protected]

JOAKIM BRINKLighting designer/ Lighting technicianTEL. 031-10 81 [email protected]

BENGT BRYDEWALLTheatre [email protected]

SARAH CARLESONLighting technicianTEL. 031-10 82 [email protected]

FREDRIC CLEMBORN Theatre [email protected]

BERNAT COMELLAS ESTERUELASLighting technicianTEL. 031-10 81 [email protected]

LARS EHNEBUSKE Theatre [email protected]

DENNIS EKDAHLOperatorTEL. 031-10 82 [email protected]

NIKLAS ELFVENGRENLighting technicianTEL. 031-10 81 [email protected]

FREDRIK ENGLERStage hand/Tour managerTEL. 031-10 81 [email protected]

NIKLAS ERICSSONStage handTEL. 031-10 82 [email protected]

MAGNUS FREDLERTheatre technicianTEL. 031-10 82 [email protected]

STEFAN FRIDESONTheatre [email protected]

FRIDA FRIDELL BREITENSTEINLighting technicianTEL. 0709-546 [email protected]

FRIDA GOODRICHLighting technicianTEL. 031-10 81 [email protected]

JUSTIN GOODRICHLighting technicianTEL. 031-10 81 [email protected]

PETER GÖTZLINGERLighting technicianTEL. 031-10 81 [email protected]

KENT HELLBERGLighting technician/Tour managerTEL. 031-10 81 [email protected]

TOBIAS HELLSTRÖMLighting technicianTEL. 031-10 81 28tobias.hellströ[email protected]

GUNNAR ISAKSSONTheatre [email protected]

ELLEN JERNEHOLMFollow-spot operatorellen.jerneholm@ opera.se

PETER JOHANSSONStage handTEL. 0707-577 [email protected]

GÖRAN KROK OperatorTEL. 031-10 81 [email protected]

GÖRAN KVISTOperatorTEL. 031- 10 82 [email protected]

SONNY KOROSCHETZTheatre [email protected]

MATS LAGOStage handTEL. 031-10 81 [email protected]

ROMAN LINDQVISTTheatre [email protected]

MALIN MARTINSSONTheatre [email protected]

JONAS MELANDEROperatorTEL. 031-10 81 [email protected]

MICHAEL MENNELLTheatre [email protected]

BO NÄTJEHALLTheatre [email protected]

RUNE PETERSSONTheatre [email protected]

KATRIN PETTERSSONTheatre technicianTEL. 031-10 81 [email protected]

MORGAN SKÖNVALLTheatre [email protected]

DAVID STOKHOLMLighting technician/Tour managerTEL. 031-10 81 [email protected]

SAGA STOKHOLMLighting technicianTEL. 031-10 81 [email protected]

JOHAN WEICHTTheatre [email protected]

KARIN WIJKLighting technicianTEL. 031-10 81 [email protected]

STINA WINDMARK WESTLUNDTheatre [email protected]

HANNA ÖSTERGRENTheatre [email protected]

Our offices are on the 5th floor

STAGE, LIGHTING & VIDEO

Page 10: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

1918

GeneralWe work with all stage equipment, rigging, lighting and video. We perform/program all set changes during a performance. We manage the logistics, assembly, adjustment, disassembly of stages and décor.

The lighting director/deputy stage manager production supervisors are responsible for lighting/décor during the production. The lighting director/deputy stage manager can assist you with additional equipment, technical solutions, planning, etc.

A team will oversee the production from the idea presentation meeting to the final performance.

The same light board operator does all the programming for your production.

Productions (incl. additional equipment) must be built and handled by your assigned staff.

We fulfil your vision.

Additional rigging and lighting equipment for the rigging is only permitted to be placed in their intended positions.

What we expect from youIn addition to the information supplied to the workshops we will also require:

• A synopsis of stage sets with times for set changes.

• Times for, and speeds of, stage machinery. Schematics for lighting installations in the décor.

• Information about ”extra” equipment not included in existing lighting rigging.

• Information about the number of follow spotlights.

• Show projections with angles, distances, etc if relevant.

To considerScenography including lighting must fit on the stage (within the sound curtains) and may only

be stored in one of the side stage areas. In order for the décor to be stored in-house no component may exceed a height of 8.4 m, or 5.75 m for basement storage. The décor should consist of components with both dimensions.

The décor must be able to be separated during storage and the maximum dimensions should be 8.4 × 2.1 m. The scenography should be able to be built and operated by a maximum of eight technicians over two hours, and must be able to be disassembled in one hour.

All larger lighting installations, projections, video, etc. must be communicated at idea presentation for budgeting purposes. Light plot, the colour filter list and information about gobos must be submitted before the 1st lighting check is done.

What you can expect from usA professional and results-based team whose task is to, under prevailing constraints, do its utmost to fulfil the production team’s objectives.

Usual stage times8.00 Stage and lighting technicians start the day by removing residual items from the previous day’s performance. The current day’s rehearsal décor is set up.

10.30–14.30 Rehearsal without lighting.

11.00–14.30 Rehearsal with lighting.

11.00–13.30 30 minute lunch break within these times to be planned individually.

14.30–17.30 Rehearsals end for the day and the evening’s performance is set up.

17.30–18.30 Lighting check.

19.00 The performance commences.

Technical directives for tour-designated productions

STAGEStage size W × D × H 18 × 18 × 14 m

Performance area W × D 15 × 15 m

(The performance area when touring should be able to be reduced to 13 × 13 m to fit onto smaller stages with different viewing angles.)

Trim height 10 m

Stage opening 12–15 m

Advanced fittings that require rehearsal must be done by max. 2 people.

DÉCORDécor must be adaptable to the sizes of different stages.

The materials used for décor should be able to be assembled, disassembled and transported several times.

The décor should be able to be divided into components measuring 6x2 m with a weight of approx. 60 kg.

The maximum weight for décor is 150 kg/m2. Hanging décor (curtains & backdrops) max. 16 × 9 m.

LIGHTINGThe Göteborg Opera’s tour rigging will be used during the production and shall accompany the tour. Information regarding tour rigging must be communicated at the idea presentation meeting.

SOUNDThe Göteborg Opera has a regular PA system that will be used for the production.

Cordless microphones, etc. are types of equipment that must be rented for touring. This will be included in the budget for the production and tour.

TRANSPORTWe use a truck for tours in Europe. It should accommodate décor, costumes, lighting, and sound equipment.

Truck inner dimensions 8.7 × 2.4 × 2.4 m (50.4 m3) 13.6 tonnes.

STAFFWe strive to minimise the amount of staff on tours.

The performance should be able to be run by 7 technicians (stage, lighting, sound, dressers).

All equipment must be able to be unloaded, assembled and set up within 13 hours, and disassembled and loaded in 3 hours.

SOUND, LIGHTING AND VIDEOSOUND, LIGHTING AND VIDEO

Page 11: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

2120

Workshops, Construction & Props

WORKSHOPS, CONSTRUCTION & PROPS

GeneralThe workshops are made up of several competencies: constructors, smiths, carpenters, set painters, upholsterers, special effects and props makers. Our flat structure means that you will have direct contact with production managers within each group, but major changes need to first be communicated to the technical production manager who administrates and handles all requests for production of décor, special effects, and props - including furniture.

Working hoursThe workshops are open weekdays during business hours.

What we expect from youWe expect a complete delivery which describes the artistic requirements in detail. The set designer is expected to leave sufficient time for discussion and questions throughout the production process. In those cases where props and décor need to interact with lighting, sound and costume, the set designer is expected to initiate the discussion with the artistic team and to keep the workshop department updated.

A COMPLETE DELIVERY INCLUDING THE FOLLOWING:

Emailed for appraisal 1 week prior to the technical collation:

• A list of all required décor elements, included specific numbers needed.

• A preliminary props list. • Requests for earlier delivery of certain décor

elements, e.g. by start of rehearsals. • Plans/drawings external dimensions and

description of function for all décor elements that are to be produced from scratch.

• Plan and elevation drawings for all tableaus with set designs drawn onto Göteborg Opera’s original blueprints.

A further delivery at the technical collation:

• Detailed set model at 1:25 scale, to be usable by set painters.

• Reference images of furniture, props, special set details and any inspiration images for set painters.

• If projection of still or moving images is required, a detailed description including: image/video artwork, projector positions, desired format and size of projection surfaces.

• If print is required, print artwork ready to be sent to the printers’.

To considerWe are a repertory theatre so our storage space is limited, and available production times are not negotiable.

What you can expect from usThat together with our technical production manager we will adapt to the artistic vision within available frameworks.

Set designs are modelled in 3D by the construction department. The model and other plan material will be available in the construction office after the technical collation.

That together with the team’s production managers - usually made up of a constructor, metalworker, carpenter, painer and props maker - work towards a common goal in constructing décor and props.

The décor will be complete by the first stage-build, which is usually 5 weeks prior to the premiere.

At the beginning of rehearsals in rehearsal rooms, we will provide rehearsal props according to the preliminary props list (see above). A finalised list will complete by first stage rehearsals.

During rehearsals in rehearsal rooms props staff will be available if necessary. When rehearsals move to the stage a prop maker will attend each rehearsal.

VICTORIA WALLENBERGDepartment headTEL. 031-10 81 [email protected]

LOTTI ALMQVISTProp maker TEL. 0500–44 34 [email protected]

ROGER ANTFOLKMetalworkTEL. 031-10 82 [email protected]

THOMAS ANTFOLKMetalworkTEL. 031-10 82 [email protected]

HILLEVI CARLSSONScenic paintingTEL. 031-10 82 [email protected]

ELIN EMRETSSONCarpenterTEL. 031-10 82 [email protected]

BEN GRIFFITHSScenic paintingTEL. 031-10 82 [email protected]

HANNES HANSSONConstructionTEL. 031-10 82 [email protected]

FREDERIC JOHANSSONTechnical production leader TEL. 031-10 81 [email protected]

LENNART HESSLESpecial effects & propsTEL. 031-10 81 [email protected]

ERIK JANSSONCarpenterTEL. 031-10 82 [email protected]

ANNA LA CARRUBBAProp maker TEL. 031-10 81 [email protected]

LARS-PEDER LINDSTRÖMProp maker TEL. 031-10 81 [email protected]

OLOF MARZELIUSConstructionTEL. 031-10 81 [email protected]

ELINOR OLSSONProp maker TEL. 031-10 81 [email protected]

PER OTTOSSONCarpenterTEL. 031-10 82 [email protected]

JONNA PEDEVILLAProp maker TEL. 031-10 81 [email protected]

MATTIAS PERSSONCarpenterTEL. 031-10 82 [email protected]

MARKUS REHNCarpenterTEL. 031-10 82 [email protected]

LEIF ROBERTSSONProp maker TEL. 031-10 81 [email protected]

BIRGITTA STRÖMQVISTProp maker TEL. 031-10 81 [email protected]

PER-ÅKE SVENSSONConstruction TEL. 031-10 80 [email protected]

YLVA THORÉNScenic paintingTEL. 031-10 82 [email protected]

MARK VON WERTHERCarpenterTEL. 031-10 82 [email protected]

JOHAN WIKSTRÖMMetalworkTEL. 031-10 82 [email protected]

You can find us on floors 3 & 5

Page 12: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

2322

Stage décor must be constructed in such way that it can be divided for transport and long-time storage.

For environmental reasons we request that you try to match the décor components to the dimensions in our standard directory system Gröna Pricken.

Wall frames are available in heights of 8.40m and 5.80m, with widths of 1 m and 2m. Carriages are 1–4 m in length and are 0.167m in height. Once the décor is in-house it is handled in larger modules and is almost always built on wheels.

IMPORTANT DIMENSIONS:Max. height for storage at stage floor level: 8.40 m

Max. height for basement storage: 5.80 m

Partition dimension 2m for width and depth.

STAGE MACHINERYModule dimensions

Example of natural dividing lines

Standard drapes, Main StageBlack velvet borders• 5 canopies 20 × 5 m

• 2 canopies 20 × 2 m

• 1 echo canopy 20 × 4 m

• 9 sets of leg drapes 13.4 × 3.5 m

• 5 sets of leg drapes 13.4 × 2.10 m

• 1 canopy 20 × 7 m

Borders under stage balconiesAvailable in black

Black box borders in black

Grey velvet

• 6 canopies 20 × 4 m

• 9 sets of leg drapes 13.4 × 3.5 m

• 1 bisected backdrop 20 × 11 m

Scrim/gauze• 1 white scrim 20 × 10 m• 2 black scrims 18 × 10 m• 1 grey scrim 18 × 10 m

Projection screens• 1 white 18 × 10 m

• 1 grey 18 × 10 m

• 1 black/grey 18 × 10 m

Backdrops• 1 black echo velour (bisected)

20 × 10 m.

• 2 black silk: circa 11 × 18 m

• 1 black silk (bisected): circa 10 × 18 m

• 1 black: circa 7 × 18 m

• 1 black pleated silk

Grand drapes• Red drop curtain (Standard)

• Black tableau (Sound dampening safety curtain)

Borders to be hung if possible:• Drapes on batten

5, 10, 15, 22, 25, 35, 41, 49

• Canopies on batten 8, 21, 33, 40, 53

Standard drapes, Small Stage • 1 white 6 × 3 m

• 1 grey 8.3 × 5.7 m (with timber batten)

• 1 grey backdrop

• Regular black border

• White projection screen 6 × 7 m

BATTENStd. backdrops: Soft 10 × 18 m Framed 8.4 × 10 m Max. width batten 1-5 16 m (18)Max. width batten 6-55 18 m (20) Specifications See sectional drawingsStage podiums 4Exterior dimensions 15 × 3.5 m Specifikationer Se sektionsritning

ROTATING STAGE Rotating stage platform’s exterior dimensions 15 × 14 mHeight 0.66 mDiameter 13.8 mSpecifications See sectional drawings Loopholes (trapdoors) 28 hydraulic loopholes (trapdoors), can be opened individually or in groups. 7 braces/podiums.

PROSCENIUM Opening 12–16 mHeight max 9.3 mDance floor One per stage podium and partially integrated into the floor to the auditorium.

Page 13: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

2524

Technical directives for toursMUSICAL & DANCE PRODUCTIONS IN THE VÄSTRA GÖTALAND REGION

THOMAS JOHANSSONTechnical Manager for regional operationsTEL. 0703-14 51 20 [email protected]

TECHNICAL DIRECTIVES FOR TOURS

A-STAGES

Stage dimensions• Stage size 14 × 8 × 8 m (W × D × H)• Performance area 10 × 8 m (W × D)• Stage opening 10 m• Line shaft depth 8 m

Décor• Décor should be adaptable to various

stage designs.• The materials used should be able to be

assembled, disassembled and transported several times.

• Décor should be able to be divided into components measuring max. 6 × 2 m and approx. 60 kg.

• Max. weight for décor is 150 kg/m2.• Max. weight for hanging décor is 200 kg.• Max. dimensions for hanging décor are

12 × 8 m.

Electricity requirements• Lighting 2 × 63 A• Sound 1 × 16 A

Transport• The truck used must accommodate décor,

lighting, sound, costumes & make-up.• Truck’s inner dimensions:

9.5 × 2.4 × 2.4 m (55 m3)

Staff• We strive to limit the amount of staff to

5–6 technicians.• All fixtures must be able to be unloaded,

assembled and set up within 8 hours, and

disassembled and loaded in 3 hours.

B-STAGES

Stage dimensions• Stage size 9.5 × 6 × 5 m (W × D × H)• Performance area 8 × 6 m (W × D)• Stage opening 8 m

• Line shaft depth 5 m

Décor• Décor should be adaptable to various stage

designs and viewing angles. Should also be able to be used on A stages.

• The materials used for décor should be able to be assembled, disassembled and transported several times.

• Décor should be able to be divided into components measuring max. 6 × 2 m and approx. 60 kg.

• The max. weight for décor is 150kg/m2.• The max. weight for hanging décor is

70 kg.• The max. dimensions for hanging décor are

9.5 × 5 m.

Electricity requirements• Lighting 1 × 63 A• Sound 1 × 16 A

Transport• A truck is used and it must accommodate

décor, lighting and sound equipment, costumes/make-up.

• Truck inner dimensions

9.5 × 2.4 × 2.4 m (55 m3)

Staff• We strive to limit the amount of staff to

4–5 technicians.• All fixtures must be able to be unloaded,

assembled and set up within 5 hours, and

disassembled and loaded in 2 hours.

C-STAGES / COMMUNITY CENTRES

Stage dimensions• Stage size 5 × 3.5 × 2.4 m (W × D × H)• Performance area 5 × 3 m (W × D)

• Stage opening 5 m

Décor• Décor should be adaptable to various stage

designs and viewing angles. Should also be able to be used on B stages.

• The materials used for décor should be able to be assembled, disassembled and transported several times.

• Décor should be able to be divided into components measuring max. 2 × 2 m and approx. 60 kg.

• The maximum weight for décor is

150kg/m2.

Electricity requirements• Lighting/sound 1 × 16 A.• Both lighting and sound (if applicable) should

be included.

Transport• A small truck is used and must accommodate

décor, lighting and sound equipment, costumes and make-up.

• Max. weight: 950 kg

• Truck inner dimensions 4 × 2 × 2 m (16 m3)

Staff• 2 multi-skilled technicians• All fixtures must be able to be unloaded,

assembled and set up within 3.5 hours.• Disassembled and loaded in 1.5 hours.

Included in The Göteborg Opera’s mandate is to stage musical and dance productions on The Göteborg Opera Skövde Stage and on tours in Västra Götaland. In order to reach out to the entire region, and based on the substantial differences in performance venues, we have divided the productions into three categories. The following information can be considered preconditions for us being able to tour.

Page 14: Technical handbook - The Göteborg Opera · COSTUME1&1MAKE2UP costume8and8ake up8coordinator 9 costume8cutters painting/patination8studio headdress8studio eather/footwear8studio 9

2726

Facility management

HÅKAN JÖNSSONManager FM GroupTEL: 031-10 82 [email protected]

KATARINA SIGVARDSSONGroup manager CleaningTEL. 031-10 82 [email protected]

ARNE SAHLSTEDT Assistant managerTEL. 031-10 82 [email protected]

JOHAN NILSSONElectrician/ Fire safety managerTEL: 031-10 81 [email protected]

OLA LINDSTEDT Group manager, Electricians & Stage mchineryTEL. 031-10 82 [email protected]

PETER STRANDGroup manager LogisticsTEL. 0705-83 02 [email protected]

GeneralFM Group (Facility Management) is responsible for the services required for the operation to function properly. You will find us at our personnel entrance where we staff the entrance and reception.

We ensure that auditoriums, foyers and other venues are clean and in full working condition with regard to climate, electricity, fire safety and other technical installations.

We modify and adapt our building to a business in constant change.

It is our responsibility to transport and store decor and props.

It is our responsibility to ensure that stage machinery functions safely and correctly. We design, construct and build special solutions together with our construction department.

What we expect from youIn order to deliver service of the highest quality, we request that you submit the preconditions as early as possible, e.g.

• Order the items you need from the relevant group manager.

• Be clear about what, when and, if possible, how.

• Please use our internal portal, wherein you can order services and find information that will facilitate your residence here.

What you can expect from usA service organisation that will do its utmost to ensure your residence with The Göteborg Opera will be unforgettable and successful.

Working hoursCleaning: Mon-Fri 6.00–22.00 Sat-Sun 8.00–16.00Stage machinery: Mon-Fri 8.00–17.00

Maintenance: Mon-Fri 8.00–17.00

Logistics: Mon-Fri 8.00–17.00

Electrical dept: Mon-Fri 7.00–16.00

Fire safety Mon-Fri 7.00–16.00

Internal services Mon-Fri (excl. holidays): 6.30–23.00 Sat-Sun 8.00–23.00