Technical & Fiscal Reporting
Seminar
Given to New Grantees of
the BIRD Foundation
July 2018
Tal Kelem
Business Development
![Page 2: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/2.jpg)
BIRD Approved Projects - June 2018
BIRD
Ref. IL company US Company PBC
(Primary BIRD Contact)
1606 ARTsys360 Ltd. ECSI International Inc. Limor Nakar-Vincent
1608Correlor Data Science
Intelligence Ltd. Advanced Energy Inc. Tal Kelem
1610 Diamond Valley Ltd. Ion Beam Milling Inc. Dr. Eitan Yudilevich
1611 DouxMatok Ltd. American Sugar Refining Inc. Dr. Ron Maron
1612 Manam Applications Ltd. AviSight Inc. Tal Kelem
1614 OxiTone Medical Ltd. Cigna Corp. Dr. Ron Maron
1615 Pixellot Ltd. HockeyTech Inc. Dr. Ron Maron
![Page 3: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/3.jpg)
NextGen First Responder Technologies
Projects Approved - June 2018
BIRD Ref. IS company US Company PBC(Primary BIRD Contact)
3023 ELTA Systems Ltd. and TLC Solutions, Inc. Tal Kelem
3024 HiRiseTech Ltd. Allstate Sprinkler
CorporationLimor Nakar-Vincent
Ph
oto
:T
al K
ele
m, B
IRD
![Page 4: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/4.jpg)
BIRD to Invest $6.3 Million in 7 New Projects
![Page 5: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/5.jpg)
BIRD Staff
Eitan Yudilevich, Ph.D.
Executive Director
Natalie Galperin
Chief Financial Officer
Limor Nakar-Vincent
Deputy Executive Director of Business
Development & BIRD Energy
Ron Maron, Ph.D.
Senior Director of Business
Development
Tal Kelem
Director of Business Development
Chava Doukhan
Office Manager
Moran Lazar
Financial Manager
Oshrat Attias
Administrative Assistant
Maha Wakileh
Information Systems Manager
Main Telephone Number: 972-3-6988300
West Coast
(California)Director of Business Development
West Coast
Maya Vardi Shoshani
East Coast & Midwest
(New Jersey)
Director of Business Development
East Coast & Midwest
Andrea Yonah
Headquarters - Israel U.S. Offices
![Page 6: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/6.jpg)
6
Guidelines & Forms Fiscal & Technical Seminar & Handouts
Documents on BIRD’s website
![Page 7: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/7.jpg)
7
Guidelines & Forms BIRD Procedures & Forms Entire Procedures Handbook
Documents on BIRD’s website
![Page 8: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/8.jpg)
8
Documents on BIRD’s website
BIRD Procedures & Forms Entire Procedures Handbook
![Page 9: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/9.jpg)
10
Topics for Discussion
Immediate steps towards signing the
Cooperation and Project Funding Agreement (CPFA)
Reporting:
• Upload System
• Project Structure & Reports Timing
• Structure & Content of Technical Reports
• Final Technical Report
Commonly asked Questions
Ph
oto
by
Rau
l Pe
trio
nU
nsp
lash
![Page 10: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/10.jpg)
Before signing the CPFA(Cooperation and Project Funding Agreement)
11
Ph
oto
by
Jo
an
na
Ko
sin
ska
on
Unsp
lash
![Page 11: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/11.jpg)
12
What is Needed in Order to Obtain
the Approved Grant Money?
► Adjusted budgets Should equal twice the approved grants, original ratio should be kept
► Adjusted program plan (Gantt) Reflect updated project start date - “Effective Date”
► Missing details supplied as instructed by Ms. Chava Doukhan, BIRD’s Office Manager (03-6988307)
► Signed copy of relevant company-company agreement
![Page 12: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/12.jpg)
13
What is Needed in Order to Obtain
the Approved Grant Money?
► Financial Status Analysis private companies only, provide substantiating material
► Finalization of CPFA details – issued by BIRD
► CPFA is circulated with the companies for signaturethree copies sent by BIRD to the Israeli company, BIRD is last to sign
BIRD executes first grant payment to each company
![Page 13: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/13.jpg)
14
Critical Dates of a BIRD Project
Project ‘Effective Date’“The effective date of this Agreement shall be the _____ day of _______,
20__ The development work shall commence on the aforementioned
date and, unless sooner terminated by the Foundation in accordance
with Section I, the development work shall terminate ____ months
following the effective date”
Project ‘Termination of Product Development’ date “The conclusion of the Product Development pursuant to and in
accordance with the Proposal, including the Product being ready for
commercialization”
CPFA signing date
Don’t confuse this with the project start date, known as – ‘Effective Date’!
![Page 14: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/14.jpg)
Reports
15
Ph
oto
by
raw
pix
elo
nU
nsp
lash
![Page 15: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/15.jpg)
16
Project Structure & Report TimingProject duration: 18 months, 3 segments of 6 months each
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
FIRST SEGMENT
PROJECT SECOND SEGMENT
STARTS THIRD SEGMENT
Interim Report: a joint technical report, fiscal from each company
Interim 1 - Report due 1 month after the end of 1st segment
Interim 2 - Report due 1 month after the end of 2nd segment
Final report (interim report + marketing) - due 2 months after end of project
Project Start is defined in CPFA
as: “Effective Date”
“Termination Date”
Interim Report Due Final Report DueInterim Report Due
![Page 16: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/16.jpg)
17
Need for Technical Reports
Monitoring the project’s progress
Determination of BIRD’s payment to grantees
Tool for companies to manage their joint R&D activities
Requirement of “Cooperation & Project Funding Agreement”
![Page 17: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/17.jpg)
18
Reports: Upload System
Log In
![Page 18: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/18.jpg)
19
Reports: Uploading Documents
![Page 19: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/19.jpg)
20
Uploading Files
Reports: Uploading Documents
![Page 20: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/20.jpg)
We require
uploading the technical and fiscal reports
and
one hard copy sent to our office
21
Reports: Uploading and Copies
Photo by freestocks.org on Unsplash
![Page 21: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/21.jpg)
22
Standard Report Cover Page (BIRD Procedures & Forms tab in website)
Technical Reports: Content
![Page 22: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/22.jpg)
23
1. Report Cover Page (BIRD Procedures & Forms tab on website)
2. Table of Contents
3. Objectives:
• of the project
• of the segment covered by report
4. Summary of Accomplishments
5. Results:
• On a task-by-task basis
• Deviations from the Program Plan
• Implications of modifications on the developed product
Technical Reports: Content (see ‘Procedures Handbook’)
Photo by Kevin Ku on Unsplash
![Page 23: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/23.jpg)
24
6. Plans for Next Project Segment
• Rescheduling or additions to activities
• Impact of changes on original Program Plan
7. Graphical Comparison of Results Vs Program Plan
• In graphical form (Gantt chart, Microsoft Project) show tasks & time-
schedule deviations from Program Plan (Annex D of CPFA)
Technical Reports: Content
![Page 24: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/24.jpg)
25
Technical Reports: Updated Gantt
![Page 25: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/25.jpg)
26
8. Cooperation Between the Companies
• Communication & coordination of activities
• Mutual benefits from integrated work
• Corrective measures taken and needed
Technical Reports: Content
Ph
oto
by
Jo
sh
Ca
lab
rese
on
Unsp
lash
![Page 26: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/26.jpg)
Developing a Successful
Partnership: Guidelines
Identify the undercurrents and importance of the project outcome for your partner
Recognize cultural differences and the different skills of the parties
Manage the Relationship across the Network:
• Develop communication routes, not a single one
• Develop agreed procedures in case of challenges
• Create formal and Informal relationships
between the companies
Invest the Time and Effort, it is critical not less than technology!
27
![Page 27: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/27.jpg)
9. Risk Analysis
• Proposal - original Risk Analysis Table
• Updated Risk Analysis Table
• Add explanation
28
Impact
Commercialization PotentialBudgetDurationRankingName
MediumMediumMediumMedium“Coating does not meet all
requirements”
Medium Low Medium Low “Concept of Operation is not
acceptable by the FAA”
New evaluation of the risk: Segment 1
”Concept of Operation is not acceptable by the FAA” - Increased Risk
Technical Reports: Content P
ho
to b
yJa
red
Ric
eo
nU
nsp
lash
![Page 28: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/28.jpg)
10. Market and Commercialization Plans
• Changes in market potential or sales forecast
• Impact of market changes on Program Plan
29
Technical Reports: Content
Ph
oto
by
Sa
mu
el Z
elle
ro
nU
nsp
lash
![Page 29: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/29.jpg)
10. Published Information
• Articles in professional literature
• Patents
• Press releases
30
Technical Reports: Content
![Page 30: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/30.jpg)
CPFA - Publications
31
![Page 31: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/31.jpg)
32
Final Technical Report
Part I:
Same as in Interim Reports
(except section 5 - Plans for Next Project Segment )
Including Future Activities:
● Future development work planned, jointly
and/or separately, related to the Product
● Marketing activities to be undertaken,
either jointly and/or separately,
as part of the Product sales efforts
Ph
oto
by
Jo
n T
yso
no
nU
nsp
lash
![Page 32: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/32.jpg)
33
Part II: Updated Marketing Forecast
Requires a separate signed cover page!
Final Technical Report
Ph
oto
by
Daig
aE
llab
yo
nU
nsp
lash
![Page 33: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/33.jpg)
34
Part II: Updated Marketing Forecast
Re-definition of relevant products / applications
Market acceptance of product
Commercialization forecasts
Updated 3 years market size & sales forecast
Comparison with forecast in proposal
New products opportunities
Future joint activities planned by companies
Final Technical Report
Ph
oto
by
Daig
aE
llab
yo
nU
nsp
lash
![Page 34: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/34.jpg)
35
Updated Marketing Forecast
![Page 35: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/35.jpg)
36
Updated Marketing Forecast (Handbook page 52)
![Page 36: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/36.jpg)
37
Updated Marketing Forecast (Handbook page 53)
![Page 37: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/37.jpg)
Reports: Requirements/Suggestions
If you are using acronyms or abbreviations in your report,
kindly provide the glossary of terms
Please read the directions clearly and prepare the reports “by
the book”.
If you have questions - give us a call!
At the end of the project, a questionnaire will be sent to the
companies
38
Ph
oto
by
An
toin
e B
arrè
so
nU
nsp
lash
![Page 38: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/38.jpg)
Common Questions Asked
Ph
oto
by
Ma
rina
Sa
lles
on
Unsp
lash
Photo
by
Marin
a S
alle
son
Unspla
sh
![Page 39: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/39.jpg)
40
Common Questions Asked
Actual progress is slower than Program Plan:
Do I submit TR as scheduled? YES
Actual spending is less than forecast:
Do I submit TR as scheduled? YES
Actual spending is greater than forecast and actual
progress is same as or ahead of Program Plan:
Do I submit TR as scheduled? SEE PBC
Only TR/Fiscal report is ready:
Will submitting TR without fiscal reports for same period, or submitting
fiscal reports without TR reports be of any advantage? NO
Photo by Tom Plouff on Unsplash
![Page 40: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/40.jpg)
41
What happens if the project scope changes?
Advise PBC in writing/meeting
Request formal (written) modification
by both companies
→ Include fiscal implications
→ Include new program plan
What happens if more time is needed to complete the project?
Advise PBC in writing/meeting
Submit formal (written) request by both companies
→ Include reasons for delay, and implications
→ Include extended program plan
What happens if project is completed ahead of schedule?
Complete and submit reports
Common Questions Asked
Photo by Tom Plouff on Unsplash
![Page 41: Technical & Fiscal Reporting Seminar · Interim Report: a joint technical report, fiscal from each company Interim 1 - Report due 1 month after the end of 1st segment Interim 2 -](https://reader034.fdocuments.net/reader034/viewer/2022052015/602c25b194d98f3a4a183fee/html5/thumbnails/41.jpg)
42
The BIRD Team
Wishes You All a
Successful Development &
Commercialization of the Joint Project