TECHNICAL BID FOR OPERATIONS AND MAINTENANCE … · TECHNICAL BID FOR OPERATIONS AND MAINTENANCE...
Transcript of TECHNICAL BID FOR OPERATIONS AND MAINTENANCE … · TECHNICAL BID FOR OPERATIONS AND MAINTENANCE...
INDUSTRIAL EXTENSION BUREAU (A Government of Gujarat Organization)
VOLUME – III
PRICE BID
BID DOWNLOADING
27/09/2016 to 18/10/2016
up to 11.00 AM
PRI BID MEETING 13/10/2016
at 4:00 PM
LAST DATE OF ONLINE
SUBMISSION
18/10/2016
up to 11.00 AM
LAST DATE OF
PHYSICAL DOCUMENT
SUBMISSION
18/10/2016
Up to 12:00 Noon
DATE OF TECHNICAL
BID OPENING
18/10/2016
at 1:00 P.M.
PRESENTATION Date, Time and place will be
intimated later
TECHNICAL BID FOR OPERATIONS AND MAINTENANCE CONTRACT FOR MECHANICAL, ELECTRICAL, ELECTRICAL LOW
VOLTAGE AND FIREFIGHTING SERVICES AT MAHATMA MANDIR
INDUSTRIAL EXTENSION BUREAU Block No. 18, 2
nd floor, Udyog Bhavan, GH-4
Sector - 11, Gandhinagar - 382 010 Phone: +91-79-2325 0492/93. Fax: +91-79-2325 0490
Email:[email protected] Website: - www.indextb.com, www.vibrantgujarat.com
Operation and Maintenance works-MEF works Summary Mahatma mandir, Gandhinagar
Sr. No. Component of Works Unit Amount in Rs.
A Electrical Works In Lot Per Year
B Fire Fighting Work In Lot Per Year
C Lift Work (Only Operation) In Lot Per Year
D Gas Pipeline Works In Lot Per Year
E Audio, Video, Electronic Security System & IT Section In Lot Per Year
F Project Manager/Operation Manager/Facility Manager In Lot Per Year
Gross Total Amount in Figure ( A to F) Rs.
1
2
3
4
5
6
7
Where there is discrepancy between the rates in figures and in words, whichever is less shall govern. Where there is discrepancy between the unit
rate & the line item total resulting from multiplying the unit rate by the quantity, the unit rate as quoted will govern.
If the total amount of bid quoted is less than actual summation of cost of all components or parts as the case may be then the quoted amount shall
govern and difference between the actual summation and the amount quoted shall be considered as a discount.
The Agency shall provide/fill up detailed cost break up ofTools/Tackels/Equipments, Consumable, considred in Part I to the Price Bid
(A2,B2,C2,D2,E2) as a separate Annexure in hard copy along with Bid submission.
All duties, custom duties, taxes (including all Central excise tax, Central Govt. & all state Govt. taxes, PF, EPF to employees if any.) and other
levies payable by the agency or for any other cause as on the date for submission of bids shall be included in the Rates and Prices submitted by the
bidder. No any other taxes shall be paid separately. Only Service Tax which shall be reimbursed on actual, as per govt. rules, on production of
documentary evidence.
Related payment shall be made on the basis of actual work performed as per scope of works which shall be certified by Employer/Engineer-in-
Charge.
VOLUME -III-PRICE BID
Abstract Summary of Operation & Maintenance works
Notes :
All quantities of all Operation and Mainteance items are to be considered as per scope, information, details as mentioned in Volume I and II
while quoting the final rate. The manpower charges should be towards wages only to manpower including all allowances, statutory levies like ESI
& EPF Employer shares, but excluding only Service Tax which shall be reimbursed on actual, as per govt. rules, on production of documentary
evidence.
The amount put here is including Sundays, holidays, festival days, rainy days.
iNDEXTb CRDC-CEPT 1
Operation and Maintenance works-MEF works Summary Mahatma mandir, Gandhinagar
Notes :
All quantities of all Operation and Mainteance items are to be considered as per scope, information, details as mentioned in Volume I and II
while quoting the final rate. The manpower charges should be towards wages only to manpower including all allowances, statutory levies like ESI
& EPF Employer shares, but excluding only Service Tax which shall be reimbursed on actual, as per govt. rules, on production of documentary
evidence.
8
Sign: Engineer In Charge, iNDEXTb Sign: Agency with Seal
If existing structure/facility/system/any part of Phase 1A, 1B & 2A are damaged during any works. No additional claim will be payable but the
Bidder has to complete damaged work in its original state and as per IndexTb's instructions.
iNDEXTb CRDC-CEPT 2
Operation and Maintenance works-MEF Volume III -Price Bid -Part I Mahatma Mandir, Gandhinagar
Sr.
No. Description of Work Unit
Nos.
requie
rd
Estimated Rate
Per Employee
Per Month
Total Amount
For 12 months
A OPERATION & MAINTENANCE OF ELECTRICAL SYSTEMS
1 Operation: Full time round the clock and year round, operation of Various Electrical System and connected/related works which includes
RMU , HT panel , DG set , LT panel , Transformer , Distribution board , MV panels , Fans , Fixtures , Busduct , cabling works and all other
items which are executed in the premises at Mahatma Mandir including keeping log books and records of Electrical system uptime, Hours of
Operation, down time or failures on various parameters and other functional requirment including liaisoning with Govt. of Gujarat and other
statutary authorities such as Fire service/Explosive department etc. Agency should have all kind of necessary meters, tools and tackles.
Note:- Operation team to ensure smooth operation on daily basis including switching ON, OFF, Lighting automation controls and all operational
works as required by facility management team as per the timing of the place. Bidder/agency to also maintain charts of Voltage, current, power
factor, Active & Reactive power consumption, Maximum demand on a regular basis and shall also ensure to have Maximum demand is
controlled & Power factor correction to unity takes place. This shall be recorded regularly and proper record shall be maintained.
Maintenance:- Maintenance of the system supplied, installed, Commissioned in the premises of Mahatma Mandir . This will include start up /
commissioning routine servicing, regular maintenance, preventive maintenance of equipments and components and break down repairs as and
when occurred, ensuring that system does not remain out of service for a period more than 8 hours in case of major breakdowns and one hour in
the case of minor breakdowns due to any unforeseen break down. The necessary spares and consumables required for satisfactory maintenance
of the installation and system will be supplied by iNDEXTb at free of cost. Agency shall carry out a survey of the entire scope and submit list of
spare required to iNDEXTb. So that necessary material will remain in store. Agency should have all kind of necessary meters, tools and tackles.
Note:- Maintenance team to ensure that routine maintenance on a regular basis is carried out so that all the electrical & Lighting
equipment are checked, maintained at regular intervals and smooth operation can take place. (Detailed Work as Shown in "Scope Of
Work")
A1 MAN POWER CHARGES
1.1 Senior Project Engineer No 1
1.2 Electrician No 2
TOTAL AMOUNT OF "A1"
A2 MACHINARY ,TOOLS,EQUIPMENTS & CONSUMABLES CHARGES
2 Charges for Providing, storing and maintaining machines, equipment, tools and tackles, small or big, and another item(s) that may be required
for fulfillment/requirements of the contract (Attach separate Annexure A2 indicating cost bifurcation of each iteams/machinery/tools considered
under this section in detail)
Lumpsum 1
TOTAL AMOUNT OF "A2" (Per Year)
A3 PROJECT MANAGEMENT/PROJECT COORDINATION SERVICE/OVERHEAD CHARGES
(In percentage ------ of A1+A2 above)
3 All kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other charges/overhead/Profit which shall include here: All
expenditure on providing technical/managerial/supervisory/administrative/labour services by all means to get the work through deployed MEP
O&M Work as mentioned in Techncial as well as O&M Gudielines.
Lumpsum 1
TOTAL AMOUNT OF "A3"
TOTAL AMOUNT OF (A1+A2+A3) OF ELECTRICAL STREAM ( For 1 Year)
PART-I
Electrical- Operation and Maintenance works
1
Operation and Maintenance works-MEF Volume III -Price Bid -Part I Mahatma Mandir, Gandhinagar
Sr.
No. Description of Work Unit
Nos.
requie
rd
Estimated Rate
Per Employee
Per Month
Total Amount
For 12 months
B OPERATION & MAINTENANCE OF FIRE FIGHTING SYSTEM
1 Operation:Full time round the clock and year round, operation of Various Fire Fighting System and connected/related works which includes
Fire Pumps, Valves, Hydrants, Hose Box, Hose Reels, Sprinklers, Alarm Check Valves, Alarm Panel, Detectors, Extinguishers and all other
items which are executed in the premises at Mahatma Mandir including keeping log books and records of Fire Fighting system uptime, Hours of
Operation, down time or failures on various parameters and other functional requirment including liaisoning with Chief Fire Office and other
statutary authorities such as Electrical Inspector /Explosive department etc. Agency should have all kind of necessary meters, tools and tackles.
Note:- Contractor to also ensure smooth operation on daily basis including switching ON, OFF, Fire Pumps automation controls and all
operational works as required by facility management team as per the timing of the place. Contractor to also maintain charts of Hydrant System
Pressure, Sprinkler System Pressure, Pumps Pressure, Pumps Operating Current, Any Mechanical Noise / Vibration, Diesel Engine Battery
Status, Diesel Tank Level, Lubrication oil Level, Detection System Fault, Alarm Panel Acknowledgement on a regular basis and shall also
ensure to have All the System is controlled & Pressure to be maintained. This shall be recorded regularly and proper record shall be maintained.
(Detailed Work as Shown in "Scope Of Work")
Maintenance:- Maintenance of the system supplied, installed, Commissioned in the premises of Mahatma Mandir . This will include start up /
commissioning routine servicing, regular maintenance, preventive maintenance of equipments and components and break down repairs as and
when occurred, ensuring that system does not remain out of service for a period more than 8 hours in case of major breakdowns and one hour in
the case of minor breakdowns due to any unforeseen break down. The necessary spares required for satisfactory maintenance of the installation
and system will be supplied by iNDEXTb at free of cost. Agency shall carry out a survey of the entire scope and submit list of spare required to
iNDEXTb. So that necessary material will remain in store. Agency should have all kind of necessary meters, tools and tackles.
Note:- Maintenance team to ensure that routine maintenance on a regular basis is carried out so that all the Fire Fighting equipment
are checked, maintained at regular intervals and smooth operation can take place. (Detailed Work as Shown in "Scope Of Work")
B1 MAN POWER CHARGES
1.1 Operator Cum Technician Nos. 3
1.2 Safety Officer Nos. 1
1.3 Project Engineer Nos. 1
1.4 Technician Nos. 3
TOTAL AMOUNT OF "B1"
B2 MACHINARY ,TOOLS,EQUIPMENTS & CONSUMABLES CHARGES
2 Charges for Providing, storing and maintaining machines, equipment, tools and tackles, small or big, consumables and another item(s) that may
be required for fulfillment/requirements of the contract (Attach separate Annexure B2 indication cost bifurcation of each iteams/machinery/tools
etc. in detail)
Lumsum 1
TOTAL AMOUNT OF "B2" (Per Year)
B3 PROJECT MANAGEMENT/PROJECT COORDINATION SERVICE/ OVER-HEAD CHARGES (In percentage ------ of B1+B2
above)
3 All kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other charges/overhead/Profit which shall include here: All
expenditure on providing technical/managerial/supervisory/administrative /labour services by all means to get the work through deployed MEP
O&M Work as mentioned in Techncial as well as O&M Gudielines.
Lumsum 1
TOTAL ESTIMATED AMOUNT OF "B3"
TOTAL AMOUNT OF "B1+B2+B3" OF FIRE FIGHTING STREAM ( For 1 Year)
Fire fighting- Operation and Maintenance works
2
Operation and Maintenance works-MEF Volume III -Price Bid -Part I Mahatma Mandir, Gandhinagar
Sr.
No. Description of Work Unit
Nos.
requie
rd
Estimated Rate
Per Employee
Per Month
Total Amount
For 12 months
C OPERATION OF LIFT SYSTEM
1 Operation:Full time round the clock and year round, operation of Various Lifts and all other items which are executed in the premises at
Mahatma Mandir including keeping log books and records of Lifts uptime, Hours of Operation, down time or failures on various parameters and
other functional requirement including liasioning with Electrical Inspector and other statutory authorities. Agency should have all kind of
necessary meters, tools and tackles.
Note: Contractor to also ensure smooth operation on daily basis including switching ON, OFF, Lifts automation controls and all operational
works as required by facility management team as per the timing of the place. Contractor to also maintain charts of Lifts working and Parts
repairing on a regular basis and shall also ensure to have All the System is controlled & Lifts to be maintained. This shall be recorded regularly
and proper record shall be maintained. This shall be recorded regularly and proper record shall be maintained.
(Detailed Work as Shown in "Scope Of Work")
C1 MAN POWER CHARGES
1.1 Operator (5+1) Nos. 6
TOTAL AMOUNT OF "C1" Rs.
C2 MACHINARY ,TOOLS,EQUIPMENTS & CONSUMABLES CHARGES
2 Charges for Providing, storing and maintaining machines, equipment, tools and tackles, small or big, consumables and another item(s) that may
be required for fulfillment/requirements of the contract Only For Operation Purpose (Attach separate Annexure C2-indication cost
bifurcation of each iteams/machinery/tools etc. in detail)
Lumsum 1
TOTAL AMOUNT OF "C2" (Per Year)
C3 PROJECT MANAGEMENT/PROJECT COORDINATION SERVICE/ OVER-HEAD CHARGES (In percentage-------of C1+C2
above)
3 All kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other charges/overhead/Profit which shall include here: All
expenditure on providing technical/managerial/supervisory/administrative /labour services by all means to get the work through deployed MEP
O&M Work as mentioned in Techncial as well as O&M Gudielines.
Lumsum 1
TOTAL AMOUNT OF "C3" Rs.
TOTAL AMOUNT OF "C1+C2+C3" OF LIFT STREAM ( For 1 Year) Rs.
Lift -Operation and Maintenance works
3
Operation and Maintenance works-MEF Volume III -Price Bid -Part I Mahatma Mandir, Gandhinagar
Sr.
No. Description of Work Unit
Nos.
requie
rd
Estimated Rate
Per Employee
Per Month
Total Amount
For 12 months
D OPERATION & MAINTENACE OF GAS PIPING SYSTEM
1 Operation:Full time round the clock and year round, operation of Various Gas Piping Installation and all other items which are executed in the
premises at Mahatma Mandir including keeping log books and records of Gas Piping uptime, Hours of Operation, down time or failures on
various parameters and other functional requirement including liasioning with Gas Supplier and other statutory authorities. Agency should have
all kind of necessary meters, tools and tackles.
Note: Contractor to also ensure smooth operation on daily basis including switching ON, OFF, Gas Piping controls and all operational works as
required by facility management team as per the timing of the place. Contractor to also maintain charts of Gas Piping working and Parts
repairing on a regular basis and shall also ensure to have All the System is controlled & Gas Flow & Pressure to be maintained. This shall be
recorded regularly and proper record shall be maintained.
Maintenance: Maintenance of the system supplied, installed, Commissioned in the premises of Mahatma Mandir . This will include start up /
commissioning routine servicing, regular maintenance, preventive maintenance of equipments and components and break down repairs as and
when occurred, ensuring that system does not remain out of service for a period more than 8 hours in case of major breakdowns and one hour in
the case of minor breakdowns due to any unforeseen break down. The necessary spares required for satisfactory maintenance of the installation
and system will be supplied by INDEXTB at free of cost. Agency shall carry out a survey of the entire scope and submit list of spare
required to INDEXTB. So that necessary material will remain in store. Agency should have all kind of necessary meters, tools and tackles.
Note:- Maintenance team to ensure that routine maintenance on a regular basis is carried out so that all the Gas Piping & Accessories
are checked, maintained at regular intervals and smooth operation can take place. (Detailed Work as Shown in "Scope Of Work")
D1 MAN POWER CHARGES
1.1 Operator Cum Technician Nos. 1
TOTAL AMOUNT OF "D1" Rs.
D2 MACHINARY ,TOOLS,EQUIPMENTS & CONSUMABLES CHARGES
2 Charges for Providing, storing and maintaining machines, equipment, tools and tackles, small or big, consumables and another item(s) that may
be required for fulfillment/requirements of the contract (Attach separate Annexure D2 indication cost bifurcation of each
iteams/machinery/tools etc. in detail)
Lumsum 1
TOTALAMOUNT OF "D2" (For 1 Year)
D3 PROJECT MANAGEMENT/PROJECT COORDINATION SERVICE/ OVER-HEAD CHARGES (In percentage------ of D1+D2
above)
3 All kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other charges/overhead/Profit which shall include here: All
expenditure on providing technical/managerial/supervisory/administrative /labour services by all means to get the work through deployed MEP
O&M Work as mentioned in Techncial as well as O&M Gudielines.
Lumsum 1
TOTAL AMOUNT OF "D3" Rs.
TOTAL AMOUNT OF "D1+D2+D3" OF GAS PIPELINE STREAM ( For 1 Year) Rs.
Gas Piping Operation & Maintenance
4
Operation and Maintenance works-MEF Volume III -Price Bid -Part I Mahatma Mandir, Gandhinagar
Sr.
No. Description of Work Unit
Nos.
requie
rd
Estimated Rate
Per Employee
Per Month
Total Amount
For 12 months
E OPERATION & MAINTENACE: Audio, Video, Electronic Security System & IT Section
1 Operation: Full time round the clock and year round, operation of Audio, Video, Electronic Security System & IT Section System and
connected/related works which includes Audio Section: Sound Reinforcement System (SRS), Public Addressing System (PA), Emergency Talk
Back System (ETBS), Digital Infrared Interpretation System (SIS), Digital Wireless Audio Conference, Audio Conferencing System. Video
Section: Indoor LED Walls & LCD Screen displays, Digital Canvas-MicroTiles
Display, Video Distribution & Streaming System, Video Conferencing, AV Projection System. Electronic Security Section: CCTV Surveillance
System, Access Control System, Door Framed Metal Detector (DMFD), Baggage Scanners, Boom Barriers, System & Bollards Security, Under
Vehicle Scanning System (UVSS).Information Technology Section: Wi-Fi System, Data & Voice System, Building Management System
(BMS).
Maintenance: Maintenance of the system supplied, installed, Commissioned in the premises of Mahatma Mandir . This will include start up /
commissioning routine servicing, regular maintenance, preventive maintenance of equipments and components and break down repairs as and
when occurred, ensuring that system does not remain out of service for a period more than 8 hours in case of major breakdowns and one hour in
the case of minor breakdowns due to any unforeseen break down. The necessary spares and consumables required for satisfactory maintenance
of the installation and system will be supplied by INDEXTB at free of cost. Agency shall carry out a survey of the entire scope and submit list of
spare required to INDEXTB. So that necessary material will remain in store. Agency should have all kind of necessary meters, tools and tackles.
Note:- Maintenance team to ensure that routine maintenance on a regular basis is carried out so that all the Audio, Video, Electronic
Security System & IT Section System equipment are checked, maintained at regular intervals and smooth operation can take place.
(Detailed Work as Shown in "Scope Of Work")
E1 MAN POWER CHARGES
1.1 Sr.Engineer (Head of Dept) No 1
1.2 Asst. Engineers (Diploma)-Operation No 13
1.3 Technician (ITI Certificate)-Operation No 18
1.4 Asst. Engineers (Diploma)-Maintenance No 10
1.5 Technician (ITI Certificate)-Maintenance No 13
TOTAL AMOUNT OF "E1" Rs.
E2 MACHINARY ,TOOLS,EQUIPMENTS & CONSUMABLES CHARGES
2 Charges for Providing, storing and maintaining machines, equipment, tools and tackles, small or big, and another item(s) that may be required
for fulfillment/requirements of the contract (Attach separate Annexure E2 indication cost bifurcation of each iteams/machinery/tools etc. in
detail)
Lumsum 1
TOTAL AMOUNT OF "E2" (For 1 Year) Rs.
E3 PROJECT MANAGEMENT/PROJECT COORDINATION SERVICE/OVERHEAD CHARGES
(In percentage -------of E1+E2 above)
3 All kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other charges/overhead/Profit which shall include here: All
expenditure on providing technical/managerial/supervisory/administrative /labour services by all means to get the work through deployed MEP
O&M Work as mentioned in Techncial as well as O&M Gudielines.
Lumsum 1
TOTAL AMOUNT OF "E3" Rs.
TOTAL AMOUNT OF "E1+E2+E3" OFAudio, Video, Electronic Security System & IT Section STREAM ( For 1 Year) Rs.
Audio, Video, Electronic Security System & IT Section- Operation & Maintenance
5
Operation and Maintenance works-MEF Volume III -Price Bid -Part I Mahatma Mandir, Gandhinagar
Sr.
No. Description of Work Unit
Nos.
requie
rd
Estimated Rate
Per Employee
Per Month
Total Amount
For 12 months
F Scope-Role/responsibility as per Section 6 of Volume-II
F1 MAN POWER CHARGES
1 Project Manager/Operation Manager/Facility Manager No 1
TOTAL AMOUNT OF "F1" Rs.
E2 PROJECT MANAGEMENT/PROJECT COORDINATION SERVICE/OVERHEAD CHARGES
(In percentage -------of F1 above)
2 All kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other charges/overhead/Profit which shall include here: All
expenditure on providing technical/managerial/supervisory/administrative /labour services by all means to get the work through deployed MEP
O&M Work as mentioned in Techncial as well as O&M Gudielines.
Lumsum 1
TOTAL AMOUNT OF "F2" Rs.
TOTAL AMOUNT OF "F1+F2" OF Section F ( For 1 Year) Rs.
Gross Total Amount of all sections Part I- (A+B+C+D+E+F) (For 1 Year) Rs.
1
2
3
4
5
6
7
8
9
10
The manpower charges should be towards wages only to manpower including all allowances, statutory levies like ESI & EPF Employer shares, but excluding only service tax which shall be reimbursed on
actual, as per govt. rules, on production of documentary evidence.
The rates shall be quoted for this section shall inclusive of cost of Manpower, overhead, statutory expenses, taxes and profit. The amount put here is including Sundays, holidays, festival days, rainy days.
The tenderer should quote manpower charges in financial bid strictly in accordance with the minimum wages as decided by the Central Govt. /GoG If the rates quoted found below the minimum wages,
tender will be rejected.
Actual work done shall be reviewed and noted for making Monthly/Quaterly agreed payments as per Relavnt Payment Clauses.
If the total amount of bid quoted is less than actual summation of cost of all the components/parts as the case may be, then the total quoted amount shall govern and difference between actual summation and
amount quoted shall be considered as a discount.
If total amount of bid is more than actual summation of cost of all components/parts as the case may be,then the individual cost of the components/parts shall govern and total amount shall be reduced to
actual summation and it shall be considered as mistake in totaling.
Where there is discrepancy between the rates in figures and in words, whichever is less shall govern.
All duties, custom duties, taxes (including all Central excise tax, Central Govt. & all state Govt. taxes, PF, EPF to employees if any.) and other levies payable by the agency or for any other cause as on the
date for submission of bids shall be included in the Rates and Prices submitted by the bidder. No any other taxes shall be paid separately. Only Service Tax which shall be reimbursed on actual, as per govt.
rules, on production of documentary evidence.
After completion of 12 months/ a year of contract period, an escalation of 5% on total cost of previous year would be made in the charges for works. The bidders intend this agreement to be a binding
contract. No other rate escalation in any charges will be made to the successful bidder for difference of minimum wages/charges. Decision of iNDEXTb stands final on this matter
Any ambiguity found in Price bid shall be brought to the notice in writing during pre-bid meeting.
Notes & Remarks :-
6
Operation and Maintenance of MEF works Price Bid_Part II Mahatma Mandir, Gandhinagar
Sr.
No. Description of Work Unit Nos.
Estimated Rate Per
Employee Per Day
Electrical O&M- FOR EVENT DAYS
A OPERATION & MAINTENACE OF ELECTRICAL SYSTEM- (Extra Man Power rates)
1 Item Description will be same as per Regular Days BOQ. (Detailed Work as Shown in "Scope Of Work")
Additional Men Power will be required in day & night shift during Event days. Amount will be paid extra as per actual
men power provided on event days ( if required additional by client). This is in addition to normal men power as
mentioned in staff requirements ( Part I ).
The Cost shall be inclusive of all kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other
charges/overhead/Profit. All expenditure on providing Technical/managerial/supervisory/administrative/labour services
by all means to get the work through deployed MEP O&M Work as mentioned in Techncial as well as O&M Gudielines.
1.1 Extra Project Engineer for Event Man Day 1
1.2 Extra Electricians for Event Man Day 1
Fire Fighting O&M - FOR EVENT DAYS
B OPERATION & MAINTENACE OF FIRE FIGHTING SYSTEM- (Extra Man Power rates)
2 Item Description will be same as per Regular Days BOQ. (Detailed Work as Shown in "Scope Of Work")
Additional Men Power will be required in day & night shift during Event days. Amount will be paid extra as per actual
men power provided on event days ( if required additional by client). This is in addition to normal men power as
mentioned in staff requirements ( Part I ).
The Cost shall be inclusive of all kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other
charges/overhead/Profit. All expenditure on providing Technical/managerial/supervisory/administrative/labour services
by all means to get the work through deployed MEP O&M Work as mentioned in Techncial as well as O&M Gudielines.
2.1 Extra Operator Cum Technician for Event Man Day 1
2.2 Extra Project Engineer for Event Man Day 1
2.3 Extra Technician for Event Man Day 1
PART II
Electrical O&M FOR EVENT DAYS
iNDEXTb CEPT-CRDC 1
Operation and Maintenance of MEF works Price Bid_Part II Mahatma Mandir, Gandhinagar
Lift Operator FOR EVENT DAYS
C OPERATION OF LIFT- (Extra Man Power rates)
3 Item Description will be same as per Regular Days BOQ. (Detailed Work as Shown in "Scope Of Work")
Additional Men Power will be required in day & night shift during Event days. Amount will be paid extra as per actual
men power provided on event days ( if required additional by client). This is in addition to normal men power as
mentioned in staff requirements ( Part I ).
The Cost shall be inclusive of all kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other
charges/overhead/Profit. All expenditure on providing Technical/managerial/supervisory/administrative/labour services
by all means to get the work through deployed MEP O&M Work as mentioned in Techncial as well as O&M Gudielines.
3.1 Extra Operator Person for Event Man Day 1
Gas Pipeline O&M- FOR EVENT DAYS
D OPERATION & MAINTENACE OF GAS PIPELINE- (Extra Man Power rates)
4 Item Description will be same as per Regular Days BOQ. (Detailed Work as Shown in "Scope Of Work")
Additional Men Power will be required in day & night shift during Event days. Amount will be paid extra as per actual
men power provided on event days ( if required additional by client). This is in addition to normal men power as
mentioned in staff requirements ( Part I ).
The Cost shall be inclusive of all kind of Taxes/Service charges/Project Managenent fee/Poject coordination/ other
charges/overhead/Profit. All expenditure on providing Technical/managerial/supervisory/administrative/labour services
by all means to get the work through deployed MEP O&M Work as mentioned in Techncial as well as O&M Gudielines.
4.1 Extra Operator and Maintenance Person Cum Technician for Event Man Day 1
1
2
3
Notes and Remarks :-
The manpower charges should be towards wages only to manpower including all allowances, statutory levies like ESI & EPF Employer shares, but excluding only
service tax which shall be reimbursed on actual, as per govt. rules, on production of documentary evidence.
The rates shall be quoted for this section shall inclusive of cost of Manpower, overhead, statutory expenses, taxes and profit. The amount put here is including
Sundays, holidays, festival days, rainy days.
The tenderer should quote manpower charges in financial bid strictly in accordance with the minimum wages as decided by the Central Govt. /GoG If the rates
quoted found below the minimum wages, tender will be rejected.
iNDEXTb CEPT-CRDC 2
Operation and Maintenance of MEF works Price Bid_Part II Mahatma Mandir, Gandhinagar
4
5
6
7
8
9
Actual work done shall be reviewed and noted for making Monthly/Quaterly agreed payments as per Relavnt Payment Clauses.
Any ambiguity found in Price bid shall be brought to the notice in writing during pre-bid meeting.
If the total amount of bid quoted is less than actual summation of cost of all the components/parts as the case may be, then the total quoted amount shall govern and
difference between actual summation and amount quoted shall be considered as a discount.
If total amount of bid is more than actual summation of cost of all components/parts as the case may be,then the individual cost of the components/parts shall govern
and total amount shall be reduced to actual summation and it shall be considered as mistake in totaling.
Where there is discrepancy between the rates in figures and in words, whichever is less shall govern.
All duties, custom duties, taxes (including all Central excise tax, Central Govt. & all state Govt. taxes, PF, EPF to employees if any.) and other levies payable by the
agency or for any other cause as on the date for submission of bids shall be included in the Rates and Prices submitted by the bidder. No any other taxes shall be
paid separately. Only Service Tax which shall be reimbursed on actual, as per govt. rules, on production of documentary evidence.
iNDEXTb CEPT-CRDC 3