TECHNI CAL REP ORT RAL RESOURCE ESTIMATE
Transcript of TECHNI CAL REP ORT RAL RESOURCE ESTIMATE
V
MRB & Ass1100-1740 Val-d’Or, Qc
sociates chemin Sulc, J9P 7H1
MINE
Ea
livan
TECHNI
ERAL RES
ast CadillVal-d’NTS 32
Pre
Chalice G
ICAL REP&
SOURCE E
lac Gold P’Or, Québ-C/03, 31N
epared for:
old Mines Li
Febru
PORT
ESTIMAT
Project,bec N/14
imited
uary 12, 201
TE:
JohAbderr
17 (amende
hn Langton razak Ladided March 12
P.Geo. i P.Geo.
2, 2019)
44444444
1.0 SUMMA1.1 INTRO1.2 PROPE1.3 GEOLO1.4 RESOU1.5 CONCL1.6 RECOM2.0 INTRO2.1 SOURC2.2 SITE V2.3 UNITS3.0 RELIAN4.0 PROPE4.1 LOCAT4.2 MINER4.3 ROYAL4.4 ENVIR4.5 PERMI4.6 OTHER4.7 PROPE5.0 ACCES6.0 HISTO6.1 THE NPERSHING-D
6.1.1 6.1.1.6.1.1.
6.1.2 6.1.2.6.1.2.
6.1.3 6.2 THE C
6.2.1 6.2.2
7.0 GEOLO7.1 REGIO7.2 LOCAL7.3 PROPE7.4 GEOLO7.5 MINER8.0 DEPOS9.0 EXPLO10.0 DRILLI11.0 SAMPL12.0 DATA V13.0 MINER14.0 MINER14.1 INTRO14.2 DRILL14.3 ASSAY14.4 GEOLO14.5 MINER14.6 ASSAY14.7 VARIO14.8 BLOCK14.9 BLOCK14.10 SPECI14.11 DILUT14.12 METAL
ARY ............ODUCTION ...ERTY DESCRIOGY AND MINURCE ESTIMALUSIONS .....MMENDATIONDUCTION ANCES OF INFOVISIT ..........S OF REFERENNCE ON OTHEERTY DESCRIPTION ...........RAL CLAIM TELTIES AND RERONMENTAL LITS .............R RELEVANT ERTY SUMMASSIBILITY, LORY .............ORDEAU PRO
DENAIN BLOCNordeau Eas1 Historic 2 Recent wBateman cla1 Historic 2 Recent wPershing-DeHIMO PROJELac Simon &Villebon claim
OGICAL SETTIONAL GEOLOGL GEOLOGY ..ERTY GEOLOGOGY OF NORDRALIZATION .SIT TYPES ....RATION ......ING ............LE PREPARATIVERIFICATIO
RAL PROCESSRAL RESOURCODUCTION ...-HOLE DATA Y GEOSTATISOGY & MINERRALIZED ZONY COMPOSITEOGRAPHY .....K MODELLINGK MODEL VALFIC GRAVITY
TION & RECOVLLURGICAL C
..................
..................PTION AND O
NERALIZATIOATE ...............................NS ..............ND TERMS OFORMATION ....
..................NCE .............ER EXPERTS .PTION AND L..................ENURE AND DELATED INFOLIABILITIES ....................FACTORS .....RY ..............
OCAL RESOUR..................
OJECT CLAIM CKS) ............st and Nordeawork ..........work ...........
aim block ......work ..........work ...........nain claim blCT CLAIMS (
& Nova claim m block .......ING ............GY ................................GY ...............DEAU WEST D........................................................................ION, ANALYSN ................
SING AND MECE & MINERA..................VALIDATION
STICS ..........RALIZED ZONNE ASSAYS & E GRADE X TH..................G & GRADE ELIDATION .....Y & VOLUMETVERY ...........
CONSIDERATI
TABLE ....................................OWNERSHIP .ON ....................................................................F REFERENCE........................................................................LOCATION ......................DISPOSITIONORMATION ...........................................................................RCES, INFRAS..................BLOCKS (NO
..................au West claim..........................................................................................ock ............LAC SIMON, blocks ..................................................................................................DEPOSIT .............................................................................ES AND SEC..................TALLURGICAL RESERVE E..................
N ...................................
NE INTERPRETCOMPOSITIN
HICKNESS CO..................STIMATION P..................
TRICS ............................IONS ...........
East Cadil
OF CONTE.......................................................................................................................
E .......................................................................................................................
N .....................................................................................................
STRUCTURE A.................
ORDEAU EAST.................
m blocks ............................................................................................................NOVA AND V...........................................................................................................................................................................................URITY ..........................
AL TESTING ..ESTIMATES .....................................................TATION & MONG .............ONTOURING .................PARAMETERS....................................................................
llac Gold Proj
NTS ....................................................................................................................................................................................................................................................................................................................................................AND PHYSIOG.................T, NORDEAU........................................................................................................................................
VILLEBON BLO..................................................................................................................................................................................................................................................................................................................ODELLING ......................................................
S ....................................................................................
ject – 2017 T
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................GRAPHY ........................ WEST, BATE................................................................................................................................................OCKS) ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Technical Rep
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................EMAN AND ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
port 2
......... 5
......... 5
......... 5
......... 5
......... 6
......... 6
......... 6
......... 8
......... 8
......... 8
......... 9
........ 12
........ 13
........ 13
........ 13
........ 16
........ 16
........ 16
........ 17
........ 17
........ 18
........ 19
........ 19
........ 19
........ 19
........ 24
........ 30
........ 30
........ 31
........ 33
........ 34
........ 34
........ 37
........ 38
........ 38
........ 40
........ 41
........ 44
........ 44
........ 49
........ 50
........ 50
........ 51
........ 52
........ 53
........ 54
........ 55
........ 55
........ 58
........ 62
........ 67
........ 71
........ 72
........ 75
........ 79
........ 79
........ 79
........ 80
w
14.13 ENVIR14.14 CUT-O14.15 RESOU14.16 SUMM14.17 CONCL15.0 ADJAC16.0 OTHER17.0 INTERP17.1 RISKS18.0 RECOM19.0 REFERCERTIFICATE
LIST OF FIG
Figure 2.1 SiFigure 2.2 ReFigure 4.1 BaFigure 4.2 Eaexploration cFigure 6.1 Eawork ...........Figure 6.2 BeFigure 6.3 BeFigure 7.1 ReFigure 7.2 SiFigure 7.3 GeFigure 7.4 SiFigure 14.1 PFigure 14.2 LFigure 14.3 HFigure 14.4 3Figure 14.5 3Figure 14.6 EFigure 14.7 HFigure 14.8 LFigure 14.9 EFigure 14.10 Figure 14.11 Figure 14.12 Figure 14.13 Figure 14.14 Figure 14.15 Figure 14.16 Figure 14.17 Figure 14.18 Figure 14.19 Figure 15.1 F
RONMENTAL COFF GRADE ..URCE ESTIMAARY OF CATELUSIONS .....ENT PROPER
R RELEVANT DPRETATION A
S AND UNCERMMENDATIONENCES ........
E OF QUALIFI
GURES
mplified geolegional base ase-map of East Cadillac Gcompanies ...ast Cadillac G.................
est results (hest results (hegional geolomplified geoleology undermplified strat
Plan map of foLog-normal pHistogram plo3D isometric 3D isometric E-W longitudiHistogram ploLog-normal pE-W longitudiLinear down3D omni-dir3D direction3D direction3D E-W longGold price (UE-W section South-facingSouth-facingSouth-facing
Former Chimo
CONSIDERAT..................ATE .............EGORIZED RE..................
RTIES ...........DATA AND INAND CONCLURTAINTIES ....NS .................................CATION .......
logical map omap showingast Cadillac G
Gold Property ..................
Gold Property ..................ighlighted) frighlighted) fr
ogy map of Ablogical map orlying the Eastigraphic coluormer Nordea
probability ploot – all assaytop/down-dipN-S cross seinal section vot – mineralizprobability ploinal section v
n-hole semi-vectional semal semi-varioal semi-vario
gitudinal sectUS$/oz Au) –view looking
g longitudinag longitudinag longitudinao Gold Mine (
TIONS ..............................................ESOURCES .......................................
NFORMATIONSIONS ................................................................................
of Abitibi Greeg location of tGold Propertyshowing form
..................showing dist
..................rom 1988 drirom 1988 dribitibi Greenstof southeastest Cadillac Proumn for the aau West propot – all Au assy sample interp view – geolction view –
view – geologzed zone samot – mineralizview – compovariogram – 1i-variogram –ogram – 1.5 mogram – 1.5 mion view – m
– 6 month, dag south showil section – ml section – pol section – m(July 2006) ..
East Cadil
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
enstone Belt the East Cady showing clamerly distinct.................tribution of in.................lling by Monilling by Monitone Belt shorn part of Aboperty .........area of the Eaperty limits &says (uncut) rval lengths .logy solids & geology solidy solids & su
mple interval zed zone 1.5osite grade x 1.5 m compos– 1.5 m compm compositesm composites
mineralized zoaily, and 30-ding indicated ineralized zo
oints used to ineralized zo.................
llac Gold Proj
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
in Quebec ...illac Gold Pro
aim groups stt claim group.................nformal claim.................cor (GM4843cor (GM4850
owing locationbitibi Greensto.................ast Cadillac G
& drill-holes u..................................surfaces mo
ds & surfacesurfaces modelengths .......m compositethickness consites (Au cut)posites (Au cs (Au cut) Azs (Au cut) Az
one block modday moving aresource blo
one block modestimate blo
one block mod.................
ject – 2017 T
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................operty ..........taked and oppings owned ..................
m blocks from..................30) ..............07) ..............n of East Cadone belt ........................Gold Propertysed to calcul....................................del .............
s model ........l ...................................es (Au cut) ...ntouring ......) ................cut) .............z 090º Dip -3z 270º Dip -6del ..............averages ......ocks & drill-hodel ..............ock grades ....del ................................
Technical Rep
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................tioned by Chby various ..................
m previous exp......................................................dillac Gold Pro....................................y .................ate the MRE....................................................................................................................................................................................30º .............60º .................................................ole intersecti........................................................................
port 3
........ 80
........ 80
........ 82
........ 86
........ 87
........ 90
........ 91
........ 92
........ 93
........ 94
........ 96
...... 104
.......... 10
.......... 11 alice ... 14
.......... 15 ploration .......... 20 .......... 22 .......... 23 operty .. 39 .......... 42 .......... 43 .......... 45 .......... 57 .......... 59 .......... 61 .......... 64 .......... 65 .......... 66 .......... 68 .......... 70 .......... 71 .......... 72 .......... 73 .......... 74 .......... 74 .......... 76 .......... 80 ons ..... 84 .......... 86 .......... 87 .......... 88 .......... 90
T
TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
TT
T
A
LIST OF TAB
Table 1.1: SuDecember 31Table 1.2: PrTable 4.1: ClTable 6.1: NoTable 6.2: NoTable 6.3: SuTable 6.4: SuTable 6.5: MTable 6.6: SuTable 6.7: SeTable 6.8: SuTable 6.9: SuTable 6.10: BTable 6.11: STable 6.12: STable 6.13: STable 6.14: STable 6.15: BTable 14.1: STable 14.2: UTable 14.3: UTable 14.4: UTable 14.5 UTable 14.6: UTable 14.7: UTable 14.8: MTable 14.9: UTable 14.10:Table 14.11:Table 14.12 CTable 14.13 ITable 14.14 December 31Table 14.15 STable 17.1 SCadillac GoldTable 18.1 Pr
LIST OF AP
APPENDIX I -
BLES
ummary of M1st, 2016 ...reliminary Buaim informatordeau West ordeau West ummary of 20ummary of 20ineral Resourummary of 20elected Best Rummary of 20ummary of 20Best results oSelected BestSummary of 2Summary of 2Summary of SBest Results FSummary of Univariate HisUnivariate HisUnivariate Hisnivariate HistUnivariate HisUnivariate HisMineralized ZUnivariate His Interpolation Bank of CanCut-off GradeIndicated ResEstimates of 1st, 2016) ...Summary of ummary of c
d Property ....reliminary Bu
PPENDICES
- List of Claim
Mineral Resou..................dget for Recotion for GlobeHistorical “RHistorical “R
006-2007 No008 Nordeau rce Estimate 009 Drill-HoleResults of 20010 Drill-Hole011 Nordeau of Globex Re-t Results From2009 Drill-Ho2011 Drill-HoSelected 201From 1983 LoDDH's in Norstogram Statstogram Statstogram Stattogram Statisstogram Statstogram Stat
Zone Composstogram Statn Parameters
nada Monthly e Calculationssources at InAdditional In..................Categorized ategorized re..................
udget for Rec
S
ms
rce Estimate ..................ommended Wex Mining’s Beserves” Estieserves” Esti
ordeau ProjecWest Drilling- Nordeau Wes: Nordeau 09 Diamond-es: Nordeau East Drill-Hosampling Pro
m 1988 and 1oles: Batemanoles on the Ba1 Best Drillinouvem Drillinrdeau West Dtistics – All Autistics – "Histtistics – "Recestics – All Asstistics – Minetistics – Mineites ............tistics – Mines .................Average US$s - Nordeau Wcremental Cu
nferred Resou..................Resources at
esources at 2..................ommended W
East Cadil
- East Cadilla.................
Work on East ateman and mate from Tmate from Jet Drilling Camg Campaign (
West (from LanEast Claim B-Drill Hole CaEast Propertyoles ............ogramme .....1990 Bateman Claim Blockateman claimng Results: Bang, Simon WeDatabase ......u Assays (unoric" Au Assaent" Au Assaysay Sample Iralized Zoneralized Zone.................ralized Zone.................$ Currency ExWest Resourcut-off Gradesurces at Vario.................
t 2.75 gpt Au.75gpt Au cu.................
Work on East
llac Gold Proj
ac Gold Prop.................Cadillac GoldNordeau prop
Tremblay (199ean (1990; Gmpaign (Plato(Plato Gold) .ngton and Holock ...........
ampaign-Nordy .................................................
an Drilling Prok ................
m block ........ateman East est Occurrenc.................cut) ...........ays (uncut) ..ys (uncut) ...Interval LengAu Assays (uSample Leng.................1.5 m Comp.................xchange Ratece ..............s ................ous Cut-off G.................
u Cut-off Gradut-off grade: .................
t Cadillac Gold
ject – 2017 T
erty, having ..................d Project ......perties .......90) .............GM49867) ....o Gold) ..........................orvath, 2009..................deau East ..........................................................ograms ............................................Property .....
ce .......................................................................................
gths .............uncut) .........gths ..............................osites (Au cu..................es ...................................................rades (with e..................de ...............Nordeau Wes..................d Project .....
Technical Rep
an effective ..............................................................................................................................) ....................................................................................................................................................................................................................................................................................................................................................ut) ......................................................................................effective date....................................st Project - E....................................
port 4
date of ........... 6 ........... 7 .......... 15 .......... 21 .......... 24 .......... 26 .......... 26 .......... 27 .......... 27 .......... 28 .......... 28 .......... 29 .......... 30 .......... 31 .......... 32 .......... 32 .......... 33 .......... 35 .......... 56 .......... 58 .......... 60 .......... 60 .......... 61 .......... 67 .......... 67 .......... 69 .......... 69 .......... 79 .......... 81 .......... 81 .......... 83
e of .......... 85 .......... 86
East .......... 93 .......... 95
T
t
Aw
T
“
t
T
T
1.0 SUMMA
1.1 IntrodChalice GoldMines (QueExchange (A
This Report(the “Authode la Fauneare Qualifierecommendexploration the mineral
1.2 ProperOn OctobeAnnouncemwith GlobexProject, cona 60% intebinding optRichmont MProject claim
To further hectares, inNovember o
Chalice’s co“Property” oof VauqueliCity of Val-dthe Larder historic and
1.3 GeologThe Propertgreywacke, mineralizatisemi-massiviron formati
The immedisince the m(now closeduntil its clooccurrences
ARY
uction d Mines Limbec) Inc., isASX: CHN)
t was prepaors”), of MRe du Quebeced Persons ded explorat
companies potential o
rty Descriper 12th, 2
ments for Chx Mining Entnsisting of 3erest. On Notion to acquMines Inc. (“ms, cover 2
consolidaten the immedof 2016.
onsolidated or the “Projen, Villebon, d’Or, and coLake-Cadil
d active gold
gy and Minty is within
iron formaon on the ve sulphideions, or in s
iate vicinity mid-1940’s wd), which oposure in lates, several w
mited (“Chalis a publicly tand Toronto
red by JohnRB & Associac standards according totion programcurrently o
f the Proper
ption and O016, Chalihalice pressterprises Inc37 claims owovember 23uire a 70% Richmont”),593 hectar
e its land diate vicinit
land holdinect”), are inPershing a
omprise a slac fault zo
d mines.
eralizationthe Abitibi G
ation and mProperty is
es, typicallysheared and
of the East when gold-bperated for e 1996. Theith historic
ce” or, the “traded junioo Stock Exch
n Langton (ates, in accof disclosuro National mme is approperating inrty.
Ownershipce announ
s announcemc. (“Globex”wned 100%3rd, 2016, C
interest in . The Chimores.
position Chty of the No
ngs, herein n western Qnd Denain tignificant coone, a prol
n Greenstone
mafic volcanfound asso within sed altered ma
Cadillac Goearing lensenearly 15 ye East Cadresources.
East Ca
“Company”)or mining cohange (TSX
M.Sc., P.Gecordance witre for minerInstrument ropriate, con the area, a
nced (*seements), tha”) to acquire by Globex
Chalice furth73 claims
o Gold claim
halice stakeordeau and
referred touebec (NTStownships, sontiguous laific regiona
Belt, overlynic rocks aloociated withdimentary rofic volcanic
old Propertyes were fou
years and prillac Gold P
dillac Gold Pr
), the parenompany listeX: CXN).
eo.) and Vinth Ministèreral projects.43-101, an
nsistent witand necessa
e www.chat it had sig
e its interestand 17 cla
her announccomprising
ms, which ar
ed 23 addiChimo proj
o as the EaS Map 32C/0some 50 kiland positional structura
ying a highlong nearly
h quartz veiocks in closrocks.
y has been tnd near theroduced in eProperty hos
roject – 2017
nt company ed on the A
ncent Jourdae des Resso. Misters Land are of thth those of oary in order
licegold.comgned a bindt in the 1,45ims in whicced that it the Chimo
re contiguou
tional claimject claims,
ast Cadillac03 and 31N/lometres ea along the el break tha
ly sheared s15 kilometns containise associat
the focus of e present daexcess of 34sts numero
7 Technical R
to Chalice Gustralian St
ain (Ph.D., ources natungton and Jhe opinion tother junior r to help de
m /Investoding letter o54 hectare Nh Globex mhad entere
o Gold Projeus with the N
ms, totalling, in Septem
c Gold Proje/14), coveriast-southeaseasternmostat hosts nu
sequence oftres of strikng disseminion with m
explorationay Chimo Go49,000 goldus catalogu
eport 5
Gold tock
P.Eng.), relles et Jourdain that the mineral
etermine
or /ASX of intent Nordeau
maintains d into a ect from Nordeau
g 1,325 mber and
ect (the ng parts st of the t part of umerous
f altered ke. Gold nated to agnetite
n activity old Mine d ounces ued gold
T
T
w
T
T
t
“
f
w
1.4 ResourThe NordeaResource, t
The 2017 Mdrill-holes. (Gemcom) m x 2.5 m calculationswas selecte
Table 1.1:
Resource
Measured Indicated
Measured + Inferred
Total Inferre
1.5 Conclu
The East anastomosithe host srelatively unrenowned L“break” thanumerous szones and Property areprinciple pacovers apprmineral resoccurrencesfor addition
1.6 Recom
Future expshould incluwhich weresuccess of geological mdrilling.
rce Estimaau West dephe only curr
Mineral ResoGold gradesblock modex 5.0 m. A
s. An assumd for cut-of
: Summary
e (Category)
Indicated
d
usions
Cadillac Gng high-str
sedimentaryndeformed Larder Lake-at defines tsyn-deformathe secondae of primaryassage waysroximately source, the s. The authoal gold reso
mmendation
loration woude diamone largely de
which weremodelling, g
te posit, 1,500rent resourc
ource Estimas were deteel with X-Y-Zcut-off grad
med gold prif grade calc
y of Mineraan effe
Main B Total
Total Main B
Total
Gold Projectain zones ( and maficrock. This “-Cadillac Brethe Pontiacational, epigary fracturiny importancs for sulphid15 km of pChimo Gold
ors concludeources.
ns
rk on the nd-drilling feveloped froe attributedgrade contou
0 m east ofce on the Ea
ate of Nordermined usinZ (i.e., eastde of 2.75 gce of US$1
culations.
al Resourceective date
Zone
t overlies (“shear-zonec volcanic corridor” is eak (Cadillac-Abitibi subgenetic quang and brecce to minerade- and golrospective gd Mine (cloe that the E
East Cadillafocused on om the sucd to the reuring and ex
East Cadil
f the closedast Cadillac
eau West, sng an inverst-west, nortgpt Au ($14250/oz at a
e Estimate of Decemb
No M
a tectonoes”), ranginrock into interpreted c Tectonic Zbprovince b
artz-vein/discciation thaalization, as d-bearing sground alonosed), and East Cadillac
ac Gold Profurther delcess of rec-analysis oxperimental
llac Gold Proj
d Chimo MinGold Projec
ummarized se distancedh-south, ve
45/tonne proan exchange
- East Cadber 31st, 20
Tonnes
Measured Res223,
1,225,
225,1,097,
14,
1,112,
ostratigraphing in thicknhectometric to represenZone) - a 30boundary insseminated at have affe
they are insolutions. Thng this corrnumerous cc Gold Prop
operty is wlineating thcent drilling f historic dl block mod
ject – 2017 T
ne, hosts a ct.
in Table 1d-squared aertical) blockoduction coe rate of $C
dillac Gold P016
s Au G
(gp
sources 382960342
342749572
321
ic corridor ness and inc to kiloment the easte00 km long,n the regiogold-ore sy
ected the ronterpreted tohe East Cadidor, which catalogued erty merits
arranted. Te resource campaigns
drilling datadelling for ta
Technical Rep
NI 43-101
.1, is basedlgorithm intk dimensionst) was useCAD 1.31/$
Property, h
rade pt)
In-S
4.18 3.07 4.17
4.17 4.1
3.59
4.09
characteritensity, thaetric “lozenern extensio first-order
on, and is ystems. Theocks underlyo have actedillac Gold Phosts a NIgold-minerafurther exp
The work pat Nordea
s (2006-201 using mod
argeting exp
port 6
Mineral
d on 121 to a 3-D ns of 5.0 ed in the US 1.00
having
Situ Au (oz)
30,019193
30,212
30,212144,635
1,680
146,315
ized by at divide nges” of on of the tectonic host to
e shear-ying the d as the Property 43-101 alization ploration
rograms u West, 11), the dern 3D ploration
T
t
T
AfT
A
A
The tectonoand has beethe sequencproperty thGrass corrid
The authorsuccessfullyhost historic
A resource-for the NordThe study smineralizati
It is recommPhase 1 surfa airbo data
relev LiDA surfa diam
Contingent Phase 2 diam
A prelimina
Table 1.
Surface samAirborne AEData compiLiDAR surveySurface striDrilling to eContingency
Drilling of taContingency
ostratigraphen intersectce below 25e sequencedor, but not
rs recommy applied atc resources,
database ofdeau West bshould provion along ind
mended tha
ace mappingorne EM sur integrationvant historicAR survey foace stripping
mond-drilling
on positive
mond-drilling
ry budget fo
2: Prelimin
mpling - rocEM survey lation and iny pping, map
expand existy 15%
argets geney 15%
ic sequenceted by nume50 depth. Te is similarly
rigorously.
end that tt Nordeau W, and/or kno
f the historiblock, is recide for an adicated tren
t future exp
g accompanrvey; n including cal data, andor 3D modelg, mapping g down-dip o
Phase I res
g on a range
or the recom
nary Budge
Phase 1
k, soil, core
ntegration,
ping and sating mineral
Phase 2
erated by Ph
e that hostserous histor
To the west,y recognized
the same West be apown concen
c geologicalcommended aggressive dnds identifie
ploration by
nied by rock
verifying d generatinging surface and sampliof known m
sults, the Ph
e of targets
mmended w
et for Reco
1
and spectr
generation
mpling on pized zones
Sub
2
hase 1 work
Sub
East Cadil
s the Norderic and recen, beyond thd and has b
explorationplied to thetrated gold
l and drillingfor the rem
drilling progd from this
Chalice sho
, soil, core a
and merging a 3D modcontrol; ng on priori
mineralized o
hase II explo
generated
ork is summ
ommended
al sampling
of 3D mode
priority targ
btotal Phas
btotal PhasOverall T
llac Gold Proj
au West rent drill-holee limits of Cbeen tested
n strategiese other occmineralizat
g data, simimainder of thramme to tand previou
ould include
and spectra
ng existing del of the co
ty targets;occurrences
oration prog
by Phase 1
marized in T
d Work on EDril
(met
el
ets
1,6
se 1
Dril(met
4,0
se 2
otal
ject – 2017 T
sources cones, but few hCartier Reso along the
s and techurrences ontion.
ilar to that whe East Cadtest deeper us studies.
the followin
al analyses;
drill hole onsolidated p
.
gram should
studies and
Table 1.2.
East Cadillaling tres)
Cosme
600 $2
ling tres)
Cosme
000 $2
Technical Rep
ntinues to tholes have tources’ ChimSimon Wes
hniques than the Prope
which was cdillac Gold Pparts of the
ng work:
databases,property;
d comprise:
d exploration
ac Gold Prost / etre Bu
$
$250 $4
$$1,0
st / etre Bu
250 $1,$
$1,1 $2,1
port 7
he east, targeted mo Mine st - Blue
at were erty that
compiled Property. e known
adding
n work;
oject
udget
200,000$85,000$50,000$50,000100,000400,000132,750
017,750
udget
000,000150,000
150,000167,750
T
2 TT
t
T
TT
a
T
T
J
t
Tt
2.0 INTRO
This TechniLangton anPatrick LengCadillac GoMunicipality2.1).
The purposThe Authorstandards opolicy. Chalthe AustralCanadian co
In October author a NaThis mandaGold Projec
The purposTechnical REstimate (Mexploration.
It is underspublic disclSEDAR* (wand Retriev
2.1 Source
The bulk of line SIGEOof the Minismade use Geological Sprincipal mReferences
This ReportLangton and
2.2 Site Vi
John LangtoNovember 1located histto pick-up tallow accessThe area of that were se
ODUCTION
cal Report ond Aberrazagvel, Explorold Project y of Val-d’O
e of this rers’ review aof the Canaice is a pubian Stock Eorporate off
of 2016, thational Instrate was expt holdings (
se of this dReport on thMRE) on the.
stood that tosure of th
www.sedar.cval: the princ
es of Inform
the historicOM databasestère des Reof publicly
Survey of Cmaterial revi
section of t
t draws hed Horvath (
sit
on, conducte13th of 2016toric drill-cotrucks, thans to their huthe Propert
een corresp
AND TERM
on the East k Ladidi (th
ration Managis located
Or, in the ge
eport is to sand preparaadian Securblic companyExchange (ices located
he Companyrument 43-1panded in NFigure 2.2
document ishe East Cade Nordeau W
his Technicae mineral rom), as reqcipal filing s
mation
cal geologice (http://sessources ny available Canada, scieewed and his docume
eavily from 2009; GM64
ed site visits6. During thellars and chks in part tounting sites.ty is mainly
ponded to th
MS OF REFE
Cadillac Gohe “Authorsger (Canadain western eological se
support the ation of thrities Adminy headquartASX) and “
d at: 1 Yonge
y retained 101 (NI 43-November 2). The effec
s to provideillac Gold PWest gold d
al Report (tresource unquired by Nsystem of th
al informatiigeom.mine
naturelles etAssessmen
entific papeused in thnt.
previous r4504) and B
s to the Easese forays, ecked for beo the local h. Most of thecovered by
he mapped g
East Cadil
ERENCE
old Project (s”) of MRB a) of ChaliceQuebec, C
etting known
public disclis report wnistrators’ Ntered in Aus“CXN” on te Street, Su
MRB, a Val101) Techni2016 to incltive date of
e Chalice’s roject that
deposit, and
the “Report”nderlying thI 43-101. *
he Canadian
ion sourced es.gouv.qc.ct de la Faunnt Reports,rs from vare preparati
reports by Bourgoin an
st Cadillac GMr. Langtonedrock expohunters whoe secondary
y glacio-fluvgeological u
llac Gold Proj
(the “Prope& Associat
e Gold MineCanada, somn as the Ab
losure of gowere carriedNational Insstralia tradinthe Torontouite 1801, To
-d’Or-basedical Report olude all of f this Report
Board of Dwill include
d to provide
”) will be ushe East Cad*System forn Securities
for this Reca/signet/clane du Queb on-line rerious earth ion of this
Kramo andd Castongu
Gold Project n checked thosures. The o have cleary trails are aial depositsnits.
ject – 2017 T
rty”) was cotes (“MRB”)es Limited (“me 50 kilombitibi Green
old resourced out in costrument 43ng under th
o Stock ExcToronto, Ont
d geologicalon the Nordthe consolidt is Decemb
Directors wie an updatee recommen
sed to suppdillac Gold Pr Electronic Commission
port was diasses/I1102ec (MRNFQesources, pscience Joudocument
d Langton ay (2007; G
on Octoberhe access tomain acces
red the trailsalso readily ; however,
Technical Rep
o-authored ) at the req“Chalice”). Tmetres eaststone Belt
es on the Pompliance w3-101 (NI
he symbol “Cchange (TSXario.
l consultingdeau Projectdated East
ber 31, 2016
ith an indeed Mineral Rndations for
port the subProject by fDocument A
n.
stilled from 2_indexAccu). The Authpublications urnals. A lisis included
(2010; GMGM64272).
r 17th and o the Properss trails are s of fallen traccessible bthe few out
port 8
by John quest of The East t of the (Figure
Property. with the 43-101) CHN” on X), with
firm to t claims. Cadillac
6.
pendent Resource r further
bsequent filing on Analysis
the on-ueil?l=a) hors also
of the st of the d in the
M65127),
rty, all open
rees to by ATV. tcrops
T
TT
The drill site(2006-2011located, all recorded UTGPS. The reno recent dstored at Gl
There has bThis report
2.3 Units o
Currency am
Grid coordin
Quantities aincluding mdistance, heWhere applunits) for co
es and drill 1) are easilyof which haTM coordinaecorded dip rill-holes onlobex’s facil
been no signis considere
of Referenc
mounts ($)
nates on ma
are stated inetric tons (tectares (ha)icable, impeonsistency.
roads from y recognizabad intact meates of all thand bearing
n the Properities in Rouy
nificant newed current a
ce
are reported
aps and figu
n metric unitonnes, t) a) for area, aerial units ha
the recent dble as such. etal identificahe located hog direction orty. Core froyn-Noranda
data generas of Decem
d in Canadia
ures are bas
ts, as per stnd kilogramnd grams (gave been co
East Cadil
drilling progNumerous ation flags, oles were coof the collar om the previ (QC).
rated on theber 31st, 20
an Dollars (
ed on the U
tandard Canms (kg) for mg) or gramsonverted to
llac Gold Proj
grammes bydrill collars and were corroboratedr was also coious drilling
e Project sin016.
$ or CAD$)
UTM NAD 83
nadian and mass, kiloms per metric the Interna
ject – 2017 T
y Plato Gold from these orrectly ide
d in the fieldorroborated programs b
ce Mr. Lang
or “America
3 Zone 18 pr
internationaetres (km) ton (gpt) fo
ational Syste
Technical Rep
Corporationcampaigns ntified. The
d by a hand- on-site. Thby Plato Gol
gton’s site v
an” dollars (
rojection.
al practice, or metres (or gold gradem of Units
port 9
n were
-held here are ld is
visits.
(US$).
m) for des. (SI
Figgure 2.1: Siimplified geological m
East Cadil
map of Abi
llac Gold Proj
itibi Greens
ject – 2017 T
stone Belt
Technical Rep
in Quebec
port 10
c
Figure 2.2: Regional basse map showiing location o
East Ca
of the East Cad
adillac Gold Proje
dillac Gold Pro
ect – 2017 Techn
operty
nical Report 11
T
A
T
T
t
T
Tt
T
3.0 RELIAN
Chalice promethods, apertaining t
The results been summreports), uimplementaAuthors’ opgeological paccording to
This report,reports andThe informamisleading.
MRB & Assothat may eMRB unders
The statemgenerally acat the timemisleading guarantee oany, suffere
This Reportthe serviceunderstood made basedsole respon
The Authorsconclusions and the pur
NCE ON OT
ovided profand provideto the Projec
of known marized in sed to com
ation of Natpinion that personnel” uo standards
, which has other infor
ation receiveThe opinion
ociates has exist concerstands that
ents and occepted scie
e of writing,at the date
of conclusioned by any ot
t was prepaes performe
that any ud upon it, esibility of th
s believe thaand recom
rpose for wh
THER EXPE
fessional did informatict in its poss
past activitthis report
mpile informtional Instruthese repounder the dacceptable
s been preprmation maded appears ns stated he
not verifiedrning the licChalice is re
pinions expentific judge, and with te of this Ren is intendether party a
red in full aed may notuse that anexcept for the other par
at the informmendationshich the Rep
RTS
scussion anon regardinsession
ties in the i. Some of mation on tument 43-1rts appear definition ofto the expl
ared in accde availableto be comperein are giv
d the legal tcenses or oesponsible t
pressed in tement, printhe belief theport. Becaed or can beas a result o
accordance t be approother partyhe purpose
rty.
mation useds, is valid anport has bee
East Ca
nd opinionsng the prop
immediate vthis histor
the Project101 and theto have be
f NI 43-101oration com
ordance to to MRB & Alete and, toven in good
titles to the other agreemto have cond
this documenciples and hat such stuse of the
e given. MRBf decisions
with NI 43-priate to s
y makes of s legislated
d to preparend appropriaen prepared
dillac Gold Pr
s regardingperty agree
vicinity of trical work (t area, were 2005 Regeen comple1, and that mmunity at t
Regulation Associates bo the best kn
faith.
Property orment(s) betducted the p
ent are givepractices, b
tatements ainherent u
B accepts nomade or act
-101 standasatisfy the this report under prov
e this Reportate consider.
roject – 2017
g effective ments and
the Cadillac(i.e., geologre preparedgulations ofeted by “quthe informa
the time.
NI 43-101by the mananowledge of
r any undertween thirdproper lega
en in good based on inand opinionsuncertainty o responsibtions based
ards; howevneeds of o
t, or any revincial secu
t, and to forring the stat
7 Technical R
future expall geologic
c East Projegical and td before thf 43-101. Iualified profation was p
, is based oagement of f the author
rlying agreed parties; hl due diligen
faith implenformation ps are not fain this procility for damon this rep
ver, as the sother partieeliance or durities laws,
rmulate its tus of the Pr
eport 12
ploration cal data
ect have technical he 2001 It is the fessional prepared
on data, Chalice.
rs, is not
ement(s) however, nce.
menting provided alse and cess, no
mages, if ort.
scope of es, it is decisions
are the
roject
4
4T
TV T
T
4A
A
T
T
ap
k
4.0 PROPE
4.1 LocatioThe East Caby various Bateman, Pof which amineralizaticomprises Township, aVal-d’Or, Qu
The approx333300 Easequivalent t
The properobtained froline claim m
4.2 MineraAll claims cDecember 2Appendix Idevelopmenavailable at
The rental amount to claims comp
There are aexploration claims; howof the accumMining Act (*The holderapply all orprescribed rits renewal, kilometre rain respect of
ERTY DESC
on adillac Gold
explorationPershing, Vilare closely on style a150 claimsat the easteuebec, on N
ximate centst, 5320200to 48º 00’ 4
rty boundarom the MRN
management
al Claim Tecomprising 20, 2016, anI. Details ont, mining w www2.pub
fees requir$7,259.22; prising the e
a total of $3companies
wever, thesemulated wo(http://legisr of adjoininr part of therequirementsprovided th
adius circle mf which work
RIPTION A
Property, cn companiellebon, Novarelated wit
and exploras covering ern end of tNTS Map She
tre of the 0 North, in 48” Latitude,
ries have nNFQ websitt system (ht
nure and Dthe Proper
nd the rentan claims reworks, and licationsduq
ed for the whereas th
entire prope
,649,011.04on the for
e credits cark credits issquebec.goung claims mae amounts sps to a claim e land that imeasured frok was perfor
AND LOCAT
comprises aes, referreda and Lac Sth respect ation targe5,372.4 hehe Val-d’Oreet 32C/03
Project hasZone 18 of, 77º 14’ 07
not been lee www.mrnttps://gestim
Dispositionrty are curral fees, requnewals, worsite rehabil
quebec.gouv
renewal of he total asseerty upon th
4 in accumumerly sepannot neces
s subject to uv.qc.ca/en/ay, not later pent to perfthe renewalis the subjecom the geom
rmed in exces
East Cadil
TION
a number ofd to hereinSimon claim
to their pts. The co
ectares mair gold minin(see Figure
s Universal f the 1983 7” Longitude
egally survenfp.gouv.qc.m.mines.go
n rently in gouired minimrk credits, citation are
v.qc.ca.
all of the essment woheir annivers
ulated work rate propersarily be disthe conditio
/ShowDoc/cthan the da
form, in respl of which is ct of the applmetrical centss of the pre
llac Gold Proj
f formerly dn as the N
m blocks (Figphysical locaonsolidated nly in the
ng camp, soe 2.2).
TransverseNorth Ame
e.
eyed. The .ca/mines/inouv.qc.ca/).
ood standinmum work aclaim accesssummarized
claims upoork credits rsary dates a
k credits fromrties that costributed acons outlinedcs/M-13.1).ate of the exppect of a clapplied for,
lication for rtre of the paescribed requ
ject – 2017 T
distinct claimNordeau Wegure 4.1 aation, undeEast Cadisoutheast
ome 50 km
e Mercator erican Datum
claim bounndex.jsp, an
ng. The rennd excess cs rights, allod in the Mi
n their nexrequired for amounts to
m work comomprise thecross the Prd in Section
piry of the claim, any wo, up to the arenewal is in
arcel of landuirements.
Technical Rep
m groupingsest, Nordeand Figure 4erlying rockllac Gold Ppart of Va
east of the
(UTM) coom (NAD83)
ndary outlinnd the GES
newal datescredits are sowable expning Act of
xt anniversathe renewa$146,607.6
mpleted by pe East Cadilroperty. Dis 76* of the
claim to be rork in excesmount necesncluded with
d subject to th
port 13
s owned au East, 4.2), all k types, Property auquelin town of
ordinates geoide;
ne were TIM on-
s, as of shown in loration, Quebec
ary date al of the 60.
previous lac Gold sposition Quebec
renewed, ss of the ssary for hin a 4.5 he claim
Figure 4.1: Base-map of East Cadillaac Gold Propeerty showing c
East Ca
claim groups
adillac Gold Proje
staked and op
ect – 2017 Techn
ptioned by Ch
nical Report 14
halice
Figure 4.2: EEast Cadillac GGold Property
East Cadillac Go
y showing formc
old Project – 201
merly distinctcompanies
7 Technical Repo
t claim groupi
ort 15
ings owned byy various exp
ploration
4
t
t
T
4
t
tt
4
wf
4.3 Royalt
On October Mining Enteconsisting ointerest. Chpayments tCAD$120,0over a four Globex (theright to witany time.
On Novembacquire a 7(“Richmont”claims, covetotal optionCAD$3.1 m
Upon meetiSmelter Royto withdraw
Upon compis subject tocertain claiCAD$1.0M,
To further chectares, inNovember o
4.4 Enviro
No environEnvironmenthe goal of ensure the however, nthere are ntime.
4.5 Permit
Permits aredrilling), awatercoursefor these department
ies and Re
12th, 2016,erprises Inc.of 37 claimshalice may atotalling CA00 in the firyear period
ere are no ethdraw from
ber 23rd, 200% interest”). The Chier 2,593.4 n paymentsillion over a
ing these reyalty (NSR)
w from the a
leting all obo usual joinms with prupon either
consolidate in the immedof 2016.
nmental Li
mental perntal permit(sreturning tlong term
o environmo environm
ts
e required and potente alteration,activities s
ts in a timely
elated Infor
, Chalice an (“Globex”)
s owned 10acquire its iAD$590,000rst year) and. Upon exeexisting royam the agree
16, Chalice t in 73 claimimo Projecthectares. C
s of CAD$2a period of fo
equirements to Richmongreement a
bligations unnt venture dre-existing r party dilut
its land posdiate vicinity
iabilities
rmits are cs) may be rhe land to a
m ecological ental liabilit
mental requi
for some oially for t, water-crosshould be y fashion, a
rmation
nounced th to acquire 0% by Globinterest in t
0 over fournd undertakiercising its oalties in relament, foreg
further annms comprisit claims, wChalice can e200,000 to our years.
s and exercnt on claimsat any time,
nder the terdilution termroyalties),
ting its Proje
ition Chalicey of the Nord
currently asrequired at aa use whos
and envirties were inrements to
of the recomtheir assocssing, clear-submitted
allowing for
East Cadil
at it had siginterest in Gbex and 17 the Nordeau
years to ing exploratoption Chalication to thegoing any in
nounced thang the Chimhich are coearn a 70%Richmont a
cising the os with no prwaiving its
rm sheet anms includingwith a righect interest
e staked 23 deau and C
ssigned to a later datee value is a
ronmental snherited wit
maintain a
mmended eciated env-cutting) as by Chalicea four to six
llac Gold Proj
gned a bindGlobex’s 1,4claims in w
u Project claGlobex (inction expendce will gran
e Nordeau Pnterest in t
at it had enmo Gold Proontiguous w
% interest inand funding
ption, Chalre-existing interest in
nd forming ag reverting tht to buy bto less than
additional chimo projec
the Propere to fulfil envat least equstability of h any of thny of the c
exploration ironment-alwell. The a
e Gold to x week proc
ject – 2017 T
ing letter of453.6 hectawhich Globeaims by macluding an
ditures of CAnt a 3% GroProject claimthe Nordeau
ntered into oject from Rwith Globexn the Chimog exploratio
ice shall theroyalties. Cthe Chimo P
a joint ventto a 1.5% Nback 0.5% n 10%.
claims, totact claims, in
rty for expvironmentaal to its prethe land a
he claims onclaims in go
programmelteration uappropriate the appro
cessing perio
Technical Rep
f intent withre Nordeau x maintainsaking annuainitial paym
AD$2.5 millioss Metal Roms). Chalice u Project cla
a binding oRichmont Mix’s Nordeauo Project by on expendit
en grant a halice has tProject claim
ure, the agrNSR (0.5% of the roy
lling 1,325. September
ploitation pul requiremeevious valueand its watn the Propeood standing
es (e.g., dndertakingsPermit Apppriate goveod.
port 16
h Globex Project,
s a 60% al option ment of ion, also oyalty to has the
aims, at
option to nes Inc. Project making
tures of
1% Net the right ms.
reement NSR on
yalty for
4 r and
urposes. ents with e and to tershed; rty, and g at this
iamond-s (e.g., lications ernment
4 T
4 TA
w
ww T
w
tt
w
4.6 Other
To the Authaccess, title
4.7 Proper
The East CArchean Abgold mininglitho-tectoninterpreted Domain is mand volcani
Gold minerwithin sedimaltered mafdisseminatewithin quarwith gold m
The East Casince the mChimo gold until its clos
Numerous ebearing zonwere calcula
Nordeau EaNordeau WeNordeau WeSimon West6.90 gpt Au
*These estthey pre-dto the onedeterminewere, in sopotential o
Relevant F
hors’ knowlee, or the righ
rty Summa
adillac Goldbitibi Greensg camp. Theic Domain (as the east
made up of c assemblag
alization onmentary rocfic volcanic ed to locallyrtz veins or
mineralizatio
adillac Gold mid-1940’s w
mine, whicsure in late
exploration nes at a numated by prev
st (Tremblaest (Tremblaest (Explomt: uncategou for lens B.
timates aredate the aps set out ind that the ome instanof the Prop
Factors
edge there ht or ability
ary
d Property istone Belt oe East Cadill(Rocheleau eern extensioa series of
ges in shear
n the propecks in close rocks. The
y semi-masassociated
n include ar
Property awhen gold ch operated1996.
programs omber of occvious opera
ay 1988-89)ay 1988-89
mine-1990) rized “Reser
e strictly hplication on sections statistical
nces, incorrperty to hos
are no signto perform
is strategicaof the Superac Gold Proet al., 1997on of the Caf lenticular sred contact.
erties is fouassociation gold mine
ssive sulphid with sulphrsenopyrite,
nd surroundbearing len for nearly
n the Propeurrences, fotors:
“Probable) 162,200 to) 126,800 t100,700 to
rves” of 67,
historical inof Regulatio1.2 and 1.methods urectly applst a econom
East Cadil
nificant factowork on the
ally located rior Provinceperties are ), and are tadillac Tectosedimentary
und as eithen with magnralization isdes. Gold is
hide minera pyrite, pyrr
ding area hases were fo15 years an
erty over theor which the
e Reserves”onnes @ 6.7tonnes @ 6.onnes @ 5.3000 t gradin
n nature anon 43-101 3 of the Reused to detlied. They amically via
llac Gold Proj
ors, risks, oe Property t
in the soue, at the eaunderlain b
transected bonic Zone. Ty units, incl
er one of tnetite iron fs associateds usually folization Therhotite and
ave been thound near tnd produced
e years have following
7 gpt Au 1832 gpt Au 243 gpt Au 180ng 6.30 gpt
nd they shoand make
egulation. termine thare, howev
able gold re
ject – 2017 T
or legal issuthroughout
uth-eastern astern extreby rocks beloby a large dThe volcanouding band
wo styles oformations; d with quaround in thee sulphide mminor chalc
he focus of the area thd in excess
ve led to thehistorical “r
“Possible3,700 tonne42,600 tonn0,000 tonnet for lens A a
ould not bee use of catFurthermo
he average ver, indicatesource.
Technical Rep
ues that mathe year.
part of theeme of the Vonging to theformation -sedimentaed iron form
of occurrenc(2) in shea
rtz veins coe form of frminerals ascopyrite.
explorationat later hosof 349,000
e delineationreserve” est
e Reserves”es @ 6.0 gpnes @ 6.3 gpes @ 5.5 gpand 34,000
e relied ontegories diore, it has b
assay gradtive of the
port 17
ay affect
e prolific Val-d’Or he Trivio corridor ry Trivio mations,
ces: (1) ared and ontaining ree gold sociated
activity sted the 0 ounces
n of gold timates*
t Au; pt Au; pt Au;
t at
n since fferent been des
T
V
t
V
A T
t
T
T
5.0 ACCES
The PropertLaurier, QC(“Chemin Carea. At kilProperty foentrance toSecondary parts of the
Val-d’Or, 50contractors,relatively inthe past proand for use
Val-d’Or Aischeduled phelicopter oaccording tAirport in M
The physiogareas of muthick glaciapine, poplar
The area haand the iceaveraging Summers amoderate, Exploration accessed du
There is sufmining oper
SIBILITY,
ty is accessC. ApproximChimo”) leadometre 3.5
or 1 km. Cho the closeseasonal ro
e Property (s
0 km west , equipmentnexpensive aoducing Chiin ore-proc
rport (IATApassenger soperators, to the Natio
Montreal (QC
graphy of thuskeg and bl sand and gr and birch t
as a typical leaves the –15°C in Jare warm ranging frooperations
uring the wi
fficient spacrations, taili
LOCAL RES
ible from pamately 6 kmds east to t (from Hwyhemin Chimed Chimo Moads and trsee Figure
of the Prot and suppliand is mainmo Mine is
cessing, if re
A: YVO, ICAservice, andlocated on onal Airport
C), and to su
he Property bog. The aregravel depotrees, and v
continentallakes abou
January andand relativom 200 to s can be cnter months
ce, and accengs storage
SOURCES,
aved Highwm south of tthe former y 117), Chemo re-enterMine, and ails off the 4.1).
perty, is a es to mining
ntained by Hstill in plac
equired.
AO: CYVO), d services b
site. The ts Policy. Lurrounding c
area is fairea has very sits. Vegetavarious shru
l boreal climut early-midd February
vely dry wi500 millim
arried out s when the
ess to surface, waste dis
East Cadil
INFRASTR
way 117, thethe village Chimo Mine
emin Chimors the Propremains wiarterial Ch
compreheng and exploHydro-Quebe. There is
serves as both privateairport is c
Local air secommunitie
rly flat-lyingfew exposu
ation is boreubs, mosses
mate. Snow d May. Wint. The grouth a mean
metres annyear roundground is fr
ce rights, foposal, and p
llac Gold Proj
RUCTURE A
e main routof Louvicoue and the L
o passes threrty at kiloithin the P
hemin Chim
nsive miningoration operaec. A high-vample local
a point ofe and commclassified inervices connes. Vehicle r
g with gentlures of bedreal, consistin and lichen.
stays on thters can be und is frostn temperatually, with d, though trozen.
r exploratioprocessing p
ject – 2017 T
AND PHYSI
te between urt, an all sLac Michimarough the wometre 9.0,Property un
mo allow dire
g centre suations in thevoltage powl supply of w
f call for amercial fixedn the Regionect to Truentals are a
y rolling topock, being ung mostly o.
he ground fbitterly coldt free fromure of 22°half of it
the wetland
n work and plants.
Technical Rep
OGRAPHY
Val-d’Or anseason gravanitou sportwestern par, just northtil kilometrect access
upplying pee area. Elecwer line thatwater, both
air carriers d-wing airconal/Local cudeau Interavailable on-
pography anunderlain mf black spru
rom mid-Nod with temp
m May to O°C. Precipit
arriving asd areas are
for any eve
port 18
nd Mont-vel road t fishing rt of the h of the re 22.5. to most
ersonnel, ctricity is t served potable
offering raft and category rnational -site.
nd large mainly by uce, jack
ovember perature October. tation is s snow. e better
entual
t
T
f
Il
t
tf
6.0 HISTO
NOTE: The the Provincand http://of the Prov(GM’s). A li(Section 21
The East Cactivities siproperty. Nby companfollowing sgeographica(Figure 6.1
It should blengths an
6.1 The NoPershi
6.1.1 Nord
6.1.1.1 His
1946-47: O(8) holes wMining and
1948-49: O
1957-58: Nthe discove
1962: VauqNordeau clapotential fo
1963-65: V(GM16371)
1974: A sumEast blocks
1979-83: Sout magneGM35513; surveys (GMblocks (GMtime, the infirst “reserv(Gagnon an
RY
GESTIM ance’s mineralsigeom.mrn
vince of Questing of GM1.0).
Cadillac Golince the m
Numerous neies investigummary ofal distributio1). All coord
be noted tnd not true
ordeau Prong-Denain
deau East
storic work
Oneonta Perswere subseqDevelopme
Oneonta Pers
ordeau Minry of gold b
quelin Iron aims (contigr iron ore in
Vauquelin Irand drilled
mmary repoby Vauquel
OQUEM (Soetic (Mag)
GM36435; M37729), fo36462; GMnformation ve” estimatnd Gagnon,
d SIGEOM s resources
nf.gouv.qc.cebec’s data’s pertinent
ld Propertymid-1940’s wew gold-beagating the pf historical on into the Ndinates are U
that unlesswidths.
oject Claim blocks)
and Norde
k
shing Minesquently drillnt Co., and
shing drilled
ing Co. Ltd.earing lense
Mines Ltd. guous at th
n the sedime
ron Mines L5 holes (70
ort with drillin Iron Mine
ociété Québéand electrGM37356;
ollowed by 37746; GMgathered ontion was pr1982).
systems areand are ac
ca/. The GESabase of Prot to the East
y and surrowhen gold aring structpotential fowork com
Nordeau ProUTM, NAD83
s otherwise
Blocks (N
eau West cl
s Ltd. compled on Nordencountere
d 27 holes, t
. completedes No.1, 2 a
(Mines de Fhe time), aentary iron f
Ltd. did som00 m) (GM1
l-hole sectioes Ltd. (GM
écoise d’expromagnetic ; GM39354diamond-dr39230). A tn the gold roduced on
East Cadil
e the principccessible onSTIM and Sovincial Asst Cadillac G
ounding arebearing leures were dr iron ore pleted on oject claim b3 Zone 18.
e stated, a
ordeau Eas
laim blocks
eted geologdeau West, ed the first g
totalling 3,4
a 24-hole pand 3 on the
Fer Vauquend drilled 1formations
me sporadic 6372; GM17
ons was com30500; GM3
ploration mi(EM) geop
4; GM3990rilling on thtotal of 41 zones delinthe Norde
llac Gold Proj
pal repositonline at httSIGEOM websessment Reold Property
ea has beenses were discovered in the sedithe Projectblocks and t
all drill-inte
st, Nordea
s
gical and geunder optio
gold indicati
400 m, on N
programmee Nordeau E
elin Ltée.) w14 holes (1(GM12839)
work inclu7080).
mpiled for th30501).
nière) optiophysical su7; GM4027
he Nordeau holes (6,64
neated on theau West a
ject – 2017 T
ry for histotps://gestimb-sites alloweports or “y is include
en the subjfound on
during the mentary irot is dividedthe Chimo P
ervals repr
u West, Ba
ophysical (Mon at that ions in the i
Nordeau Wes
e, totalling 4East claim b
was incorpor,150 m) de.
ding a geo
he Nordeau
oned the prourveys (GM74), along West and N
40 m) was he propertiend Nordeau
Technical Rep
rical informm.mines.gouw on-line seGestimes Md in the Ref
ject of expthe nearby1950’s and on formatiod on the bProject claim
resent dow
ateman and
Mag) surveytime to Insmmediate a
st.
4,530 m, thalock (GM04
rated, acquesigned to
physical EM
West and N
operties and37355; GMwith geoc
Nordeau Eacompleted.es was suchu East occu
port 19
ation on v.qc.ca/ earching Minieres” ferences
ploration y Chimo
1960’s, ons. The basis of m blocks
wn-hole
d
ys. Eight spiration area.
at led to 860).
ired the test the
M survey
Nordeau
d carried M38857; chemical st claim By this h that a urrences
Figure 6.1: East Cadillac Gold Property sho
East Cadillac Go
owing distribu
old Project – 201
ution of inform
7 Technical Repo
mal claim bloc
ort 20
cks from previious explorati
ion work.
gAa
o
c
R
1983: The induced poland updatin
1984: Louv
1987: CambCadillac Faoutlined nuEast Cadilla
1987-90: MRoche Ltd., holes for 5historical “Nordeau Wparameters
polyg Spec mini cut-o high no d no c “pro
longinter
Table
Histori
“Pro
“Pos
TOTAL“
These estgenerally Although tand some the applicaones set othe 1988 econsiders to make Regulation
property oparization (IP
ng the “rese
em complet
bior flew a rult Zone frmerous anoc Gold Prop
Mines VauquConsulting
5,889 m onmineral res
West and Nused at the
gonal area ocific gravity:mum horizooff grade: 2 assays cut ilution factorown pillar ebable reseritudinal secrsections.
6.1: Histor
Zones :
cal Classif
bable Reser
ssible Reserv
L 1988 Hist“Reserves”
timates weaccepted athe methodof the par
ation of Rout in sectiestimates ithe above use of th
n 43-101 (R
ption was tP) geophysirve” estima
ted 21 holes
regional VLFrom east ofomalies inc
perty (GM45
elin Ltd. regGroup (“Ro
n Nordeau Eserves” by Nordeau Eae time were of influence : 2.9 g/cm3;ontal width: 2.74 gpt Au;
to: 52 gpt Aor considereexcluded rves” compution; “possi
rical Reser
ication
rves”
ves”
torical ”
ere preparat the timd used for rameters a
Regulation ions 1.2 anis no longeestimates
hese estimRequireme
transferred cal survey p
ate on the N
s totalling 4
F-EM and mf Val-d’Or tluding stron
5687).
gained the oche”), comEast (GM47Roche (Trest claim bas follows:around dril
; 1.5 m; Au;
ed;
uted within ble reserve
rve EstimatTrem
NO
Tonnes
126,800
242,600
369,400
red in accme, using a
the estimaare no lonNI 43-101
nd 1.3 of ther appropris to be stricmates in aents Applic
East Cadil
to Société prior to drillordeau Wes
,867 m on t
mag survey tto lake Mang magneti
property in pleted 24 ho7403). This emblay, 19locks (Tab
l-hole inters
a 15 m ras” obtained
tes for Norblay, 1988
ORDEAU W
s Au Gra
0 6
0 6
0 6
cordance all availablation woulger valid t1 and makhe Regulatiate and shctly historiaccordancecable to All
llac Gold Proj
minière Louing 12 holesst gold zone
the Nordeau
that coveredchi-Manitouc trends al
1987 and, oles for 4,7drill camp
988a and 1ble 6.1). E
sections on
dius from q from the 1
rdeau West8).
WEST
ade (gpt)
6.16
6.35
6.28
with stanle drilling ld still be atoday. Theke use of tion. The uhould not bical in natue with thel Disclosure
ject – 2017 T
uvem Inc., s totalling 2es.
u East claim
d the area iu (approximong the len
following re21 m on Noaign led to
1989)(GM48Estimation
a vertical lo
qualifying in15-30 m rad
t & Nordea
NOR
Tonnes
162,200
183,700
345,900
ndards, terand samp
appropriatee above escategories
use of the tbe relied oure and cae provisioe).
Technical Rep
who compl2,608 m (GM
m block.
n the vicinitmately 40 kngth of the
ecommendaordeau Westo the estim8424) on bmethod an
ongitudinal
ntersectionsdius from qu
au East (fro
RDEAU EAS
Au Grad
6.7
6.0
6.3
rms and ppling informe, the termstimates ps differentterm “rese
on. MRB thutions the
ons of Par
port 21
leted an M41828)
ty of the km) and
current
tions by t and 30 ation of
both the nd basic
section;
s on the ualifying
om
ST
de (gpt)
70
01
33
policies mation.
ms used re-date
t to the erve” in erefore
e reader rt 2 of
w
T
t
In their 198objective ofwas to drive
1988: (GM4metres in auriferous zThe iron forzone of thethe Nordeau
Figure
1988: (GMimmediate quartz veinarsenopyrite
1988: Minestructure be
88 report onf upgradinge a decline t
48430) In Jthe area bzones withirmations ocmafic rock
u West depo
e 6.2: Best
48507) In vicinity of s and veinle. Best resu
s Vauquelinelow the “re
n Nordeau E the “reservto access th
January andbetween then sequencecur immedias is charactosit sequenc
t results (h
February, the Nordeaets (up to
ults are show
Ltd. drilledeserve” bloc
East, Rocheves” and de
he zones and
d February,e Nordeau
es of mafic ately northterized by sce. Best res
highlighted
Monicor Eau East occ5% arsenopwn in Figur
d 4 holes forks. No signi
East Cadil
recommenefining the d extract a b
, Monicor EWest and volcanics, eof the mafichearing andults are sho
d) from 198
xploration currence. Tpyrite and pre 6.3.
r 1,279 m oificant result
llac Gold Proj
ded an undcharacteristbulk sample
Exploration Nordeau E
epiclastic sec volcanics,d folded defown in Figur
88 drilling
drilled 4 hThis drilling pyrrhotite)
on Nordeau ts were rep
ject – 2017 T
derground ptics of the e for testing
drilled 6 hoEast occurrediments, a whereas th
formation zore 6.2.
by Monicor
holes totalliintersected
and some v
West in an orted (Cham
Technical Rep
rogramme wbody. The p
g.
oles totallinrences, inteand iron forhe southernones compa
r (GM4843
ing 724 md mineralizveinlets of
attempt to mpagne, 19
port 22
with the proposal
g 1,194 ersecting rmation. contact
arable to
30)
in the ed grey massive
test the 85).
AJ
w
“
Figure
1990: Mineany existingstructure. Hover 6.6 m,
After reviewJean (1990;erroneous groups of awithin a shlongitudinallongitudinaldetermine t
Subsequentzones that echelon”, gqualifying in
spec mini cut-o high no d 30 m
“Probable rlaterally anreserves” w35 m) from
e 6.3: Best
s Vauqueling intersectioHole W-90-0, at ±490 m
wing the No; GM49867)assumptionassays. Theheared and section p section.
the average
tly, Explomwas model
gold-bearingntersectionscific gravity:mum horizooff grade: 2 assays cut ilution take
m crown pilla
reserves” wd 20 m ve
were obtainequalifying i
t results (h
n Ltd. resumon. Of the 706 returned
m and ±675
ordeau Wes) came to ths, particulae “ore-gradd altered mproduced inFurthermoreassay grad
ine proposeled on the
g lenses. Ts respected 2.9 tonnes
ontal width: 2.7 gpt Au;
to: 34.3 gpn into accouar excluded
were compurtically fromed from the intersection
highlighted
med drilling holes drille 5.4 gpt Aum deep res
st databasehe conclusioarly in connde intersectmineralized 1988 shoe, it was es were, in
ed a new gconcept of
The entire the followin
s/m3; 2.0 m;
pt Au; unt;
uted from am qualifying
next 10 m s.
East Cadil
d) from 198
to test theed (3,471 mu over 17.8pectively.
e for Gestioon that the enecting lateions” were structure,
ould therefodeterminedsome insta
geological “a mineraliz
width of thg paramete
a rectangulg intersectiolaterally (1
llac Gold Proj
88 drilling
e Nordeau Wm), 5 interse8 m and hol
on Minière Eerstwhile “reerally and
determinepossibly grore have bd that the nces, incorr
reserve” eszed shear-zhe mineraliers:
lar area ofons on the 2.5 to 22.5
ject – 2017 T
by Monicor
West structuected the tale W-90-07
Explomine eserve” estivertically sd to be rareater thanbeen consid
statistical rectly applie
stimate for zone hostinized shear
f influence longitudinam) and 15
Technical Rep
r (GM4850
ure at depthrgeted gold carried 3.6
Ltd. (“Explomate was b
selected assndomly dis
n 20 m thidered a co
methods ed.
the Nordeag a numbewas includ
extending l section; “ m verticall
port 23
07)
h, below bearing
6 gpt Au
omine”), based on says, or stributed ck. The
omposite used to
au West r of “en ded and
12.5 m possible y (20 to
T
mRreRah
A
w
2
The 1990 ExTable
T
These 199make use Regulationreported aestimate isResource cand Minerhistorical i
1990: MineNordeau W(totalling 1holes). Theresults were
1994: MineNordeau Eaidentified. TAuriferous 30.73 m - 3were encouzones mine
1994: Mineeastern clareported fro
6.1.1.2 Re
2006: On MMining EnteOctober 200do a first properties aunder the sprovided in ground in timmediate Nordeau We
xplomine hi6.2: Norde
Histor
“Probable
“Possible
OTAL 1990
90 “reservof catego
n. The useand shoulds required categories,ral Reservin nature a
s Vauquelinest. Their w,942 metre
e targeted e reported t
es Vauquelist block (GMThe zones horizons we32.25 m) auntered in cralized with
es Vauquelinim of the Nom hole N94
cent work
May 24th 20erprises. Pla06 and Marcpass drillingand determiupervision oBourgoin athe area anvicinity. Al
est property
storical “Reeau West H
Zone
ical Classif
e Geological
Geological
0 Historica
ve” figures,ories differ of the terd not be
d to fulfil ths, as set ouves. MRB tand warns
n Ltd. and Lwork involv
es) near themineralizedto be disapp
n Ltd. comM52637). Swere testedere intersecnd 4.85 gptcontact with massive an
n Ltd. compNordeau Eas4-5 (GM526
006, Plato ato completch 2007 (Tag over the ine the bestof M. Peter nd Castongnd begin a though all y was priorit
eserve” EstimHistorical “R
fication
Reserves”
Reserves”
l “Reserve
s, pre-daterent to therm “reservrelied upo
he requiremut in the Ctherefore the reader
Louvem comved surveyine intersectio structure
pointing (GM
mpleted a gix individuad by 6 drillcted that yit over 1.34h iron formand semi-mas
pleted a 6 st group wi38).
Gold Corpoted a 7,363able 6.3). T
recently ot targets forKarelse, P.Euay (2007).concerted four miner
tised for fut
East Cadil
mates are taReserves”
es”
e the applie ones setve” is no lon. A comments of tCIM Definitconsiders
r to make u
mpleted theirng some ofons of W-9was interse
M50373).
ground Magl iron forma-holes (619elded gradem (hole 94
ation and assive sulphi
short-hole th the best
oration (“Pla3 metre surThe objectivptioned Nor future expEng. and MR. Positive reeffort to e
ral propertieure explorat
llac Gold Proj
abulated in ” Estimate (
Tonn
100,
180,
280,
ication of t out in selonger app
mplete re-ethe Regulation Standthe abov
use of thes
r last reportf the previo90-06/-07 (ected by al
g-EM geophations and t9.1 m) in Fes of: 1.48 4-5, 59.79 associated wdes (pyrrho
drilling camt intersectio
ato”) optionrface diamove of this inordeau Eastploration. ThRB. Detailedesults prompexpand the es yielded tory work.
ject – 2017 T
Table 6.2. (Jean, 199
NORDEA
nes
700
000
700
Regulationections 1.2propriate fevaluation ation and todards for Mve estimatse figures a
ted exploraous holes a2 were wedll four hole
hysical survthree distincFebruary of
gpt over 1m - 61.13 mwith quartz otite, pyrite
mpaign totaon of 4.85
ned the proond-drilling itial drilling t, West andhe programd results of pted Plato toknown golencouragin
Technical Rep
90: GM4986
AU WEST
Au Grade
5.3
5.5
5.4
n NI 43-12 and 1.3 for what is
of the reo respect M
Mineral Restes to be appropriate
tion prograand drilling dged from
es; however
vey on partct shear zonf 1994 (GM1.52 m (hom). These iveins and and arseno
alling 619 mgpt Au ove
operty fromcampaign bprogramme
d Bateman me was carthe programo acquire add resourcesg gold valu
port 24
67)
(gpt)
01 and of the
s being esource Mineral sources strictly ely.
mme on 4 holes existing r, assay
t of the nes were M52638).
le 94-2, ntervals silicified pyrite).
m on an er 1.3 m
Globex between e was to mineral
rried out mme are dditional s in the ues, the
2
f
2
2007: In Dall historic efurther expdatabase foof Ottawa, Odrill program
2008: BetwEngineeringWest Propedemonstratprogrammedown-dip pWest claim
Selected “b 0.77 1.00 5.66 4.28 1.90 5.54
ecember 20exploration ploration. Aormat by MROntario, whmme.
ween Januag, Plato comerty (Table ed good gr
e holes wererojection ofblock into g
est” results 7 gpt Au ove0 gpt Au ove6 gpt Au ove8 gpt Au ove0 gpt Au ove4 gpt Au ove
007, Plato cresults on
All historicaRB and forwo used GEM
ry and Sepmpleted a 14
6.4), succade and coe collared, f the main ground not h
from the 20er 18.95m (er 8.05 m (her 8.50 m (her 8.05 m (her 5.85 m (her 3.00 m (h
commissionethe Nordea
al diamond-warded to A. MCOM® Reso
ptember of 4 hole, 8,55cessfully intntinuity ovewith permizone continheld by Plato
008 drilling hole NW-08hole NW-08-hole NW-08-hole NW-08-hole NW-08-hole NW-08-
East Cadil
ed MRB to cu West Proj-drilling woS. Horvath
ource Model
f 2008, foll5 metre diatersecting ther a strike (ssion, off t
nued outsido, at a dept
programme8-04, 548.45-05, 393.65-06, 553.80-07, 567.00-08, 452.05-10, 589.95
llac Gold Proj
complete a ject, and toork was suh Engineerinlling softwa
owing the amond-drillinhe main zo(east-west)the propertye the northth of approx
e included:5 m – 567.45 m – 401.70m – 562.300 m – 575.05 m – 457.95 m – 592.9
ject – 2017 T
detailed dio provide reubsequently g Inc. (“Hore to design
recommendng programone to a de of 550 m. y. It was inhern boundaximately 100
40 m); 0 m); 0 m); 5 m); 0 m); 5 m).
Technical Rep
gital compiecommendat
incorporatrvath Enginn and recom
dations of me on the N
epth of 700Some of th
nterpreted tary of the N00 m.
port 25
lation of tions for ted into eering”)
mmend a
Horvath Nordeau
0 m and he 2008 that the Nordeau
Table 6
Tab
6.3: Summa
Hole
PG06PG06PG06PG06PG06-PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06PG06
To
ble 6.4: SumHole INW08-0NW08-0NW08-0NW08-0NW08-0NW08-0NW08-0NW08-0NW08-0NW08-NW08-NW08-NW08-NW08-
Total
ary of 2006
e ID
6-01 6-02 6-03 6-04 -04A 6-05 6-06 6-07 6-08 6-09 6-10 6-11 6-12 6-13 6-14 6-15 6-16 6-17 6-18 6-19 6-20 6-21 otal
mmary of 2ID 01 02 03 04 05 06 07 08 09 10 11 12 13 14 l
6-2007 Nor
2008 Nord
East Cadil
rdeau Proj
deau West D
llac Gold Proj
ject Drilling
Drilling CaLen
ject – 2017 T
g Campaig
Length (m
549 396 249 198 501 500 450 600 434 501 231 200 150 200 200 201 240 240 240 240 240 603
7363
ampaign (Pngth (m)
504 366 654 699 498 648 699 525 549 650 740 576 700 747
8555
Technical Rep
gn (Plato G
m)
Plato Gold)
port 26
Gold)
2
T
2009: FolloMineral Res2009 Mineralgorithm a($85/tonne an exchang
Table 6.5:
Resource
Measured Indicated
Measured + Inferred
Total Inferre
From OctobNordeau Eaprogram, scontinuationclaims (GM
Ho
NE0NE0
NE0NE0NE0NE0NE0NE0
NE0NE0NE0
To
wing the cosource Estimal Resourceand block dproduction e rate of $C
Mineral Re
e (Category)
Indicated
d
ber 19th to ast (11 holesummarizedn of minera65127). Tw
Table 6.6
ole ID
09-01 09-02
09-03 09-04 09-05 09-06 09-07 09-08
09-09 09-10 09-11 otal
ompletion omate (MRE)e Estimate odimensions cost) was u
CAD 1.162/$
esource Es
Main B Total
Total Main B
Total
December es), and 83 in Table lization zon
wo mineraliz
: Summary
f the 2008 ) was publisof Nordeau Wof 5.0 m x
used in the $US 1.00 wa
stimate - N
Zone
11th, 200934 m in 3 h
6.6, was es previous
zed zones w
y of 2009 D
Length (
354600
402600403600324402
351231432
4,699
East Cadil
diamond-drshed (LangWest (Tablex 2.5 m x calculationsas selected
ordeau We
No M
9, Plato comholes on Ba
designed sly identified
were intersec
Drill-Holes:
(m)
9
llac Gold Proj
rilling progrton and Hoe 6.5) used5.0 m. A
s. An assumfor cut-off g
est (from L
Tonnes
Measured Res223,
1,225,
225,1,097,
14,
1,112,
mpleted 4,6ateman (seeto test th
d on the Nocted at Nord
: Nordeau
A
ject – 2017 T
ramme, an orvath, 200d an inversecut-off gra
med gold prigrade calcul
Langton an
s Au G
(gp
sources 382960342
342749572
321
699 m of de Section 6e along-str
ordeau Westdeau East (T
East Claim
Azimuth
180° 180°
180° 180° 180° 180° 180° 180°
180° 180° 180°
Technical Rep
updated NI09; GM6450e distanced-de of 2.75 ce of US$82lations.
nd Horvath,rade
pt) In-S
4.18 3.07 4.17
4.17 4.1
3.59
4.09
diamond-dri6.1.2). Therike and dt and NordeTable 6.7).
m Block
Di
-7-7
-7-7-7-7-7-7
-7-5-7
port 27
43-101 04). The -squared
gpt Au 25/oz at
, 2009) Situ Au (oz)
30,019193
30,212
30,212144,635
1,680
146,315
illing on e drilling own-dip
eau East
ip
0°0°
0°0°0°0°0°0°
0°0°0°
Fg 2
2
Table 6.7
Hole ID
NE09-01
TOTAL
NE09-02
TOTAL 1Initial fire Final is thegold noted
2010: The 2on June 2nd
Hole ID
NE10-01
NE10-02
NE10-03
TOTAL
2011: A diaBateman clholes, totalon the Nord
7: Selected
From (m)
294.00 295.50 296.40 297.00 298.00
223.30 224.40 225.40 226.40 227.40 228.90
assay; 2Ch average ofwithin samp
2010 drilling, 2010. It co
Table 6.
Length
309
210
317
L: 836
amond-drillinaim blocks ling 11,966
deau East bl
d Best Resu
To (m)
295.50 296.40 297.00 298.00 299.50
224.40 225.40 226.40 227.40 228.90 230.00
eck fire assf the two fiple interval d
g campaign omprised 3
8: Summa
h (m) Az
9
0
7
6
ng campaigbetween J
6 metres. Seock (Table
ults of 200
Interval (m)
1.500.900.601.001.505.501.101.001.001.001.501.106.70
say; 3Total ire assays oduring drill
by Plato (Gdrill-holes o
ry of 2010
zimuth
180°
180°
180°
n by Plato (anuary 25th
eventeen (16.9). The r
East Cadil
09 Diamond
Au1 (gpt)
1.1057.100.086.301.23
0.7643.1018.650.620.392.01
metallic sieor the metacore logging
GM66369) on Nordeau
0 Drill-Hole
Dip E
-60°
-65°
-60°
(GM66369)h, 2011 and17) holes agremaining h
llac Gold Proj
d-Drill Hole
) Au2 (gp
3.15
0.066.721.37
0.59
0.400.582.18
eve fire assaallic sieve reg
began May East, totalli
es: Nordeau
Easting (UT
334801.
334950.
334950.
) was carried May 15th,ggregating oles were d
ject – 2017 T
e Campaig
pt) MS(gp
74.7
34.414.
ay of coarsesult, when
27th, 2010 ing 836 met
u East Prop
TM-X) N
05
94
16
d out on the, 2011. It c8,758 metrrilled on the
Technical Rep
n-Nordeau
S3
pt) Au
(g
270* 74
061
140
40* 3495 14
0028
se crush rejn available.
and was cotres (Table
perty
Northing (U
5319598
5319550
5319599
e Nordeau Ecomprised res were coe Bateman c
port 28
u East
Final4
gpt)
2.134.700.076.511.304.350.684.404.950.510.492.108.01ject; 4Au *Visible
mpleted 6.8).
UTM-Y)
8.03
0.26
9.67
East and 27 drill-mpleted claims.
T
2
w
t
NNNNNNNNNNNNNNNNN
The best int 1.57 3.01 1.89 6.15 4.47 6.04 5.39 4.53
2014: On ANordeau Grout a samp2011. The pand to verauriferous zwhere 1,198holes from t27 samples the re-samp
Tab
Hole ID
NE-11-01 NE-11-02 NE-11-03 NE-11-04 NE-11-05 NE-11-06 NE-11-07 NE-11-08 NE-11-09 NE-11-10 NE-11-11 NE-11-12 NE-11-13 NE-11-14 NE-11-15 NE-11-16 NE-11-17 TOTAL:
tervals from7 gpt Au ove1 gpt Au ove9 gpt Au ove5 gpt Au ove7 gpt Au ove4 gpt Au ove9 gpt Au ove3 gpt Au ove
April 26, 20roup of claimpling campapurpose of trify the feazones (GM68 samples (the Nordeau(33.3 m) w
pling progra
ble 6.9: Su
Length (m)
357 513 597 501 648 600 501 456 599 600 585 600 402 501 500 399 399
8,758
m the 2011 cer 4.80 m aner 1.50 m (her 3.00 m (her 1.00 m (her 1.00 m (her 0.60 m (her 1.00 m (her 3.00 m an
013, Globexms that had aign on drilthis samplinasibility of 68593). Mos(1,482.85 mu East blockwere collecteamme are pr
ummary of
Azimuth
180° 180° 221° 180° 180° 181° 195° 180° 180° 180° 180° 177° 180° 180° 180° 180° 180°
campaign onnd 1.36 gpt hole NE-11-hole NE-11-hole NE-11-hole NE-11-hole NE-11-hole NE-11-nd 5.23 gpt
x Mining Enbeen optiol-core from
ng was to tetracing min
st of the sam) from 22 dk were samped from threresented in
East Cadil
2011 Nord
h Dip
-70° -60° -75° -60° -75° -62° -68° -60° -70° -70° -70° -67° -60° -70° -70° -60° -50°
n Nordeau EAu over 3.002); 06); 09); 10); 11); 15); Au over 1.8
nterprises Inned to Plato
m work comest previousneralizationmpling wasdrill-holes wpled for a toee drill-holeTable 6.10
llac Gold Proj
deau East D
Easting (UTM-X)
334724.92334726.70334725.96334797.89334797.89334956.03335051.30335149.30335150.84335298.48335452.03335600.42335750.53335750.46335824.64335899.65336100.68
East were: 05 m (hole
80 m (hole
nc. recovereo Gold Corp
mpleted by Ply un-samp zones acr concentrat
were collecteotal of 45 saes from the 0.
ject – 2017 T
Drill-Holes
) No(U
2 53190 53196 53199 53199 53193 53190 53190 53194 53198 53193 53192 53193 53196 53194 53195 53198 5319
NE-11-01);
NE-11-17).
ed 100% op. In June 20Plato Gold led potentiaross non-sated in the Ned and re-anamples (52.Bateman bl
Technical Rep
orthing TM-Y)
9598.68 9747.06 9748.70 9744.29 9744.29 9748.92 9696.76 9497.53 9644.88 9651.00 9649.41 9648.42 9446.77 9498.38 9446.24 9449.76 9347.11
of the rights014, Globexbetween 20
al mineralizeampled areNordeau Wenalysed. Thr6 m). An adlock. Best re
port 29
s to the x carried 006 and ed areas as near
est block ree drill-dditional esults of
t
Hole ID
PG-06-0PG-06-0PG-06-0PG-06-0PG-06-0PG-06-2PG-06-2
6.1.2 Bate
6.1.2.1 His
1946-47: Mmagnetic smagnetic a(1,500 m). the holes w
1949: Oneoon the sout
1954: Malaarea, whichgeochemicaGM39327). induced pol
1970: Umexpart of the
1979-82: Sout magneGM35513; G
1981-82: electromagn
1983-85: Bpart of thgeochemicaanomalous
1988: Bateand an indanomalous
1989-90: MBateman Banomalies (
Table
D
06 08 08 09 09 21 21
eman claim
storic work
Mining Corpurvey (GM0nomalies wLocations oere drilled o
onta Pershinh-east part
rtic Gold Fih included pal and electr
During thearization su
x completedproperty.
OQUEM (Soetic (Mag) GM36435) t
Wescap Ennetic survey
Bateman Bayhe block ral survey dovalues of go
man Bay Mduced polaraxes.
Mines Vauquay Mining C(GM47922;
6.10: Best
From (m)
271.60 169.50 234.00 294.80 297.00 351.20 376.00
m block
k
. of Canada06675A) an
were noted aof the drill-hon the Batem
ng Mines Ltdof the prop
ields Ltd. cparts of theromagnetic e same yeaurveys run fo
d geophysic
ociété Québéand electr
that covered
nergy Corpys (GM3729
y Mining Corevealing sone by Bateold and arse
Mining Co. crization (IP)
uelin Ltd. eCo., and deGM49666).
t results of
a covered thnd geologicand subseqholes are shman claim b
d. intersecteerty.
ompleted ae Bateman surveys wer, the east or Newkirk
cal magnetic
écoise d’expromagnetic d much of th
p. Ltd. co1; GM38554
o. carried oeveral souman Bay Menic.
completed a) survey o
expanded thefined addit There follo
East Cadil
f Globex Re
To (m)
272.85 171.00 235.50 296.00 298.00 363.00 385.00
he southeascal mappingquently testehown but noblock.
ed a graphit
n airborne claim block
ere done on part of the
Mining Corp
c and electr
ploration mi(EM) geop
he Bateman
overed the4).
ut a magnetheast-trenining Co. ov
a magnetic n two part
he area of tional east-owed an Ind
llac Gold Proj
e-sampling
Inter
11111
19
stern part og (GM06677ed with fouo logs are i
tic sulphide-
survey covk (GM38618
the east pae property wp. Ltd. (GM0
romagnetic
nière) optiophysical sun block.
e Bateman
etic/electromding anomver part of
survey (totts of the p
geophysicato southea
duced Polari
ject – 2017 T
g Programm
rval (m)
1.25 1.50 1.50 1.20 1.00 1.80 9.00
of the prop7). Strong ur drill-holencluded in t
-rich horizon
vering the M8; GM39325art of the pwas covere03439)
surveys ove
oned the prourveys (GM
block wi
magnetic sumalies (GM4
the block (G
tal field andproperty an
l coverage ast-trendingization geop
Technical Rep
me
Au (g
3.42.23.33.58.11.51.1
erty with asoutheast-ts totalling 3the report.
n in one hol
Machi-Manit5). As a fo
property (GMd by magn
er the south
operties and37355; GM
ith magne
urvey over t40036). AGM43286) r
d vertical gnd outlined
begun in 1 exploration
physical sur
port 30
gpt)
5 3 3 7 3 0 3
ground trending 3,176 ft None of
e drilled
ou Lake llow up, M03669; etic and
heastern
d carried M38857;
tic and
the east humus
returned
gradient) several
1988 by n target rvey and
tf
2
w
a 15-hole, 1(GM48410)14 on the B71.30 m), w66.8 m); 7.m (hole BA-
1990: Explsampling su
1990: Mineinterval en(GM49659)traced for mfrom the 19
Table 6
6.1.2.2 Re
2009: In lathole was abweakly auriand arsenop
1,557.22 m . The drillinBateman clawith some v.83 gpt Au o-88-14, 76.0
oration Mourvey over t
s Vauquelincountered . This drillinmore than 988 and 199
6.11: Select
HI
BA9
BA9
BA9
BA9
BA9
BA9
BA9
BA9
BA9
BA8
cent work
te 2009, Plabandoned afferous zonepyrite (2%)
diamond-dg programm
aim block: 3visible gold over 2.00 m05 m - 76.4
nicor Inc. ethe property
n Ltd. drilledin hole BA
ng defined tw100 m late
90 drilling ca
ted Best Re
Hole ID
Gra
90-08
90-09 (5.
90-10
90-11
90-12 (9.
90-13
90-15
90-16
90-21
88-14 (3.
* = Cut to
ato completefter 31 m ane (1.19 gpt A, within she
rilling progrme encount3.9 gpt Au (- including
m (hole BA-845 m).
employed Gy, revealing
d 23 holes tA-88-14 (Gwo parallel rally and toampaigns ar
esults From
ade (Au gpt) 2.2 8.0
7) 9.6 * 8.0 1.6 1.4 2.0 3.9 1.0 2.3 1.3 3.1
.7) 10.0 7.4 2.9 1.2 1.0 1.1 3.4 1.0
.9) 12.8 2.1
Au 34.3 gpt ;
ed 2 holes tnd not compAu over 2.8 eared graphi
East Cadil
ramme to teered signific(high assay 9.11 gpt Au88-14, 69.3
Geokemex a few anom
totalling 3,0GM48410),mineralized
o a depth ore summariz
m 1988 an
Interval (m) 0.50 0.30
4.50 ** 2.50 **
0.25 0.30 0.90 1.25
1.80 ** 4.90 **
0.50 2.45 ** 1.90 **
2.50 0.50 1.00 0.35 1.2
2.7 ** 1.5 5.05 0.40
** = well-defin
totalling 802pleted (Tablm) in quart
itic shale at
llac Gold Proj
est a numbecant gold bcut to 34.3
u over 0.553 m - 71.3 m
Inc. to carmalous areas
095 m to teand variou
d gold zonesof 50 m. Sezed in Table
d 1990 Ba
From
143.00156.9829.6545.7552.1552.95
143.30150.1546.8556.2040.7545.5061.9053.8062.970.9086.5513.00
112.2076.5366.2576.05
ned mineralize
2 m on the Ble 6.12). Htz stringers 194.4 m do
ject – 2017 T
er of the geoearing secti
3 gpt) over m (hole BAm); and 2.0
rry out a gs (GM50036
est the laterus other gs (some 10 elected “bese 6.11.
teman Dril
- To (m)
0 - 143.50 8 - 157.28 5 - 34.15 5 - 47.80 5 - 52.40 5 – 53.25 0 – 144.20 5 – 151.40 5 – 48.65 0 – 61.10 5 – 41.25 0 – 47.95 0 – 63.80 0 – 56.30 5– 63.45 0 – 71.90 5 – 86.90 0 – 14.20 0 – 114.90 3 – 78.03 5 – 71.30 5 – 76.45 ed zone
Bateman claole BE09-03mineralized
own-hole (G
Technical Rep
ophysical anions in hole5.05 m (66
A-88-14, 6606 gpt Au ov
geochemical6).
ral extensiogeophysical m apart) th
st” results r
lling Progr
aim block. A3 intersected with pyriteGM65127).
port 31
nomalies e BA-88-6.25 m - 6.25 m - ver 0.40
humus
n of the targets
hat were reported
rams
A third d a e (1%)
2
T
t
Ho
BE0BE0BE0
To
2011: A dia15th, 2011 (block (Tablzones and mineralizati
T
Hole ID
BE-11-01
BE-11-02
BE-11-03
BE-11-04BE-11-05BE-11-06BE-11-07BE-11-08BE-11-09BE-11-10TOTAL:
Holes BE-1best results(Table 6.14
The 2011 dassociated amore southnortherly Ithrough BE1,650 m alo
Table 6.
ole ID
09-02 09-03 09-04 otal
amond-drill(GM66369).le 6.13). Th
to evaluaon.
Table 6.13:
Leng(m)
1 351
2 402
3 351
4 4025 4036 2527 2528 3009 2460 249
3,20
1-01, BE-1s (4.82 gpt 4).
drill-holes oauriferous m
herly IF hosF was inte
E11-05. A nong strike a
.12: Summ
ing campaig. A total of 3he programmate previou
: Summary
gth ) Azim
1 180
2 180
1 180
2 1803 1802 1802 1800 1806 1909 180
08
1-02, BE-1Au over 1.5
utlined twomineralizatiots the historsected by
new auriferond between
mary of 200
Length (
31 (abando402402834
gn by Plato3,208 m in tme was desusly untest
y of 2011 D
muth D
0° -7
0° -7
0° -7
0° -70° -50° -50° -50° -70° -40° -5
1-05 and B5 m) were o
(2) sub-paon similar toorical Batem
Holes BE0ous zone as 10 m and 2
East Cadil
09 Drill-Hol
(m)
oned)
o was carrieten (10) hoigned to invted zones
Drill-Holes
ip Eas
70°
70°
70°
70° 50° 50° 50° 70° 49° 50°
BE-11-08 inobtained fro
arallel, strato those discoman East re09-02, BE09ssociated w215 m verti
llac Gold Proj
les: Batem
A
ed betweenles were co
vestigate thebelieved t
on the Bat
sting (UTM
338480.97
338100.14
337975.74
337802.20337601.93338449.77338617.16338701.23338798.65338897.29
ntersected aom 126.5 m
tiform, iron overed on tsource (Ma9-03 and,
with the norcal depth.
ject – 2017 T
man Claim B
Azimuth
180° 180° 180°
n January 2mpleted on e historic Bato have p
teman claim
M-X) No
7
4
4
0 3 7 6 3 5 9
auriferous m to 128.0 m
formation the Nordeaup 3). The pBE09-04 a
rtherly IF is
Technical Rep
Block
Di
-7-7-7
25th, 2011 athe Batema
ateman minpotential fo
m block
orthing (UT
5319516.
5319660.
5319620.
5319703.5319793.5319152.5319090.5319047.5319052.5319048.
mineralizatim in Hole B
(IF) horizou East Propepreviously uand Holes Bs now defin
port 32
ip
0°0°0°
and May an claim neralized or gold-
TM-Y)
68
02
46
29 05 90 34 39 36 41
on. The E-11-03
ns, with erty. The unknown BE11-01 ned over
w
wt
Table 6.Hole
BE-09BE-11
BE-11
BE-11
6.1.3 Pers
1946-47: Mmagnetic sumagnetic an(1,500 m). was drilled
1954: Malaarea (GM38were done othe same yesurveys run
1958: The eCo. Ltd. (G(GM06528)
1979-82: Sout magneGM37356) surveys foll
1981: A VLPershing-Deof magnetic
1986-88: ADumont CoGM46287).
14: SummID
9-02 1-01
1-02
1-03
shing-Dena
Mining Corp. urvey (GM06nomalies weLocations oon the Pers
rtic Gold Fie8618; GM39on the area ear, the soun for Newkir
eastern partGM06346) a.
OQUEM (Soetic (Mag) that covereowed (GM3
LF-EM surveenain block c iron forma
A geochemiconsulting. This work w
ary of SeleFrom (m
223.30145.90208.30209.00210.20119.70121.00122.00126.50286.00
ain claim b
of Canada 6675A) andere noted anf the drill-hhing-Denain
elds Ltd. com325). As a fof the Pers
uth part of tk Mining Co
t of the propnd an elect
ociété Québéand electr
ed much o7729).
ey by Lynx (GM38329)tion.
cal (humus)Several w
was followed
ected 2011m) To0 230 140 200 210 210 120 120 120 120 28
block
covered the geological nd subsequeoles are shon claim bloc
mpleted an follow up, ghing-Denainhe property
orp. Ltd.
perty was cotromagnetic
écoise d’expromagnetic f the Persh
Canada-Am) outlined se
) survey waeakly anomd-up with a
East Cadil
1 Best Drillio (m) 30.00 46.80 09.00 10.20 10.75 20.00 22.00 23.00 28.00 87.00
e southwestemapping (Gently testedown but no k.
airborne sueological, gn Bateman cy was covere
overed withc survey ru
ploration mi(EM) geop
hing-Denain
meric-Spartoeveral anom
as carried omalous assground geo
llac Gold Proj
ling ResultsInterv
6.0.0.1.0.0.1.1.1.1.
ern part of GM06677). S with four dlogs are inc
rvey coverineochemical claim blocked by magn
h a magneticn by Contin
nière) optiophysical sun block. Ge
on that covmalies coinci
out over thesay resultsophysics (ma
ject – 2017 T
s: Batemanval (m) .70 .90 .70 .20 .55 .30 .00 .00 .50 .00
the propertyStrong soutdrill-holes tocluded in the
ng the Machand electro(GM03603;etic and ind
c survey donental Minin
oned the prourveys (GMeological an
vered the sodent with m
e Pershing-s were obagnetic) sur
Technical Rep
n East PropAu
8010301240
y with a groheast-trend
otalling 3,17e report. On
hi-Manitou Lomagnetic s GM39327)
duced polari
ne by Monong Explorat
operties and37355; GM
nd lithogeoc
outhern parmapped occu
Denain bloctained (GMrvey (GM47
port 33
perty (gpt)
8.01 .20 .62 .68 .05 .54 .80
2.29 4.82 .36
ound ding 76 ft ne hole
Lake urveys . During zation
or Mining tion Ltd.
d carried M38857; chemical
rt of the urrences
ck by P. M44027; 285).
w
w
t
6.2 The Ch 6.2.1 Lac
1966: Raympart of the economicall
1969: Kerr block and dGraphite-ricUp to 20%
1972: SOQassayed for
1975: Spandrilling, norwest extens
1975-76: Mof, and conwork done o1,655.3 ft (gpt Au over
1979-83: SelectromagnGM40058) tprevious woeastern par
1981: Follocompilationreported in metres (GMoccurrence.interest wer
1983-84: Ssouthweste(humus) anthe new cla
1983: Durinof the SimNumerous a
himo Projec
Simon & N
mond TiblemLac Simon ly notable in
Addison Midrilled 4 holech slates witpyrite, 10%
UEM drilledr copper, zin
nex Resourcrth of the Csion of a def
Moss Lake Dtiguous withon the area (505 m) folr 0.30 m) in
SOQUEM (netic geophthat covereork and loc
rt of the Nov
owing a st of statutora few trenc
M39364) in Minor sulre noted.
SOQUEM acrn part of
nd geophysicims (GM401
ng Decembemon West oauriferous in
ct Claims (
Nova claim
mont Gold Mblock to tes
ntervals wer
ines carriedes aggregatth dissemin
% pyrrhotite
3 holes tonc, lead and
es completehimo Mine (fined magne
Developmenth, the Chimat the time
low-up diam hole MV-1
Société Quhysical survd much of cation of pova block. Ge
ructural mary work citiches, SOQU
the westephide mine
cquired 108the Lac S
cal surveys 142; GM410
er of 1983, occurrence, ntervals wer
(Lac Simon
blocks
ines Ltd. drst for a wesre encounte
out a magting 1,329 ftated and loand trace c
otalling 1,42 silver (GM3
ed a ground(GM31231)etic respons
t Co. acquirmo Mine proe, and includmond-drilling(GM32291)
uébécoise dveys (GM37the Lac Simosited mineeological and
apping caming very goUEM carried ern part of eralization w
8 additionaimon block(mag’, EM,
000).
Louvem Minapproxima
re encounte
East Cadil
n, Nova and
rilled 7 holesstern extensred (GM172
g-EM surveyt (405 m) tcally massiv
chalcopyrite
22 ft (433 m35544). Onl
d geophysica. Further drse anomaly.
red a block perty. GM3des drill-logg programm.
d’exploratio7355; GM3
mon block. Weralized zond lithogeoch
mpaign comood gold va
out a 9-hothe Lac S
was encoun
al claims (Nand carrie
IP), and di
nes Inc. drilately 1 kmred. Best re
llac Gold Proj
d Villebon
s totalling 3sion of the C257).
y over the wto test a nuve sulphideswere inters
m) to test Ely minor gra
al mag’ survrilling was r
of claims o1325 comprs, drill-sect
me intersect
on minière)34757; GM3Work includnes (GM350hemical surv
mpleted in lues from e
ole diamondSimon claimntered, but
Nova claimed out geoamond-drill
l 12 holes tm west of esult are sho
ject – 2017 T
blocks)
3,000 ft (91Chimo Mine
western parmber of cons accountedsected (GM3
EM and graades were e
vey over anrecommende
n Lac Simorises a comions, and plted 0.32 oz
) carried o38857; GMded a geolog007; GM355veys followe
the summeearlier drilli-drill campa
m block, net no gold
m block) coological mapling work (5
totalling 2,9the Chimo own in Tabl
Technical Rep
5 m) on thee mineraliza
rt of the Lanductive anod for the ano38605).
vity anomancountered
area with ped to test th
n claim blocpilation of plan maps. A
z/t over 1 ft
out magneM35513; GMgical compi513), included (GM3772
er of 1981ng and nataign totallinear the Bluvalue of e
ontiguous wpping, geoc5 holes - 73
69 m in theMine (GM
le 6.15.
port 34
e central tion. No
c Simon omalies. omalies.
alies and .
previous he east-
ck, west previous A 4-hole, t (~11.0
etic and M37356; lation of ding the 29).
1 and a ive gold
ng 1,311 e Grass conomic
with the chemical 9 m) on
e vicinity M41830).
T
t
v
t
Table 6.15Hole ID
07-83-0107-83-0107-83-0207-83-0307-83-0307-83-0407-83-0407-83-0407-83-0407-83-0407-83-0407-83-0407-83-0407-83-0807-83-0907-83-1207-83-12
1984: Wordiamond-drintrusion knporphyry dy
The observobserved ocollected anm) and 0.62
1984-85: Gclaim block to test variGeophysica
1986: In Jaholes in thamounts of
1987: In Javicinity of tnote were in
1987: In thSimon Projeexcavated arocks, was Mine, locatethe availabl
5: Best Res F1 1 2 3 3 4 4 4 4 4 4 4 4 8 9 2 2
k by SOQUrilling in 3 hnown to hosyke is transe
ed veins an the surfacnd analysed2 gpt Au ov
Golden Pond(eastern pa
ous magnetl (VLF-EM) s
nuary and Fhe vicinity
gold were n
anuary, Chathe Chabelantersected.
he summer ect, approxalong the codesigned to
ed approxime literature
ults From From (m)
193.3199.4199.8176.6221.3
87.394.9
117.6140.2252.5257.0252.5256.2128.4
88.5164.6401.3
UEM in 198holes, the pst sulphide-ected by fau
nd mineralice and in e. Best resuler 0.50 m (
d Resourcesart of Lac Stic and condsurveys and
February, Cof the Chanoted from
bela Mineraa-Vauquelin
of 1987, Limately 1 kontact betwo intersect
mately 1 km .
1983 Louv T
30 44 82 62 34 30 95 68 20 56 03 56 29 47 53 63 39
84 on the purpose of w-bearing (Pyults anomalo
zation in dearlier drill-hlts were 0.7hole 958-84
s acquired gSimon blockductive anod geological
habela Mineabela-Vauqutheir assaye
ls Inc. drilleoccurrence
Louvem undkm west of tween the Ch
mineralizedto the east
East Cadil
vem DrillingTo (m)
193.90200.18200.62177.54222.15
89.4396.50
118.22141.50253.58258.13254.55259.69129.68
93.28167.69403.68
Nova claimwhich was ty-Asp-Po-Auous in arsen
rill-core weholes. A tot72 gpt Au ov4-8; 74.95 m
ground nort), and drille
omalies outlmapping w
erals Inc. druelin occurred core sam
ed 5816 ft (e (GM45332
dertook thethe Chimo imo volcani
d zones 4 at. No further
llac Gold Proj
g, Simon WInterv
block (GMto evaluate u) quartz-tonic, and hos
ere noted ttal of sixty-ver 15 cm (m - 75.45 m
th of the Ced 14 holes ined by pre
were also car
rilled 3,380 rence (GM4mples.
(1,773 m) in2; GM45943
e constructiMine (MB88c band andnd 3 west r informatio
ject – 2017 T
West Occurval (m)
0.60 0.74 0.80 0.92 0.81 2.13 1.55 0.54 1.30 1.02 1.10 1.99 3.40 1.21 4.75 3.06 2.29
M41804) coa small au
ourmaline vests the Maril
o be simila-three (63) (hole 958-8m).
himo Mine totalling 27
evious explorried out (G
ft (1,030 m43495; GM4
n 10 diamo3). No mine
on of an a8-14). This the centraat the 125
on on this ve
Technical Rep
rrence Au (g
omprises 33uriferous poeins. An asyne gold sh
ar to those core sampl4-6; 8.60 m
and Nordea7,619 ft (8,oration (GMM42504).
m) in 7 diamo43684). On
nd-drill holeeralized inte
ccess rampeast-dippinl band sedimlevel of the
enture was
port 35
pt) 11.48
3.803.653.122.785.563.433.363.914.903.023.851.786.407.132.643.32
32 m of rphyritic sociated
howing.
already es were
m - 8.75
au West 418 m),
M42328).
ond-drill ly trace
es in the ervals of
p on the g ramp, mentary e Chimo found in
f
V
t
t
v
2
T
1988: In thdiamond-drnorth of thefrom their a
1988: CamVillebon cladrilling and states that turbidite-dointerpretatioand Trivio gthe south a
1989: Cam5,457.5 mecurrent Lacoverburden samples wit
Sulphide mchalcopyriteholes southobtained frobserved involcanic rocNOV87-06: and from h(151.9 m -
1989-90: MBateman Banomalies (GM47922; 1,557.22 m(GM48410)of the proje
2003: MiraSimon blocThe holes inof 3.26 gpt noteworthy
he first quarill holes in e Chabela-Vassayed core
bior Inc. aim blocks. heavy minethe results
ominated Poon dictated groups, muss some wor
mbior Inc. retres in 198 Simon anddetermine
th a total int
mineralizatioe, was founhwest of throm the hon 2 quartz cks. Best re6.1 gpt Au
hole NOV87154.6 m); 3
Mines Vauquay Mining Con the easGM49666)
m diamond. No signific
ect.
bel Resourck and compntercepted tAu over 0.6.
arter of thethe extremVauquelin oe samples.
cquired a gCambior caeral geochems of the drilontiac Groupthat the Cast pass thoukers had pr
eported res7-88 (GM49
d Nova claimd from an terval lengt
n (trace tod in associa
he Chimo dles drilled and carbo
esults from t over 0.6m -08: 1.6 gp3.5 gpt Au o
uelin Ltd. eCo., and destern part . There follo-drilling prcant minera
ces Inc. acqpleted ten (the targeted65 m in hol
e year, Baree northwes
occurrence (
group of claarried out a mical sampllling prograp rocks, notadillac Fault ugh the norreviously sug
sults from a9340). Thesm blocks anearlier bas
h of 1,959 m
o 5%), comation with qdeposit (Laon the Novnate veinlethe diamond(84.9 m -
pt Au over over 3.2 m
expanded thefined additof the Lac owed an Indrogramme alized interv
quired a sm(10) shallowd mineralizee FV-03-03
East Cadil
exor Mineratern part of(GM48022).
aims comprcomprehen
ling programmme indica by the TrivZone, a reg
rthern part ggested.
a 16-hole dse drill-holesnd targeted sal till sampmetres were
mprising maquartz and c Simon clva claim blets associatd-drilling pr87.5 m); 13.7 m (74.(301.5 m -
he area of tional east-
Simon bloduced Polarto test a
vals were en
mall group ow diamond-ed zone; ho(26.75 m -
llac Gold Proj
als Inc. drilf the curren. Only trace
rising most nsive overbmme (GM46ate that thevio Group, agional structof the East
diamond-drs were concanomalous
pling prograe collected a
ainly pyrite,carbonate vlaim block)lock. Gold ted with a rogramme w.3 gpt Au o.8 m - 78.5304.7 m).
geophysicato southea
ock, north ization geopnumber o
ncountered
of claims in-drill holes towever, with- 27.4 m), t
ject – 2017 T
led 6,585 fnt East Cade amounts o
of the Lacurden rever
6939). The ae property as was poputure that seCadillac Go
rilling progrcentrated ins gold conceamme. A tand analyse
, arsenopyrveins and v). No signifflecks and fault cross
were from oover 4.3 m (5 m); 1.8 g
l coverage ast-trendingof the Nor
physical surof the geopfrom holes
n the westetotalling 43h the excepthe gold ass
Technical Rep
ft (2,007 millac Gold pof gold wer
c Simon, Norse-circulatiauthor of this underlainularly believeparates theold Property
ramme aggn three areaentrations intotal of 1,3ed for gold-c
rite, pyrrhoveinlets in tficant resularsenopyri
sing Chimo obtained fro(91.0 m - 9gpt Au ove
begun in 1 explorationrdeau Westrvey and a physical andrilled on t
ern part of 31.2 m (GMption of one say values w
port 36
m) in 10 property, re noted
ova and ion (RC)
he report n by the ved. This e Pontiac y, not to
regating as of the n glacial 59 core
content.
tite and the drill-ts were te were horizon
om holes 95.3 m); r 2.7 m
1988 by n target t claims 15-hole, nomalies this part
the Lac M61314).
interval were not
w
t
t
tw
6.2.2 Ville
1946-47: Msurvey (GManomalies wLocations owere drilled
1954: Malaarea, whichthe same ysurveys run
1958: The eCo. Ltd. (Gdrilled on thout by Cont
1962-65: Meastern parsurvey was
1965: Blackblock outlinto uneconom
1979-83: SelectromagnGM40058) previous wolithogeoche
1981-82: Wmagnetic an
1983: Bateeastern paranomalies.
1989-90: MBateman Banomalies oInduced Poto test a nwere encou
ebon claim
Mining Corp. M06675A) awere noted f the drill-h
d on the Ville
rtic Gold Fih included pyear, the ean for Newkir
eastern partGM06346). The mag’ anotinental Mini
Monor Mininrt of the blcompleted
k River Minning a strongmic sulphide
SOQUEM (Sonetic (EM) gthat covereork and locmical surve
Wescap Enend electrom
man Bay Mrt of the V
Mines Vauquay Mining Con the eastlarization geumber of thntered from
block
of Canada and geologiand subseq
holes are shebon claim b
ields Ltd. cparts of thest part of tk Mining Co
t of the propThree diamoomalies (GMing Explorat
ng Co. Ltd.ock. Three in 1963 (GM
ing Ltd. cag conductore mineraliza
ociété Québgeophysical ed most of cation of poys followed
ergy Corp. agnetic surv
Mining Co. cillebon bloc
uelin Ltd. eCo., and detern part oeophysical she geophys
m holes drille
covered thecal mappinquently testhown but noblock.
ompleted a Villebon cl
the propertyorp. Ltd. (GM
perty was coond-drill ho
M06400; GMtion Ltd. (GM
. carried oustrong ano
M13117), an
rried out a r that was tation (GM16
bécoise d’exsurveys (Gthe Villebo
osited miner(GM37729)
Ltd. covervey (GM372
arried out ack (GM4003
expanded thefined additf the Villebsurvey and sical anomaed on this p
East Cadil
e eastern pag (GM0667ted with fouo logs are i
n airborne aim block (y was coverM03439)
overed witholes totallingM08657). AnM06528).
ut a geophomalies wernd an EM su
ground geotested by di6835).
xploration mM37355; GM
on block. Wralized zone).
red the eas291; GM385
a magnetic/36). The su
he area of tional east-bon block (G
a 15-hole, lies (GM484art of the p
llac Gold Proj
art of the pr77). Strongur drill-holesncluded in
survey cov(GM38618; red by mag
h a magneticg 1,353 ft nother elect
hysical magre noted (Gurvey follow
ophysical Miamond-dril
minière) carM34757; GM
Work includees (GM3500
stern part 554).
/electromagrvey outlin
geophysicato southea
GM47922; 1,557.22 m
410). No siroject.
ject – 2017 T
roperty with southeast-s totalling 3the report.
vering the MGM39325;
gnetic and in
c survey do(412.4 m) romagnetic
gnetic (magGM11980). wed in 1965
Mag-EM survling and det
rried out mM35513; GMed a geolog07; GM3551
of the Ville
gnetic surveed several
l coverage ast-trendingGM49666).
m diamond-gnificant m
Technical Rep
a ground m-trending m3,176 ft (1,Three of th
Machi-ManitGM39327)
nduced pola
ne by Monowere subsesurvey was
g) survey oA subseque(GM16375)
vey on the termined to
magnetic (MM36435; GMgical compil13). Geolog
ebon block
ey that covesoutheast-t
begun in 1 explorationThere follo
-drilling progmineralized i
port 37
magnetic magnetic 500 m). he holes
ou Lake . During arization
or Mining equently s carried
over the ent mag .
Villebon o be due
ag) and M37356; ation of ical and
with a
ered the trending
1988 by n target owed an gramme ntervals
Tf
Tv
tt
Af
y
T T
w
A
t
7.0 GEOLO
The East Cfront, in thOrogenic Pr
The Abitibi volcaniclastmafic-ultramhave been cintruded bycontact witcomprises aturbidites wthe Propertsimplicity fr
7.1 Region
Geological uAbitibi Supefrom oldestIsland Grouyounging dsedimentaryGroup. Age supergroupTectonic Zo
The categosuccession, introduced of Val-d'Or highly straidiscontinuitlow-strain dweakly defo
Rocheleau eAssup, GarComplex”), of mixed orand Rochele
Rock units ometamorphmetamorphto the sillim
OGICAL SET
adillac Golde south-eas
rovince (Fig
Greenstonetic rocks wmafic sills, acomplexly d
y late kinemth the Pona monotono
with minor inty have berom the follo
nal Geology
units in theergroup andt to youngesup, and madirection toy Trivio Grorelationship
s are in cne (CTZ).
orization of was re-ex
the conceptinto lithotened and faies (i.e. Gadomains, wormed volca
et al. (1997rden Island,a zone of h
rigin, was ineau et al. (1
of the Abitibism, whereism, rangin
manite-kyani
TTING
d Property istern part o
gure 7.1).
Belt (AGB)ith coeval and plutonsdeformed, matic granodtiac Domai
ous successintercalated veen metamoowing rock d
y
e Val-d’Or ad the Pontiast, volcanic ainly volcanowards theoup, ultramaps between ontact alon
the rocks xamined byt of partitioectonic domaulted multirden Island
which are junic and sed
7), subdivide, Val-d’Or, highly deformnterpreted a1990).
bi Supergroueas Pontiac g from the te zones of
is located aof the proli
comprises clastic and
s of potassiumetamorphoiorite and mn (Bellecomion of highlvolcanic andorphosed, tdescriptions
rea are subac Supergrorocks of th
nic rocks ofe south. Tafic and mathe units o
ng a major
underlyingy Gaudreau ning the va
mains. The h-lithologic a Tectonic Zuxtaposed wimentary ro
ed the rocksTrivio and
med and ans the exten
up are affecSupergroucontact neathe amphib
East Cadil
a few kilomfic Archean
repeated koexhalative
um-poor dioosed to the monzonite pmbe Gneissy deformedd intrusive rthe “meta”s.
bdivided intooup to the she Kinojevis f the Malarthe Pontiac afic volcanicof the Pontiar, regional
the area et al. (19
rious sedimhigh-strain dassemblage
Zone and Trwith the hiock successi
s east of VaVillebon. T
nastomosingsion of the
cted by Greep rocks arear the CTZ, bolite facies.
llac Gold Proj
etres northn Abitibi Gre
omatiitic to sedimenta
oritic to tonasub-greenslutons. The s Belt of Dd, upper grerocks. Altho” prefix has
o two lithossouth. The Group, sedtic Group. T
Supergrouc Villebon Gac Supergrotectonostra
into a stra986) and Rmentary anddomains for
es that are rivio Structuigh strain dions.
al-d’Or into The Trivio g blocks of sCadillac Tec
enschist face character southward .
ject – 2017 T
hwest of theeenstone B
calc-alkalic ary rocks, palitic composchist to gre
southern pDimroth et eenschist toough all of ths generally
stratigraphicAbitibi Sup
dimentary rThis sequeup consists
Group and soup are contatigraphic b
aightforwarRocheleau ed volcanic rorm narrow, coincident
ural Compledomains, fo
five lithotecDomain (or
sedimentaryctonic Zone
cies to lowerized by thefrom uppe
Technical Rep
e Grenville Belt of the S
cycles of laporphyries, osition. Theseenschist facpart of the A
al., 1982)o amphibolithe rocks un been omi
c assemblagergroup com
rocks of thence has ans of the vedimentarytentious. Thbreak, the
rd lithostratet al. (1990ock formatio elongated with major
ex). By contorm large a
ctonic domar “Trivio Sty and volcane by Marquis
r Amphiboliteir higher gr greenschis
port 38
tectonic Superior
avas and layered
se rocks cies and
AGB is in ), which te grade derlying tted for
ges: the mprises, Garden
n overall volcano- Pontiac
hese two Cadillac
tigraphic 0), who ons east belts of
r crustal trast the areas of
ains; the tructural nic rocks s (1983)
te facies grade of st facies
Figure 7.11: Regional Geeology Map of
East Cadillac Go
f Abitibi Green
old Project – 201
nstone Belt sh
7 Technical Repo
howing locatio
ort 39
on of East Caddillac Gold Pro
operty
Tt
Tt
w TT
f VT
tV
T
V
t
7.2 Local G
The volcanothe south (Imreh, 198
The Abitibi tholeiitic voand predomMalartic Growhich unde
Trivio GroupThe Trivio composed opyroclastic greywacke, massive to lapilli tuff, r"Trivio Strufault contac
Villebon GroThe Villebonbetween thcontact (Robrecciated vtholeiitic baVillebon GroPontiac Gro
Pontiac GroThe mainly argillite, wit(Dimroth e(chemically of the seqcharacterizeincreasing ihornblende,Various stuGreenstone
Imreh (198succession Group with rocks. Thescomprising
Kalliokoski lithological the CadillacBelt, and w
Geology
o-sedimentalimb of a 84).
Supergroupolcanic rocksminantly thooup) that arlie the imm
p Group co
of coarse crocks. Themudstone
pillowed, threspectivelyuctural Comct relations b
oup n Group liese Villebon
ocheleau etvolcanic floasalts and aoup as the “up (Gaudre
up metasedim
th minor met al., 1982
similar to tquence (lmed by their n grade sou, staurolite udies sugge Belt suprac
84) believethat stratigthe Dubuiss
se conclusiothe Pontiac
(1987) forand structu
c Fault. Suchere metamo
ary units unregional th
p successions of the La Moleiitic volcaare in contamediate area
mprises a lastic sedim
e sedimentaand iron
holeiitic andy. Rocheleauplex", whichbetween the
s south of tGroup and al., 1990)ws ranging andesites (G“Villebon Litau et al., 19
mentary Pononomictic a2; Mortensethose of the
mreh, 1976bhigher graduthward fro
and sillimest that Pocrustal rocks
d that the graphically oson Formatons are a Supergroup
r one, conral block seh a scenarioorphosed pr
derlying thehe east-wes
n youngs soMotte-Vassaanic rocks oact, to the sa of the Prop
structurallyments, turbiary rocks cformation,
d andesitic bu et al. (199h they chare various m
the "Trivio Sthe ”Trivio
). The Villefrom serpe
Gaudreau ehotectonic D986).
ntiac Groupnd polymict
en and Care Dubuissonb); Rochelee of metamm the biotit
manite-kyanintiac sedims and older
Trivio andoverlay the ion, as bothpoint of cop are unrela
siders thatparate from
o suggests trior to depos
East Cadil
e area aroust trending
outhward, aan and Dubuof the Jacolsouth, withperty and ar
y complex dites, thole
consist of cwhereas v
basalts and 90) renameracterized aixed-origin s
Structural C Structural bon Group entinized koet al., 1986Domain”, an
consists oftic conglomrd, 1993). n Formation)eau et al.
morphism thate zone of tite zones o
ments were volcano-plu
d Pontiac gAbitibi ass
h comprise aontention, aated to the A
t the Pontim Abitibi strahe Pontiac dsition of the
llac Gold Proj
nd the Eastantiform;
nd compriseuisson Forma, Val d'Or the Trivio,re described
sedimentaeiitic and caclast-supporvolcanic and
andesites, ed the Trivioas a lithotecsedimentary
Complex"; hComplex" comprise m
omatiites, to6). Rocheleand infer it to
f a sequencmerate, iron
Thin ultram) are presen 1990). Pan adjacentthe greenscof the amp
derived mutonic rocks
groups consemblage. Ha sequence as other woAbitibi Supe
iac Supergrata, with thedeposits aree Abitibi Belt
ject – 2017 T
t Cadillac Gothe LaMott
es predomimations (Lowr and Heva , Villebon ad as follows
ary-volcanic alc-alkaline rted polymd pyroclastigraphitic a
o Group of ctonic block y and volca
owever, strare obscuremainly maso Mg-rich (au et al. (1o lie stratigr
ce of turbidformation a
mafic to mnt at or nea
Pontiac Grot Abitibi Grechist facies, phibolite fa
mainly from (Mortensen
stituted a He also corr
of mafic to orkers suggergroup form
roup Groupe suture zone older thant. The Villeb
Technical Rep
old Propertyte-Vassan A
nantly komawer MalarticFormationsnd Pontiac :
rock assevolcanic floictic congloic rocks condesitic crySharpe (19based on c
nic rocks.
ratigraphic red by theirssive, pillow(picritic) bas1990) classiraphically be
itic greywaand graphitafic volcan
ar the inferroup sedimeeenstone Be
through tocies (Jolly, erosion ofn and Card,
single sedimrelated the ultramafic
gest that thmations.
p forms a ne correspo rocks of thbon Group,
port 40
y occupy Anticline
atiitic to c Group) s (Upper groups,
emblage ows and omerate, onsist of stal and 68), the complex
relations r faulted wed and salts, to ified the elow the
cke and ic schist ic flows red base ents are lt rocks,
o garnet, 1978). f Abitibi 1993).
mentary Villebon volcanic he units
distinct nding to e Abitibi which is
t T
f
T
t
f Tt
t
T
t
w T
south of thethe Pontiac
The geologiaccurately dstudies (Gaof the Chimfault lies mu
One of the observed inTrivio Grouconformity metamorphobscured bythat, basedstratigraphiincluded th(GM46939) Sharpe inclfrom amphi
The type anthe area is contend thathe Abitibi restricted tcorridor assso-called Cstructural dprecipitation
7.3 Proper
Most of the(TSC), a kilTectonic Zoranging in trock into hethe secondimportance ways for su
The sedimeapparent thgrained qua3) coarse-gnarrow, lenalmost 1 kduring the northern vomainly comash tuff, lapis observed
e Cadillac Fadomain and
ic disparitiesdelineated iudreau et a
mo Mine; howuch farther
main criten the rocks p rocks wewith it, w
osed than y recrystallizd on litholc discontinu
he area nowcorroborateuded in hisbolite to gre
nd age of rostructurally
at: 1) the TrPontiac cono Trivio Grsociated to thimo horizodiscontinuityn of minera
rty Geology
e East Cadiometres-wi
one (Figurethickness aectometric tary fracturto the minlphide- and
entary rockshickness, anartzo-feldsprained felds
nticular bankm, are inte
sedimentaolcanic bandposed of anpilli tuff andin the Trivi
ault and encd not correla
s in the litein eastern Lal., 1986; Swever, Quebsouth.
ria used tounderlying
re depositedwhereas th
the inter-zation and tlogical, meuity occurs aw covered ed Sharpe'ss Trivio Groeenschist fa
ock present y controlled,rivio and Vilntact (i.e., roup rocks the Cadillacon, which y associatels from auri
y
llac Gold Pde deformae 7.2). Thend intensityto kilometricring and brneralization
gold-bearin
s of the Trivnd comprise athic sandsspathic sandds of masserbedded wtion proces is compose
ndesitic basad felsic bloco Group fro
closed by Poated with th
rature are tLouvicourt aauve et al.,bec governm
determine the East C
d rocks on e more sovolcanic sethe imprint etamorphic along the nby the Eas
s observatiooup some Pacies.
on the prop, occurring lebon groupthe Cadillacin the vicin Fault, whicpasses trand with theferous, sulp
roperty is ution corrido
e TSC is chy, commonlc “lozenges”recciation tas they are
ng solutions
io Group tha rhythmic
stone and sidstone and;sive and pilwith the sedss (Figure ed of basalt alt and interks and grapm west to e
East Cadil
ontiac Grouphe Dubuisso
the reason tand Vauque, 1987; Macment compi
the positioCadillac Gold
top of the outherly Poedimentary of a regionaand struct
orth edge ost Cadillac ons (MacNeiPontiac Grou
perty is largmainly in a
ps are part oc Fault); 2)nity of the ch is the mansects the e Cadillac Fphide-rich hy
underlain byr interpretearacterized y referred t” of relativethat have ae interpretes.
at underlie c sequence oiltstone; 2) 4) local intlowed basadimentary u
7.3). Accoand magne
rstratified aphitic schisteast.
llac Gold Proj
p rocks shon Formation
that the poselin TownshcNeil and Avlation maps
on of the Cd Property. Abitibi Belt
ontiac Domrocks, and
al foliation".tural informof the PontiaGold Propel and Averiup metased
gely irrelevaassociation wof the Ponti) the Trivio Property, i
ajor control East Cadilla
Fault Zone,ydrotherma
y rocks of ed as the ea
by anastomto as “shealy undeformaffected thd to have a
the Propertof proximal a magnetit
terbeds of pltic lavas, wunits showiording to Resian basalt,ndesite withs. A gradua
ject – 2017 T
uld then ben of the Abit
sition of thehips. It is inverill, 1988)s (SOQUEM,
CTZ is the mSharpe (19
t volcanic pmain rocks d their prim. Sharpe (19mation, a ac Domain. erty, and dll, 1988) bu
diments tha
ant as all gowith shear zac SupergroStructural
s part of aon mineralac Gold Pro that was l fluids.
the Trivio Sastern extenmosing defar-zones”, tmed rock. The host rocacted as the
ty range froturbidites m
te-rich bandpolygenetic with an appng that volRocheleau , whereas thh lenticular al increase i
Technical Rep
e included astibi Belt.
e CTZ has nnterpreted b) to pass ju, 1978) indi
metamorphi968) supposile and in aare "muc
mary textu968) also remajor tectSharpe's m
drilling by Cut also showt were retr
old mineralizzones. The oup and lie Complex, w
a wide defoization; andoperty, is aa conduit
Structural Cnsion of the ormation cohat divide the shear-zoks are of e principle
om 200 to 8made up ofded iron forconglomeraparent thicklcanism waet al. (198he southernzones of cryin pyroclast
port 41
s part of
not been by some ust north cate the
ic grade sed that apparent h more
ures are emarked tonic or
map area Cambior wed that rograded
zation in Authors south of which is ormation d, 3) the a major for the
Complex Cadillac
orridors, the host ones and primary passage
800 m in : 1) fine rmation; ate. Two kness of s active 88), the n band is ystalline tic facies
FFigure 7.22: Simplifieed geologiccal map o
East Cadil
of southeas
llac Gold Proj
stern part
ject – 2017 T
of Abitibi
Technical Rep
i Greensto
port 42
ne belt
FFigure 7.3: Ge
East Cadillac Go
eology underly
old Project – 201
ying the East
7 Technical Repo
Cadillac Gold
ort 43
d Property.
T
Tvt
t T
A
T
t T
tt
A
The northehorizons of
The IF banvarying fromthe top of magnetic-ato the east,
The contacindicated bynear the No
A simplified
7.4 Geolog
The stratigrpillowed basiltstone anmafic volcasedimentarytonalitic, co
The local st(average 70bedding annorth-southProterozoic
Most commthe sedimethe volcanic
7.5 Minera
Gold mineraCadillac Faudeposit whemetamorphassociated w
A number oavailable onunderlie the
rn sedimenstrongly fol
nds consist m 0.2 mm t
the beds. nomaly map where it ha
cts betweeny the commordeau West
stratigraph
gy of Norde
raphic succesalts and an
nd lesser coanic rocks, y unit. Hostmmonly qu
tratigraphy 0º), and yod to the lat
h and northediabase dik
monly observntary rocksc rocks. Gar
alization
alization in tult or subsidere gold occosed volcanwith banded
of gold occurn-line (http:e Property. T
ntary band ded iron for
of beds ofto 50.0 mmThe magn
ps for more as been inte
n the volcamon occurrent deposit.
hic column f
eau West D
ession in thendesites, ovonglomerateup to 400 t Trivio Groartz- and fe
is overturneounging souter shear zoeast-southw
ke on the No
ved alteratis, and; chlornets occur l
the area frodiary structucurs with qunic rocks andd magnetite
rrences, cat//sigeom.mThe principa
(north ofrmation (IF)
f intercalatem in thicknesnetite-rich b
than 15 kmersected by
anic and sence of talc-c
or the East
Deposit
e area of thverlain by; 2e, and “topp
m thick (toup rocks aeldspar-phyr
ed, striking uth. A well-dones that awest faults aordeau East
on types aroritization, alocally, part
m Rouyn toures. This is artz and arsd in bands oiron format
talogued by mines.gouv.qal occurrenc
East Cadil
the southe) that vary f
ed wacke, sss, with thebanded ironm from the fdrilling.
edimentary chlorite-seri
Cadillac Go
he Nordeau 2) a central ped” by banthe Chimo re intrudedric dykes.
generally edeveloped rre present tare reportedclaim block
re: epidotizamphibolitizticularly with
o Val d'Or haevident at t
senopyrite iof semi-mastion (Sauve
MRNF Quebqc.ca/signetce are summ
llac Gold Proj
ern basalt bfrom 3 m to
siltstone, che amount ofn formationformer Chim
units is gicite schist a
ld Property
West depossedimentar
nded iron fovolcanic un
d by thick (
east-west (~regional schthroughout d, at least k.
ation, carbozation and hin the iron
as a strong the Chimo Mn longitudinssive arseno et al., 1987
bec with dest/classes/I1marized as f
ject – 2017 T
band) incluo 70 m in ap
hert and mf magnetite n is traceabmo Mine to L
generally stalong their
is shown in
sit consists ry unit madormation; 3nit) overlain1 m - 30 m
~ 295°), diphistosity (S2the immedone of whic
onatization silicificationformations
affinity for Mine and thnal shear zoopyrite and 7).
scription an102_indexAfollows:
Technical Rep
des at leaspparent thic
magnetite laincreasing
ble on geoLake Machi-
trongly shecontacts, es
n Figure 7.4
of: 1) massde up of gre) a central
n by; 4) thm), granodi
pping steep2) is sub-padiate vicinitych is occupi
and silicificn/carbonatiz.
areas near te Nordeau wnes in pyrrhotite
d metadataAccueil?l=a)
port 44
st three kness.
aminates towards
ophysical -Manitou
ared as specially
4.
sive and ywacke, band of
he south ioritic to
ply north arallel to y. A few ied by a
cation of zation of
the west
,
Figuree 7.4: Simpplified strattigraphic cP
East Cadil
column for Property.
llac Gold Proj
the area o
ject – 2017 T
of the East
Technical Rep
Cadillac Go
port 45
old
t
A
“
w
T
T
f
T
f
Nordeau W
Gold mineranorth to southe Trivio Gsporadic tusheared roc
Gold is founbrown tourdeformationsome amouintergrown
All reportedand dippingpreviously ebeen interspattern of t“ore grade”corridors. N25 m of pyrwestern pareferred to
The other mhave irregu#2, and 30100 m eacnorth of str
Selected bein Section referred to S
Nordeau E
The most s#2, #3) relof interbedstructures afollow stratless than 2
The minera(pyrite, pyrgarnet and 1988). Combiotitization
Structure #continues geach other further east
West: Occu
alization on uth as NorthGroup. Walffaceous ho
cks include s
nd in breccirmaline, can corridors unts of pyrwith arseno
d structures g 55-70° toestimated), ected at a the lenses ” intersecti
Neverthelessroclastic roc
art of the pas the “Main
mineralized lar continuit
0 m south oh. Sporadicuctures #1
est intervals6 of this
Section 14
ast: Occur
ignificant mated to the
dded mudstare made uigraphy andm thick on
alization conrrhotite, arsgold. Gold i
mmon alteran.
#1 was tracgenerally eafor some 13t and possib
rrence # 3
the Nordeah, #1, #2, l rocks are orizons andsilicification,
ated zones arbonates a(Jean, 1990rite, pyrrhoopyrite.
are more oo the northtransect thdepth of 60puts into qons may as, it is reporcks in the eproperty. Fon” zone.
zones (#3 ty, and incoof a graphitc intersectioand #2.
from recenreport. For
4.
rence # 32
mineralizatio upper iron tones, siltsup of gold-bd the strongaverage.
nsists in 1-senopyrite ais found as ation of wal
ced for 450 st-west for
30 m, and ably in a strat
32C/03-006
au West bloc#3) within massive to
minor gra, amphibolit
cemented wand sulphid0). Arsenopytite and tra
or less imbeh. Zones #1he Nordeau 00 m locallyuestion the
appear to brted that strastern part or this reas
and North) onsistent goic marker h
ons show th
nt drilling bythe Minera
2C/03-005
n on the Noformation
tones, greybearing, sug, regional
5% dissemand traces free grains l rocks inclu
m laterally220 m. Bo
are stratigratigraphic po
East Cadil
60 (NI 43-
ck is found shear-zoneso pillowed ophitic schis
tization, car
with grey sdes in an yrite is the aces of cha
dded into th1 and #2 (West claim
y. As pointee geological be randomlructures occof the prop
son, Zones
are less weold mineralizhorizon, hashat the Nor
y Plato on tal Resource
55 (historic
ordeau Eastof the Trivioywackes anlphide-rich E-W schisto
minated sulpof chalcopyin quartz orude amphib
y, whereas oth extend taphically lesosition simila
llac Gold Proj
-101 Miner
in 4 distincs that transor brecciatests. Commorbonatization
moky quart“en échelomajor sulpalcopyrite.
he regional (for which
m group for ed out by Jand assay
y located wcupied by Zoperty, merg #1 and #
ell understozation. Zones been definrth Zone oc
he Nordeau Estimate o
c resource)
t claim blocko Group sednd iron forquartz vein
osity, dip fr
phides or seyrite) in assr as inclusiobolitization,
structure #to a depth s than 30 mar to #1, ha
ject – 2017 T
ral Resourc
ct lenses or sect the mafed basalts on alterationn and biotiti
tz lodes, veon” patternhide constitGold is fou
schistosity historical re600 m alo
Jean (1990)continuity
within the ones #1 ane into a sin
#2 are som
od as they e #3, whichned along tccupies a po
u West occuon this dep
)
k is found idimentary rrmations. Tnlets and vrom 50º to
emi-massivsociation wions in the suchloritizatio
#2, to the sof some 20
m apart. Stras been trac
Technical Rep
ce)
zones (knowfic volcanic and andesitn processesization.
eins or veinl within thtuent (3-15und as free
striking N28eserves havng strike a), the “en eacross strikwider defod #2, separgle structur
metimes col
are poorly is south of
two traces oosition som
rrence are posit, the re
n 3 structurrocks, whichThe 3 sub
veins that g75° north,
e sulphide th quartz, ulphide mineon, silicificat
south struct00 m. They ructure #3, ced for some
port 46
wn from rocks of tes with s of the
ets with e wider %) with e grains
80-290° ve been nd have echelon” ke since ormation rated by re in the lectively
defined, f #1 and of about
me 30 m
included eader is
res (#1, h consist -parallel
generally and are
veinlets chlorite, erals (b, tion and
ture #1, parallel
which is e 240 m
w A
T
“t
t
T
t A
A
T4
t
laterally andwere estima
A fourth mishear zone disseminate
Selected beoccurrence
Bateman (
There is on1990 drillinpart of the “smoky” quthin inclusiostratigraphithickness rhistorical dr3.9 gpt Au a
Simon Wes
The Simon considered and mineraof the Trivgreywackesschistosity.
In the summProject. Locexcavated arocks, was Mine, locatethe availabl
According to GM4
83.8 GM3
Insm
SIGEOM listAu for lens
Bluegrass:
This occurre450 m, flagreywacke, trace chalco
d to a depthated from q
neralized stthat transe
ed sulphides
est intervalszone are sh
(East): Occ
nly one repog campaignclaim grou
uartz veins cons and coacally. They anging fromrill-hole inteacross 5.05
st: Occurre
West occuto be the wlogical char
vio Group ss and iron foSeveral en
mer of 1987cated approxalong the codesigned to
ed approxime literature
o the SIGEO41830 - 7.18); 11.49 gp32291 - 11.3mill, 1945).
ts historical B.
: Occurrenc
ence compranked to th
argillite anopyrite. Ars
h of 150 mualifying po
tructure on ects mafic vs in carbona
s from recehown in Sec
currence# 3
orted gold on on Batemaup. Both lencontaining 2atings on thcan be trac
m 1.2 to 3ercepts from
m (GM484
ence # 32C
urrence is lwestern exteracteristics. sedimentaryormations, aechelon sty
7, Louvem uximately 1 ontact betwo intersect
mately 1 km .
OM on-line d13 gpt Au opt Au over 032 gpt Au o
“reserves”
ce 32C/03
ises quartz-he north annd conglomsenopyrite o
. As reporteortions of ea
Nordeau Eavolcanic roctized and ch
ent drilling ction 6 of th
32C/03-20
occurrence an East delinnses are as2-5% dissemhe sulphide ced for abou.9 m. Tabl
m the Batem10; GM4965
C/03-0052
located appension of thMineralizati
y rocks, whand occur ayle lenses ar
undertook thkm west of
ween the Chmineralizedto the east
database, thover 3.75 m.59 m (sam
over 0.30 m
as 67,000 t
-0050
-veins in a 1nd the sou
merate, the occurs as fin
East Cadil
ed in a prevch of these
ast carrying cks south ohloritized ro
by Plato inhis report.
005 (histor
of some signeated 2 gossociated wminated arsgrains. The
ut 100 m latle 6.11 in an East pro59).
(historic r
proximately he Chimo Mon appears hich consiss lenses pare interprete
he constructthe Chimo imo volcani
d zones 4 at. No further
he best recom (hole 83-
mple 83-1);m (sample M
t grading 6.3
1.5 m wide uth by volc
mineralizatne to coars
llac Gold Proj
vious section3 structure
erratic, lowof the iron focks with we
n the weste
ric resourc
gnificance oold mineralizith graphitisenopyrite ae two zoneterally and tSection 6
operty. The
resource)
1 km wesine horizon to be relatt of interbrallel to theed over a st
tion of an acMine (MB88c band andnd 3 west r informatio
orded assays-9); 11.45
MV1; 38.06
30 gpt for le
shear-zone canic rockstion consistse dissemina
ject – 2017 T
n, historicales.
w-grade goldformation, aell-develope
ern part of
ce)
on the Batezed lenses ic shales thand free gos are paralto a depth o
6 of this rebest record
st of the Cs as it hosted to the u
bedded mude stratigraphtrike of appr
ccess ramp 8-14). This the centraat the 125
on on this ve
s are as follgpt Au ove
g / t Au ov
ens A and 3
over a strik. Hosted wts of arsenoations asso
Technical Rep
mineral “re
d values occand contain
ed garnets.
f the Norde
eman propein the south
hat are intruld, which oclel and 10 of some 50 eport lists ted intersect
Chimo Minets similar gepper iron fodstones, silhic units anroximately 1
on the Simeast-dippinl band sedimlevel of the
enture was
ows: er 0.61 m
ver 1.52 m
34,000 t at 6
ke of approxwithin Trivioopyrite, pyciated with
port 47
eserves”
curs in a ns 1-5%
eau East
rty. The h central uded by ccurs as m apart m, with
the best tion was
e and is eological ormation tstones, d to the 1.2 km.
on West ng ramp, mentary e Chimo found in
(sample
(hole 6,
6.90 gpt
ximately o Group rite and parallel
t
carbonate-atrenches.
SIGEOM list GM4
gpt A GM
gold
altered shea
ts the best r41830 - 8.90Au over 0.368973 - 19(sample K4
ar zones inje
recorded as0 gpt Au ov0 m (hole 5
9.55 gpt go482031).
ected with q
say results ver 1.50 m (5B); 1.82 gpld (sample
East Cadil
quartz. Nativ
as: (hole 1); 11pt Au over 120508), 1.3
llac Gold Proj
ve gold, is r
1.00 gpt Au 1.55 m (sam32 gpt gold
ject – 2017 T
reported in
over 0.40 mpling 7-83-d (sample K
Technical Rep
drill-core an
m (hole C4)-11); K482026), 2
port 48
nd a few
); 10.15
2.55 gpt
tf T
tt
f
8.0 DEPOS
Gold mineragold occurre
1. gold (arseformmine
2. strucquarfounand
Both types to 5% whenformations.
The best intor near the the entire Ithat a mineat the ironauriferous, derived, it along the mchemical intformation.
SIT TYPES
alization on ences:
mineralizaenopyrite,
mations. Seeralization. cturally conrtz and carbd in the volminor chalc
of mineralizn in quartz
tersections contacts of
IF/country reralized hydn formation
shear-zoneis assumed mineralized teraction at
the East C
ation in sipyrrhotite
econdary q
ntrolled goldbonate veinlcanic units)copyrite; gra
zation occurveins to as
from the vaf the iron forock contacdrothermal “ horizons.
e associatedthat the clhorizon tha
t the iron-ric
adillac Gold
licified lodeand pyriteuartz vein
d mineralizas parallel to). Associateaphitic horiz
r as free gols much as 2
arious recenormation; hoct, but rathe“front” crossAs it is g
d quartz veose associaat transectsch horizons
East Cadil
d Property is
es with die) spatiallying is com
ation in alto the schistd disseminazons are com
d associated20% to 50%
t and historowever, theer appear ts-cut stratigenerally aceins in the ation betwees the East rather than
llac Gold Proj
s categorize
isseminatedy related tmmonly as
tered and stosity and sated sulphidmmon.
d with sulph% when in a
ric drilling cae mineralizeto cross-cutgraphy, depccepted tha
Cadillac Teen iron formCadillac Gon the existe
ject – 2017 T
ed into two
d to semi-to sedimenssociated w
sheared zonshear zonesdes include a
hide mineraassociation w
ampaigns ced zones aret stratigraphpositing goldt the fluidsectonic Zonmation and old Propertyence of prim
Technical Rep
types of ep
-massive sntary bandwith this t
nes with qus (most likearsenopyrite
ls ranging fwith magne
onsistently e not presehy. It is end-bearing ss that prec
ne were notgold minera
y is the resmary aurifer
port 49
pigenetic
ulphides ed iron type of
uartz or ely to be e, pyrite
from 1% etite iron
occur at nt along visioned ulphides cipitated
t locally alization sult of a ous iron
A
9.0 EXPLO
Chalice is cCadillac Goprogrammeexploration
10.0 DRI
As at the da
ORATION
compiling ald Property.
e on the Prohas been ca
LLING
ate of this R
all available. As at the operty that arried out o
Report, Chal
data fromeffective dawas halted
on the Prope
ice had not
East Cadil
previous eate of this Rd prior to iterty by Chal
completed
llac Gold Proj
exploration Report, Chats completioice.
any diamon
ject – 2017 T
work complice had begon, due to
nd-drilling o
Technical Rep
pleted on tgun a soil ssnowfall. N
n the Prope
port 50
the East sampling No other
erty.
wtV
t
A
w
11.0 SAM
It is the Auoperators fcommon usopinion thatwho employthe historicValidation P
For informimplementapertain to e
GM6 GM6 GM6 GM6 GM6 GM6
With respecestimate, thof Peter KaprogrammeM.Sc., P.Geinsertion ofinserted intcore sampliand one ofSamples withe remainregia digest
ALS-Chemelaboratory. quality manwith this syauditing tec
MPLE PREPA
thors’ opinioor reportingse at the timt the past eyed industrycally reporteProgramme
mation regaation of NI exploration p61314 (Bour64272 (Bour64504 (Lang65127 (Kram66369 (Lang68593 (Mano
ct to the rhe 2006-20arelse P.Geoe was carrieeo. The prof one standato the streaing programf three sepath visible going samplestion and AAS
ex LaboratoALS Cheme
nagement system, reguchniques.
ARATION,
on that the g assay resme the varioxploration py’s standarded data. Asshould be im
arding rece43-101 sta
programmesrgoin, 2004)rgoin and Cagton and Homo and Langgton and Pacon and Perre
recent drilli07 core-samo on behal
ed out undeogramme foard sample m every 40
mme entailearate gold sold were ans underwenS (atomic a
ories Ltd. oex has attaystem coveular interna
ANALYSES
sample presults prior tous historicprograms wds of their tis such, themplemented
ent sampleandards), ts carried ou); astonguay, rvath, 2009gton, 2010)checo, 2011e, 2014).
ng programmpling progf of MRB &
er the director quality cinto the sa
0 samples. Ted the randostandard sa
nalyzed by snt fire assaybsorption sp
of Val d'Or,ined ISO 9
ering all aspl audits are
East Cadil
S AND SECU
eparation, ato the implal programsere supervisime; howeve Authors rd by the inco
e preparatihe reader t since the
2007) ; 9); ; 1);
ms by Platogramme was& Associatest supervisiocontrol durmple streamThe programom insertionamples intoscreen/fire Ay/AA analyspectrometry
, Que., an 001:2000 r
pects of thee undertake
llac Gold Proj
URITY
nalytical anlementations were carrsed by expe
ver, there is recommend oming party
on analysiis referred implementa
o Gold thats carried ous, whereas
on of Jason ring the 20ms every 30mme of quan of one bla
o the samplAA (atomic sis. Silver cy).
accredited registration,e assaying pen by staff
ject – 2017 T
nd security pn of NI 43-ried out. It erienced geono guarantthat a Da
y into the pr
is and secto the foll
ation of NI 4
t were usedut under the
the 2008 Ross B.Sc.
006-07 cam0 samples aality controlank, one dule streams absorption)content was
lab, was , which requprocess. To
members
Technical Rep
procedures 101 were tis also the Aologist or entee of the qata Verificatroject.
curity (i.e.owing repo
43-101:
d for the re direct supdrill-core s and John
mpaign entaand a blankl for the 20uplicate (1/every 15 s
) methods, ws assayed b
the primaruires evidenensure com
specially tra
port 51
used by those in Authors’ ngineers uality of tion and
., post-orts that
resource pervision sampling Langton iled the
k sample 008 drill-/4 core), samples. whereas by aqua
y assay nce of a mpliance ained in
T
T
tf
A
t
t
12.0 DAT
Other than used in themethods emThis simplyrather than
The GEMS software’s corrected inthe drill-holfor other presource es
After verifycalculated autilized in resource to2009 estima
12.1 Qua
Regular daanalytical lathe Nordeadata verificquality, andconsideratioprogrammetherefore no
TA VERIFIC
the reportse preparatiomployed. Qy reflects th
a lack of di
drill-hole dvalidation pn the databe data was ossible locatimation is
ing that thean MRE of Langton &
onnages andate were ap
lity contro
ta verificataboratories u West projcation findind thereforeon is furthees, have beo additional
CATION
s published on of this tuality contr
he limited aligence from
database usprograms toase by recodisplayed a
ation, deviaconsidered
ere were nothe NordeaHorvath (2
d grades asppropriate.
l
ion protocoon the dat
ject. The Aungs accepta support thr supporteden carried material wa
since 2004technical rerol methodsassessment m the histor
sed in the Mo check foonciliation wand reviewetion or simto be of acc
o validation u West dep2009)(GM64s reported
ols were caa collected uthors consably supporhe use of td by the facout since tas needed f
East Cadil
4, none of teport contais and securrequiremen
rical operato
Mineral Resr erroneous
with MRB and in 3D andilar related
ceptable qua
errors in tposit using 4504). The in 2009, co
arried out during previder that, art the geolthese data ct that no ahe previousfor further v
llac Gold Proj
the assessmin details ority procedunts and repors.
source Estims data entrnd the origid assorted p errors. Thality with no
he 2009 dathe same pre-calculat
onfirming th
by both thvious drill-c
as a result ological interin the Min
additional ds (2009) Miverification.
ject – 2017 T
ment or histof the sampures were aporting stan
mate was vries. All repnal data so
plan and sece drill-hole o significant
atabase, MRparameters ted MRE arhat the me
he project core sampliof the protorpretations neral Resourilling, nor ineral Reso
Technical Rep
torical workpling and aalso not disndards of th
validated usported erroources. Addiction views t
database u errors.
RB & Associand drill-ho
rrived at ththods used
operators ang program
ocols employand the d
urce Estimasurface expurce Estima
port 52
k reports nalytical scussed. he time,
sing the ors were itionally, to check used for
ates re-ole data he same for the
and the mmes on yed, the database te. This
ploration ate, and
13.0 MIN
Other than 1960’s, thesamples fromineralizedsuccessfully
NERAL PRO
testing for re was no re
om the East material ex
y for nearly
CESSING A
magnetic coeport of mint Cadillac Goxtracted fro15 years at
AND METAL
oncentrationneral procesold Propertym the Prope the nearby
East Cadil
LLURGICAL
n of iron richssing or miny. It can beerty would r
y former Chi
llac Gold Proj
L TESTING
h material fneralogical ee reasonablyreact similaimo Mine m
ject – 2017 T
from the iroexaminationy assumed, rly to the oill.
Technical Rep
on formationn performed however, tre that was
port 53
ns in the on gold that any s treated
T
T
w
14.0 MIN
The historidocumentedreserve estentirely irreregulations Estimate (Mand HorvathNo additionCadillac Gol
MRB & AssResource Edatabase westimation. completely underlying 2009 minerbeen applie
This SectionResource Eswithin ChalReport.
NERAL RESO
c resourced in the “Himates (Treelevant, as for reporti
MRE) for theh, 2009; GMnal exploratld Project, t
sociates useEstimate prwere assess
The claimssurrounded
the former ral resource d to the cur
n of the Repstimate for ice’s East C
OURCE & M
s and reseHistory” sectmblay, 198they pre-d
ng mineral e Nordeau WM64504) is ction work hhat would re
ed the Nordresented in sed, review that compd by, claimNordeau Wcalculation
rrent MRE.
port, modifiethe Nordea
Cadillac Go
MINERAL R
erves repotion of the 8; Jean, 19date NI 43resources
West depositconsidered has been caender the 2
deau West this Repo
wed and rerised the No
ms of the Eest property(Langton &
ed from Lanau West prold Property
East Cadil
RESERVE ES
rted for CTechnical
990) are con3-101 and and reservet by A. S. Hoto be accuraarried out 009 MRE ou
deposit driort. Drill-ho-validated ordeau Wes
East Cadillacy extended
& Horvath, 2
ngton & Horoject, which, as curren
llac Gold Proj
STIMATES
halice’s EaReport. Thensidered by do not comes; howeveorvath Engiate as at thon the claiut-dated or
ll-hole datale, lithologprior to itsst property c Gold Probeyond its
2009); howe
rvath (2009 represents
ntly defined
ject – 2017 T
st Cadillac ese early, ithe Author
mply with er, the 2009neering Inc
he effective ims compriinaccurate.
abase to cay and assas use for tin 2009, arperty. The boundaries
ever, no suc
), contains s the only N at the eff
Technical Rep
Gold Projnitial resou
rs and issuecurrent NI9 Mineral Rcorporated (date of thissing Chalice
alculate the ay records the 2017 rre now part
mineralizeds at the timch restrictio
an updatedNI 43-101 Rfective date
port 54
ject are urce and ers to be
43-101 Resource Langton Report. e’s East
Mineral in this
resource t of, and d zones e of the
ons have
Mineral Resource e of this
A
t A
w T
t
tA
f
tfw
Il
14.1 Intr
A total of recorded in
Drill-holes oresource es333075E ancollared northe Nordeau
A total of Nordeau Wwas used fo
The Databanorthing-eletables incluSurvey Tabtypes that wArchean gemanipulatio
Digital mapused to ass
Sample asdetermined/for the samDatabase. Ithe resultinfinal Au grawas reques2008-Phaseassaying; h
It should blengths an
14.2 Drill
Table 14.1Database tcompliance Drill-holes considered
oduction
279 drill-hothe Nordea
on or proxistimation bynd 333850Erth of the fou West claim
121 drill-hoest project
or the 2017
ase is comevation) driuding a Dowble records dwere codedology. Addit
ons, such as
s of interpreist interpret
say results/entered by
me sample, In the instag assay val
ade for the sted for the
e 2 drill prowever, on
be noted tnd not true
l-hole Data
1 summarizethat were u
versus mothat pre-dacompliant w
oles from tau project G
mal to the y using a lo
E (NAD83 Zoormer Nordm block at d
oles were sclaims, creMineral Res
prised of all-hole coordwn-hole Sudown-hole d by MRB ustional tables
s assay com
eted surfacetation of the
s in the Dy MRB from the assays nces where ues were cosample. Forproject, anogram, assly the gold (
that unlesswidths.
a Validation
es the vintaused for thore recentlyate NI 43-1with NI 43-1
the former EMS® datab
former Norocation filteone 18). Theau West p
depth.
selected usieating a susource Estim
a primary hdinate data urvey Table,drill azimuthsing the Qus in the Datposites and
e geology, de drilling res
Database ithe originalwere averametallic-sc
onsidered tor the 2006 ad resulting
saying for A(Au) values
s otherwise
n
ge, total nuhe MRE. Thy completed101 are her101 are here
East Cadil
Nordeau Ebase.
rdeau West er to includis allowed t
project boun
ng the abobordinate r
mate.
header tablin UTM NAD, Lithology hs and incliebec Ministtabase havedrill-hole in
drill-hole locsults.
nclude only data source
aged to prodcreen technio supersedeand 2008-Phassays wer
Ag was disin the Data
e stated, a
umber and the table idd drill-holes rein termedein termed “
llac Gold Proj
ast and No
project wede only drillthe inclusionndary and d
ove filter torelational da
le containinD 83 Zone 1Table and
nations; thetry of Energe been consntersections
cations and
y final asse. Where mduce the finiques were ed earlier rehase1 drill cre entered iscontinued aabase were
all drill-inte
total metreadentifies ho
completedd “historic”,“recent”.
ject – 2017 T
ordeau Wes
ere selectedl-holes betwn of some ddrilled south
o define hoatabase (th
ng 3-axis (18 coordinat
Assay Tabe Lithology
gy & Mines structed to ss, with mode
property bo
signed Au multiple fire anal assay gremployed f
esults and wcampaigns, n the GEMSand replaceused for the
ervals repr
age of drill-holes that pr under NI , whereas
Technical Rep
st claim blo
d for modelween UTM drill-holes thhward, cross
les relevante “Databas
(X-Y-Z, or tes, with se
ble: the DoTable recogeologic legstore assortelled solids.
oundaries w
(gold) vaassays are rrade enterefor sample awere enteredsilver (Ag)
S database.ed by arsee MRE.
resent dow
holes presenre-date NI43-101 gudrill-holes t
port 55
ocks are
ling and Eastings hat were sing into
t to the e”) that
easting-econdary own-hole rds rock gend for ted data
were also
lues as reported
ed in the analysis, d as the analysis For the nic (As)
wn-hole
nt in the 43-101
idelines. that are
Tw
T
Ff T
v
v
w
The tabulatwhereas the
MRB providnoted whethand enteredgovernmentholes, the sassay resucertificates.
The supporadequate toMineral Res
Figure 14.former prop
The 96 hist25 recent dvalidate his
Prior to anvalidation pDatabase bywas displaypossible locacceptable q
Series
N-9 to 13484-81-16, 21, 2210-484-82-30 to 48-83-01 to 04, 5A8-84-40 to 42, 42a0-1VE-1 to 7 and 9 toW87-01 to 24W88-01 to 04W90-01 to 09, 09Subtotal pre-43-PG-06-01 to 04, 0NW08-01 to 14Subtotal 43-101
Totals Nordeau W
Table 1
tion in Table remaining
ed a summher original d results. Tht assessmensource data lts. MRB’s
rting documo justify incsource Estim
1 shows a perty bound
toric drill-hodrill-holes atoric results
ny calculatioprograms to y reconciliatyed and revcation, devquality with
2, 26 to 2943
A, 5B, 6 to 12a, 43
o 14
9B101 Compliance04A, 05 to 09, 21
Compliant
West DDHs
4.1: Summ
le 14.1 indi 25 drill-hol
mary listing or copies o
he source font files and included coaudit did
mentation fluding all of
mate.
plan view ary of the N
oles are shore well dists.
ons being ccheck for e
tion with MRviewed in 3
viation or s no significa
S
Vintage
1957-58198119821983198419841985198719881990
20062008
mary of Dri
icates that 9les (i.e., 20
of the sourf original asor all data uinternal com
opies of somnot necess
or historic f the drill-ho
of the 121 Nordeau We
wn in blackributed alon
carried out,erroneous dRB and the 3D, and assimilar relaant errors.
Summary of DDH
# of Holes
57
141351
13244
1096111425
121
East Cadil
ill-holes in
96 of the 1.7%) are “r
ces for the ssay certificused in the mpany recome or all asssarily inclu
drill-hole doles in the D
drill-holes st project c
k and the 25ng the exte
, the Databata entries.original dat
ssorted planted errors.
Hs in Nordeau We
# of meters Com
989 Nord1,181 Soqu2,594 Soqu2,671 Soci1,003 Soci
194 Gold7,948 Gold4,721 Mine1,279 Mine5,164 Mine
27,7444,981 Plato8,551 Plato
13,532
41,276
llac Gold Proj
Nordeau W
21 drill-holeecent”.
historic assates are avaDatabase i
ords. For all say certificade an acc
data and sDatabase th
selected folaims.
5 recent drients of the h
base was v. All reporteta sources. An and secti The Data
est Database
mpany
deau Mining Co. Luemuemete Miniere Louveete Miniere Louve
den Pond Resourcden Pond Resources Vaquelin Lteees Vaquelin Lteees Vaquelin Ltee
o Gold Ltd.o Gold Ltd.
ject – 2017 T
West Datab
es (i.e., 79.
say data in ailable to vais reported but 18 of t
ates in suppounting of
sample assahat was ultim
r resource
ill-holes arehistoric drill
validated used errors weAdditionallyion views, base is co
Data Source
td. GM06036GM37746, GMGM39230
em Company Reem Company Reces GM42328ces GM42328
GM47403GM48424GM49867
Company ReCompany Re
Technical Rep
base
.3%) are “h
the Databaalidate the rby MRB to the 96 histoport of the r
all histori
ay results mately used
estimation
e shown in rling to supp
sing the soere correctey, the drill-hto check fo
onsidered to
Assay C
partialM39230 yes
yesport partialport no
partialnoin hardcin hardcin hardc
port yesport yes
port 56
historic”,
ase, and reported be from
oric drill-reported c assay
appears d for the
and the
red. The port and
oftware’s ed in the ole data or other o be of
Certificates
copy reportcopy reportcopy report
Figure 14.1: Plan maap of former N
East Cadillac Go
Nordeau West
old Project – 201
t property lim
7 Technical Repo
mits & drill-hol
ort 57
les used to caalculate the MMRE
t
F
14.3 Assa
Geostatisticthe historicResults are
Univariate s
Histogram spopulation cbelow-detecpopulation-v
Figure 14.2assays at Nalong the g
BackgroundMixed/ThresMineralized High-grade Nugget/Erra
Four (4) sarequire specompositing
ay Geostat
cs were comc drill-holespresented h
statistics we
statistics focontains a sction-limit (variance vaTable 14.2
2, a log-norNordeau Weraph and su
d/Waste Popshold PopulaPopulation Population
atic Populat
mples gradcial consideg and resou
istics
mpleted on ts demonstraherein.
ere complete
r the 10,06significant n(Table 14.lues for the2: Univaria
rmal probabst may be s
ummarized a
pulation - ation – – – ion -
ing from 72eration; the rce estimati
All DDH
MinimumMaximumNumber oTotal Num
MinimumMaximumNumber oClass Int
MinimumMaximumTotal Pop
Mean Median StandardVarianceCoefficie
he drill-holeates any b
ed for all Au
7 sample renumber of w2). This is collective s
ate Histogr
bility plot of sub-populatas follows:
2.5 to187.9 grade for t
ion.
H Raw Au Ass
Nord
m Cutoff Value m Cutoff Value of Samples <=0 mber of Samples
m Histogram Valum Histogram Valuof Class terval
m Population Datam Population Datpulation
d Deviation e nt of Variation
East Cadil
e sample asias in com
u assays fro
esults in thewaste sampl
reflected isamples. ram Statist
all Au assay
ted, as defin
gpt Au arethese 4 sam
says Histogra
deau West
3
s Used 10
ue ue
a point ta point 1 100
Ungrouped D 0.403649 N/A 2.845252 8.095457 7.048820
llac Gold Proj
ssay data tomparison to
m the 121 d
e Database les (n=3,12in the skew
tics – All Au
ys, shows tned by the
01
e consideredmples was c
am Statistics
0.00187.90
31280067
0.00100.00100 1.00
0.00187.90067
Data Grouped D 0.783893 0.542403 2.533306 6.417638 3.231699
ject – 2017 T
o determine data from
drill-holes a
indicate th28) with golwed mean-v
u Assays (
hat the entichange in
<0.10 g0.10 to 1.5 g1.5 to 10.0 g10.0 to 55 g
>55 g
d to be nugcut to 60 gp
ata
Technical Rep
whether darecent dri
t Nordeau W
at the totald-grades ofversus-med
(uncut)
ire populatioslope of the
gpt Au gpt Au gpt Au gpt Au gpt Au
gets, and thpt Au prior t
port 58
ata from ill-holes.
West.
l sample f zero or dian and
on of Au e linears
herefore to assay
T
t T
T
The Au asspopulationsthese Au as
The histogrholes (Tabapproximathole subposubpopulatismall dispasubpopulatisubpopulati
The historicconsidered provided th
Figure 1
say data wa. Tables 14
ssay subpop
rams of Au ble 14.4) dely 2/3 of t
opulation. Ton are slig
arity is attron that aron is 45.9 g
c drill-hole Arepresenta
e 4 extreme
0.01
0.60
11.06
50.00
88.94
99.40
99.99
100.00
Pro
ba
bil
ity
0.001
Software By Ge
All Raw Au Ass
14.2: Log-n
as sub-popu4.3 and Ta
pulations, re
sub-populatdemonstratehe assays in
The mean ghtly higher
ributable prre above 5gpt Au.
Au assays shtive and se values in t
0.010
emcom
says ND West
Waste
<0.10 gp
normal prob
ulated into able 14.4 pspectively.
tions for the distribution the historgrade, medthan those
rimarily to 55 gpt Au
how no appauitable for the historic
0.100
LOG Norm
All DDH
Nor
e
t Au
0
East Cadil
bability plo
historic driprovide the
e historic dons that aric drill-holedian, and ve of the rethe 4 extre. The high
arent bias vinclusion idata are cu
Real Value
1.000
mal Probabi
Raw Au Ass
rdeau West
Mixed
0.10 – 1.5 gpt Au
llac Gold Proj
ot – all Au
ll-hole and summary h
drill-holes (Tre similar subpopulat
variance ofecent drill-heme Au ashest Au as
versus the rn results ut to a maxim
0 10.0
ility Plot
says
Mineralized
1.5 – 10.0 gpt Au
ject – 2017 T
assays (un
recent drilhistogram st
Tables 14.3to the totation and 1/3f the historole assay s
ssays withinssay in th
recent drill-hused for remum value
000 100
High Grade
10 - 55 gpt Au
Nu
> 55
4 s
Technical Rep
ncut)
l-hole samptatistics for
3) and receal populatio3 in the receric drill-holesubpopulation the histoe recent d
hole assays esource estof 60 gpt A
0.000
uggets
5 gpt Au
samples
port 59
ple sub-each of
ent drill-on, with ent drill-e assay on. This ric data drill-hole
and are imation,
Au.
Tabl
Tab
le 14.3: Un
ble 14.4: Un
Pr
43
MMNTo
MMNC
MMTo
MMStVaCo
nivariate H
nivariate H
e-43-101 D
Minimum CutMaximum CuNumber of SaTotal Numbe
Minimum HisMaximum HisNumber of CClass Interva
Minimum PopMaximum PoTotal Populat
Mean Median Standard DevVariance Coefficient of
3-101 DDH
inimum Cutoaximum Cutoumber of Saotal Number
inimum Histoaximum Histumber of Clalass Interval
inimum Popuaximum Popotal Populatio
ean edian tandard Deviariance oefficient of V
Histogram S
Histogram S
DDH Raw A
Nor
toff Value utoff Value amples <=0
er of Samples
stogram Valuestogram Valulass
al
pulation Dataopulation Datation
Un viation f Variation
H Raw Au A
Nor
off Value off Value mples <=0 of Samples
ogram Valuetogram Valueass
ulation Data pulation Dataon
iation
Variation
East Cadil
Statistics fo
Statistics f
u Assays U
rdeau West
Used
e ue
a point a point
ngrouped Dat 0.4251 N 3.2328 10.4512 7.6035
Assays Un
deau West
Used
e e
point a point
Ungrouped 0.35874 N 1.7826 3.1779 4.9692
llac Gold Proj
for “Histori
for “Recen
Univariate
t
0.0 187.9 2448 6805
0.00 100.00 100 1.00
0.00 187.90 6805
ta Grouped 74 0.798
N/A 0.543836 2.842231 8.07764 3.561
nivariate S
t
0.00 45.90 680 3262
0.00 100.00 100 1.00
0.00 45.903262
d Data Grou46 0.754/A 0.539
693 1.71893 2.953
231 2.27
ject – 2017 T
ic” Au Assa
t” Au Assa
Statistics
00
Data8009387821457790546
tatistics
uped Data44459352844130387754
Technical Rep
ays (uncut)
ays (uncut)
port 60
)
)
F
T
Further anaa result of Figure 14.3
Table
The statisticrange fromintervals arcompositingany potentia
alysis was covarying sam3 the histog
14.5: Univ
cs (Table 1<10 cm to
re 1.5 m, g interval ofal bias in th
Figure 1
Fre
qu
ency
%
0
0.05
0.10
0.15
0.20
0.25
Soft
All A
ompleted tomple lengthgram plot of
variate Hist
14.5) show o 8 m. Theand nearly
f 1.5 m is she sample gr
14.3: Histo
Minimum HMaximum HNumber of Class Interv
Minimum PMaximum PTotal Popul
Mean Median Standard DVariance Coefficient
All DDH
0 1.00 2.00
5
0
5
0
5
tware By Gemcom
Au Assay Interval Lengths ND
o investigatehs. Table 1f sample int
togram Sta
the mean ae histogram y 99% of suggested inrade that co
ogram plot
Histogram ValuHistogram ValClass val
Population DatPopulation Dalation
Deviation of Variation
H Au Assay
Nor
00 3.00 4.00
Norm
DWest
East Cadil
e potential b14.5 provideerval length
atistics – A
and median plot (Figu
sample inten order to nould result f
– all assay
ue lue
ta point ata point 1
Ungrouped 0.968 0.481 0.231 0.497
y Sampe Int
rdeau West
Real Value
5.00 6.00
mal Histogram
llac Gold Proj
bias that maes the sumhs for all dri
All Assay Sa
sample inture 14.3) reervals rangenormalize refrom varying
y sample in
0.00 10.00 40 0.25
0.030 8.00000010067
d Data Group8260 1.01N/A 1.00
1309 0.491658 0.247086 0.48
terval Leng
t
7.00 8.00
m
ject – 2017 T
ay be introdmmary histog
ll-hole assa
ample Inte
terval lengtheveals the e from 0.2esults and eg sample len
nterval len
0
ped Data9954
05092988104881289052
gths
9.00 10.00
Technical Rep
duced in thegram statisys in the Da
erval Lengt
h to be 1 mmajority of
25 m to 1.essentially engths.
ngths
port 61
data as tics and atabase.
ths
m, with a f sample 5 m. A
eliminate
t A
w
f
t T
A
tt
T
v
t
14.4 Geo
Within the majority of zone(s). A only within
NOTE: Althothe “meta”
A series ofbetween UTwere used 333850) arformer Norboundaries restricted to
In addition,1000 m, wegeology (i.e
Drill-hole prthe establis
The drill-hointerpolatiolimits of thintersectionexpanded to
Several lithlithology dainterpreted
A major str-65º towardthe main Cathe S-V Fauand wire-fraFault contac
Two distincsedimentaryvolcanic conof interveniproject claim
Polygons wethe upper aeach sectiosediments.
logy & Min
total sampthese sam
mineralized the defined
ough all of tprefix has b
f 21 north-TM Eastingsin areas wi
re approximrdeau Westat half the
o respect th
, a series ofere createde., oriented
rofiles werehed plans a
ole collar cn net) surf
he former Nn points weo cover the
hological unata and demsurface geo
uctural contds 020º acradillac Tectoult drill-holeamed to genct surface w
ct horizons y rocks fromntact. The Iing sedimenms, and dow
ere digitizedand lowermoon were tiedThe upper l
neralized zo
ple populatimples likely
zone mode zones of m
the rocks debeen omitte
-south oriens 333075 ath fewer dr
mately coincit project cdistance to
e property
f 21 plan vie, and a singapproximat
e establishedand sections
coordinates face of topoNordeau Weere used tolimits of the
nits and gemonstrate oology.
tact betweeoss the immonic Zone, le intersectionerate a 3D
was clipped a
of strongly m a few meF horizons vnts. The unwn-dip to de
d on each oost contactsd and wire-imit of the I
one Interp
on, approxoccur in ba
el was intermineralizatio
escribed in td for simplic
nted cross-nd 333850.rill-holes. Thident with tclaims, respo the adjaceboundaries.
ews, spacedgle longitudtely east-we
d to displays, and in 3D
and elevaography. Thest project o create a e former pro
eological feobvious con
en sedimentmediate areaocated apprn points on
D surface TINagainst the
magnetic,tres to 50+
vary from a nits appear epths over 1
of the 21 cros of the IF -framed to IF solid was
East Cadil
pretation &
imately 1/3arren rock preted and n, and is rev
this section city from th
-sections, s. Occasionahe “end” sethe westernpectively. Eent sections
d at 50 m indinal sectionest) was gen
y the drill-hmodels.
ations werehe topograpclaims. Sim3D bedrockoperty.
eatures are ntinuity acro
ary and vola. This controximately 1each of the
N of the S-Vbedrock top
oxide iron m stratigrafew metresto parallel
1000 m.
oss sectionshorizons, reproduce a
s clipped aga
llac Gold Proj
& Modelling
3 have gradoutside theconstructedviewed here
of the Repoe rock desc
spaced at 2l 50 m, anections (i.e.n and easteEach sectios excepting
ntervals fron, perpendicnerated alon
ole traces,
e used to phic surfacemilarly, the k topograph
consistentoss all sect
canic rockstact is interp1 km north.e vertical crV Fault contpography su
formation (aphically bels to 20+ m tthe S-V Fa
s using the espectively.3D solid T
ainst the be
ject – 2017 T
g
des below e limits of dd to allow sein.
ort have beecriptions.
25 m intervd one 75 m, Section 3
ern propertyon’s width
the end se
m surface (cular to theng UTM Nort
lithology an
create a 3e was expadrill-hole o
hy surface
tly identifieions, and c
(the so-calpreted to be. A polyline ross sectiontact. The upurface.
(IF) occur ilow, but strthick, with aault across
drill-hole in The IF sec
TIN of the edrock topog
Technical Rep
detection ldefined minelection of
en metamor
vals, were m, section s333075 and y boundarieis defined
ections, whi
(0 m) to a de indicated sthing 53195
nd assay re
3D TIN (tranded to cooverburden-
that was s
d in the dcorrelation w
led S-V Faue a splay fawas digitizes, tied in pl
pper limit of
n the hangructurally abapproximatethe Nordea
tersection pction polygoIF and integraphy surfa
port 62
imits. A neralized samples
rphosed,
devised spacings Section
s of the by the
ch were
depth of strike of 500.
esults on
riangular over the -bedrock similarly
drill-hole with the
ult), dips ult from ed along lan-view the S-V
ing wall bove the ely 10 m au West
points at ons from ervening ace.
A
t
T
t
w At
Atw
w
w
F
A sequenceFault contacthe southeinterpreted
The volcandistances. Cthe same Interpretatinumerous fwithin the f
Approximattalc-chloriteinterpreted S-V Fault. parallel, div
All mineralithe S-V Fauwithin the v
Drill-hole asand cut-off were modelof appareninspected awhen possib
Mineralizatidips nearly shearing, aarsenopyritedeformationen-echelon strike and disruption/tgeological m
Figure 14.4isometric pl
of mafic toct. The seq
ern fault difrom drilling
ic units soCorrelation ovintage, ason of the fault offsetsault bounde
tely 100 m e and/or grto represenAdditional s
verging and/
zed zones iult and the svolcanic stra
ssays were grades) to
lled using annt continuolong drill-hoble.
on appears parallel wi
lteration, vae), and rarn corridor crzones or ledown-dip.
termination model conta
4 and Figuran (top/dow
intermediauence is apips more sg.
outh of theof certain vs drill-log spatial dist
s, which suped southern
structurallyraphite schisnt a fault zosimilar inte/or conjugat
dentified fosub-parallelatigraphy ex
displayed aevaluate ann approximaus mineraloles to optim
to be largeith the majariable quarre visible goross the minenses; how. The mincaused by cts.
re 14.5 shown-dip) and
te tuffs andpproximatelyshallowly n
e S-V Faultvolcanic unitentries andtribution of pport the sublock is wit
y below the st have beeone (the sorvals are lote fault stru
or resource Lower Fau
xcept the mi
and composnd interpretate 0.50 gptization. Dumize bound
ely confinedjor structurrtz veining old. Locally,neralized zo
wever, the mneralized zothe interpre
ow the surfa cross sectio
East Cadil
d flows occuy 400 m thinorthward c
t contact ats is locally d rock des
these “souuggestion ththin a high-d
S-V Fault cen regularly-called Lowogged furthctures.
estimation lt, located 1ineralized zo
ited using vt zones of gt Au cut-off uring sectioaries of the
d to a singles, and is with up to , secondary
ones, disruptmineralized one limits eted cross-c
ace and solidon view, res
llac Gold Proj
py a fault-bick near surconverging
are difficult possible, es
scriptions authern” volchat the entdeformation
contact, nay intersecte
wer Fault) thher south a
lie within a 100 m southone(s).
various metgold mineralf to identify on digitizinge mineralize
e relatively characterize10-15% su
y sub-parallting the minenvelope iswere furt
cutting shea
ds geologicaspectively.
ject – 2017 T
bounded blorface, but nwith the
to correlaspecially bere typicallycanic units tire 400 m vn corridor.
rrow (<2 med in drillinhat approximnd are also
100 m widh. No sub-u
hods (i.e. vlization. Theand digitizeg, the ass
ed zone to g
narrow zoed by the lphides (pylel conjugatneralization s remarkabther refinear zones and
al models w
Technical Rep
ock south of narrows at dnorthern fa
te over sigtween drill-
y more conis complic
volcanic suc
m wide) integ. These u
mately parao interprete
de corridor bunits were m
varied equale mineralizee the limits tsays were grades >1-2
ne that stripresence o
yrite, pyrrhote faults wiinto boudin
bly consistend to accod conformit
with drill-hol
port 63
the S-V depth as ault, as
gnificant -holes of nsistent. cated by ccession
ervals of units are allels the ed to be
between modelled
lengths ed zones to zones visually
2 gpt Au
kes and f strong
otite and thin the
naged or nt along ount for ty to the
es in 3D
M
Figure 14
etasediment-mfault con
Mineral Z
4.4: 3D isomet
metavolcanic ntact
Zones
East Cadillac Go
tric top/down
3D Iso
3D Geolog
old Project – 201
n-dip view – g
ometric Top /
gy and Minera
Nordeau
775
7 Technical Repo
geology solids
/ Down-Dip V
al Zone Solid
u West
5m
ort 64
s & surfaces m
View
ds Model
Oxide IF
model
Figure 14.5
Oxide 20 - 40+m
5: 3D isometri
3D Iso
3D G
IF wide
East Cadillac Go
ic N-S cross s
ometric Cros
Geology and
N
Meta
old Project – 201
section view –
ss Section V
d Mineral Zon
Nordeau Wes
asediment-metfault conta
7 Technical Repo
– geology solid
iew (Facing
ne Solids Mo
st
avolcanic ct
ort 65
ds & surfaces
East)
odel
Mineral
1000
m
s model
l Zones
F
Tfw
T
Figure 14.section view
Near surfacdisrupted bso-called B approximat250 m of dZone, or be
The mineraformer Nordwas not clipinclude the
The Main Zocalculated t
Figur
.6 displays w, facing sou
ce (i.e. < 2y crossing fZone compely 10 m so
drilling, sugge offset from
alized zonesdeau West ppped at thedeeper dow
one solid voo have a vo
re 14.6: E-
100
0m
the minerauth.
50 m deepfaults and rprises a seriouth of the gesting that
m the Main Z
s dip approxproject claime north bouwn-dip drill-h
olume is calcolume of 36,
-W longitud
E-
Faults
alized zone
), the zoneelated sheaes of weaklso-called M
t the B ZonZone by cros
ximately 65ms at depthndary for thhole interse
culated at 3,000 cubic m
dinal sectio
W Long Sect
3D Mineral
No
East Cadil
solids and
es of mineraaring into smly mineraliz
Main Zone, bne lenses cosscutting fau
5O to the no (Figure 14he 2017 MRction points
3.15 million metres.
on view – g
tion View (Fac
l Zone Solids
ordeau West
775m
llac Gold Proj
d drill-holes
alization aremaller boudzed, parallelbut which aould be sheults.
orth and ex4.6); howevRE, as it was in the grad
cubic metre
geology so
cing South)
s Model
ject – 2017 T
s in 2D eas
e demonstrainaged/en-e, en-echelo
are only defar-displaced
xit the nortver, the minas for the 2de interpolat
es, whereas
olids & surf
B
Mineral Z
Northern
Limit of at formeproperty
Technical Rep
st-west long
ably more sechelon lensn lenses thfinable in thd parts of t
th boundaryneralized zo2009 MRE, stion process
s the B zone
faces mode
Main Zone
B Zone
Zone Limit
Property Boun
mineralized zoer northern y boundary
port 66
gitudinal
severely ses. The at occur
he upper the Main
y of the one solid so as to s.
e solid is
el
ndary
one
T
t
TtT
w
14.5 Mine
The mineramineralizedthe definedassays occu
Table 1
The mean gthe total saThe results
Table 14.7within the li
Table
eralized Zo
lized zone w zone. The mineralize
ur within the
14.6: Univa
grade of themple populamay be bia
7 provides simits of the
14.7: Univ
one Assays
wire-frame ssummary hd zone (Tabe defined m
ariate Histo
e mineralizeation grade.sed as a res
summary hdefined min
variate His
Minimum CMaximum Number ofTotal Num
Minimum HMaximum Number ofClass Inte
Minimum PMaximum Total Popu
Mean Median Standard DVariance Coefficien
Minimum HisMaximum HisNumber of CClass Interva
Minimum PopMaximum PoTotal Popula
Mean Median Standard DeVariance Coefficient of
s & Compos
solid was ushistogram uble 14.6) sineralized zo
ogram Stat
d zone assa. The variansult of varie
istogram unneralized zo
stogram Sta
Cutoff Value Cutoff Value f Samples <=
mber of Sampl
Histogram VaHistogram Vaf Class rval
Population DaPopulation D
ulation
Deviation t of Variation
stogram Valuestogram Valu
Class al
pulation Dataopulation Datation
U viation f Variation
East Cadil
siting
sed to selecunivariate stshow that aone.
tistics – Mi
ay populationce and coefed sample le
nivariate staones.
atistics – M
0 es Used
alue alue
ata point Data point
Ungrouped 2.31 5.01 25.17 2.16
e ue
a point a point
Ungrouped D 0.7399 N 0.4285 0.1836 0.5791
llac Gold Proj
ct only drill-tatistics for a total of 9
ineralized
on is 2.42 gpfficient of vaengths.
atistics for
Mineralized
0.00 60.00 19 919
0.00 60.00 60 1.00
0.00 60.00 919
d Data Grou2345 2.4 N/A 1.0
17249 4.972789 24.669767 2.0
0.000000 4.000000 20 0.200000
0.090000 3.050000 919
Data Groupe978 0.751N/A 0.635549 0.432654 0.18637 0.575
ject – 2017 T
-hole assaysAu assays
19 (i.e., les
Zone Au A
pt Au, signiariations are
sample ass
d Zone Sam
ped Data417301029570967766678698
055087
d Data13605000238869605474
Technical Rep
s within thewithin the
ss than 10%
Assays (unc
ficantly highe also notab
say interval
mple Lengt
port 67
e greater limits of
%) of all
cut)
her than bly high.
lengths
ths
F
T
f
v
w T
A
Figure 14.defined min
Fi
The histograre generalfrom <10 ccomposite ivariable sam
Prior to comgrade and la list of thewireframe s
There are 8average intan average of 2.4 m an
Assays wermineralizedgpt Au wehistogram Compositinglength (<1.
7 is a normneralized zon
igure 14.7:
ram statisticlly shorter, m to 3 m. Fnterval of 1
mple lengths
mpositing tength of ea
e 99 drill-hosolid. Compo
88 composiersection legrade of 1.
nd average g
re composi zone solid re used fostatistics fog started at5 m) at the
Fre
qu
ency
Co
un
t
00
50
100
150
200
250
Softwa
mal histograne.
: Histogram
cs shown inwith a mea
Figure 14.71.5 m was ss.
he assays ch drill-holele intersectiosites were
ites from thngth of the .78 gpt Au. grade of 2.2
ted on 1.5(i.e., withinr the compor the 1.5 t the upper lower conta
0.40 0.80
are By Gemcom
am of the sa
m plot – mi
Table 14.an length o7 further revselected to
within the e intersectioions and thecalculated u
he Main ZoMain Zone The B Zone
22 gpt Au.
5 m equal n the intervposite calcu
m equal-lr contact of act of the in
0 1.20 1.60
Norm
East Cadil
ample assay
ineralized
.7 indicate tf 0.75 m, bveals that 9eliminate a
wire frame on was calcue calculatedusing the Au
ne and 11 mineral sol
e is conside
sample levals shown ulations. Talength comthe interse
ntersection w
Real Value
2.00 2.40
mal Histogram
llac Gold Proj
y interval le
zone samp
that samplebut are high9% of the s
any possible
on 1.5 m ulated and rd composite u assays cu
from the Bid is 8.3 m
erably narro
engths within Table 14
able 14.9mposites (n=ections and was retained
2.80 3.20
m
ject – 2017 T
engths with
ple interva
es within thhly variablesample intere bias introd
equal lengreviewed. Tagrades and
t to a 60 gp
B Zone of and near “twer with an
hin the def4.8). The Aprovides su=517), thathe last, u
d as a comp
3.60 4.00
Technical Rep
hin the limit
al lengths
he mineralize in length, rvals are <1duced by th
ths, the coTable 14.8 pd lengths wipt maximum
mineralizatitrue thicknen average th
fined limits Au assays cuummary unt were gensually odd,posite point
port 68
ts of the
zed zone ranging
1.6 m. A e highly
omposite provides ithin the
m.
ion. The ess” with hickness
of the ut to 60 nivariate nerated. interval
.
Table 14
Main ZonHole Zo 10-484-82-30 Ma 10-484-82-31 Ma 10-484-82-32 Ma 10-484-82-35 Ma 10-484-82-36 Ma 10-484-82-38 Ma 10-484-82-40 Ma 10-484-82-41 Ma 10-484-82-42 Ma
10-484-82-43 Ma 484-81-21 Ma 484-81-27 Ma 484-81-28 Ma 8-83-01 Ma 8-83-02 Ma 8-83-03 Ma 8-83-04 Ma 8-83-05B Ma 8-83-06 Ma 8-83-07 Ma 8-83-08 Ma 8-83-11 Ma 8-83-12 Ma 8-84-40 Ma 8-84-41 Ma 8-84-42 Ma 8-84-43 Ma N-12 Ma NW08-01 Ma NW08-02 Ma NW08-03 Ma NW08-04 Ma NW08-05 Ma NW08-06 Ma NW08-07 Ma NW08-08 Ma NW08-09 Ma NW08-10 Ma NW08-11 Ma NW08-12 Ma NW08-13 Ma PG-06-01 Ma PG-06-02 Ma PG-06-03 Ma
Average Ma
4.9: Univari
e DDH Intersectionne Interval
ain 1.48ain 5.73ain 3.54ain 4.86ain 12.04ain 11.12ain 7.24ain 10.74ain 3.10
ain 4.67ain 4.50ain 4.50ain 4.71ain 7.84ain 3.53ain 3.22ain 7.73ain 7.05ain 1.84ain 5.31ain 28.14ain 5.99ain 5.43ain 7.25ain 46.09ain 17.68ain 7.46ain 3.10ain 8.00ain 2.95ain 4.26ain 18.95ain 6.30ain 8.64ain 8.05ain 7.40ain 2.20ain 10.15ain 2.55ain 5.70ain 7.05ain 14.12ain 11.62ain 10.50
ain 8.28
Table 1
iate Histog
nsAu gpt
17.675.152.240.645.610.800.540.722.04
0.797.451.001.101.560.721.990.851.540.900.741.620.480.940.900.731.160.642.471.732.253.710.771.185.574.361.680.922.920.890.592.771.491.811.61
1.78
Minimum CMaximum CNumber of Total Numb
Minimum HMaximum HNumber of Class Inter
Minimum PMaximum PTotal Popu
Mean Median Standard DVariance Coefficient
14.8: Miner
gram Statis
Main ZHole PG-06-04A PG-06-05 PG-06-06 PG-06-06 PG-06-07 PG-06-08 PG-06-09 PG-06-21 VE-1
VE-3 VE-4 VE-7 W 87-01 W 87-02 W 87-03 W 87-04 W 87-05 W 87-06 W 87-07 W 87-08 W 87-10 W 87-11 W 87-13 W 87-14 W 87-15 W 87-17 W 87-19 W 87-20 W 87-20 W 87-21 W 87-22 W 87-23 W 87-24 W 88-01 W 88-02 W 88-03 W 88-04 W 90-02 W 90-05 W 90-06 W 90-07 W 90-08 W 90-09 W 90-09B
Cutoff Value Cutoff Value Samples <=0
ber of Samples
Histogram ValuHistogram ValuClass
rval
Population DataPopulation Dat
ulation
Deviation of Variation
East Cadil
ralized Zon
stics – Minecut)
Zone DDH IntersectZone Inter
Main 13 Main 15 Main 18 Main 10 Main 17 Main 7 Main 11 Main 6 Main 12
Main 3 Main 4 Main 4 Main 1 Main 0 Main 4 Main 7 Main 3 Main 7 Main 2 Main 1 Main 2 Main 3 Main 0 Main 3 Main 1 Main 3 Main 18 Main 11 Main 11 Main 2 Main 4 Main 2 Main 10 Main 7 Main 17 Main 8 Main 7 Main 3 Main 10 Main 17 Main 6 Main 11 Main 1 Main 3
s Used
e ue
a point ta point
Ungrouped D 2.0648 N 4.0039 16.0313 1.9390
llac Gold Proj
ne Compos
eralized Zo
tionsrval Au gpt3.05 1.095.50 1.258.30 1.670.50 1.627.40 5.087.15 0.74
.50 0.456.00 2.252.99 1.25
3.35 0.464.27 2.264.09 1.87
.00 2.680.90 4.604.50 1.357.00 1.213.60 0.617.10 0.322.50 1.35
.60 1.732.50 1.093.00 0.990.80 4.523.42 3.94
.80 0.833.10 1.718.00 2.14
.70 6.24
.91 1.632.10 2.314.60 3.082.00 2.090.30 1.437.80 0.647.60 0.818.24 1.547.15 0.443.08 1.880.30 0.947.80 5.566.90 3.57
.21 1.91
.50 2.443.49 4.95
0.00 60.00 17 517
0.00 60.00 60 1.00
0.00 60.00517
ata Grouped 848 2.1054N/A 1.0375911 3.9727304 15.782083 1.8869
ject – 2017 T
sites
one 1.5 m
B Hole10-484-82-3310-484-82-3410-484-82-38484-81-16 484-81-27 8-84-40 W 87-02 W 87-05 W 87-09
Average
Data416500709413900
Technical Rep
Composite
Zone DDH IntersecZone Int
3 B4 B8 B B B B B B B
B
port 69
es (Au
ctionsterval Au gpt
1.41 1.853.37 1.490.07 1.544.76 2.452.05 2.990.93 1.471.50 1.194.10 1.283.30 4.15
2.39 2.22
T
v
F T
T
F
The statisticm compositvariance ansample pop
Figure 14.8
The log-norset that can
Internal WaMixed InterMineralized High-grade
The composgpt Au thatgrade interppopulation o
Figure 14.8
1
Pro
ba
bil
ity
cs shown intes within thnd coefficienulation prov
8 is a log-n
rmal probabn be charact
aste Populatnal Waste/LPopulation Population
site geostatt are uniqupolation ranof samples.
8: Log-nor
0.01
0.60
11.06
50.00
88.94
99.40
99.99
100.00
0.010
Software By Gemco
MZ 1.5m Au Compo
Table 14.9he mineraliznt of variativides for bet
ormal proba
bility plot ofterized as fo
ion - Low-grade P- -
istics indicae to the bu
nges should
rmal proba
0.10
L
om
osites (Au cut 60 gpt) - N
9 demonstrzed zone soion are alsotter correlat
ability plot o
f the 1.5 m ollows:
Population -
te the preseulk of the mbe restricte
bility plot
0
LOG Norm
NDWest
East Cadil
rate a reduclids comparo significanttion of samp
of the 1.5 m
composites
ence of a higmineralized ed during re
– mineraliz
Real Value
1.000
mal Probab
llac Gold Proj
ced mean grred to the intly reducedples during
m composite
s indicates s
gh-grade posub-popula
esource estim
zed zone 1
10.000
bility Plot
ject – 2017 T
rade of 2.11ndividual as. The reducgrade interp
s.
subpopulatio
<0.4 g0.4 – 1.0 g1.0 – 8.5 g
>8.5 g
opulation oftion. The remation for t
1.5 m comp
0 1
Technical Rep
1 gpt Au forssays; howeced variancepolation.
ons within t
gpt Au gpt Au gpt Au gpt Au
f samples abesults suggthe high-gra
posites (Au
100.000
port 70
r the 1.5 ever, the e of the
the data
bove 8.5 est that
ade sub-
u cut)
T
A
t
T
twt
14.6 Assa
The mineraTable 14.8A 10 m x 1zone, as shthe cells foselected to shows the mineralized
Figure 14
The mineracorrelate wtrends in thwith the intthe northwe
ay Compos
alized zone 8 were conto10 m grid cown in Figur contourinallow the dresults for zone.
4.9: E-W lo
alized zone with geologihe data: 1) terpreted faest.
10
00m
site Grade x
intersectionoured on a cell dimensiure 14.6. Ag based ondata to genethe Au com
ongitudina
composite cal featuresa shallow trult structur
Faults
DDH
x Thicknes
n compositevertical gridon was use
An inverse d a 75 m raerate any pmposite gra
l section v
grade thics. The gradrend that dires, and; 2)
E-W Long S
Intersection
East Cadil
ss Contouri
e grades and establisheed to cover distance algadius 2D sppossible trenade x thickn
view – comp
kness contode x thicknps approxim a steep tre
775m
Section View
Grade x Len
Nordeau We
llac Gold Proj
ing
nd thicknesd along an the extent
orithm was pherical seands naturallness interse
posite grad
ours demonness contoumately -30ºend that dip
(Facing Sout
gth Colour C
est
ject – 2017 T
ss calculatedeast-west lo
ts of the moused to intrch. The sply from the ection point
de x thickn
nstrate trenuring indica
towards thps approxim
Minera
Northe
th)
Contours
A
Limit at forprope
Technical Rep
d and tabuongitudinal odelled minterpolate grpherical seadata. Figu
t contouring
ness conto
nds that aptes two pre east, sub
mately -60º
al Zone Limit
ern Property Bo
Au gpt x Lengt
of mineralizedrmer northern erty boundary
port 71
ulated in section.
neralized ade into
arch was ure 14.9 g of the
ouring
ppear to rominent -parallel towards
oundary
th meters
d zone
V
F
T
A
14.7 Vari
Variographysamples. Thin a drill-hosample loca
Figure 14.composites
Figu
The modellesame sampan effective(radius) coindicated in
A 3D omni-identify a directional m
ography
y is an analhe down-hole database
ation), and t
10 shows thof the Au a
ure 14.10: L
ed variograle point) of
ely true widorresponds Table 14.8
directional sglobal rangmodelling a
1
Ga
mm
a (
H)
00
0.30
0.60
0.90
1.20
1.50
Software By Ge
1.5m Composit
Ga
mm
a (
H)
00
0.30
0.60
0.90
1.20
1.50
Software By Ge
1.5m Composit
Ga
mm
a (
H)
00
0.30
0.60
0.90
1.20
1.50
Software By Ge
1.5m Composit
ysis of samle linear sem
e and providthe down-ho
he results ossays cut to
Linear dow
m in Figure0.10 gpt Auth across thwell with t8.
semi-variogge of influend indicates
.5m Equal L
D
5 9
emcom
tes NDWest
5 9
emcom
tes NDWest
5 9
emcom
tes NDWest
mple variancmi-variogra
des the bestole range of
f down-holeo 60 gpt ma
wn-hole sem
e 14.10 indu. The ranghe strike anthe averag
ram was geence in thes a range of
Length Au A
own-Hole L
14 18
Linear
14 18
Linear
14 18
Linear
East Cadil
ce (semi-varm measure indication of influence fo
e linear variaximum, and
mi-variogr
dicates a ree of influennd dip of me mineraliz
enerated usie data. Figf influence o
Assay Comp
inear Semi-V
Range [m]
23 27
r Semi-vario
Range [m]
23 27
r Semi-vario
Range [m]
23 27
r Semi-vario
llac Gold Proj
riance) as as variance fof the nuggor samples.
ography comd normalize
ram – 1.5 m
elatively lowce down-ho
mineralizationzed zone in
ing the 1.5gure 14.11of up to 50 m
osites (Au c
Variogram
32 36
ogram
1) Nugget E
2) Spherica
32 36
ogram
32 36
ogram
1) Nugget E
2) Spherica
ject – 2017 T
a function ofor the closeet value (va
mpleted on d to the pop
m composi
w nugget infole is indicatn. The 4 mntersection
m composit shows res
m.
cut 60 gpt)
41 45
Effect( 0.10)
al( 4.06, 0.82)
41 4541 45
Effect( 0.10)
al( 4.06, 0.82)
Technical Rep
of distance best spaced ariance at th
1.5 m equapulation var
ites (Au cu
fluence (varted to be ne range of inlength of
tes in an attsults of the
555
port 72
between samples he same
al length riance.
t)
riance at ear 4 m, nfluence 8.3 m,
tempt to e omni-
v
v
w
Figur
3D directiondirections variograms influence. Fvariograms
Each of the30º dip dirmineralizedSimilarly, thother highe
Results frombetween saindicate ranindicative oindicated fo090º dip -3would suggradius in aindicated azpreferred.
re 14.11: 3D
nal specific vof specific that could
Figure 14.along azim
two directirection corr trends idehe azimuth r-grade min
m the variogmples along
nge across tof the averaor two speci30º, and; 2)gest a spherall directionzimuth with
Gam
ma
(H)
00
0.40
0.80
1.20
1.60
2.00
Software B
Gam
ma
(H)
00
0.40
0.80
1.20
1.60
2.00
Software B
Gam
ma
(H)
00
0.40
0.80
1.20
1.60
2.00
Software B
1.5
D omni-dir
variograms influence be well fitt
.12 and Fiuth (Az) 09
ons identifieresponds wentified from270º -60º
neralized tre
graphy indicg strike andthe mineralige 8 m widific direction) Az 270º drical ellipse s. Two simh range of
30 60
By Gemcom
30 60
By Gemcom
30 60
By Gemcom
5m Equal Le
Om
rectional se
were generon grade. ted with moigure 14.10º dipping -
ed demonstwith the shm the contodip directio
end.
cate a globad down-dip, zed zones f
dth of the Mns identifiedip -60º. Thecould be u
milarly orien75 m and
90 120
3D Se
NDW15mcmps
90 120
3D Se
NDW15mcmps
90 120
3D Se
NDW15mcmps
ength Au As
mni Directio
East Cadil
emi-variog
rated in 10ºTwo spec
odels, and t13 display -30º, and A
trate rangesallow easteouring and n correspon
al correlatioas indicate
from the doMain zone. Cd from the 3e two directused; howevnted search intermediat
Range [m]
150 180
emi-variogra
s Omni Directio
Range [m]
150 180
emi-variogra
s Omni Directio
Range [m]
150 180
emi-variogra
s Omni Directio
ssay Comp
onal Semi-V
llac Gold Proj
gram – 1.5
º incrementsific directiothat were iresults of
Az 270º dipp
s from 70 merly plunge geological nds with the
on of gold vaed by the omown-hole linCorrelations3D directiontions are never, variogr ellipses eate axis with
210 240
am
nal (10m lag)
1) Nugget Effe
2) Spherical( 5
210 240
am
nal (10m lag)
210 240
am
nal (10m lag)
1) Nugget Effe
2) Spherical( 5
posites (Au
Variogram
ject – 2017 T
5 m compos
s of azimuthons were fndicative ofthe mode
ping -60º, re
m to near 80of one of
modelling (e north-wes
alues for dismni-directioear variogra
s for distancnal specific ear normal raphy did nach with loh the globa
270 300
ect( 0.68)
51.17, 0.46)
270 300270 300
ect( 0.68)
51.17, 0.46)
cut 60 gpt)
Technical Rep
sites (Au c
h and dip tofound to gf greater ralled 3D direspectively.
0 m. The Azf the highe(see Figuresterly plung
stances up onal variograam is only 4ces up to 7variographyto one anot
not support ong axis all range of
port 73
cut)
identify generate anges of rectional
z 090º -er grade e 14.9). e of the
to 50 m am. The 4 m and 5 m are y: 1) Az ther and a 75 m ong the 50 m is
Fig
Fig
gure 14.12:
gure 14.13:
Gam
ma
(H)
0.6
1.2
1.8
2.4
3.0
Gam
ma
(H)
0.6
1.2
1.8
2.4
3.0
Gam
ma
(H)
0.6
1.2
1.8
2.4
3.0
Gam
ma
(H)
0.4
0.8
1.2
1.6
2.0
Gam
ma
(H)
0.4
0.8
1.2
1.6
2.0
Gam
ma
(H)
0.4
0.8
1.2
1.6
2.0
: 3D direct
: 3D direct
0 30 60
60
20
80
40
00
Software By Gemcom
0 30 60
60
20
80
40
00
Software By Gemcom
0 30 60
60
20
80
40
00
Software By Gemcom
1.5m Equal
1.5m Equa
0 40 80
40
80
20
60
00
Software By Gemcom
0 40 80
40
80
20
60
00
Software By Gemcom
0 40 80
40
80
20
60
00
Software By Gemcom
tional semiAz 09
tional semiAz 27
60 90 120
3D S
NDW15mcm
*
60 90 120
3D S
NDW15mcm
60 90 120
3D S
NDW15mcm
*
l Length Au A
Az 090 Dip -3
al Length Au A
Az 270 Dip -6
80 120 160
3D Se
NDW15mcmps
80 120 160
3D Se
NDW15mcmps
80 120 160
3D Se
NDW15mcmps
East Cadil
i-variogram90º Dip -30
i-variogram70º Dip -60
Range [m]
150 180
Semi-variogram
mps Az 090 Dip -30
Range [m]
150 180
Semi-variogram
mps Az 090 Dip -30
Range [m]
150 180
Semi-variogram
mps Az 090 Dip -30
Assay Compos
0 (Shallow NE
Assay Compos
60 (Steep NW
Range [m]
200 240
emi-variogram
s Az 270 Dip -60 (15
Range [m]
200 240
emi-variogram
s Az 270 Dip -60 (15
Range [m]
200 240
emi-variogram
s Az 270 Dip -60 (15
llac Gold Proj
m – 1.5 m c0º
m – 1.5 m c0º
210 240 2
m
(15m lag)
1) Nugget Effec
2) Spherical( 69
210 240 2
m
(15m lag)
210 240 2
m
(15m lag)
1) Nugget Effec
2) Spherical( 69
sites (Au cut 6
E Plunge)
sites (Au cut 6
Plunge)
280 320 3
m
5m lag)
1) Nugget Effect( 0
2) Spherical( 77.55
280 320 3
m
5m lag)
280 320 3
m
5m lag)
1) Nugget Effect( 0
2) Spherical( 77.55
ject – 2017 T
composites
composites
70 300
ct( 0.00)
9.97, 1.98)
70 30070 300
ct( 0.00)
9.97, 1.98)
60 gpt)
60 gpt)
60 400
0.18)
5, 0.93)
60 40060 400
0.18)
5, 0.93)
Technical Rep
s (Au cut)
s (Au cut)
port 74
T
A
T
T
Ttt
Awv
The two ellintermediat
Orientation 1st Rotation1st Rotation2nd RotationDip-60º)
Search Ellip Int
Search Ellip Int
14.8 Bloc
A block moNordeau We
The block m
Block modeNo Block MoBlock cell dNo. of ColumNo. of RowsNo. of Leve
Within the b
Rock (Miner
The Main Zblocks that blocks withi
The mineratreatment wthe minerazone codedcode 25), ablocks repre
Percent Bloc
A Percent bwithin the volumetric a
lipses are de axis as fo
by Z-X-Z R about Z ax about X ax
n about Z ax
pse 1 - Princtermediate A Tertiary Ax
pse 2 - Princtermediate A Tertiary Ax
ck Modellin
del project est project a
model geome
el origin – UTodel Rotatioimensions –mns – 160 (s – 320 (N) ls – 210 (El
block model
ralized zone
Zone and B occurred w
in the Main
lized zones was requiredlized zones Rock blocknd 2,203 blesent the m
ck Model
block modelmineralizedand resourc
defined by llows:
Rotation of Axis -10º (orxis -65º (orxis 30º (o
cipal Axis Axis xis
cipal Axis Axis xis
ng & Grade
was establiarea.
etry is summ
TM x=3330on (i.e. x=E,– 5 m (E), 2(E)
)
project a s
e) Block Mod
Zone solidswithin the reZone and 2
solids wered. No additiblocks req
k model. A locks were a
maximum nu
was establd zones solce reporting
a single or
Axis rient x-axis rient y-axis orient x-axis
Estimatio
ished in the
marized as f
50 (Easting, y=N, z=El.5 m (N) , 5
eries of bloc
del
s were usedespective m6 to blocks
e clipped agional rock c
quire grade total of 11
assigned to mber of blo
lished and pids. The Pe.
East Cadil
ientation an
at strike Azdown dip)
s rake to Az
AA
AA
n Paramet
e GEMS soft
follows:
), y=53194) 5 m (El)
ck models w
d to select ineralized zwithin the B
gainst the bcoding was
estimation.0,969 blockthe B Zone
ocks that cou
populated wercent bloc
llac Gold Proj
nd reversin
z 100º)
z 090º Dip-3
Az 090º DipAz 270º DipAz 190º Dip
Az 270º DipAz 090º DipAz 190º Dip
ters
tware syste
00 (Northin
were establi
and assignzones. A rocB Zone.
bedrock toporequired for. Figure 14ks were asse (rock codeuld be grade
with the calck model w
ject – 2017 T
g the range
30º and y-a
p -30º Rangp -60º Rangp -25º Rang
p -60º Rangp -30º Rangp -25º Rang
em to cover
ng), z=5400
shed to stor
unique intck code of 2
ographic sur the rock b4.14 displasigned to the 26). The ae estimated
culated percas used to
Technical Rep
es of the lo
xis rake to
e 75m e 50m ge 4m
e 75m e 50m ge 4m
r the extent
0 (Elevation)
re various d
teger rock c25 was ass
urface so noblock modelays the minhe Main Zonaggregated d.
centages foo weight blo
port 75
ong and
Az 270º
ts of the
)
data.
codes to igned to
o further as only
neralized ne (rock 113,172
or blocks ocks for
A
A
Figure
Grade Block
A grade bloand grade i
Grade Estim
A search/int
Points Used
Blocks Estim Bl
Search Type
Minimum NoMaximum NMaximum NMaximum N
Be
10
00m
e 14.14: 3D
k Model
ock model wnterpolation
mation Param
terpolation
d for Estimat Au cu Store
mated - Bloclocks with R
e – Octanct
o. of SamplNo. of SampNo. of SampNo. of Samp
DDH Interse
drock Surface
D E-W long
was establisn profiles de
meters
profile was
te - 1.5 m aut to 60 gpt ed with resp
cks with RocRock Code 2
sub-divided
es -1 for Inles - 24 les per Holeles per Octa
ection Grade
e
gitudinal se
shed to storetailing the c
established
assay compomax beforeective mine
ck Code 25 6 estimated
d Ellipsoid
ferred Estim
e – 4 ant – 6
e x Length C
Norde
775m
East Cadil
ection view
re calculatedcriteria and
with the fo
osites withine compositineralized zone
estimated bd by Points w
mates, 6 for
Colour Conto
eau West
m
llac Gold Proj
w – minera
d grades usparameters
ollowing para
n defined limng e integer ro
by Points wiwith Rock C
Indicated E
ours & Rock
M
N
A(C20
ject – 2017 T
alized zone
sing predefis for grade i
ameters to
mits of mine
ck codes
th Rock CodCode 26 only
Estimates (i
k Block Mod
Main ZoRock
B ZoneRock
Mineral Zone L
Northern Prope
No Main ZoneRock Cod
(outside pro
Limit of minerat former nortproperty boun
dditional MaiCode 25) not 009 resource
Technical Rep
e block mod
ined sampleinterpolation
estimate gr
eralized zone
de 25 only y
.e., 2 holes)
el
one BlocksCode 25
e BlocksCode 26
Limit
erty Boundary
e Blocksde 0operty)
ralized zone thern ndary
in Zone Blockincluded in
e calculations
port 76
del
e search n.
rade.
es solid
)
y
ks
s
Tv
t
tv T
w
T
Search & In
In order to by the geointerpolate axis of each
The two prevariographysame Z-X-Zmineralizedalong the 0the Y-axis a(i.e., northwtrend direcvariogram.
The Z-X-Z R1st Rotation1st Rotation2nd Rotation
In order toseparate granges. In gand y-axis within the mensure sam
The log-norsubpopulatigrade subprestricted tozone.
Search-Inte~66% of in50% of x anz-axis increz-axis for h
Ellipse 1 Principal X-ARange X – 5Range Y – 3Range Z – 1
nterpolation
most accurological intgrades alon
h ellipse.
eferred treny. Each of tZ axis of r zone. The
090º azimutas the primwest plungiction and s
Rotation for about Z ax about X ax
n about Z ax
o more accrade interpgeneral, 66ranges of thmineralized
mples were in
rmal probabon of samp
population oo 3.0 m to p
erpolation Rdicated rangnd y axis raased to 15 igh-grade sa
Axis along A50m 35m 15m
Ellipse Orie
rately estimaerpretation,
ng the indica
nds are normthe two searotation to first ellipse th -30º trenary axis witng). For bo
specified wi
both ellipsexis -10º xis -65º xis 30º
curately estpolations w% of the inhe ellipses uzone were
ncluded from
bility plot ofples >8.5 gof samples.prevent spre
anges Usedge for x andnge for samm to allow famples >8.
Az 090º Dip
entation & R
ate resource, two simiated trends
mal to one arch ellipsesorient the is defined w
nd (i.e., north longer raoth ellipsoidth the sho
es is defined
timate and ere requiredicated ranused to estiused for es
m along stri
f the 1.5 m pt Au. The The z-axieading of na
for Indicated y axis mples >8.5 gfor variation5 gpt Au res
-30º
East Cadil
Ranges
es as indicalarly orientof mineraliz
another wits used for s
ellipse in with the X-artheast plunange of influds, the inteorter range
d as follows
categorize ed using seges from vaimate Indicastimation, ake and dow
mineralizedrange of in
s range foarrow high-g
ed Resource
gpt Au ns in strike/dstricted to 3
High-grRange Range Range
llac Gold Proj
ated by varited ellipsoidzation using
th nearly thsearch intethe 100º a
axis as the nging). The uence alongrmediate axas indicat
:
resources,earch-interpariography wated Resou longer tert
wn-dip, desp
d zone comnfluence war high-gradgrade inters
e Estimates
dip 3.0m
rade >8.5 gX – 25m Y – 17.5mZ – 3m
ject – 2017 T
ography resds were ug longer ran
he same indrpolation arazimuth anprimary axisecond elli
g the 270º xis is definted from th
it was depolation elliwere used trces. As ontiary Z-axis pite minor lo
mposites indas reduced de samples sections acr
gpt Au Rang
Technical Rep
sults and sused to selges for the
dicated rangre defined wnd -65º dips with longepse is definazimuth -60ed along thhe omni-dir
etermined tipses with to define thly compositrange was
ocal variatio
icates a hig50% for th>8.5 gpt
ross the min
ges
port 77
upported ect and primary
ges from with the p of the er range ned with 0º trend he other rectional
hat two varying e x-axis
te points used to
ns.
gh-grade he high-Au was
neralized
Tvft
A
t
A
Ellipse 2 Principal Y-ARange X – 3Range Y – 5Range Z – 1
Search-Inte133% of ind100% of x az-axis increz-axis restr
Ellipse 1 Principal X-ARange X – 1Range Y – 7Range Z – 2
Ellipse 2 Principal Y-ARange X – 7Range Y – 1Range Z – 2
Special Bloc
Two speciavalues calcufor each bloto estimatecategorizatiIndicated Rinterpolatiodrill-holes.
Grade Inter
An inverse model. InitiIndicated R
Grade interResources. populating athe steep n2,900 block
A comparisunestimatedhowever, ssuggesting shoots.
Axis along A35m 50m 15m
erpolation Rdicated rangand y axis rased to 20 icted to 6 m
Axis along A100m 70m 20m
Axis along A70m 100m 20m
ck Models
l block modulated durinock estimatee blocks waon of estim
Resource bln profile cr
rpolation
distance sqal grade intesources
rpolation waEllipse 1, oa total of 14northwest pks with grad
on was comd blocks witsignificantly that Ellipse
Az 270º Dip
anges Usedge for x andrange for sam to allow f
m for high-gr
Az 090º Dip
Az 270º Dip
dels, in addng the gradeed was stors stored in
mated resouocks. Sinceiteria, block
uared algorterpolation w
as first comriented on t4,924 blocklunge, up-de.
mpleted reveth the Ellips
fewer bloe 1 may be
-60º
for Inferred y axis mples >8.5for variationrade sample
-30º
-60º
dition to the interpolatired in a blo
a block murces. Blocke a maximuks calculate
rithm was uwas complet
pleted usingthe shallow
ks with graddated only b
ersing interse 1 interpo
ocks were e oriented a
East Cadil
High-grRange Range Range
d Resource
gpt Au ns in strike/des >8.5 gpt
High-grRange Range Range
High-grRange Range Range
e Au-gradeon process.ck model. Sodel. These
ks estimatedum of 4 sa
ed with 5 o
sed to calcuted using al
g the ellipseeasterly plue. A secondblocks with
rpolations wolation. Theestimated
along the p
llac Gold Proj
rade >8.5 gX – 17.5mY – 25m Z – 3m
Estimates
dip Au
rade >8.5 gX – 50m Y – 35m Z – 6m
rade >8.5 gX – 35m Y – 50m Z – 6m
e block mod The distan
Similarly, the special md with 6 oramples per r more sam
ulate the grl parameter
e ranges deunge, was ud interpolati
zero-grade
with Ellipse e resulting ninitially by
principal plu
ject – 2017 T
gpt Au Rang
gpt Au Rang
gpt Au Rang
del, were ece to the ne
he total numodels were
r more poinr hole was mples includ
rades storedrs defined a
efined for eused for theon, using E
e, and popu
2 first and number of y Ellipse 2 unge of high
Technical Rep
ges
ges
ges
established earest sampmber of poin
used to asnts were fla
establishedde a minimu
d in the gradbove for est
stimating Ine first interpEllipse 2 orieulated an ad
then up-dablocks was
versus Elher-grade z
port 78
to store ple point nts used ssist the gged as
d in the um of 2
de block timating
ndicated polation, ented on dditional
ating the similar; lipse 1,
zones or
Af
t
A
t
Tt
t
T
T
t
As a resultfollowed by
Subsequentseries of intestimation p
Search ellipblocks and the longer grade in an
A total of 152,416 gratotal of 70,2
14.9 Bloc
The resultinthe capped-observed bcomposite gmineralizedthe average
14.10 Spec
The only reWest are frSG measureg/cm3. The current NI mineralizedusing a spe
The Main Zcalculating the percent
14.11 Dilu
No considerestimated r
t, final India second in
t to interpolterpolationsparameters
pse 1 with estimated ginferred ranadditional 4
17,824 gradde blocks a240 estimat
ck Model Va
ng block mo-composite
between blograde with t zone (Tab
e composite
Zone
25 (Main Zo
26 (B‐Zone
cific Gravit
corded dataom 6 sampements is 2historic res
43-101 reg zones are cific gravity
Zone and tonnages. I of the bloc
tion & Rec
rations wereesources.
cated Resonterpolation
ation of gras were comp.
the longer grade for anges was us4,355 block
de blocks aare categorited grade bl
alidation
odel was vagrades in c
ock grades the average
ble 14.10), grade.
Table NumCom
one) 4
e)
ty & Volum
a for specificles of core f.90 g/cm3 wsource and ulations, usfrequently of 2.90 to c
B Zone rocIn addition, k within the
covery
e made for d
urce grade using Ellips
ades using tpleted, in o
inferred ran additionased to inters.
re categorizized as Infeocks.
alidated by cross-section
and neighe of the inteshows that
14.10: Intmber of posites
497
20
metrics
c gravity (SGfrom historiwith a margreserve est
sed an SG ologged withcalculate re
ck codes wthe percen
e mineralize
dilution or re
East Cadil
estimates se 2, and up
he indicatedrder to esti
nges was ul 48,061 blorpolate grad
zed as Indierred Resou
visually comn and plan vbouring comerpolated blt the averag
terpolationCompositesAverage
2.06
2.22
G) measureic hole 10-4inally highetimates (seeof 2.90 for h up to 10%source tonn
were assignt model wad zone for t
ecovery, an
llac Gold Proj
were calcup-dating pre
d resource emate grade
used to inteocks. Subsede into unes
cated Resources. The t
mparing theviews. In gmposites. Alocks, at a 0ge block gr
n Paramete Numbe
Block
6803
2202
ements of m484-82-30. Tr sample lee Section 6calculations
%-15% sulpnage.
ned specifics used to wthe reported
nd no crown
ject – 2017 T
ulated applyeviously une
estimate paes using the
erpolate graequently, sestimated blo
urces, whertotal resour
e estimatedeneral, a goA compariso0.0 g/t Au crade is typic
ers er of ks
BlAve
36 1
2 2
mineralized sThe averagngth weight6), althougs. Considerihides suppo
c gravities weight the ed resources.
pillar was s
Technical Rep
ying Ellipse estimated bl
rameters, ae Inferred R
ade in unesearch ellipseocks and es
reas and adrce occurs w
d block gradood correlaton of the cut-off, withcally compa
ocks erage
1.90
2.21
samples at Ne of the 6 rted averageh not compng further orts justifica
of 2.90 g/estimated b
subtracted f
port 79
1 first, locks.
a second Resource
stimated e 2 with stimated
dditional within a
des with tion was average hin each arable to
Nordeau recorded e of 2.92 pliant by that the ation for
/cm3 for locks by
from the
T
F
v
14.12 Meta
The Authorsmineralizaticonsideratioother possib
14.13 Envi
No considernoted to cooperations consideratio
14.14 Cut-
Figure 14.moving aveUS$1250/oz
Figure
Table 14.approximataverage exvalue used
allurgical C
s are not awon is docu
ons have beble metallur
ironmental
rations haveontain up towill need t
on of potent
-off Grade
.15 is a grerages for z Au was se
14.15: Gol
11 provideely the samchange rateto convert t
Considerat
ware of any umented toeen made forgical issues
l Considera
e been mado 10%-15%to evaluate tial acid dra
raph of the a 10 mo
elected for c
ld price (U
es the Bame period (es for the lathe US$ gold
ions
metallurgico contain uor potentials.
ations
de for any % sulphides
the impacinage and c
US$ daily nth period ut-off grade
US$/oz Au)
nk of CanApril 1, 20ast 10 mond price to C
East Cadil
al studies frup to 10% refractory
possible enwith arseno
ct of mine ontained lev
average goto Jan 31
e calculation
) – daily, 10
nada mont16 - Janua
nths is calcuDN$ for cut
llac Gold Proj
rom the Nor%-15% sulp
component
vironmentaopyrite. Anywaste rockvels of arse
old price sh1, 2017. Ans.
00- and 20
thly averagry 31, 201ulated at 1 t-off grade c
ject – 2017 T
rdeau West phides withts to the m
al issues. Thy potential k and mill nic.
howing 100An approxim
00-day mov
ge US$ ex7). The me$US = 1.3
calculations
Technical Rep
area; howeh arsenopyrineralization
he mineralizmining andtailings dis
0 day and 2mate mid-p
ving avera
xchange raean of the 31 $CDN an.
port 80
ever, the rite. No n or any
zation is d milling posal in
200 day point of
ages
ates for monthly
nd is the
f T
$
Tabl
Potential exmining metzones of mim, and is lohole stopinmining metrequired. M
Mineralizatilocated 2 kflotation con
Total produ$145/tonnegrade deter
$Production145$/tonne
le 14.11: BMo
Se
O
N
D
Janu
A
xploitation othods, mostineralizationocally indicag methods hods are esilling & proc
on at Nordkm to the ncentration
uction costs e was used rmination is
n/(Gold Pricee / ( $1250
Table 14.
Prodcution
Mining CostProcessing Total Costs
Cut-off Gra$US/oz
1250
ank of Cannth (2016)
April
May
June
June
July
August
eptember
October
ovember
ecember
uary (2017)
Average
of the estimt probably an. The Main ted to be comight be
stimated at cessing cost
eau West hwest, and followed by
are estimafor the cutas follows:
e (US$/oz) x
.12: Cut-of
n Cost Estima
tsCosts
s ($)
ade Parametez Au $C
0.00
nada MonthUS
mated resouraccessed byZone is mo
onsistent aloused for po$70-$100/tts are estima
has been cwould like
y cyanide lea
ated to rangt-off grade
x $CDN/$US x 1.31
ff Grade Ca
ates ($)low
100.0020.00
120.00
ers & CalculaCdn/$US $C
1.31
East Cadil
hly AverageSD to CAD
1.3226
1.2819
1.2942
1.2896
1.305
1.2994
1.3109
1.3251
1.3438
1.3329
1.3191
1.3105
rces at Nordy a vertical odestly wideong strike (otential minonne depenated at an a
haracterizedly require aching, to re
ge from $12calculation
S Exchange
alculations
high130.0040.00
170.00
ationCDN/oz /Au g
1637.50
llac Gold Proj
e US$ CurrC
deau West w shaft due
e, with an a(110º) and dning. Miningnding on theadditional $
d as similasimilar metecover gold
20-$170/to(Table 14
Rate/oz-gm / 31.1
s - Nordeau
avg115.0030.00
145.00
gm/oz Au Co1
52.65 11
ject – 2017 T
rency ExchCAD to USD
0.7561
0.7801
0.7727
0.7754
0.7663
0.7696
0.7628
0.7547
0.7442
0.7502
0.7581
0.7631
will likely reto the depverage neadip (-65º) dg costs fore amount of50-$70/ton
r to the hitallurgical p.
nne and he4.12). The
m Conversio1)
u West Res
osts $/t Cut-120.00 2145.00 2170.00 3
Technical Rep
hange Rate
equire undepth of the inr-true thickdip. Lower cr undergrouf developmene to recove
storic Chimprocessing,
ence, the mformula for
on)=Cut-off = 2.75 gp
source
-Off g/t2.282.753.23
port 81
es
erground ndicated ness >8
cost long und bulk ent work er gold.
mo Mine, namely
mid-point r cut-off
f Grade pt
f
T
Tvt
T
v
T
For the detrange respeincrementalcalculated production currency ex
14.15 Reso
Results of tgpt Au increbetween 2.estimated pcut-off repr
Estimated rorder to defuture drillin
Measured ReThe mineraexploration and down-dcross-cut thThe currenvariations tthe interpremoderate cMeasured R
Indicated RThe low tosupported bindicates codistances, bvariance) ismaximum restimated rcomposite p
Table 14.1Resource es
The IndicateB Zone conranges of pgpt Au to 16
termined raectively betl change incut-off gradcost variab
xchange rate
ource Estim
he resourceemental cut25 gpt Au production cesent the m
resources wmonstrate tng of potent
esources alized zone drill-hole d
dip. Numerohe mineraliznt interpreto the interp
etation and confidence lResources. N
esources o moderateby good staorrelation obeyond whis low, but inranges, theresources aspoints) were
13 providesstimates, at
ed Resourcentains only robable cut60,000 tonn
nge of estimween 2.28 estimated de. This de
ble in the ce variables,
mate
e estimate at-off grades and 3.25 gcosts. The e
mid-point, an
were also cathe wider gtially higher
model wadata, and suous faults anzed zone, loation is supretation armodel. The evel in the
No Measured
e confidenceatistical corrof grades ach correlatincreases ase confidences Indicated e included in
s results fot various cut
e contains 31,960 tonne-off grade, nes grading
mated prodgpt Au to 3production
emonstratesut-off equamay also si
are presenteranging fropt Au are cestimates thnd were app
alculated useneral exte
r-grade reso
s constructuggests thatnd narrow scally sheariupported byre possible.
nature of t interpretatd Resources
e level of relation of aalong specion is lost.
s the distance level of cResources,
n the estima
or each of t-off grades
30,212 oz ofes at an esthe Indicate4.65 gpt Au
East Cadil
duction cost3.23 gpt Au costs, thes the high tion. In adignificantly
ed herein. Tom 2.0 gpt Aconsidered that are repoplied to the
sing cut-off nt and tren
ources.
ted from int the Main shears docung and/or dy the geolThe result he mineraliztion precluds are reporte
the interprassay resultfic trends The confidece and vari
correlation i provided aation.
the minera.
f Au, almostimated graed Resourceu.
llac Gold Proj
ts (i.e., $12u (see Tablre is a resudegree of
dition, the influence th
The estimateAu to 3.5 gpthe most reorted and hfinal reporte
grades of nd of the m
nterpretationZone is relamented in tdisrupting thlogical evidis a low to zation, geoldes categored for the N
retation ants from the for ranges
ence level aance is reds considere
a minimum
alized zones
t all of whicade of 3.07 es vary from
ject – 2017 T
20 - $170), le 14.12). Tulting 0.19 f sensitivityprice of go
he cut-off gr
ed resource pt Au. The eepresentativhighlighted ed Mineral R
1.0 gpt Au ineralization
n of relativatively contthe drill-logshe continuitdence; how
moderate clogical envirrizing any oNordeau Wes
d mineralizvariograph(distances
at the maxiuced. At 66ed sufficientof 2 drill-ho
s and for t
ch is within gpt Au. Fo
m 342,000 t
Technical Rep
the cut-offThus, for egpt change
y of the esold and therade.
is reportedestimated gve for the rat the 2.75Resource Es
and 1.5 gpn, and for ta
vely widelytinuous alons are interpty of minerawever, consconfidence ronment anof the resoust deposit.
zed zone my. The vari) up to mmum distan
6% of the int to categoole intersec
the total In
the Main Zoor the low aonnes grad
port 82
f grades ach $10 e in the stimated e foreign
at 0.25 rades of range of 5 gpt Au stimate.
pt Au in argeting
spaced ng strike preted to alization. siderable level for d low to urces as
model is ography aximum nce (i.e. ndicated
orize the ctions (5
ndicated
one; the and high ing 3.59
Tt F
w
Tt
The Total tonnes gra
Figure 14.gpt Au cut-o
Of the 97 dholes and iwith some small discon
From 300 mincreases ghole traces,hole interse
The most sthis depth, Indicated R
Inferred Re
Inferred Redetailed eaResources,
Table 14
Indicated ading 4.17
16 displaysoff.
drill-hole intentersection larger gapsntinuous len
m - 700 m reatly, from, especially ection.
ignificant pthe currentesources wi
sources
esources werlier in the subdivided
Zone
Main
B
Total
4.13: Indica
Resource gpt Au at t
s the Indica
ersections, points is re
. The Indicanses or “sho
below surfm approxima
in the easte
art of the It drill-hole ith the minim
ere estimatreport. Tabfor the two
Cut-off Gradgpt Au
1.001.502.002.252.502.753.003.253.50
1.001.502.002.252.502.753.003.253.50
1.001.502.002.252.502.753.003.253.50
ated Resou
for the Nothe calcula
ated Resour
68 (i.e., >7elatively unated Resouroots” with <
face, there ately 50 m tern half of t
ndicate Resspacing is tmum two-h
ed using thble 14.14mineralized
de Volumem3
387,194233,816145,858115,37392,29377,02865,05555,16844,213
10,2289,1245,8942,6831,532
6761349086
397,421242,940151,752118,05693,82577,70465,18955,25844,299
East Cadil
urces at In
ordeau Weated cut-of
rce grade e
70%) are wiformly sparces in this 50 m block-
are 28 drillo >100 m, he property
source lies atoo wide foole requirem
he more reprovides es
d zones at v
e Density3 T / m34 2.906 2.908 2.903 2.903 2.908 2.905 2.908 2.903 2.90
8 2.904 2.904 2.903 2.902 2.906 2.904 2.900 2.906 2.90
2.900 2.902 2.906 2.905 2.904 2.909 2.908 2.909 2.90
llac Gold Proj
ncremental
est properff grade of
stimated bl
ithin 300 mced - appropart of the -dimensions
l-hole interswith signific
y. Below 700
at depths br some intement and sp
elaxed parastimates forvarious cut-o
Tonnage GT g
1,122,861678,066422,987334,582267,649223,382188,660159,988128,219
29,66026,45917,0947,7794,4431,960
389260249
1,152,522704,525440,081342,361272,092225,342189,049160,248128,468
ject – 2017 T
l Cut-off Gr
rty is estim2.75 gpt A
locks above
m of surface.oximately 2mineralized
s.
sections, thcantly large0 m depth t
between 400ersections tpecified dist
meters andr the additioff grades.
Grade In-Situ pt Au Au
2.12 76,52.72 59,23.30 44,83.61 38,83.92 33,74.18 30,04.42 26,84.65 23,94.97 20,4
2.06 1,92.14 1,82.34 1,22.62 62.81 43.07 13.744.104.13
2.12 78,52.70 61,03.26 46,3.59 39,53.90 34,4.17 30,24.42 26,84.65 23,94.96 20,5
Technical Rep
rades
mated at 2Au.
e the report
. Distributio25 m - 50 md envelope
e spacing or gaps betwthere is only
0 m and 60o contributeance.
d longer raional Total
Auu oz590261852847755019806928476
965822285655402193473433
556083137503157212853963509
port 83
225,212
ted 2.75
on of the m apart, occur in
of which ween the y 1 drill-
00 m. At e to the
nges as Inferred
Figure 14.16: E-W section vie
Bedrock
1000
m
w looking sou
k Surface
East Cadillac Go
uth showing I
old Project – 201
Indicated Reso
775m
7 Technical Repo
ource blocks &
ort 84
& drill-hole in
Minera
Northe
ntersections
al Zone Limit
ern Property B
Au gpt
Boundary
Tt
Table 1
For the lowmillion tonnResource isat an estima
The Total tonnes graResource c
4.14: Estim
w and high nes gradings almost entated grade
Inferred Rading 4.09 contains an
Zone
Main
B
Total
mates of Ad
ranges of pg 3.58 gpt Atirely withinof 3.59 gpt
Resource fogpt Au at
n estimate
Cut-off Gragpt Au
1.001.502.002.252.502.753.003.253.50
1.001.502.002.252.502.753.003.253.50
1.001.502.002.252.502.753.003.253.50
dditional I
probable cuAu to 0.81 the Main ZAu.
or the Nordthe calculd 146,000
ade Volumem3
1,263,375852,095636,689543,433417,118378,534328,777275,399247,691
24,98619,48512,66210,0057,6105,0254,3202,6772,463
1,288,362871,580649,350553,438424,728383,559333,096278,076250,154
East Cadil
Inferred Re
ut-off grademillion ton
Zone, with t
deau West lated cut-ooz of Au.
e Density3 T / m35 2.90 35 2.90 29 2.903 2.908 2.904 2.907 2.909 2.901 2.90
6 2.905 2.902 2.905 2.900 2.905 2.900 2.907 2.903 2.90
2 2.90 30 2.90 20 2.908 2.908 2.909 2.906 2.906 2.904 2.90
llac Gold Proj
esources at
, the Inferrnnes gradinthe B Zone
property off grade o
TonnageT g
3,663,7882,471,0761,846,3971,575,9551,209,6421,097,749
953,452798,657718,305
72,46156,50736,71929,01622,07014,57212,5277,7647,142
3,736,2492,527,5831,883,1161,604,9701,231,7121,112,321
965,979806,422725,447
ject – 2017 T
t Various C
red Resourcg 4.50 gpt containing
is estimateof 2.75 gpt
Grade In-Situ gpt Au Au
2.41 284,32.97 235,63.38 200,43.59 181,83.96 153,94.10 144,64.27 131,04.50 115,64.63 106,9
2.24 5,22.47 4,42.85 3,33.05 2,83.25 2,33.59 1,63.70 1,44.11 1,04.17 9
2.41 289,52.95 240,3.37 203,73.58 184,63.95 156,34.09 146,34.27 132,54.50 116,64.63 107,9
Technical Rep
Cut-off Gra
ces vary froAu. The In
only 14,572
ed at 1.11 Au. The I
Auu oz312665423850994635061671993
219487365841310680492027959
532152789691304315553697952
port 85
ades.
om 1.60 ndicated 2 tonnes
million nferred
T
F
14.16 Sum
Table 14.1grade of 2.7
Table 14
Resource
Measured Indicated
Measured + Inferred
Total Inferre
Figure 14.resource blo
Figure
mmary of Ca
15 provides 75 gpt Au fo4.15: Summ
e (Category)
Indicated
d
.17 is an eocks at the
e 14.17: So
Bedroc
10
00m
ategorized
a summaryor the Nordemary of Ca
effecti
Main B Total
Total Main B
Total
east-west, sreported cu
outh-facing
ck Surface
Faults
d Resource
y of the cateeau West deategorized ive date of
Zone
south-facingt-off grade
g longitudi
East Cadil
s
egorized reseposit. Resources
f December
No M
g longitudinof 2.75 gpt
inal section
775m
llac Gold Proj
sources estim
s at 2.75 gpr 31st, 201
Tonnes
Measured Res223,
1,225,
225,1,097,
14,
1,112,
al section dAu.
n – minera
ject – 2017 T
mated at th
pt Au Cut-o16)
s Au G
(gp
sources 382960342
342749572
321
displaying t
alized zone
Minera
Northe
Technical Rep
he calculated
off Grade (
rade pt)
In-S
4.18 3.07 4.17
4.17 4.1
3.59
4.09
the total es
e block mod
l Zone Limit
ern Property Bo
Au gpt
port 86
d cut-off
(with
Situ Au (oz)
30,019193
30,212
30,212144,635
1,680
146,315
stimated
del
oundary
T
t T
F
Ft
14.17 Conc
The total Mdepths fromshallow eas
No drilling the required
The results deposit havlenses (see require signand would b
Figure 14.points that
Figure 14
Figure 14.the distancegrading abo
Number
No. of PoinEstimate B
1
2-4
>5
clusions
ineral Resoum 400 m to 7terly plunge
has been cod vertical de
further deve clearly bFigure 14
nificant addbe accessibl
.18 is an ewere used f
4.18: South
19 portrayse to the neove 2.75 gpt
of Sample Po
Bedroc
100
0m
nts Used to Block Grade
4
(ie. 2 holes)
urce Estima750 m (Figue, and are li
ompleted fuepths betwe
monstrate tbeen affecte.17 and Fig
ditional highe via a ram
east-west lofor estimatin
h-facing lon
s the sameearest sampt Au.
oints Used to
ck Surface
Faults
te can be sure 14.17 kely crosscu
urther eastween 700 m to
that the resed by strongure 14.18her cost minp, at a relat
ongitudinal ng the total
ngitudinal
south-facinple point tha
o Estimate To
No
East Cadil
een to occuand Figureut and offse
ward along o 1000 m to
sources idenng shearing8). Due to thning to exptively low co
section (faresource bl
section – p
ng longitudiat was used
otal Resource
rdeau West
775m
llac Gold Proj
ur primarily e 14.18). Thet, as shown
the continuo intersect t
ntified in th, as the zoheir smallerploit; howevost compare
cing south)locks gradin
points used
inal sectiond for estima
e Blocks >2.2
ject – 2017 T
within 2 or he zones aren, by interpr
ued shallow the minerali
he upper (sones are trr dimensionver, the resed to a shaf
) and displang above 2.7
d to estima
as Figureating the to
25 gpt Au & D
Mineral Z
Northern
Technical Rep
3 lenses loe elongatedreted faults.
easterly plization.
shallow) parruncated ints, these zon
sources are ft.
ays the nu75 gpt Au.
ate block-g
e 14.18, buotal resource
DDH Intersect
Zone Limit
Property Boun
DDH Au gpt
port 87
cated at along a .
lunge at
rt of the to small nes may shallow
mber of
grades
ut shows e blocks
tions
ndary
f
T
T
T
Figure
It can be se- 625 m, a (i.e., blocksprimarily thfrom reportpoints (i.e.,
The mineraprimarily byallowable ssmaller lensdrilling.
The results opportunity
The densitymineralizatidrilling.
Distance
25
12
No. of PoiEstimate B
<1
50
>1
75
e 14.19: So
een in Figurlarge part
s with >5 she distance ting as Ind drill-holes)
lization in ty a minimusearch distases or “shoo
from the 3y to increase
y of drilling on; howeve
Bedro
1000
m
to Nearest S
5-50m
.5-25m
ints Used to Block Grade2.5m
-75m
00m
5-100m
outh-facing
re 14.18 thof the resou
sample poinbetween th
dicated Res for the Ind
he upper eaum of 2 hoance that dots” at <50
models pree and enhan
in the upper, there is
ock Surface
Faults
2D
Sample Used
g longitudi
hat in the murce has bets used for
he drill-holesources, as
dicated Reso
astern part oles (i.e., >defines Ind0 m is defin
esented cannce the exist
er part of tlittle opport
E-W Long S
d to Estimate
N
East Cadil
inal section
mineralized zeen estimate
estimate); s at this dethe maxim
ource catego
of the depo>5 sample icated Resoed by the d
n be used toting resourc
the deposit tunity to inc
775m
Section View
e Total Resou
Nordeau Wes
llac Gold Proj
n – minera
zones identied with reshowever, F
epth that prmum distancory, was exc
osit can be spoints) and
ources. Thedensity of d
o target furtces.
has delineacrease or en
(Facing Sou
urce Blocks
st
ject – 2017 T
alized zone
ified at deptults from 2 Figure 14.1revented mace allowablceeded.
seen to havd within the maximumdrill data, an
ther explora
ated severanhance thes
Miner
North
uth)
>2.25 gpt Au
Technical Rep
e block mod
ths betweenor more dr
19 shows tany of thesee between
e been intehe maximumm extents ond not by a
ation with a
al smaller lese zones by
ral Zone Limit
hern Property B
Au gpt
u & DDH Inte
port 88
del
n 400 m rill-holes that it is e blocks sample
rpolated m 50 m of these a lack of
apparent
enses of y further
Boundary
t
ersections
T
The significrecent drilli
1. in-filIndicestimIndic
2. the bdownresodeptzone
ant part of ng at depthll drilling cocated Resoumated from cated Resoublocks shown-plunge orurce might ths betweenes.
the identifies between 4uld, if succeurces, as it2 or more
urces; wn with >75r up- and dobe expande
n 650 m an
ed resource400 m and 6essful, convt is only thdrill-holes
5 m distanceown-dip sideed. Eastwardnd 1000 m
East Cadil
occurs in t625 m. The ert much ofhe >50 m (i.e., minim
e between se of the zoned from the calong the
llac Gold Proj
the newly demodels dem
f the Inferredrill-hole s
mum 5 sam
sample poines and indiccentre of theindicated s
ject – 2017 T
eveloped zomonstrate ped Resourcespacing thaples) not to
nts tend to cate the diree property, shallow east
Technical Rep
ones from thprimarily thaes in these zt precluded
o be catego
be clusteredections in wdrilling is aterly plunge
port 89
he more at: zones to d blocks orized as
d on the which the
bsent at e of the
Tw
T
ft
Tt
A
15.0 ADJA
Of significancentre of th
The mine wwith Louveoperated udismantled
The Chimo ore yieldingfrom 6 diffethe north inbearing quaMB87-05, M
The depositthan 2 km omineralizatimetamorphassociated w
A major faumine, and a
ACENT PRO
nce to this he East Cadi
was first opem as oper
until the enin 2007 and
F
Mine produg an averageerent ore shn close assartz lenses
MB88-14)...
t is similar inon-strike to on are recoosed volcanwith banded
ult splay extan importan
OPERTIES
project is thllac Gold Pr
erated by Cator for 5 nd of 1996d there are
Figure 15.1
uced in excee grade of 4oots extendociation witin sheared
n mineralogthe east. A
ognized at Cnic rocks andd magnetite
ending soutt fault could
he adjacentoperty, (see
Chimo Gold years befo
6. The infrano longer a
: Former C
ess of 379,04.9 gpt Au, ding from neth sedimentd and altere
y and strucs at the Norhimo: (1) gd (2) bandsiron format
theast off thd separate t
East Cadil
property oe Figure 4.
Mines Ltd ore manageastructure ny structure
Chimo Gold
000 ounces in three dis
ear surface ttary bandeded mafic vo
ture to the rdeau West gold-quartz ls of semi-mation.
he Cadillac Tthe sedimen
llac Gold Proj
of Cartier Re1), that hos
in 1966-67ement was on the mi
es on the sit
d Mine (July
from approstinct produto a depth od iron formolcanics (DV
Nordeau Wedeposit, twlenses in lonassive arsen
Tectonic Zonntary and vo
ject – 2017 T
esources Incsts the form
7. Productionhanded ou
ine site (Fte.
y 2006).
oximately 2.ction phaseof some 870ations and V97-01, GM
est deposit,wo different sngitudinal snopyrite and
ne may exteolcanic rocks
Technical Rep
c., located nmer Chimo M
n resumed ut to CambFigure 15.1
.4 million toes. Productio0 m, the firsthe others
M48430, GM
which lies styles of gohear zones d pyrrhotite
end to the Cs.
port 90
near the Mine.
in 1984 bior who 1) were
onnes of on came st two to as gold
M60091,
less ld in
Chimo
Tt
16.0 OTH
The authorsto a conclus
HER RELEVA
s are not awsion contrar
ANT DATA
ware of any y to that se
AND INFO
additional tet forth in th
East Cadil
ORMATION
technical dahis report.
llac Gold Proj
ata that mig
ject – 2017 T
ght lead an
Technical Rep
accredited
port 91
investor
T
t
“
f T
T
T
17.0 INTE
Chalice is inof western mineralizatiProperty inpotentially d
The East anastomosithe host srelatively unrenowned L“break” thanumerous szones and Property areprinciple pa
Gold minerain two settin
1. gold (arseformmine
2. strucassozonearse
Both types 1% to 5% formations.
The economsixty years relatively ineastern halprogrammepart of Chal
This report Property deof the cateNordeau Wnorth-northstrike.
The authorsubject of c
ERPRETAT
n the procesQuebec (ton targets.
n order to delineate ne
Cadillac Gng high-str
sedimentaryndeformed Larder Lake-at defines tsyn-deformathe secondae of primaryssage ways
alization unngs: mineralizat
enopyrite, mations. Seeralization. cturally conociated with es (typicallynopyrite, py
of mineralizwhen in qu
mic potentiaago; howe
nactive fromf of the cu
e that succelice’s East C
includes anefined at theegorized res
West depositeast and ex
s conclude continued ex
ION AND C
ss of explorihe East C. Detailed evalidate h
ew resource
Gold Projectain zones ( and maficrock. This “-Cadillac Brethe Pontiacational, epigary fracturiny importancs for sulphid
derlying the
tion occurs pyrrhotite
econdary q
trolled goldquartz or q
y in the voyrite and mi
zation occuruartz veins,
al for gold mever, most m the earlyrrent Propessfully defin
Cadillac Gold
n updated Ne Nordeau Wsources estit is shown xtends to a
that the Exploration.
CONCLUSIO
ng its mineCadillac Goldexploration
historical woes.
t overlies (“shear-zonec volcanic corridor” is eak (Cadillac-Abitibi subgenetic quang and brecce to minerae- and gold
e East Cadil
in silicified and pyriteuartz vein
mineralizatuartz and c
olcanic rockinor chalcop
r as free go and up to
mineralizatioof the grou
y 1990’s unerty in 2006ned a gold rd Project.
NI 43-101 MWest projectimated at tin Table 1 depth of a
ast Cadillac
East Cadil
ONS
ral concessid Property)and drillin
ork, increa
a tectonoes”), ranginrock into interpreted c Tectonic Zbprovince b
artz-vein/discciation thaalization, as -bearing so
llac Gold Pr
lodes with e) spatiallying is com
tion occurricarbonate vek units). Aspyrite; graph
ld associate 20% to 50
on underlyiund coveredntil recently6, Plato Goresource at
Mineral Resot (Cataloguethe calculat17.1. The mat least 700
c Gold Prop
llac Gold Proj
ions in the e) to evaluatg is proposse the def
ostratigraphing in thicknhectometric to represenZone) - a 30boundary insseminated at have affe
they are inolutions.
roperty is ep
disseminaty related tmmonly as
ng in altereeins that passociated dhitic horizon
ed with sulp0% when a
ng the Projd by the cy. After acqold Corp. co
their Norde
ources Estimed Occurrented cut-off mineralized m. It rema
perty is one
ject – 2017 T
eastern Abitte them fosed for sevfined miner
ic corridor ness and inc to kiloment the easte00 km long,n the regiogold-ore sy
ected the ronterpreted to
pigenetic in
ted to semito sedimenssociated w
ed high-straarallel the scisseminatedns are comm
phide mineraassociated w
ject area wurrent Propquiring the ompleted a eau West pr
mate for thence 32C/03-grade of 2envelope d
ains open d
e of merit
Technical Rep
tibi Greenstr high-qualveral areas ral resourc
characteritensity, thaetric “lozenern extensio first-order
on, and is ystems. Theocks underlyo have acte
origin and
i-massive sntary bandwith this t
ain (shearedchistosity and sulphides mon.
als that ranwith magne
was recognizperty has re
better part6 year exp
roject, which
e East Cadil-0060). A su.75 gpt Au dips steeplydown-dip an
and should
port 92
one Belt lity gold
on the es, and
ized by at divide nges” of on of the tectonic host to
e shear-ying the d as the
present
ulphides ed iron type of
d) zones nd shear
include
nge from tite iron
zed over emained t of the ploration h is now
lac Gold ummary for the
y to the nd along
d be the
T
T
w
t
t T
T
Table 17.
Resource
Measured Indicated
Measured + Inferred
Total Inferre
17.1 Risk
The opinionits associateMRB has exand conclushas relied owithheld, or
Chalice hasthat, to thaccurate anthe acquisit
The often cshear- andProject. Thieffect”. As ahighly varia
It is MRB’s Resource Es
assuprosassuassusme
delaygrou
chanmine
There are npolitical or oMineral Res
.1: Summa
e (Category)
Indicated
d
ks and Unce
ns expressedes and theirxercised all sions from ton this infor that a mor
warranted he best of nd true. Reation, process
complex, ervein-hoste
s style of ma result of t
able across s
opinion thstimate, as umptions uspects of eco
umptions; dumptions; mlting/refininys or other
ups; nges in ineralized zon
o known enother relevasource Estim
ary of CategWest pr
Main B Total
Total Main B
Total
ertainties
d in this repr staff, as wdue care inhis resource
ormation anre detailed a
to MRB thaChalice’s k
aders of thissing and int
rratic and loed, lode-go
mineralizationthese complshort distan
at there arfollows: sed to genonomic extrensity assumetal recog terms; r issues in
terpretationes.
nvironmentaant factors, mate.
gorized Reroject - Ea
Zone
port have bewell as retrie reviewing te estimate ad has no reanalysis may
at full discloknowledge s report musterpretation
ocalized nald style den is often relexities, resces.
re certain ri
nerate the raction incluumptions; gvery rates
reaching a
ns of mine
al, permittinother than a
East Cadil
esources atast Cadillac
No M
een based oeved from ithe suppliedare reliant oeason to bey reveal add
osure has band undersst appreciatof geologica
ture of goldeposits, suceferred to asource estim
isk factors
conceptuauding : comeotechnical and assu
agreements
eralization
g, legal, titlas discussed
llac Gold Proj
t 2.75 gpt Ac Gold Prop
Tonnes
Measured Res223,
1,225,
225,1,097,
14,
1,112,
n informatioin-house (Md informatioon the accuelieve that ditional mat
een made ostanding, ste that thereal data.
d mineralizch as are ps being nug
mation can b
that could
l data for modity pricassumptio
umptions;
with local
models, g
e, taxation,d in this Rep
ject – 2017 T
Au Cut-off perty
s Au G
(gp
sources 382960342
342749572
321
on supplied MRB) and onon. The accuracy of the any materi
terial inform
of all matersuch informe is an inhe
ation is a cpresent at gety, or pos
be difficult,
materially
consideratce assumptions; operatinand conce
communiti
geometry,
, socio-econport, that w
Technical Rep
f Grade: No
rade pt)
In-S
4.18 3.07 4.17
4.17 4.1
3.59
4.09
to MRB by n-line data suracy of thesupplied daial facts hav
mation.
rial informatmation is coerent risk of
common fethe Nordeassessing a “and grades
impact the
tion of reaons; exchanng and capentrate gra
ies and ind
and contin
nomic, markwould affect
port 93
ordeau
Situ Au (oz)
30,019193
30,212
30,212144,635
1,680
146,315
Chalice, sources. e results ata. MRB ve been
tion and omplete, error in
ature of au West “nugget-may be
Mineral
asonable nge rate
pital-cost de and
digenous
nuity of
keting, the
T
t
AfT
A T
f
18.0 REC
The Nordea(2006-2011geological mdrilling.
Future expshould incluNordeau Wethe higher resources choles, but fof Cartier Ralong the S
A resource-for the NordThe study smineralizati
It is recommPhase 1 surfa airbo data
relev LiDA surfa diam
Contingent Phase 2 diam
A prelimina
The authorsapplied at Nresources, a
Compilationfor target idproximal to
OMMENDA
u West reso1). The succmodelling, g
loration woude diamondest by expagrade “sh
continues tofew holes haResources’ Cimon West
database ofdeau West bshould provion along ind
mended tha
ace mappingorne EM sur integrationvant historicAR survey foace stripping
mond-drilling
on positive
mond-drillingry budget fo
s recommenNordeau Weand/or know
n and analysdentificationexisting res
ATIONS
ources werecess is attribgrade contou
rk on the d-drilling fonding the Moots”. The
o the east, aave targetedChimo Mine - Blue Grass
f the historiblock, is recide for an adicated tren
t future exp
g accompanrvey; n including cal data, andor 3D modelg, mapping g down-dip o
Phase I res
g on a rangeor the recom
nd the samest be applwn concentr
sis of historn and drillinsources, wh
e largely devbuted to theuring and ex
East Cadillacused on fu
Main Zone antectonostra
and has beed the sequeproperty th
s corridor, b
c geologicalcommended aggressive dnds identifie
ploration by
nied by rock
verifying d generatinging surface and sampliof known m
sults, the Ph
e of targets mmended w
me exploratioied to the o
rated gold m
ric shallow eg should be
hich will incr
East Cadil
veloped frome re-analysisxperimental
ac Gold Prourther delinend B Zone aatigraphic sen intersectence below 2he sequencebut not rigor
l and drillingfor the rem
drilling progd from this
Chalice sho
, soil, core a
and merging a 3D modcontrol; ng on priori
mineralized o
hase II explo
generated ork is summ
on strategieother occur
mineralizatio
exploration e applied inrease the via
llac Gold Proj
m the succes of historicl block mod
operty is weating the mat depth andsequence tted by num250 depth. e is similarrously.
g data, simimainder of thramme to tand previou
ould include
and spectra
ng existing del of the co
ty targets;occurrences
oration prog
by Phase 1 marized in T
es and techrrences on ton.
drilling dat attempts tability of po
ject – 2017 T
ess of recentc drilling datdelling for ta
arranted. Tmineralized d along the hat hosts erous histoTo the westly recognize
ilar to that whe East Cadtest deeper us studies.
the followin
al analyses;
drill hole onsolidated p
.
gram should
studies andTable 18.1.
hniques thathe Property
ta and 3D gto identify aotential futur
Technical Rep
t drilling camta using moargeting exp
The work phorizons prindicated pthe Nordearic and recet, beyond thed and been
which was cdillac Gold Pparts of the
ng work:
databases,property;
d comprise:
d exploration
t were succy that host
geological madditional rere exploitati
port 94
mpaigns dern 3D
ploration
rograms esent at lunge of
au West ent drill-he limits n tested
compiled Property. e known
adding
n work;
cessfully historic
modelling esources ion.
A
Table 18
Surface samAirborne AEData compiLiDAR surveySurface striDrilling to eContingency
Drilling of taContingency
8.1: Prelimi
mpling - rocEM survey lation and iny pping, map
expand existy 15%
argets geney 15%
inary Budg
Phase 1
k, soil, core
ntegration,
ping and sating mineral
Phase 2
erated by Ph
get for Reco
1
and spectr
generation
mpling on pized zones
Sub
2
hase 1 work
Sub
East Cadil
ommended
al sampling
of 3D mode
priority targ
btotal Phas
btotal PhasOverall T
llac Gold Proj
d Work on
Dril(met
el
ets
1,6
se 1
Dril(met
4,0
se 2
otal
ject – 2017 T
East Cadill
ling tres)
Cosme
600 $2
ling tres)
Cosme
000 $2
Technical Rep
lac Gold Pr
st / etre Bu
$
$250 $4
$$1,0
st / etre Bu
250 $1,$
$1,1 $2,1
port 95
roject
udget
200,000$85,000$50,000$50,000100,000400,000132,750
017,750
udget
000,000150,000
150,000167,750
V
v
J
J
J
19.0 REF
Bourgoin, Mineral Prop
ChampagnInc., interna
Dimroth, Epart of the Aof Earth Sci
Gagnon, Preport.
GaudreaulMalartic-Su
Gaudreau,secteur de Report MB8
Gaudreau,Vauquelin, DP87-01.
Germain, Mde l'Énergie
Imreh, L., gitologique.
Imreh, L., volcanologiqReport MM
Jean, A., 1Ltd., par Ge
Jolly, W.T.W.W., eds.,
KalliokoskJournal of E
Lacroix, S,(DV97-01)des Richess
Marquis, Rstructurale application a Montreal,
ERENCES
M.R. and perties, Val-
ne, M.J. , 1al report.
E., Imreh, LAbitibi Belt,ences, v. 19
. and Gagn
t, D., 2001d Inc., rapp
R., LacosLouvicourt-
86-67.
R., LacosPershing, H
M., 1972 (e et des Res
1976 (DP. Ministère d
1984 (MMque, lithost82-04.
1990 (GM4estion miniè
, 1978 - M, Metamorph
ki, J., 1987 Earth Scienc
, Doyon, M) - Rapport ses Naturelle
R., 1983 -entre les ra l'explorat173 p.
Castongua-d’Or Quebe
985 – Proj
L., Rochele Quebec. Pa9.
non, G., 19
1 - Rapport port interne
ste, P and -Vauquelin,
ste, P., RoHaig - Abitib
(DP-108) -sources Que
P-349) - Node l'Énergie
82-04) - Stratigraphiqu
49867) - Cère Explomin
etamorphic hism in the
- The Pontces, v. 24.
M, Perreauldes Geologes Quebec,
- Etude tecroches metation aurifere
ay, J., 200ec, 2007, Pla
et Vauqueli
eau, M. andart I: Stratig
82 – Estima
sur les Propar Géologi
RocheleauAbitibi. Mi
ocheleau, bi-Est. Minis
Geologie debec, Repor
ouvelle lithoet des Ress
illon de la Mue et gitolo
Campagne dne Ltd.
history of tCanadian S
tiac problem
t, S, Nanteues ResidenDV97-01.
ctono-stratigasedimentae: Unpub. M
East Cadil
07 (GM642ato Gold Co
n - Campag
d Goulet, Ngraphy and
ation des Ré
opriété Nordica Consultin
u, M., 198nistère de
M., 1987 stère de l'Én
du Canton Vrt DP-108.
ostratigraphsources Que
Motte-Vassaogique. Min
de Sondage
the Archeanhield, Geolo
m, Quebec-O
el, S, Gaudnts sur l’Act
graphique aires des Gr
M.Sc. thesis,
llac Gold Proj
272) – Techorp., by MRB
gne de Sond
N., 1982 –Paleogeogr
éserves Nor
deau (Ressong Inc.
86 (MB86-l'Énergie et
(DP87-01)nergie et de
Vauquelin (C
hie a l’ouestebec, Report
n et son avnistere des
es, Propriete
n Abitibi beltogical Surve
Ontario, in l
dreau, R, Divite Miniere
a l’est de Vroupes de T, Montreal,
ject – 2017 T
hnical RepoB & Associat
dage 1984,
Evolution oraphic Mode
rdeau Ouest
ources Miné
67). Geolot des Resso
) - Geologies Ressourc
Comte d’Ab
t de Val-d’Ot DP-349.
ant-pays mRichesses
e Bloc-Oues
t, in Fraser,ey of Canada
ight of grav
Dussault, Ce Regionale
Val-d'Or: eTrivio et deQuebec, Un
Technical Rep
ort – Nordetes.
Louvem M
f the Southel. Canadian
t, SOQUEM,
rales), Expl
gie et gitolources du
ie des Cances Quebec,
bitibi-Est). M
Or et son in
eridional: SNaturelles
st, Mines Va
J.A. and Hea, Paper 78
vity data: C
C, Morin, R en 1996. M
ssai de core Garden Isniversite du
port 96
eau Gold
ines Co.
-Central n Journal
internal
orations
logie du Quebec,
tons de , Report
Ministère
ncidence
Synthese Quebec,
auquelin
eywood, -10.
Canadian
R., 1997 Ministere
rrelation sland et Quebec
t
yV
V
TV TV T
Mortensenevolution of
RocheleauLa ceinture tectonique Riverin, G.,years of miVolume 43.
Rocheleau11) - SynthHaig et ParQuebec, Re
Rocheleau52) - Synthet de Haig -
RocheleauGisements ARessources
Sauve, P, Geologie deReport MB 8
Sauve, P, IVal-d’Or. M
Sharpe, JNaturelles d
Tremblay, Vauquelin L
Tremblay, Vauquelin L
Tremblay, Groupe-con
n, J. K., andf the Pontiac
, M., Hebede l'Abitibi
et le metam and Simarning explor
, M, Heberhese Stratigrties des Caport MB 97-
, M, Heberhese Stratig- Rapport In
, M, GaudAuriferes deQuebec, Re
Blanchet,e la mine d’87-05.
Imreh, L, Tinistere des
.I., 1968 du Quebec.
A., 1988aLtd., rapport
A., 1988bLtd., rapport
A., 1989 nseil, 24 pag
d Card, K Dc Subprovin
rt, M., St-Ji a l’est de morphisme rd, A., eds.,ation: Rouy
rt, R, Lacosgraphique, Pantons Louv-11.
rt, R, St-Jugraphique, Pnterimaire. M
dreau, R, e Chimo et eport MB88-
P, BlouinOr Chimo -
Trudel, P., Richesses N
- Canton Report RG-
a – Bloc Ot interne pa
b – Rapport interne pa
– Propriétéges.
D., 1993 -nce, Quebec
ulien, R., RVal-d'Or: uGrenvillien,, The Northwyn-Noranda,
ste, P, RacPaleogeogravicourt, Pas
ulien, P, GaPaleographiqMinistere de
Sauve, P,de Nordeau
-14.
n, J Y, ChRegion de
1993 (MMNaturelles Q
de Louvico135.
Ouest – Rar Roche Gro
rt sur le Blor Roche Gro
é Bloc Oues
East Cadil
U-Pb age c: Canadian
Racine, P., un secteur e in Rive, Mwestern Qu, Canadian I
cine, M, Gaaphique et Gscalis et De
audreau, R,que et Gitoloes Richesses
, Perrier, u - Region d
ampagne, Val-d’Or. M
91-03) - DQuebec, Rep
ourt, comte
pport sur oupe-consei
oc Nordeauoupe-consei
st, Mines Va
llac Gold Proj
constraints Journal of E
Gaudreau,economique., Verpaelst
uebec PolymInstitute of
udreau, R,Gitologique:enain, Minis
R, Perrier, Bogique du Ss Naturelles
B., 1988de Val-d’Or
M, Leclaeinistere des
Descriptions port MM 91-
e d'Abitibi-
la Campagl, 26 pages.
u - Campagl, 34 pages.
auquelin Lt
ject – 2017 T
for the magEarth Scienc
, R., and Laement mecot, P., Gagno
metallic BeltMining and
, St-Julien, Cantons V
stere des R
B, Lacoste,Secteur de VQuebec, Re
(MB88-14r. Ministère
erc, A., 19s Richesses
des Gites d-03.
est. Ministe
ne d’Explor.
gne d’Explo.
d., rapport
Technical Rep
gmatic and ces, v. 30.
acoste, P., onnu, affecton, Y., Lulin: A summa
d Metallurgy
, P., 1997 Vauquelin, PRichesses Na
, P., 1987 Vauquelin, Peport MB87-
4) - Geolode l'Énergie
987 (MB87Naturelles
d’Or de la Re
ere des R
ration 1987
ration 1987
interne pa
port 97
tectonic
1990 - te par la n, J.-M., ry of 60
y Special
(MB97-Pershing, aturelles
(MB87-Pershing -52.
ogie des e et des
7-05) - Quebec,
egion de
ichesses
7, Mines
7, Mines
r Roche
V
V
List of Sta
DP-108, Gl'Énergie et
DP87-01, Pershing et
DP-349, Imgitologique.
DP200803Ressources Open File 59
DP200804Ressources Open File 59
DV97-01, 1997. RappRichesses N
GM03439, of Newkirk
GM04860, Quebec.
GM03603, Fields Limite
GM03669, Limited.
GM06346, Claims Loca
GM06400, Vauquelin,
GM06528, Mining Expl
GM06675ACanada, Lim
GM06677, Mining Corp
GM08657, Vauquelin T
atutory Wo(http://sig
Germain, M.des Ressou
Gaudreau, de Haig, Ab
mreh, L., 1. Ministère d
, 2008. Cnaturelles
942.
4, 2008. Cnaturelles
943.
Lacroix, S, port des GeNaturelles Q
Graham, RMining Corp
Leclerc, A.,
Wilton, C.Ked.
Wilton, C.K
Dumont, Pated in Vauq
1958 - DriPershing, D
Szetu, S.Soration Ltd.
A, Britton, Jmited.
MacDonaldp. of Canada
Dumont, PTownship, A
ork Reportsgeom.mines
, 1972. Geources Quebe
R., Lacostebitibi-Est. M
1976. Nouvde l'Énergie
Cartes geoet de la F
Cartes geoet de la F
Doyon, M, eologues Reuebec.
R.B., 1955 - p. Ltd., Vauq
, 1957 - Re
K., 1955 - R
K., 1955 -
P.E., 1958 quelin, Persh
ll Logs. Monenain and V
S., 1958 - , Vauquelin
.W., 1946 -
, R.D., 194a, Limited.
P.E., 1959 bitibi Count
s: Ministère .gouv.qc.ca
ologie du Cec.
e, P., Rochinistère de
velle lithostet des Ress
physiques aune Queb
physiques aune Queb
Perreault, sidents sur
Report on quelin Twp.,
eport on Nor
Report on Ha
Report on
- Report ohing, Denain
nor Mining CVillebon Tow
Report on Township,
Geophysica
7 - Geologi
- Report ony, Quebec.
East Cadil
des Ressou/signet/clas
Canton Vauq
heleau, M., l'Énergie et
tratigraphiesources Que
couleurs Mec Report
couleurs Mec Report
S, Nantel, l’Activite M
Magnetome, Abitibi Cou
rdeau Minin
arrison-Cere
Claims in V
n Monor Mn and Villeb
Company Liwnships, Abit
Electro-MagAbitibi Coun
al Work on t
cal Report o
n Diamond
llac Gold Proj
urces naturesses/I1102_
quelin (Com
1987. Geodes Ressou
a l’ouest ebec.
MegaTEM, DP-200803/
MegaTEM, DP-200804/
S, GaudreaMiniere Reg
eter and Selunty Quebec
g Co. Ltd.,
e Option Pe
Vauquelin T
Mining Compon Townshi
imited N.P.Ltibi East, Qu
gnetic Surventy, Quebec
the S.E. Va
on S.E. Vau
Drilling, Mo
ject – 2017 T
elles et de la_indexAccue
mte d’Abitibi
ologie des curces Quebe
de Val-d’O
NTS 31N//Geological
NTS 32C/0/Geological
au, R, Dussionale en 1
lf-Potential c.
Vauquelin T
rshing Town
Township, M
pany Limiteps, Abitibi E
L. Gold-Ironue.
ey on Propc.
uquelin Gro
uquelin Tow
onor Mining
Technical Rep
a Faune du eil?l=a)
i-Est). Minis
cantons Vaec.
r et son in
14. MinistèSurvey of
03. MinistèSurvey of
sault, C, Mo1996. Minist
Survey on P
Twp., North
nship, Malar
Malartic Gol
ed N.P.L. GEast, Que.
n Claims Lo
erty of Con
oup, Mining
wnship Claim
g Company
port 98
Quebec
stère de
auquelin,
ncidence
ère des Canada
ère des Canada
orin, R., tere des
Property
hwestern
rtic Gold
d Fields
Gold-Iron
cated in
ntinental
Corp. of
m Group,
Limited
V
V
V
A
GM11980, Quebec.
GM12839,
GM13117, Villebon Tow
GM16371, Villebon Tow
GM16372,
GM16375,
GM16835, Mining Ltd.,
GM17080,
GM17257, on Raymond
GM30500, Vauquelin T
GM30501, Diamands d
GM31231, Survey, Vau
GM31325, Quebec.
GM32291, Area.
GM34757, Electromagn
GM35007,
GM35513, Electromagn
GM35544,
GM36435, et VLF, Ville
GM36462,
Dumont, P
Langevin, E
Dumont, wnships, Ab
Dumont, Pwnships, Ab
Drill Logs, V
Dumont, P
Bergmann,, Vauquelin
1965 - Dril
Booth, J.R.d Tiblemont
Dumont, DTownship.
Langevin, de la Zone D
Gledhill, Tuquelin Twp
Gledhill, T.
Gledhill, T.
Lebel, A.netiques (V
Lebel, A., 1
Lebel, A., netiques (V
Lambert, R
Amboise, Pebon 10-484
Savard, M.
.E., 1962 -
E., 1962 - R
P.E., 1963 bitibi County
P.E., 1965 bitibi County
Vauquelin I
.E., 1965 -
, H.J., 1965 Township, Q
l Logs, Vauq
., 1964 - Sut Gold Mines
D.H., 1974
E., 1974 -D’Or Principa
T., 1975 - p, Abitibi-Eas
, 1975 - Mo
, 1976 - Mo
, 1979 - LF).
1979 - Rapp
1979 - RapLF).
R., 1972 - Ra
P., Glass, F. 4.
and Leonar
Report on
Rapport Prel
- Report oy, Quebec.
- Report oy, Quebec.
ron Mines L
Report on E
- Report onQuebec.
quelin Iron
ummary Res Limited, V
- Report o
- Rapport sale de Les M
Spanex Rest County.
oss Lake De
oss Lake De
Rapport G
port Geophy
pport Geop
apport de S
and Lebel,
rd, M-A., 19
East Cadil
Monor Minin
iminaire sur
on Monor
n Electroma
imited.
Electromagn
n Geophysic
Mines Limite
port of Diamauquelin To
on the Prop
sur la MiseMines de Fer
esources Ltd
evelopment
evelopment
eophysique
ysique 10-49
hysique Pro
ondage, Pro
A., 1980 -
980 - Campa
llac Gold Proj
ng Company
r les Giseme
Mining Com
agnetic Sur
etic Survey
cal Surveys
ed.
mond Drillinownship Pro
perties of V
e en lans dr Vauquelin.
d, Supplem
Inc., Vauqu
Inc., Vauqu
e 10-497 C
97 Chimo. T
ojet Chimo
ojet Vauque
Rapport Ge
agne de For
ject – 2017 T
y Limited V
ents de Fer
mpany Limi
rvey on Va
y on Monor M
on the Prop
ng Campaigperty.
Vauquelin I
des Journea.
mentary Rep
uelin Twp, A
uelin Twp, Q
Chimo. Lev
Tests de PP
10-497. Le
elin 11-736.
eophysique.
rage. Projet
Technical Rep
Vauquelin To
Vauquelin.
ted Vauque
uquelin Iro
Mining Ltd.
perty of Bla
n July-Augu
ron Mines
au de Forag
port Magne
Abitibi-East
Quebec, Chim
ve Magnetiq
et de Pulse
eve Magnet
SOQUEM.
Leves Magn
Villebon 10
port 99
ownship,
elin and
n Mines
ck River
ust 1964
Limited,
ges aux
etometer
County,
mo Gold
ques et
EM.
iques et
netiques
0-484.
V
T
GM37291, Energy Corp
GM37355, (10-903), C
GM37356,
GM37729, 10-903. SO
GM37746, 10-484. SO
GM38329, Lynx-Ameri
GM38554, Energy Corp
GM38605, Vauquelin O
GM38618, Townships.
GM38857, Rapport Geo
GM39230,
GM39325, Province of
GM39327, Plan, Pershi
GM39354, Magnetique
GM39364,
GM39907, SOQUEM.
GM40036, Bay Mining
GM40058,
GM40142, Biochemiqu
GM40274,
Bergmann,p. Ltd., Vau
Laverdure,Cantons Vau
Glass, F., 1
Blanchet, POQUEM.
Blanchet, POQUEM.
Larouche, c-Sparton p
Bergmannp. Ltd., Vau
Hendrick, Option, Vauq
1955 - Mahandle
St-Hilaire, ophysique,
Blanchet, P
Parkinson,Quebec. Fo
1955 - Maing-Vauquel
St-Hilaire,es et Electro
Blanchet, P
St-Hilaire,
Bergmann,Company In
St-Hilaire,
Britt, C., e et Forage
Gagnon, P.
, H.J., 1981quelin Twp,
, G., 1981 uquelin, Ville
1981 - Mem
P. and Gag
P. and Gagn
C., 1982 - property Den
, H.J., 198quelin Twp,
D.H., 1969quelin Twp.,
lartic Gold
C., 1982 -Leves Magn
P., 1982 - C
, R.N., 195or Malartic G
alartic Goldlin Township
, C., 1982 magnetique
P., 1982 - R
C., 1983
, H.J., 1983nc., Vauque
C., 1983 - P
1983 - Re, Projet Nov
, 1983 - Ca
- Report on, Que.
- Leves Maebon, Denai
o Geophysiq
non, G., 19
on, G., 198
Report on nain-Pershin
82 - Report, Que.
- Drill Log, Quebec. K
Fields Limit
- Projet Simnetiques et E
ampagne de
55 - ReportGold Fields L
d Fields Limps.
- Projet e TBF sur de
apport de la
- Projet V
3 - Report oelin Twp., Qu
Projet Chimo
esultats deva 10-958, S
mpagne de
East Cadil
n VLF Electr
agnetiques n. SOQUEM
que TBF et
981 - Camp
81 - Campag
the explorang township
t on Magne
gs, Plan-Secerr Addison
ed Airborne
mon (Bloc Electromagn
e Sondage 1
t on the CLtd.
mited Harris
Chimo (10es Traverses
a Campagne
Villebon 10
on Geophysuebec.
o 10-497, T
es Travaux SOQUEM.
Tarrain 198
llac Gold Proj
romagnetic
et ElectromM.
Mag., Projet
pagne de Tr
gne D’Explo
ation carriedps.
etometer Su
ctions and G Mines Ltd.
e Geophysic
Bell) -10-9netique TBF
1981-1982,
Conduct of
son-Cere-Op
0-497), Blos Orientées
e de Sondag
0-484, Test
sical Survey
Tests de Pola
D’Explorat
82, Projet V
ject – 2017 T
Survey on
magnetique
t Simon 10-
ravaux 198
ration 1980
d out in 198
urvey on P
Geophysica
cal Survey,
03, Projet F. SOQUEM.
Villebon 10
a Geophys
ption, Elect
oc 1C, RapEst-Ouest.
ge, Simon 1
ts de Polar
ys on the Pr
arisation Pro
ion 1982,
Villebon 10-4
Technical Rep
Property of
VLF, Proje
-903. SOQU
0-81, Proje
0-81, Projet
81 over par
Property of
l Profiles, C
Pershing-Va
Leonard -
0-484. SOQU
sical Survey
tromagnetic
pport sur uSOQUEM.
0-903. SOQ
risation Pro
roperty of B
ovoquée. SO
Leves Geo
484, SOQUE
port 100
Wescap
t Simon
UEM.
t Simon
Villebon
rt of the
Wescap
Corcoran
auquelin
10-938,
UEM.
y in the
Survey
un Levé
QUEM.
ovoquée.
Bateman
OQUEM.
ologique,
EM.
V
T
T
V
T
V
GM41000, 958, SOQUE
GM41546, Ltd., East C
GM41804,
GM41828,
GM41830,
GM42328, Resources L
GM42504, Pond Resou
GM43286, Vauquelin P
GM43495,
GM43684,
GM44027, Township, V
GM45332,
GM45687, and VLF Su
GM45943,
GM46287, Township, V
GM46939, Vauquelin Sampling.
GM47285, Township, V
GM47403, Project. Vau
GM47922, Vauquelin L
GM48022,
BoudreaultEM.
Campbell, Claim Group,
Boudreault
Blanchet, P
1983 - Dril
Campbell, Ltd., Vauque
Scodnick, Jurces Ltd., C
Marchand,Property, Qu
Reukl, R., 1
Reukl, R., 1
Dumont, PVal-d’Or are
D’Silva, B.,
Podolsky, Grvey, Val-d’
D’Silva, B.,
Dumont, PVal-d’Or are
MacNeil, KTownships,
Dumont, PVal-d’Or are
Beullac, Ruquelin Mini
Lambert, GLtd., Projet B
Whitfield, T
, A.P., 1984
R.A., 1984, Vauquelin
, A.P., 1984
P., 1983 - D
l Logs, Vauq
R.A., 198elin East and
J., 1985 - RChimo North
, J., 1986 uebec.
1986 - Drill
1986 - Drill
P.E., 1986 a, Quebec.
,1987 - Drill
G., 1987 - R’Or Area Pro
, 1987 - Dri
P.E., 1988 a, Quebec.
K. and AveQuebec.
P.E., 1988 a, Quebec.
R. and Slivites Ltd.
G. and TurcBateman, C
T. and Simo
4 - Rapport
4 - Report oTwp., Queb
4 - Projet No
rill Logs, Va
quelin Proje
85 - Reportd Etang D’O
Report on th Property, V
- Bateman
Logs, Vauq
Logs, Vauq
- Geochem(Includes m
l Logs, Vauq
Report on Coperties, for
ll Logs, Vau
- Geochem(Includes m
erill, S.A., 1Reverse Ci
- Magnetom
tzky, A., 1
cotte, R., 1antons Vauq
neau, P., 19
East Cadil
de la Camp
on the Geobec.
ova (11-958
auquelin Pro
ect, Louvem
t on the 1Or Properties
he GeophysiVauquelin Tw
Bay Minin
uelin Projec
uelin Projec
mical Surveymagnetomet
quelin Projec
ombined HeCambior In
quelin Proje
mical Surveymagnetomet
1988 - Camirculation O
meter Surve
987 - Drill
1988 - Levequelin, Que
986 - Drill L
llac Gold Proj
pagne D’Exp
physical Su
8), Campagn
oject, Louve
Mining Com
1984 Drillins, Vauquelin
cal and Geowp., Quebec
ng Co. Ltd.
ct, Chabela
ct, Chabela
y on a Groter survey re
ct, Chabela
elicopter-Bonc.
ect, Chabela
y on a Groter survey re
mbior Inc., Overburden
ey on a Gr
Logs and
es Geophysbec.
Logs, Vauqu
ject – 2017 T
ploration 198
urveys Golde
ne de Sonda
m Mining Co
mpany Inc.
ng Programn Twp., Que
ological Progc.
, Pedogeoc
Minerals Inc
Minerals Inc
oup of 21 esults).
Minerals In
orne Magnet
a Minerals In
oup of 21 esults).
Nova PropDrilling a
roup of 21
Geology M
sique (PP),
elin Project
Technical Rep
83, Projet N
en Pond Re
ages. SOQU
ompany Inc
m for Goldeebec.
gram of the
chemical Re
c.
c.
Claims in P
nc.
tic, Electrom
nc.
Claims in P
perty, Villebnd Heavy
Claims in P
aps, Norde
Propriete d
, Barexor In
port 101
Nova 10-
esources
UEM.
c.
en Pond
e Golden
eport on
Pershing
magnetic
Pershing
bon and Mineral
Pershing
eau East
e Mines
nc.
V
A
V
V
V
GM48410, Region Abit
GM48424, Ouest, Regi
GM48430, Vauquelin, A
GM49340,
GM48507, Abitibi, Que
GM49659, de Vauqueli
GM49666, Vauquelin L
GM49867, Ltd., by Ges
GM50036, Vauquelin, A
GM50373, Ouest, Cant
GM52637, Bloc-Ouest/
GM52638, Vauquelin, A
GM61314, Resources.
GM64272, Properties,
GM64504, Properties,
GM65127, Bateman Ea
GM66369, Bateman Ea
GM68593, Nordeau Ea
Perron, L.ibi-Est, Que
Perron, L.,on D’Abitibi
Landry, JAbitibi, Que
Lortie, P., 1
Landry, J.,ebec. Monico
Boulianne, in, Abitibi, Q
Lambert, Ltd., Projet B
Jean, A., 1stion minièr
Geokemex Abitibi, Que
Boulianne,ton de Vauq
Deragon, R/Nordeau, C
Blanchet, Abitibi, Que
Bourgoin,
Bourgoin, Val-d’Or, Q
Langton, J.Val-d’Or, Q
Kromo, Bast Propertie
Langton, Jast Propertie
Manon, G. st & West, C
, 1988 - Rebec.
, 1988 - Adi-Est, Roche
., 1988 - bec. Monico
1989 - Cam
, 1988 - Caor Exploratio
D., 1990 -Quebec. Min
G. and TuBateman, C
990 - Campre Explomine
Inc., 1990bec. Monico
D., 1991 quelin, Abitib
R., 1994 - Cantons Vau
P., 1994 bec. Mines
M.R., 2004
M.R. and Cuebec, for P
. and Horvauebec, for P
. and Langes, Val-d’Or
J. and Paches, Val-d’Or
and Pierre, Canton Vau
Rapport de
ddenda Rese Consulting
Campagneor Exploratio
pagne de S
ampagne deon Inc.
- Campagnenes Vauqueli
urcotte, R.,antons Vauq
pagne de Soe Ltd.
- Leves Geor Exploratio
- Campagnbi, Quebec.
Leves Magnquelin, Que
- CampagnVauquelin L
4 - Rapport
Castonguay,Plato Gold C
ath, A.S., 20Plato Gold C
gton J., 20r, Quebec, fo
heco, N., 20r, Quebec, fo
R., 2014 - quelin/Pers
East Cadil
Travaux D
ultats du P Group Ltd.
e de Foragon Inc.
ondage Hive
e Forage, Pr
e D’Explorain Ltd.
, 1990 - Lquelin, Que
ondages 199
eochimique on Inc.
ne D’ExploraMines Vauq
netometriquebec. Mines
ne D’ExplorLtd.
t de Travau
J., 2006 -orp.
009 - 43-10orp.
10 - Assesor Plato Gol
011 - Asseor Plato Gol
Campagne hing. Globex
llac Gold Proj
D’Exploration
rogramme Mines Vauq
e, Propriet
er 87-88, P
ropriete Sim
tion 1989-1
Leves Geopbec.
90, Propriet
des Humus
ation Ete-Aquelin Ltd. a
ue et ElectroVauquelin L
ration 1994
ux, Propriet
- Technical
01 Technical
ssment Word Corp.
essment Wod Corp.
D’Echantillox Mining Inc
ject – 2017 T
n (1988), P
Sondage 19quelin Ltd.
te Chimo C
rojet Nova.
mon Est, Ca
1990, Proje
physique, P
te Bloc-Oues
s, Propriete
utomne 19and Louvem
omagnetiquLtd.
4, Propriete
e Minerale
Report, No
l Report, No
rk Report,
ork Report,
onnage de Fc.
Technical Rep
Propriete Ba
988, Proprie
Centre, Can
Cambior In
anton de Va
t Bateman,
Propriete de
st, Mines Va
Vauquelin,
90, Proprie Mines Inc.
e au Sol, P
e Nordeau,
Vauquelin.
rdeau Gold
ordeau Gold
Nordeau E
Nordeau E
Forages Hist
port 102
ateman,
ete Bloc
nton de
nc.
auquelin,
Canton
e Mines
auquelin
, Canton
te Bloc-
Propriete
Canton
Mirabel
Mineral
Mineral
East and
East and
toriques,
v
A
MB86-67, Louvicourt-V
MB87-05, mine d’Or C
MB87-52, Synthese SHaig - Rapp
MB97-11, Synthese Set Parties d
MM82-04, volcanologiq
MB88-14, Auriferes deQuebec.
MM91-03, d’Or. Minist
Gaudreau, RVauquelin, A
Sauve, P, BChimo - Reg
Rocheleau,tratigraphiq
port Interim
Rocheleau,Stratigraphiqes Cantons
Imreh, L., que, lithostr
Rocheleau,e Chimo et
Sauve, P, Iere des Rich
R., Lacoste,Abitibi. Mini
Blanchet, P, ion de Val-d
M, Hebertque, Paleograire. Ministe
M, Hebertque, PaleogeLouvicourt,
1984. Silloratigraphiqu
M, Gaudrede Nordeau
mreh, L, Trhesses Natu
P and Rochstère de l'É
Blouin, J.Yd’Or. Ministe
t, R, St-Juliraphique et ere des Rich
t, R, Lacosteographique Pascalis et
on de la Moue et gitolog
eau, R, Sau - Region d
udel, P., 19urelles Queb
East Cadil
heleau, M., nergie et de
Y., Champagere des Rich
ien, P, GauGitologique
hesses Natu
te, P, Racine et GitologDenain, Min
otte-Vassan gique. Minist
uve, P, Perde Val-d’Or.
93. Descripbec.
llac Gold Proj
1986. Geoloes Ressourc
gne, M, Leclhesses Natu
udreau, R, e du Secteurelles Queb
ne, M, Gaudgique: Cantnistere des
et son avatere des Ric
rrier, B., 1. Ministère d
tions des G
ject – 2017 T
ogie et gitoles du Queb
laerc, A., 19urelles Queb
Perrier, B, r de Vauqueec.
dreau, R, Stons VauqueRichesses N
ant-pays mechesses Natu
988. Geolode l'Énergie
ites d’Or de
Technical Rep
ogie du secec.
987. Geologbec.
Lacoste, Pelin, Pershin
St-Julien, Pelin, PershinNaturelles Q
eridional: Surelles Queb
gie des Gise et des Res
e la Region d
port 103
teur de
gie de la
., 1987. ng et de
., 1997. ng, Haig
Quebec.
Synthese bec.
sements ssources
de Val-
4
_
I, John Lan1. This Ce
Project,12, 201
2. I graduQueen’sprofess
3. I am clicensedProfessTempor
4. I am aQuebecMetals
5. I have 101”) adefined“qualifie
6. I have experiein explo
7. I have office ageologi
8. I havefamiliarPropert
9. I have throughCadillac(amend
10. I visited11. I have
change12. I am “i
respect13. Neither
understChalice
14. Neitherprecedi
15. I have compliainformarequired
DATED this
_________(Signed) J
ngton, M.Scertificate app, Val-d’Or, Q19; uated from ts Universityion continuo
currently wod by the ional Enginrary Membea part ownec, CANADA. Inc., and I aread the de
and certify t in NI 43-1ed person” fworked as
ence with reoring for golbeen retain
at 1 Yonge st, and not
e no prior ir with the ty, having co
prepared ah 20.0 of thc Gold Projded March 1d the East Cno person
, which is nndependent
t to the condr I, nor any tanding, noGold Mines
r I, nor any ng three yeread NI 4
ance with thation and bd to be disc
12th Day of
_________ohn P. Lan
CER
c., P. Geo.,plies to “TecQuébec NTS
the Universy, Kingston ously since orking and Ordre des
neers and er of the Asser of a geoI am also
am a minorefinition of “qhat by reaso101) and pafor the purps an exploregard to a vld and basened by ChaStreet, Suitas an emplonvolvementmineral reso-authored and take rehis Report eect, Val-d’O2, 2019);
Cadillac Goldal knowledgot reflected t” of Chaliceditions descaffiliated enr expects to
s Limited, noaffiliated en
ears from Ch43-101 andhem and. Abelief, this closed to ma
f February, 2
_________ngton, M.Sc
RTIFICATEJOHN
, of 1740 Suchnical RepoS 32-C/03, 3
ity of New in 1993 w
that time; living in QgéologuesGeoscientis
sociation of ological conon the Boaity share-hoqualified peon of my edast relevantposes of NI 4ration and various mine-metals, an
alice Gold Mte 1801, Tooyee; t with Chalisource that the previou
esponsibilityentitled “TeOr, Québec
d Property oge, as of tin this repo
e Gold Mineribed in Secntity of mineo become aor any of itsntity of minehalice Gold Md Form 43-As of the dareport contake the tech
2017 (amen
_ c., P. Geo.
East Cadil
OF QUALIN LANGTON
ullivan Rd, Vort and Mine31N/14” da
Brunswick iwith a M.Sc
Quebec and s du Québests of NewProfessionasulting firm
ard of Direcolder of Cartrson” set ou
ducation, afft work expe43-101; field geologeral depositd with the p
Mines Limiteoronto, Onta
ice Gold Miis the sub
s NI 43-101y for Sectioechnical Rep
NTS 32-C/
on October 1the date of ort; es Limited,ction 1.5 of e, is at presan insider, as associated e, have earnMines Limite-101F1 andate of the ctains all scihnical report
nded March
llac Gold Proj
IFICATIONN
Val-d’Or, Queral Resourc
ated Februar
n 1985 withc. in Geolog
I am a Prec (Licensew Brunswicl Geoscienti
m (MRB & Actors of Cartier Iron Cout in Nationfiliation witherience, I f
gist since t types, inclpreparation ed, a body ario (M5E 1
nes Limitedbject of this1 Report on ns 1.0 thro
port and Min/03, 31N/14
17th and Novf this certifi
and of the NI 43-101;
sent under aassociate, a or affiliatedned the majed, nor any have prepcertificate, tientific and t not mislea
12, 2019)
ject – 2017 T
uébec do hece Estimatery 12th, 201
h a B.Sc. ingy, and I
rofessional e 1231); tck (Licenceists of OntaAssociates),rtier Iron Corp.;
nal Instrumeh a professiofulfil the req
1985. I hauding the pof reports rcorporate h
1W7), as a
d (other thas Report, athe Nordea
ough 13.0, ineral Resou4” dated Fe
vember 13th
icate, of an
Vendors of
an agreemeaffiliated entd entities; jority of ourof its assoc
pared the to the besttechnical
ding.
Technical Rep
reby certifye, East Cadil17 (amende
n Geology ahave practi
Geologist cthe Associae M5467); rio (Licence based in orp. and Hi
ent 43-101 onal associaquirements
ave knowledprocedures relating to thaving a recontract/co
an as a QPs well as w
au West depand Sectio
urce Estimaebruary 12t
h of 2016; ny material
f the Proper
ent, arrangetity or emp
r income duciates or affitechnical re
t of my knoinformation
port 104
y that: llac Gold ed March
nd from ised my
currently ation of
and a e 1716); Val-d’Or nterland
(“NI 43-ation (as to be a
dge and involved hem;
egistered onsulting
P). I am with the posit; ons 15.0 ate, East th, 2017
fact or
rty, with
ement or loyee of
uring the iliates; eport in owledge, that is
4
_
I, Abderrazcertify that:
1. This CerProject, 12, 201
2. I graduTémiscaand I h
3. I am clicensed
4. I have 101”) adefined“qualifie
5. I have experieinvolvedof repo
6. I have office ageologi
7. I have Propert
8. I haveReport C/03, 3
9. I have 10. I have
change11. I am “i
respect12. Neither
understChalice
13. Neitherprecedi
14. I have compliapracticethis repmake th
DATED this
_________(signed) A
zak Ladidi,:
rtificate appVal-d’Or, Q
9); uated from tamingue’s Uave practise
currently wod by the Ordread the de
and certify t in NI 43-1ed person” fworked as
ence with rd in resourcrts relating been retain
at 1 Yonge st, and not no prior inv
ty, or resoure prepared and Minera
31N/14” datnot visited
e no person, which is nndependent
t to the condr I, nor any tanding, no
e Gold Minesr I, nor any ing three ye
read NI 4ance with the. As of the port containhe technica
12th Day of
_________Abderrazak
CER
, P. Geo. of
plies to “TecQuébec NTS
the UniversUniversity, ed my profeorking and dre des géoefinition of “qhat by reaso101) and pafor the purps an explorregard to ace calculatioto them; ned by ChaStreet, Suias an emplo
volvement wrces therein,and take re
al Resource ed Februarythe East Ca
nal knowledot reflected t” of Chaliceditions descaffiliated enr expects to
s Limited, noaffiliated en
ears from Ch43-101 andhem and indate of the
ns all scientil report not
f February, 2
_________k Ladidi M.E
RTIFICATEAbder
f 105 rue de
chnical RepoS 32-C/03, 3
ity of MorocRouyn Nora
ession continliving in Qlogues du Qqualified peon of my edast relevantposes of NI 4ration and a number oon for shear
alice Gold Mte 1801, Tooyee; with Chalice , that are thesponsibilityEstimate, E
y 12th, 2017adillac Gold dge, as of t
in this repoe Gold Mineribed in Secntity of mineo become aor any of itsntity of minehalice Gold d Form 43-n conformity
certificate, ific and techmisleading
2017 (amen
___ Eng., P. Ge
East Cadil
OF QUALIrrazak Lad
es Sapins, V
ort and Mine31N/14” dat
cco in 1999anda in 201nuously sinc
Quebec and Québec (Licerson” set ou
ducation, afft work expe43-101; field geologof mineral -zone relate
Mines Limiteoronto, Ont
Gold Mineshe subject ofy for SectioEast Cadillac7 (amended Property; the date ofort; es Limited, ction 1.5 of e, is at presan insider, as associatede, have earnMines Limite-101F1 andy with geneto the best
hnical inform.
nded March
eo.
llac Gold Proj
IFICATIONidi
Val-d’Or (Qu
eral Resourcted Februar
9 with a B.S11 with a Mce that time
I am a Prense 1265);ut in Nationfiliation witherience, I f
gist since 2deposit ty
ed gold dep
ed (a body tario M5E 1
s Limited othf this Reportn 14.0 of tc Gold ProjeMarch 12, 2
f this certif
and of the NI 43-101;sent under aassociate, ad or affiliatedned the majed, nor any have prep
erally accept of my knowmation that
12, 2019)
ject – 2017 T
ébec) J9P 4
ce Estimate,ry 12th, 201
Sc. in GeoloMasters Dege; rofessional ; nal Instrumeh a professiofulfil the req
2006. I hapes includiosits, and w
corporate h1W7), as a
her than ast; this Report ect, Val-d’O2019);
ficate, of an
Vendors of
an agreemeaffiliated entd entities; jority of our
y of its assocpared the pted Canadiwledge, infot is required
Technical Rep
4R4 do here
, East Cadil17 (amende
ogy and fromree in Engi
Geologist c
ent 43-101 onal associaquirements
ave knowledng the pro
with the pre
having a recontract/co
a QP, nor
entitled “TOr, Québec N
ny material
f the Proper
ent, arrangetity or emp
r income duciates or afftechnical rean mining
ormation and to be disc
port 105
eby
llac Gold d March
m Abtibi neering,
currently
(“NI 43-ation (as to be a
dge and ocedures paration
egistered onsulting
with the
Technical NTS 32-
fact or
rty, with
ement or loyee of
uring the filiates; eport in industry d belief,
closed to
APPENDIX I
List of Claims comprising the East Cadillac Gold Property (Source : Ministère des Ressources naturelles, Québec
https://gestim.mines.gouv.qc.ca/)