TeamBank AG 24.08.2015 Current project proposal: Introduction of an innovative production line @...
-
Upload
marlene-bradford -
Category
Documents
-
view
214 -
download
0
Transcript of TeamBank AG 24.08.2015 Current project proposal: Introduction of an innovative production line @...
TeamBank AG19.04.23
Current project Current project proposalproposal::
IntroductionIntroduction of an of an innovative production line innovative production line @ TeamBank with edBPM@ TeamBank with edBPM
Version 0.4
Juraj Dollinger, Thilo Rottach
TeamBank AGTeamBank AG / Seite 2 Fußzeilenbereich für Präsentationsname o. ä.Seite 2 /
Forces influencing the production line of TeamBank
TeamBank sales channels
Strategy of TeamBank:Be different/innovative on the market!
Se
rvic
es
P r o d u c t i o nP r o d u c t i o nof TeamBankof TeamBank
Cross linking in “Verbund”Cross linking with credit agencies,internal card processors, internalDataWarehouse Systems, internalWorkflowsystems, …
Critical success factors of the production:
• time pressure
• flexibility
• quality
• cost pressure
• multi client capability
TeamBank AGTeamBank AG / Seite 3 Fußzeilenbereich für Präsentationsname o. ä.Seite 3 /
Goal: Introduce a innovative, automated and transparent production line @ TeamBank
Current production Innovative production
TeamBank AGTeamBank AG / Seite 4 Fußzeilenbereich für Präsentationsname o. ä.Seite 4 /
Introduce a binding business process architecture for back office to ensure the standardization of processes
Monitoring / Controlling
FAX
Files
API
Cent
ral i
nput
cha
nnel
for a
ll bu
sine
ss e
vent
s
Elec
tron
ical
arc
hive
PUSH
-ev
ent d
ispa
tche
r
Ele
ctro
nic
al a
rch
ive
Cent
ral o
utpu
t cha
nnel
DocsProcesses @ Production
Manually
Semi-Automated
Automated
Ext
ern
al P
artn
ers
Tea
mB
ank
AG
FAX
Files
API
Docs
Back office @ TeamBank
TeamBank AGTeamBank AG / Seite 5 Fußzeilenbereich für Präsentationsname o. ä.Seite 5 /
Mapping of business architecture to IT architecture
Ce
ntr
al
inp
ut
ch
an
ne
l
Ele
ctr
on
ica
l a
rch
ive
PU
SH
-e
ve
nt
dis
pa
tch
er
Ele
ctr
on
ica
l a
rch
ive
Ce
ntr
al
ou
tpu
t c
ha
nn
el
ProductionProduction
ScanningScanning
E-Mail- andFile
Management
E-Mail- andFile
Management
FileNet P8
Content Manager
FileNet P8
Content Manager
Event dispatcher
Event dispatcher
Productionplanningsystem
Productionplanningsystem
CallCenterCallCenter
Credit request processing Credit request processing
Customer ServiceCustomer Service
Core Banking SystemCore Banking System
Active and passive DataWarehouseActive and passive DataWarehouse
Service Application 1Service Application 1
Output Manage-
ment System
Output Manage-
ment System
Business Process Management (BPM) / Workflow SystemBusiness Process Management (BPM) / Workflow System
Service Application 2Service Application 2
SalesSales
NEU
NEU
NEU
FileNet P8
Content Manager
FileNet P8
Content Manager
API
Docs
Fax
Filex
API
Files
Fax
Docs
TeamBank AGTeamBank AG / Seite 6 Fußzeilenbereich für Präsentationsname o. ä.Seite 6 /
Selective implementation of category A processes
Amount of process instances
Pro
cess
ing
du
ratio
n
Category C processes traditional production, as well manually
Category B processes traditional production, but semi-automated(isolated applications)
Category A processes Production line of the next generation in semi-automated or full-automated mode and manner.
Cost driver in business
CC
BB
AA
Process X, Y
TeamBank AGTeamBank AG / Seite 7 Fußzeilenbereich für Präsentationsname o. ä.Seite 7 /
Measure the maturity level of the current processes and design the target processes Example of the internal evaluation…
manuallymanually
Semi-automatedSemi-automated
AutomatedAutomated
Ausg
ang
Ausg
ang
Production
AU 220.01 CCC (old)
AU 220.01 CCC (new)
AU 220.02 AAA (old)
AU 220.02 AAA (new)
943.02.006 BBB (old)
943.02.006 BBB (new)
813.06.003 XXX (new)
813.06.003_XXX (old)
TeamBank AGTeamBank AG / Seite 8 Fußzeilenbereich für Präsentationsname o. ä.Seite 8 /
Calculate the net present value for the anticipated business processes
New production line
Net present value
Process C
xxxx.000 €xxxx.000 €
low
high
xxxx.000 €xxxx.000 € xxxx.000 €
Old production line
- xxx.000 € xxxx.000 €
Process H
Process B
Process G
Process F
Process E
Process C
Process DProcess A
Process I
Circle area =costs for implementation
Complexity and Risk
TeamBank AGTeamBank AG / Seite 9 Fußzeilenbereich für Präsentationsname o. ä.Seite 9 /
Introduction of a collaboration model for Business / IT alignment
Ce
ntr
al
inp
ut
ch
an
ne
l
Ele
ctr
on
ica
l a
rch
ive
PU
SH
-e
ve
nt
dis
pa
tch
er
Ele
ctr
on
ica
l a
rch
ive
Ce
ntr
al
ou
tpu
t c
ha
nn
el
ProductionProduction
Kordoba ELEKTRA CLNGCBSPartner
Systems /componentswith interfaces
BPM platformwith processes
ESB platform with SOA servicesand adapters
SOA Services /Adapters
IT
GPO/FB
Bu
sin
ess-
ITG
ove
rnan
ce
SOA: Interface 1
Interface1TeamBank
Interface 1Partner
complexityKnow how /involvement