Team Xerox Team Xerox Progress ReportProgress Report
Mechanical Engineering Design TeamMechanical Engineering Design Team
Jeff CarpenterJeff CarpenterCharlie MorrisCharlie Morris
David PostelDavid PostelJeremy RyattJeremy Ryatt
Electrical and Computer Engineering Design TeamElectrical and Computer Engineering Design TeamReuben BellikaReuben Bellika
Viet BuiViet Bui
PSU Faculty AdvisorPSU Faculty AdvisorMark Weislogel, PhDMark Weislogel, PhD
Xerox Industry AdvisorXerox Industry AdvisorTrevor Snyder, PhDTrevor Snyder, PhD
OverviewOverview
SummarySummaryDODVS FrameDODVS FrameOptic Mounting AssemblyOptic Mounting AssemblyOptics and LightingOptics and LightingBTM FrameBTM FrameBTM AutomationBTM AutomationCurrent ProgressCurrent ProgressQ&A SessionQ&A Session
SummarySummary
Objective: produce a imaging system that is capable of capturing ink drops on the drum and on the paper at identical locations
Current System: clumsy to use, vibrates Current System: clumsy to use, vibrates excessively, and the optical system fails to excessively, and the optical system fails to meet the desired image quality meet the desired image quality
There is no specific imaging system that There is no specific imaging system that compares the drum images to paper imagescompares the drum images to paper images
SummarySummary
Oil is transferred from the maintenance roller to the drum before ink is transferred by the print head
Ink transfer from drum to paper as the paper feeds between the transfix roller and drum
DODVS Final Frame DesignDODVS Final Frame Design
Uses 3x6 inch T-Slot Uses 3x6 inch T-Slot vertical supportsvertical supports
½ inch thick ½ inch thick aluminum base and aluminum base and top platetop plate
Added gussets Added gussets increase natural increase natural frequencyfrequency
Optic Mounting AssemblyOptic Mounting Assembly
Current system is heavy and cumbersomeCurrent system is heavy and cumbersome
Optic MountingOptic Mounting
•New system rotates camera to side with one easy New system rotates camera to side with one easy step. step.
OpticsOptics
Existing camera and optic components will Existing camera and optic components will be reused to reduce costbe reused to reduce cost
A second camera and optics will be A second camera and optics will be purchased purchased
New optics system will have a New optics system will have a magnification range of 3x to 21xmagnification range of 3x to 21x
LightingLighting
Metal Halide Metal Halide lighting is best lighting is best option, but option, but may be cost may be cost prohibitiveprohibitive
Splitting Splitting current light current light source may be source may be adequate adequate
BTM FrameBTM Frame
Same 3x6 inch T-Slot Same 3x6 inch T-Slot materialmaterial
Same ½ inch thick Same ½ inch thick base and top platebase and top plate
Reuses DODVS Reuses DODVS camera bracketscamera brackets
Features cover plates Features cover plates to hide messy to hide messy electronics and wires. electronics and wires.
BTM AutomationBTM Automation
XY Stage donated by XY Stage donated by Xerox, messy but it Xerox, messy but it will work. will work.
Manual cranks will be Manual cranks will be added for a manual added for a manual override featureoverride feature
EE’s are currently EE’s are currently working on motor working on motor driver operation and driver operation and integration.integration.
Current ProgressCurrent Progress
DODVS and BTM frame designs are DODVS and BTM frame designs are entering detail design stage, final drawings entering detail design stage, final drawings will be complete in a few weekswill be complete in a few weeks
Final decisions on optics and lighting will Final decisions on optics and lighting will be made this weekend, and ordered next be made this weekend, and ordered next weekweek
Manufacturing of the frame assemblies Manufacturing of the frame assemblies begin in 4 weeksbegin in 4 weeks
On track for June 1On track for June 1stst completion date completion date