Team Victorious Secret Launch Readiness Review

11
TEAM VICTORIOUS SECRET LAUNCH READINESS REVIEW Crawford Leeds Jacob Broadway Jannine Vela Tanya Hardon Devan Corona Dylan Reed November 1, 2011

description

Team Victorious Secret Launch Readiness Review. Crawford Leeds Jacob Broadway Jannine Vela Tanya Hardon Devan Corona Dylan Reed. November 1, 2011. Mission overview. Effects of high altitude Individual effects of high altitude Space elevator protection - PowerPoint PPT Presentation

Transcript of Team Victorious Secret Launch Readiness Review

Page 1: Team  Victorious Secret Launch Readiness Review

TEAM VICTORIOUS SECRETLAUNCH READINESS REVIEW

Crawford LeedsJacob BroadwayJannine VelaTanya HardonDevan CoronaDylan Reed

November 1, 2011

Page 2: Team  Victorious Secret Launch Readiness Review

MISSION OVERVIEW

• Effects of high altitude • Individual effects of high altitude • Space elevator protection • Lack of applicable information

Page 3: Team  Victorious Secret Launch Readiness Review

DESIGN OVERVIEW

• Four individual containers • Video feed • Atmospheric Sensors • Different conditions on containers

Page 4: Team  Victorious Secret Launch Readiness Review

TEST RESULTS (COCKROACHES) Can survive in a sealed container without food or water

for 3 hours

Page 5: Team  Victorious Secret Launch Readiness Review

TEST RESULTS (SENSOR DATA)

Page 6: Team  Victorious Secret Launch Readiness Review

TEST RESULTS (SENSOR DATA)

Page 7: Team  Victorious Secret Launch Readiness Review

TEST RESULTS (HOBO DATA)

Cooler Test

Cooler Test

EXTERIOR

INTERIOR

Before going in the cooler

Before going in the cooler

In the cooler

In the cooler

Removed from cooler

Removed from cooler

Page 8: Team  Victorious Secret Launch Readiness Review

TEST RESULTS (STRUCTURAL) Successful Whip test Successful Drop test Successful Kick test

Page 9: Team  Victorious Secret Launch Readiness Review

PREDICTED RESULTS

Insulated Cockroaches Exposed Cockroaches Sealed Cockroaches Unsealed Cockroaches

Page 10: Team  Victorious Secret Launch Readiness Review

BIGGEST WORRIES

Weight LEDs wont be bright enough Arduino will fail Pressure wont hold Cameras will move

Page 11: Team  Victorious Secret Launch Readiness Review

REQUIREMENTS FLOW DOWNRequirement

Detail

A RoachSat shall ascend to approximately 30,500 meters by balloon on November 5 ,2011

B Weight will be no more than 850 gC RoachSat shall carry 4 cockroachesD RoachSat shall descend safely to groundA.1 Attached to balloon with adequate pre-testingB Final weigh-inC.1 Control cockroachC.2 Cockroach 1C.3 Cockroach 2C.4 Cockroach 3C.5 Cockroach 4D.1 Structural IntegrityD.2 Secure Attachments

Level0

1