Team Project Information EIN 3390 Manufacturing Processes Spring 2011
description
Transcript of Team Project Information EIN 3390 Manufacturing Processes Spring 2011
TeamTeam Project Project InformationInformation
EIN 3390 Manufacturing ProcessesEIN 3390 Manufacturing ProcessesSpring 2011Spring 2011
Design EngineerDesign EngineerWorks with team leader to develop
specification of your product/partdevelops conceptual designdevelops functional designmakes structure/geometric design with
toleranceprovides design draft/prototypeimproves design from feedbackprovides final design
Team Leader: Team Leader: holds team meetings to discuss projectworks with team to search and find a
product/part for team projectWorks with team to develop specification of
the product/partWork with team to develop product/part
strategy/plancreates project schedule with milestonescoordinates and controls all processescoordinates communication between
engineersorganizes and coordinates team presentationTurns in team project report on time.
Manufacturing EngineerManufacturing Engineermakes manufacturing processes design
- technical requirement and descriptions- product materials, geometry (size,
shape, thickness)- production rate, volume, lead time- automation level, amount of labor
creates manufacturing plantasks for each operation stepprocedures to show how and what to do
for each steprequired machines, tools, materials for
each step
Industrial EngineerIndustrial Engineermakes manufacturing System design
interrelationship between design & properties of materials
interrelationship between processes & properties of materials
facilities layout, choice of machines, equipments
conducts manufacturing system controlproduction schedule, time studyproduct qualityoutput ratecost estimation and evaluation
Material EngineerMaterial Engineerunderstands design requirementevaluates selected approaches
case-history approachmodification of existing productsentirely new productpros and cons
considers factors and make decisionfunctional and geometric concernsphysical, mechanical propertiesmanufacturabilitycostgreen environment
Presentation date: 2/8/2011 (tentative)
Team Leader: Tarud, Christine Marie
Industrial Engineer: Espino, omar
Material Engineer: Botero, Jorge
Manufacturing Eng.: Romero, Senyon
Design Engineer: Gutierrez, Javier Enrique
Team 1Team 1Topic: Expendable-Mold Casting Topic: Expendable-Mold Casting
Presentation date: 3/8/2011 (tentative)
Team Leader: Pacheco, Andres
Industrial Engineer: Reyes, Juan Jose
Material Engineer: Rivero, Jose L.
Manufacturing Eng. Cuadra, Allen
Design Engineer: Ampie, Leonardo N.
Team 2Team 2Topic: Extrusion/Drawing Topic: Extrusion/Drawing
Presentation date: 4/7/2011 (tentative)
Team Leader: Garcia-Roves, Raul
Industrial Engineer: Gaskin, Byron J.
Material Engineer: Gil, Alexander
Manufacturing Eng.: Bayliss, Josh PaulDesign Engineer: Clarke, Philip L.
Verdia, Miguel Angel
Team 3Team 3Topic: MillingTopic: Milling
Presentation date: 2/24/2011 (tentative)
Team leader: Rodriguez, Alejandro Jr
Industrial Engineer: Atallah, issam
Material Engineer: Jarquin, Alfonso
Manufacturing Eng.: Gutierrez, Ana laura
Design Engineer: Forzan, Danylka H.
Team 4Team 4Topic: Rolling/Forging Topic: Rolling/Forging
Presentation date: 3/8/2011 (tentative)
Team Leader: Forero, Sebastian
Industrial Engineer: Sanchez, Santiago
Material Engineer: Guevara, Valentina
Manufacturing Eng.: Mofin, Santiago
Design Engineer: Mora, Carlos
Team 5Team 5Topic: Sheet-Forming Topic: Sheet-Forming
Presentation date: 2/15/2011 (tentative)
Team Leader: Morocz, Francisco
Industrial Engineer: Aldabbous, Ghanem
Material Engineer: Burrow, Gregory
Manufacturing Eng.: Grant, Jesse
Design Engineer: Oliva, Octavio
Team 6Team 6Topic: Multi-Use-Mold Casting Topic: Multi-Use-Mold Casting
Grading Policy for ProjectGrading Policy for Project1. Presentation: 50%
- Presentation format, logic, and contents - Presentation description - Understanding project- Knowledge and implementation- Q/A
2. Attendance of team activities 10%
3. Final project report: 40% -------
100%
Presentation date: 4/12/2011 (tentative)
Team Leader: Quiceno, Bryam A
Rincon, Francisco Jose
Team 7Team 7Topic: Topic: