Team No.57

2
The proposal can be sim- ply described as a truss where the typical quad- rangular or triangular grid has been altered in both the horizontal and vertical directions. Such distortion is achieved through a geo- metrical algorithm where each variation is stored in a digital model to fa- cilitate later fabrica- tion. Double-crossing truss with bays varying dimensions both in the vertical and horizon- tal directions. The truss members are circular section tubes. Single span bridge with en- castrated supports at both ends. Boulders could be used to reinforce the abutments and to restraint the ends of the circular members. Circular main truss mem- bers are made of bamboo rods treated and protect- ed against humidity and deterioration. Boulders are used at the abutments to improve their stability and to re- straint the ends of the bamboo members at the en- castrated supports. The walking platform is made of plywood and re- inforced longitudinally and transversely by bam- boo rods. Each member is made of a bam- boo rod which has been cut to size and identified with a code to facilitate the as- sembly process. Each bay can be assembled off-site and then transport- ed to site for final assembly and erection of the bridge. The curvature of the bridge is achieved by varying the angle of orientation of each rod. All the bamboo rods are straight. There is no need to bend them to achieve the geometry. Erection on site might re- quire further investigation of the site conditions. Materials used are consider- ably light and thus, erec- tion without heavy machinery should not present a prob- lem. Similar project was achieved without the need of cranes when constructing a cano- py for the terrace at the Architectural Association [for further info see con- struction sequence video at YouTube] CONCEPT TYPOLOGY MAETERIALS FABRICATION ERECTION TECHNICAL DESCRIPTION WU ZHI QIAO BRIDGE PROPOSAL Wu Zhi Qiao Bridge Design Competition 2010 MARIA MINGALLON Structural Engineer Montreal, Arup Inc

description

Team No.57

Transcript of Team No.57

  • The proposal can be sim-ply described as a truss where the typical quad-rangular or triangular grid has been altered in both the horizontal and vertical directions.

    Such distortion is achieved through a geo-metrical algorithm where each variation is stored in a digital model to fa-cilitate later fabrica-tion.

    Double-crossing truss with bays varying dimensions both in the vertical and horizon-tal directions. The truss members are circular section tubes.

    Single span bridge with en-castrated supports at both ends. Boulders could be used to reinforce the abutments and to restraint the ends of the circular members.

    Circular main truss mem-bers are made of bamboo rods treated and protect-ed against humidity and deterioration.

    Boulders are used at the abutments to improve their stability and to re-straint the ends of the bamboo members at the en-castrated supports.

    The walking platform is made of plywood and re-inforced longitudinally and transversely by bam-boo rods.

    Each member is made of a bam-boo rod which has been cut to size and identified with a code to facilitate the as-sembly process.

    Each bay can be assembled off-site and then transport-ed to site for final assembly and erection of the bridge.

    The curvature of the bridge is achieved by varying the angle of orientation of each rod.

    All the bamboo rods are straight. There is no need to bend them to achieve the geometry.

    Erection on site might re-quire further investigation of the site conditions.

    Materials used are consider-ably light and thus, erec-tion without heavy machinery should not present a prob-lem.

    Similar project was achieved without the need of cranes when constructing a cano-py for the terrace at the Architectural Association [for further info see con-struction sequence video at YouTube]

    CONCEPT

    TYPOLOGY

    MAETERIALS

    FABRICATION

    ERECTION

    TECHNICAL DESCRIPTION

    WU ZHI QIAO BRIDGE PROPOSAL

    Wu Zhi Qiao Bridge

    Design Competition 2010

    MARIA MINGALLONStructural EngineerMontreal, Arup Inc

  • Scale: 1/150 @ A3

    Not to scale

    Scale: 1/150 @ A3

    ELEVATION

    DIFFERENT VIEWS

    PLAN VIEW

    LAYOUT PLANS

    ALGORITHMIC VARIATIONS

    TECHNICAL DESCRIPTION

    WU ZHI QIAO BRIDGE PROPOSAL

    Wu Zhi Qiao Bridge

    Design Competition 2010

    MARIA MINGALLONStructural EngineerMontreal, Arup Inc