PQR / PPAP GUIDE
Teaching Aid
Last Revised February 18, 2015
(SCARs are not addressed in this guide)
PQR Description ---------------------------3
SQAM ------------------------------------------4
PQR Sample Label ------------------------9
Default Level 4 Requirements -------10
Polaris PPAP Manual --------------------11
PQR Creation ------------------------------14
PQR Form -----------------------------------15
“Same as Except” PQR-----------------19
Data Compression -----------------------20
PQR Performance Rating --------------21
Submission Recap -----------------------22
PQR Received Status -------------------25
FAQ -------------------------------------------27
Drawing Status ---------------------------32
DCR & Deviation Status ---------------33
Rejected PQR Procedure -------------34
Rejected PQR Table of Contents ---35
Reason A – Documents ----------------36
Reason B – Dimensional --------------37
Reason C – Misc -------------------------39
Table of Contents
2
BRIEF DESCRIPTION OF THE PQR SYSTEM USED AT POLARIS
(PART QUALIFICATION REQUEST)
The PQR System ensures product complies with all engineering requirements, specifications and
standards specified on the Polaris Design Record prior to delivery to the designated Polaris site. All
PQRs must be approved (conditional or full approval) prior to suppliers shipping product.*
PQR Recovery Fee* Exception
Supplier Quality Assurance ManualThe Polaris Supplier Quality Assurance Manual (SQAM) is an online guide which defines supplier expectations. Please refer to this manual for information and helpful links.
Proprietary 4
* www.polarissuppliers.com (Supplier Portal) provides suppliers with access to
many helpful tools and downloadable forms including the SQAM
Imbedded SQAM
SQAM Ref
http://www.polarissuppliers.com/
Proprietary 5
View of the Supplier Portal and access to the SQAM from the Portal
(Note Supplier Policies and Procedures making the SQAM part of the purchasing
agreement and therefore part of the Design Record)
SQAM Ref
Label for PPAP/FAIR Samples
Proprietary 9
Be sure to ship samples with the
proper label per the instructions in the
SQAM (recommended label color is orange)
SQAM Ref
Default Level 4 PPAP Request
Proprietary 10
Polaris exclusive, we do have a default Level 4 list of requirements if not otherwise specified on the PQR
SQAM Ref
Polaris PPAP Manual
Proprietary 11
Imbedded PPAP
Manual
PPAP Manual
Last Revised September 17, 2014
Proprietary 1
PPAP REQUIREMENTS ARE BASED ON THE AIAG BLUE BOOKS
“Blue Books” (PPAP-4, APQP-2, SPC-3, FMEA-4, MSA-4, TS Rules-3) which are used by Polaris Industries can be
purchased at:
www.aiag.org or Amazon.com
HOW PQR’S ARE CREATED WITHIN THE POLARIS SYSTEM
13
There are 3 ways a PQR is created within the Polaris system:
1. Print Release (initial or revision)
2. Manually created (often used as SCAR’s or in response to PCR’s)
3. Automated from Mapics when a vendor number changes
14
The information required to generate a PQR:
• Drawing
• Revision
The information required to define a PQR:
• Supplier
• Buyer
• QE (or authorized QA representative)
• A purchase order is not required to generate, define or process a PQR
• Suppliers do not have visibility of the PQR until the PQR is defined• The designated contact in the Polaris Supplier Net system will be notified when a PQR
is defined for your organization
• Important note: Once the PQR is defined to a Supplier’s organization the supplier has 100% ownership of the PQR until the PQR is approved by Polaris.
PQR Creation (Cont)
The Polaris PQR Form
Important PQR dates, both due and
received submissions are
noted here
Overview of the PQR details including PQR #, Part #,
Supplier & Buyer
Polaris site QE assigned to define the requirements and review the submissions
Running PQR history
Supplier comments related to the PQR submission (completed by the supplier)
Submission requirements as defined by the site QE based on mitigating risk and ensuring design intent.
One or more items may be selected and are due from the supplier prior to the due date indicated here.
Polaris comments related to the PQR, additional detail, submission approved, submission rejected noting reasons for rejection, etc.
FAIR and PPAP Requirements (dual dates)
Proprietary 16
Typically used for engineering samples (PV, PI, etc.) and
Production Tooling Approval.Product run on Production Tooling
but not run at rate and/or by production procedures.
Evidence that all customer Design Record requirements are properly understood and
that the manufacturing process (encompassing the entire production process – production tooling, gaging,
process, materials, and operators) has the potential to produce product
consistently meeting these requirements during an actual significant production run
at the quoted production rate.
Sample Part and Required Documentation Submission as Noted on the PQR
Proprietary 17
Per the SQAM please place the shipment method of your sample part and tracking
number here (this will help if your sample submission is lost)
Send all data electronically (in .xls, .pdf, .tif or .doc
format) via the e-mail link of the appropriate Quality
Engineer listed in the PQR system.
Please note in the Supplier Issues section the date electronic documents were submitted, method, and to
whom. If documented here and submitted correctly the accountability is now with Polaris.
Also used to communicate through the PQR system – ‘Request a Conditional Approval*’, ‘Request a Due Date
Adjustment**’, and all formal requests
Hard copies may accompany submitted samples but electronic copies must be sent for PQR submissions to the link above
• * When requesting Conditional Approval provide a brief explanation and a Conditional Approval end date• ** Same as above when requesting an adjusted Due Date
Polaris Comments Section of the PQR
Proprietary 18
rec’d = Receivedlvl 4 = Level 4 (referring to PPAP level)s/b = Should Be referring to the design record requirement (print)is = The actual measurementbal = Supplier balloon print number associated with the featuresub = Submit or submittedreq = RequirementsNCR = Non-Conformance Report
The Comments section of the PQR has a limit to the number of characters we can use when addressing the submission. We want to communicate as much as we can in our responses and because of this we often abbreviate our responses. We thought it might be helpful to explain some of these abbreviations…
Same as Except PQR
“Same as Except”
In some cases, in order to better control inventory, Polaris may release a new part number that is very similar to a previous part number (slight tooling modification, new tool, refurb, etc.). The Responsible Quality Representative may choose to allow a “same as except” type of submission. In this case, the supplier should reference the previously approved PQR and Part number on the PSW and include any changes in parts and PQR documentation from the previous submission to the new submission”.
Proprietary 19
Same as Except PQR XXXXX
Data Compression for Submission
Proprietary 20
www.powershrink.com/
Electronic PQR submissions can be quite large. In order to
submit the documents via email to the appropriate QA please compress by using PDF, ZIP or PowerShrink
(preferred is PowerShrink)
Note:Regarding zip files in order for zipped files to pass through the Polaris firewall the name Polaris must be in the file name
PQR Performance Rating
Proprietary 21
Supplier Performance – QualityPolicy Statement: Quality will have a 30% weight toward the overall GPA in 2012. PPM Performance will make up 20% of the Quality Performance. PQR (Part Qualification Request) Performance will make up 10% of the Quality Performance
Recap
Send all data electronically (in .xls, .pdf, .tif or .doc format) to the e-mail link of the appropriate Quality Engineer listed in the PQR system.
Please be sure to include a numbered (bubbled or ballooned) Polaris print with any Dimensional Results (including FAIR) submissions. A submission will not be approved based on electronic data alone. A sample part is required.
If the files are “zipped”, please make sure that “Polaris” is included in the name of the .zip file or the e-mail will be quarantined by the Polaris Firewall (‘sometimes’ the POLARIS needs to be bold).
Please only send one e-mail for each PQR with the PQR number AND part number in the “subject” line of the e-mail.
Dimensional Results (including FAIR’s) shall include 100% measurement of a print (including notes) unless otherwise requested in the PQR.
If any dimensions do not meet the print/specifications, a Polaris Approved DCR or Deviation shall be included with the submission.
Make sure that the revision of the part measured matches the revision of the print AND the revision listed on the PQR.
Please ensure that the print revision states “Released”…NOT “Prerelease” or “WIP” in the left hand lower corner of the Polaris Title Block (on the print). Only Polaris Released Prints will be accepted for submission of a PQR.
If you don’t have the Polaris released print, please contact the Polaris Purchasing agent.
Proprietary 22
Recap (cont.)
Ship the sample part(s) to the attention of the responsible Quality Engineer listed on the PQR. Also, include the tracking number on the PQR in the appropriate area.
Sample parts are required for any PPAP or FAIR submission. The sample part(s) must be shipped shortly after the electronic data is submitted.
PPAP PQR sample parts shall be produced (from production tooling, using production personnel, and run at rate) off of production tooling.
FAIR PQR sample parts should be produced from production tooling unless otherwise specified by the QE
Do not ignore a PQR due date or submit late. If you can not meet the PQR due date, please notify the responsible Quality Engineer through the PQR under Supplier Issues. The submission package consisting of requested data and a sample part must be received by Polaris no later than the due date on the PQR – the sooner the better.
Make your request noting to whom (QE), when (date) and why.
Poor practice: submitting the PQR the date it is due
The Sample Part Tag shall be fixed to the shipping containers. The samples shall be free of charge. DO NOT SEND SAMPLE PARTS WITH INVENTORY / PRODUCTION SHIPMENTS. DO NOT SHIP THE SAMPLE PARTS AGAINST ANY PURCHASE ORDERS. The bill of lading AND/OR the Invoice must clearly state that the parts are “samples” at NO COST TO POLARIS. If samples are shipped against a purchase order, they will be received into inventory and will not be considered as PQR samples.
Proprietary 23
Example of a Data Submission
Proprietary 24
Example of a PPAP submission (in Excel format) with embedded .pdf files in each of the required element cells.
This method of PQR assembly ensures the supplier and assures Polaris that all requirements were met (at a glance)
PQR Received Status
Proprietary 25
PQRs aren’t received until both electronic submissions AND sample parts are received by QA. Once received, the received date will display here.
PQR Received Status (Cont)
Proprietary 26
Received Status (both electronic and sample) can
also be found hereUpper location is received in system,
lower location are received notes
Important note: If Polaris indicates the data & sample are received and the supplier or Polaris makes changes (any change involving submit) the PQR received status will be removed.
FAQIf a supplier submits the PQR on the due date and Polaris does not select received on that day, will the supplier get penalized?
It must be flagged as at least received within the calendar month that it is due PQRs are expected to be submitted prior to the due date on the PQR.
When there are two due dates in the system (for example 1 for a FAIR and 1 for a PPAP) and we receive the FAIR data on time, does the due date automatically move out to the later due date once the first on has passed?
Each requirement date is viewed independently however a PQR is only counted once in a given month. For example if the FAIR is due in December and the PPAP in January. The FAIR is approved in December. It counts positively for the supplier in December. The metric does not look at the PPAP date until January.
Confirming the time stamp for calculating “on time” PQRs based off checking “received”, correct?
Suppliers should try to make sure their submission reaches the plant at least 48 hrs prior to the due date to allow for it to be processed by plant QA. Plant QA should at least flag it as received within 48 hrs of its arrival at the plant.
If a supplier submits a late PQR (and they get dinged) and we conditionally approve the PQR submission when received a new date is set for the conditional approval – will the supplier get dinged again for being late to the conditional approval date?
If a PPAP is due in December and the supplier has not submitted it by December 31 st, they would get dinged. If we came back in January and conditionally approved the PPAP to be due in January and by January 31 st we had not received the resubmission the supplier would have received two hits. One for December and one for January.
Proprietary 27
FAQ (cont.)
Why will Polaris not accept hard copies of submission data in lieu of electronic data?
Hard copies cannot be entered into our system and thus viewed by the many people who need access to the data
Electronic submissions can also be traced verifying date of submission
Why does data need to be submitted in .xls, .pdf, .tif or .doc format?Data must be submitted in acceptable formats which Polaris can open conveniently
Why are bubbled/ballooned prints required with each Dimensional Results or FAIR submission?
The numbered print is used to correlate dimensional data from the supplier
When submitted data to the appropriate QE per the PQR request should anyone else within Polaris be copied?
It is a good idea to copy the Purchasing Agent and the SQE on submissions
Who approves PQRs and what limits do they have?Polaris QEs are responsible for final approval of PQRs (in MTY SQEs approval PQRs)
Polaris QEs are not authorized (alone) to make decisions outside of the Design Record for non-compliant submissions unless supported by an approved DCR or Deviation
Proprietary 28
FAQ (cont.)
Why must the submitted data be against a RELEASED Polaris drawing?Polaris Purchasing Agents and Engineers provide suppliers with pre-released drawings for quoting
purposes or early discussion
Preliminary, Pre-release or WIP drawings can change at any time with no notice and are exempt from the Polaris Release Cycle
The Released drawing is a contractual agreement as noted on the PO
PQRs are automatically generated after a print is released
Only production POs and production drawings can be PPAPd
What if multiple revisions exist in the PQR system for the same P/N?Previous revision requirements can be moved forward to the latest PQR upon supplier request
This is not done automatically and subject to certain conditions
Examples:If the earlier revision has never been purchased the earlier PQR can be retracted
If the elements of the next revision has earlier been met the later PQR can be retracted or approved Earlier PQR included an approved DCR
The PQR may be a SCAR
It may be a supplier change PQR
Other examples/conditions may exist. Please contact the QE listed on the PQR
What if the due date on the PQR cannot be met?DO NOT ignore the PQR – your metrics will be negatively affected
Notify the QE through the PQR as noted earlier PRIOR to the PQR due date and provide a reason
Proprietary 29
FAQ (cont.)
How important is the PPAP/FAIR sample label and sample submission information in the Supplier Information section of the PQR?
Polaris has many locations and departments. Unless the samples are routed correctly with the correct information the submitted samples can be delayed or even lost
Providing the Shipper Name, Tracking Number and when shipped in the Supplier Information section of the PQR allows for:
Tracking if deliveries are lost or delayed
Provides evidence that the supplier complied with the request – on time
How will I know if the sample part ship location been changed?Always check the Quality Engineer section of the PQR under Ship To: (4th panel right side)
Why must I ship a sample part for a FAIR submission and why must it be made from production tooling?
FAIRs are used for tooling approval. Unless submitted parts are made from production intent tooling the production tooling cannot be verified.
Notify the QE through the PQR as noted earlier PRIOR to the PQR due date
What happens to submitted samples after auditing at Polaris?Samples are scrapped after approval
Sometimes samples may be used for destructive testing and could be destroyed in the process
Proprietary 30
FAQ (cont.)
What if I receive a Conditional Approval and the Req Date on the PQR does not match the Conditional Approval date?
The QE should move the Req Date out to match the Conditional Approval date. It is a manual process so if the QE failed to adjust the date please contact the QE and request the date be changed. Do this to avoid a negative metric for being late.
What common problems to we see regarding PQR submissions?KPCs are not addressed on Control Plans and PFMEAs
Please refer to pg 91 of the AIAG 4th Edition PFMEA Manual under Classification (e)
Cpk values are not submitted for KPCs in the MSA or when requested on the PQR
Tier II supplier documentation not submitted
Submission is not in English
Results must be submitted in the same format as the Polaris drawing – mm not inches
PSW is filled out incorrectly
Requested elements and/or samples not submitted
Submissions are past due
Proprietary 31
PROCEDURE TO ADDRESS A REJECTED
PQRThis can also be used to avoid a rejection with the initial
submission
Last Updated April 14, 2014
Rejected PQR Contents
Rejection Reason ‘A’ – Documents……….5Most reasons why a PQR was rejected for documentation and how to address
Rejection Reason ‘B’ – Dimensional….…..6Most reasons why a PQR was rejected for dimensional issues and how to address
Rejection Reason ‘C’ – Miscellaneous……8Most reasons why a PQR was rejected for miscellaneous issues and how to
address
*Polaris/Supplier Disputed Quality Measurement Results
The Polaris quality labs are equipped with state of the art measurement tools specific for the type of products we use. The staff is well trained and experienced at measuring the submitted material we receive from suppliers. We are not immune from error but 96% of the time when measurements are challenged by suppliers the Polaris staff is proven to be correct – as verified by the supply base which disputes the results.
Based on common problems when investigating correlation please take the time to check the following:
How are the parts being measured constrained? Parts that meet the print in a clamped state most often do not meet the print when in a free state. Unless otherwise noted on the print Polaris does not clamp the parts being checked.
When switching probes are they recalibrated prior to use? Is the GD&T being interpreted correctly? Are we checking to the print without assumptions and shortcuts (#1 hitter)? Verify your data by “dumbing down” the technique. CMM measurements can be complex;
verify with a height gage, bore gage, or caliper.
If, after careful review, you have determined the product was measured correctly against the released Polaris drawing/model please contact your SQE or QE named on
the PQR
THANK YOU!
The purpose of this guide is to assist suppliers in the resubmission of PQRs which have been rejected by Polaris for various reasons.
Please use this guide to resubmit before you contact your Polaris representative about rejected PQR.
Rejected PQRs need to be addressed and resubmitted ASAP so not to impact delivery schedules. 10 days or less to resend data and/or ship a new sample is preferred
Only contact the Polaris representative if this guide does not address the issue and you need further assistance.
Thank you for helping us build a partnership with our supply base, you are vital to our overall success