TCORE - Concourse B Renovation Public NoticeSean Loughran, Planning & DevelopmentJanuary 23, 2019
![Page 2: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/2.jpg)
Presentation Overview• The Public Notice Requirement
• PDXNext Capital Projects and Terminal Core Redevelopment: Recap
• Concourse B Renovation: Key Benefits, Project Facts, & Renderings
• Project Budget & Minority Contracting
• Concourse B Renovation Public Comment
2
![Page 3: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/3.jpg)
Airport Plan District - Notification Requirement• When is notice required?
• Part of a City land use review?
• Airside
• Landside
• Development or Alternation
• Mailed public notice
• Public meeting opportunity = PDX CAC
• Application for building permits
• xxx3
![Page 4: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/4.jpg)
4
Sequence of Events
Public Notice – Concourse B Renovation
Design &
Construction
Ongoing
Design – through summer 2019
Horizon Relocation to Concourse C – fall 2019
Construction – through summer 2021; opening fall 2021
Communication and outreach
Today
![Page 5: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/5.jpg)
PDXNext Major Capital Projects
Terminal Balancing/Concourse E Extension
Quick Turn Around Facility
Parking Additions & ConRAC
$67MComplete
$282MConstruction underwayComplete late 2021
$215MConstruction underwayComplete mid-2020
Terminal Core/Concourse A & B$950M (Phase 1)Early design Construction start – early 2020Complete late 2024 (est.)
Terminal Core Redevelopment
5
$100M (part of TCORE budget)Final design 2019Construction Complete 2021
Concourse B Redevelopment
![Page 6: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/6.jpg)
Existing Concourse A & Key Changes• Concourse A constructed as a temporary facility by Horizon in 1988• Built to serve smaller, regional markets• Aircraft size and number of service frequencies have both increased• Level of service has steadily decreased as a result
6
![Page 7: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/7.jpg)
TCORE Major Project Scope & PhasingPhase 1 - $950M• Western Expansion, including underground utilities• New roof structure• Concourse B Renovation, Concourse A Demolition, Remain
Overnight Parking• Terminal mezzanine relocations
Phase 2• Terminal Core Renovation, including Ticket Lobby• Baggage Claim Improvements
7
![Page 8: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/8.jpg)
8
Concourse B Renovation & Concourse A Demo
Existing B
B Addition
A Demolition
TriMet Coordination
P1 Garage
![Page 9: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/9.jpg)
Concourse B Renovation - Interior
Upper level
9
Lower (ground) level
![Page 10: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/10.jpg)
10
Exterior Rendering
TriMet PlatformConcourse B Addition
Walkway to Aircraft
P1
Ticket Lobby
Rental Car Center (future)
![Page 11: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/11.jpg)
11
Interior Rendering
![Page 12: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/12.jpg)
Concourse B Renovation Project Facts• Includes demolition of Concourse A• Renovation of existing Concourse B, including 18,000sf addition• Reconfiguration of ground load operation with 6 aircraft parking
positions and enhanced remain overnight parking• Recommissioning of Gate B4• Improved passenger concessions and amenities
• Requires temporary relocation of current Horizon operation to Concourse C
12
![Page 13: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/13.jpg)
PDXNext Major Capital Projects
Terminal Balancing/Concourse E Extension
Quick Turn Around Facility
Parking Additions & ConRAC
$67MComplete
$282MConstruction underwayComplete late 2021
$215MConstruction underwayComplete mid-2020
Terminal Core/Concourse A & B$950M (Phase 1)Early design Construction start – early 2020Complete late 2024 (est.)
Terminal Core Redevelopment
13
$100M (part of TCORE budget)Final design 2019Construction Complete 2021
Concourse B Redevelopment
![Page 14: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/14.jpg)
Concourse B Renovation Key Benefits• Implementation of Airport Futures (Airport Master Plan)• Provides long-term aircraft parking capacity for PDX• Improves availability and configuration of remain overnight parking• Vastly improves the PDX user experience• Provides TriMet ability to double-track in the immediate vicinity and
improve south-side bike and pedestrian access to PDX
14
![Page 15: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/15.jpg)
South-side Bike and Pedestrian Improvements
15
![Page 16: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior](https://reader034.fdocuments.net/reader034/viewer/2022050108/5f464a101fd68239e97754ea/html5/thumbnails/16.jpg)
16
Budget Summary & Minority Contracting
Concourse B Renovation budget included within overall TCORE project budget of $950M.
*Figures rounded to nearest million
$ 80M$ 10M$ 1M$ 1M$ 1M$ 7M$100M
ConstructionDesignProcurementsProgram Mgmt.PermitsContingencyTotal
Concourse B Renovation* Minority Contracting
• Design goal: 10%• Design progress to date: 6.7%• Construction goal: 20%