TCM – Matola Coal Terminal 9th Indian Ocean Ports ...
Transcript of TCM – Matola Coal Terminal 9th Indian Ocean Ports ...
![Page 1: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/1.jpg)
TCM – Matola Coal Terminal9th Indian Ocean Ports &
Logistics22nd January 2015
1
![Page 2: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/2.jpg)
Agenda
1. Terminal History2. Export History3. Current Terminal Infrastructure4. Expansion Plans5. Phase 4A magnetite concept
2
![Page 3: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/3.jpg)
Aerial View of Maputo Port
3
![Page 4: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/4.jpg)
Terminal History• 2005 : Grindrod purchased API Holdings, took over the TCM sub
concession
• 2006 – 2010: Phase 1 & 2• Create a reliable throughput capacity of 4Mtpa • Improve integrity by optimizing layout of existing storage
Rail yard,
• Rebuild and refurbish stacker/ reclaimer no.2
• Re-instate central stockpile conveyor
• Refurbish the existing Ship loader,
• Ability to load Handysize vessels with coal at a 9,000 ton
per day
Phase 3• Create a reliable throughput capacity of 6Mtpa • New 2500 ton per hour shiploader and new stacker /
reclaimer
• Storage capacity to 400 000 tons
4
![Page 5: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/5.jpg)
Export History
5
![Page 6: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/6.jpg)
Current Terminal Infrastructure• Capacity of 7.5Mt / annum• 36 x storage bins – capable of
storing about 300,000 tons coal plus 200,000mt magnetite.
• 2 x refurbished stacker / reclaimers which can stack / reclaim coal at 650mt per hour.
• 1 x New stacker / reclaimer can stack / reclaim coal at 1 250mt per hour.
• 2 Shiploaders• Original ship loader 650mt coal• New ship loader capacity
1250mt coal per hour
6
![Page 7: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/7.jpg)
Current Terminal Infrastructure
7
![Page 8: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/8.jpg)
Phase 4 – Expansion Plans
8
![Page 9: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/9.jpg)
9
The Phase 4 Terminal expansion has identified the following target market for the utilisation of the facility:
• South AfricaCoal – 5Mt from Witbank / Mpumalanga CoalfieldsMagnetite – 15Mt through the Ressano Garcia line
• Zimbabwe / BotswanaCoal – ± 10Mt through the Chicualacuala line
The Terminal expansion will create dedicated Port capacity for BEE/Junior minors who are geographically well positioned to take advantage of the facility.
Phase 4 Expansion
![Page 10: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/10.jpg)
10
![Page 11: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/11.jpg)
Coal market dynamic
11
400
500
600
700
800
900
1000
1100
60
70
80
90
100
110
120
130
140
Jan11
Feb11
Mar11
Apr11
May11
Jun11
Jul11
Aug11
Sep11
Oct11
Nov11
Dec11
Jan12
Feb12
Mar12
Apr12
May12
Jun12
Jul12
Aug12
Sep12
Oct12
Nov12
Dec12
Jan13
Feb13
Mar13
Apr13
May13
Jun13
Jul13
API4 ($/t)
API4 (R/t)
Commencement of the project
![Page 12: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/12.jpg)
Iron Ore market dynamic
12
![Page 13: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/13.jpg)
Phase 4A Brownfields layout
13
![Page 14: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/14.jpg)
Previous layout - Phase 4A and 4B
1414
![Page 15: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/15.jpg)
Option 4.1Option 1
Phase 4A Greenfields layout options
![Page 16: TCM – Matola Coal Terminal 9th Indian Ocean Ports ...](https://reader030.fdocuments.net/reader030/viewer/2022011805/61d3a31cda05a254ac4eae2d/html5/thumbnails/16.jpg)
Staged development benefitsStaged development benefitsDescription Phase 4A Brownfields Phase 4A Greenfields
Scope of work i) Stacker/reclaimer #3ii) Export conveyor systemiii) Dredge workiv) Berth #1 modificationsv) Berth #2 skeletal quayvi) New ship loader #1vii) Quay conveyors/gantryviii) Rail system partial
(Stockyard – wetlands or inside rail loop)i) Tipplers (x2 dual cells)ii) Stacker/reclaimers (x2)iii) Rail system complete
Mix ratio (Mag/coal) 75/25 75/25
Terminal capacity 12 mtpa ~20-22 mtpa
Capacity increase 4.7 mtpa ~8-10 mtpa
Development time 28 months ~36 months
Capex spend ($’m) 161 275 – 343*
16
Note: * - Order of magnitude capex for Option 4.1 (inside rail loop) versus Option 1 (Wetland) based on a Concept study