Tbp’s early involvement Gerard Elema&Marcel Swinnen DfM expertDfT expert.
-
Upload
trevor-wood -
Category
Documents
-
view
224 -
download
0
Transcript of Tbp’s early involvement Gerard Elema&Marcel Swinnen DfM expertDfT expert.
tbp’s early involvement
Gerard Elema & Marcel SwinnenDfM expert DfT expert
2
• EMS, production of electronics for third parties
(B2B)
• development, test engineering, assembly,
testing and box building
• responsible for complete supply chain
• high-end, high mix
the business of perfection
3
• turnover € 30 million
• locations 2
• employees 130
• customers 50+
• floor space 8.000 m2
• ISO-9001:2008, AQAP-2120:2009
• ISO-13485 (roadmap 2014)
• JTAG AAP (Approved Application Provider)
the business of perfection
4
our mission
the tbp Way of Life is a process of cooperation
with our customers to maximize the
manufacturability and testability of a design
resulting in higher quality and lower “hidden
costs” for you as our customer
6
10 ± 3 DPMO
86,5
77,5
58,5
39
IPC7912
why DfX – Design for eXcellence
7
customer• design idea (in block diagram)
• batch size and year volume of product
• traceability
tbp• DfM rules• data-exchange guidelines• ABC component list
customer• full BOM • CAD data, preferably in ODB++ (component and outer copper layers)
tbp• DfM report containing:
• component placement check• footprint check
customer• full BOM• CAD data, preferably in ODB++ (complete design )
tbp• DfM report containing:
• analysis of makeability• footprint check• component placement check• netlist analysis
design
Design for Manufacturing (DfM)
phase 0
phase 1
phase 2
8
customer• design idea (in block diagram)• batch size and year volume of product
• traceability
tbp• DfT rules• data exchange guidelines
customer• schematics in EDIF 2.0 or Cadence Allegro format
• schematics in searchable PDF• full BOM• if possible, BSDL files
tbp• DfT report containing:
• preliminary test coverage• preliminary test strategy• preliminary slip-through• do-file
customer• CAD data, preferably in ODB++• possibly new schematics• possibly adjusted BOM
tbp• DfT report containing:
• final test coverage• final test strategy• percentage slip-through
designDesign for Test (DfT)
phase 0 phase 1 phase 2
9
• production faults are unavoidable during assembly process (DPMO)
• a test coverage of 100% is unrealistic (technical)
• slip-through is the amount of boards which are passing the test strategy and still may contain production faults at customer side
• slip-through will be calculated in advance
slip-through explained
10
test methods
X-ray
AOI
FPT
ICT
BST
combinationtest
FT
IEEE 1149.1 & IEEE 1149.6
11
DfT – way of working
test strategy “as is”: AOI + FPT + BST
test strategy “as advised”: AOI + FPT + EBS test
quality x 4,7
12
NIKHEF - HAM base promise 2
• via structural tests the slip-through can
be reduced to 0,08 %
• less functional test or no functional test at all
at board level
14
production
customer
MES
logistics
qualitydata
reports
BOM
materials (jit)visual aids
SPC
Manufacturing Execution System
16
questions
©tbp electronics bv
19
dank u voor uw aandacht