Transcript of TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di...
![Page 1: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/1.jpg)
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK
TUNNELS UNDER HIGH COVER IN CRITICAL
GEOLOGICAL CONDITIONS
Remo Grandori_Swiss Tunnel Society – September 2010
![Page 2: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/2.jpg)
TBM TUNNELING SCIENCE TECHNOLOGY AND ART
Soft ground TBM tunnelling
Rock TBM tunnelling
![Page 3: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/3.jpg)
SOFT GROUND TUNNELINGMix of science and technology
• Ground normally homogeneous• Shallow cover and water pressure• Risks more predictable, limited to
man made actions/objects• Procedures and discipline in
operation and maintenance
![Page 4: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/4.jpg)
ROCK TUNNELINGTechnology, art and small science
• No homogeneous (Rock to mud)• High cover and water pressure• Risks difficult to be predicted
(poor science) • Force of nature may become
impressive, normally were not expected
![Page 5: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/5.jpg)
EXAMPLE OF EXTREME EVENT IN ROCK TUNNELLING
The GIBE II CASE
![Page 6: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/6.jpg)
Tab.1 Water Conveyance project main data
PURPOSE HPP (432MW)
TUNNEL LENGHT 25,8 km
EXCAVTION DIAMETER 7,0 m
DESIGN DISCHARGE 100 m3/s
DESIGN INTERNAL PRESSURE min.2 bar max.7 bar
Tab.2 Lining geometrical characteristics
SEGMENT TYPE 4 HEXAGONAL
SEGMENT THICKNESS 25 cm
SEGMENTAL LINING OUTSIDE DIAMETER 6.800 mm
SEGMENTAL LINING FINAL INTERNAL 6.300 mm
SEGMENT WIDTH 1.600 mm
The Gilgel Gibe II Hydro-Power Plant 240km from Addis Ababa, in Ethiopia, between Gibe and Omo Rivers.
![Page 7: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/7.jpg)
Figure 1. Typical lining section
![Page 8: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/8.jpg)
EVENT AT THE CHAINAGE 4+196 FROM INTAKE HEADING
The tunnel face moved towards and pushed back the TBM at 40-60 mm/hour.
The measured pressure of mud was 40 bars
![Page 9: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/9.jpg)
TBM SHIELD DEFORMED
![Page 10: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/10.jpg)
LINING DAMAGED
![Page 11: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/11.jpg)
BORE HOLES FOUND MUD AT 40 BAR AND OVER 40c°
Figure 6. Mud poured out from one of the borehole
![Page 12: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/12.jpg)
BACK – CHAMBER DESIGN (BY LOMBARDI ENGINEERS)
![Page 13: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/13.jpg)
BY PASS TUNNEL AND BACK CHAMBER
![Page 14: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/14.jpg)
MUD EXTRUDED AND FLOWING INSIDE THE LEFT BY PASS TUNNEL
![Page 15: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/15.jpg)
Extruding mud in the Exploratory Adit
![Page 16: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/16.jpg)
Figure 12. Extruding mud in the Exploratory Adit
![Page 17: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/17.jpg)
Figure 13. Extruding mud at the Adit Portal
![Page 18: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/18.jpg)
Extruded mud at the Adit Portal
![Page 19: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/19.jpg)
Extruded mud in the Power Tunnel
![Page 20: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/20.jpg)
Consolidated mud filling the Power Tunnel
![Page 21: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/21.jpg)
Water pressure (manometer BH n°2 Back Chamber)
0,0
2,0
4,0
6,0
8,0
10,0
12,0
14,0
16,0
18,0
20,0
22,0
24,0
26,0
12/5
22/5 1/6
11/6
21/6 1/7
11/7
21/7
31/7
10/8
20/8
30/8 9/9
19/9
29/9
9/10
19/1
0
29/1
0
8/11
18/1
128
/11
8/12
18/1
2
28/1
2
7/1
17/1
27/1
days
p [b
ar]
2nd Event
BH-SM-1
3th Event
1st Event
4th Event
BH-SM-3
BH-SM-9
BH-SM-11 BH-SM-15
BH-SM-17-18
FOR N.3 TIMES THE LEFT ADIT AND THE TUNNEL WERE FLOODED BY THE MUD
Pressure variation measured in the Back Chamber
![Page 22: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/22.jpg)
A NEW STRATEGY WAS DEFINED
• the mud was removed from tunnel
• the Back-Up was extracted to portal
• new drainage drilling performed
• Exploratory Adit on the Right side (40m behind)
![Page 23: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/23.jpg)
RIGHT END SIDE BY PASS
![Page 24: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/24.jpg)
Rescue Chamber to recover the TBM
![Page 25: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/25.jpg)
BY PASS TUNNEL SCHEME
Concrete Plug
By pass tunnelTBM ri-assembly tunnel Fault
![Page 26: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/26.jpg)
PRODUCTION AFTER RESTART OF EXCAVATION.
Figure 28. TBM production chart after the excavation resuming
![Page 27: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/27.jpg)
The Tunnel excavation completed on June 6th
2009, the two TBMs meet at the ch.: 8+520,8
![Page 28: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/28.jpg)
EVENT OCCURRED AFTER START OF OPERATION
Remo Grandori
![Page 29: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/29.jpg)
ALMOST 10.000 CM OF MUD, SAND, BOULDERS AND BLOCKS ENTERED THE TUNNEL
Remo Grandori
![Page 30: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/30.jpg)
FROM A SECTION OF 10 – 15 m OF TUNNEL
![Page 31: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/31.jpg)
SO WE WERE AGAIN IN THE.........TO THE NECK
![Page 32: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/32.jpg)
SIX MONTH AFTER...ALMOST OUT
![Page 33: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/33.jpg)
NEVER GIVE UP
• EVEN THE WORSE SITUATIONS CAN BE OVERCOME BY ENGINEERING SPECIAL MEASURES AND DEDICATED EXPERT CREWS
• THIS IS WHAT MAKES TUNNELLING SUCH A WONDERFUL WORK
![Page 34: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/34.jpg)
DON’T STOP TBM DESIGN PROGRES
• THE PROGRESS IN TBM DESIGN WILL MORE AND MORE LIMITS THE NECESSITY OF SPECIAL MEASURES TO VERY EXTREME A ND RARE EVENTS
![Page 35: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/35.jpg)
DOUBLE SHIELD DESIGN EVOLUTION
• 1983- 1993 - Increase capacity in Hard Rock boring
• 1995- Increase Torque and Auxiliary Thrust
• 2001-2005 New DSU TBM design
• 2005-2010 – Dual mode EPB DSU
![Page 36: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/36.jpg)
TODAY STATE IN ROCK TBM DESIGN • Short shields • Conical shields • Extended overboring & overcutting • Extended ground and face treatment• Torque and thrust same of EPB TBMs• Double mode capacity (with no stand by
time) were required• Improve cutterhead design to cope with
widest range of geological applications
![Page 37: TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK · PDF fileIL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM EXCAVATION AND TUNNEL DESIGN FOR ROCK TUNNELS UNDER HIGH COVER IN CRITICAL](https://reader034.fdocuments.net/reader034/viewer/2022051320/5a78713a7f8b9aa2448c03a5/html5/thumbnails/37.jpg)
TUNNEL DESIGN
The fact that TBMs are and will be more and more capable to bore trough extremely bad ground under high cover and water pressure will move the criticality to tunnel lining and support design.