TBM Assembly Onsite - Nevada
Transcript of TBM Assembly Onsite - Nevada
![Page 1: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/1.jpg)
TBM Assembly Onsite
![Page 2: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/2.jpg)
TBM Assembly Onsite
![Page 3: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/3.jpg)
Cutter Head - Welding in temperature controlled tent
TBM Assembly Onsite
![Page 4: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/4.jpg)
Sloan, NV
Forms being filled with concrete
Workers installing gasket
Precast Lining Segment Plant
![Page 5: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/5.jpg)
TBM Shield Precast concrete segmental lining
Precast Concrete Segments
![Page 6: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/6.jpg)
Precast Concrete Segments
~ 660 of 2500 rings onsite
![Page 7: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/7.jpg)
Segment Feeder
![Page 8: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/8.jpg)
Example: Installation of Segmental Lining
![Page 9: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/9.jpg)
Operator Cabinet
![Page 10: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/10.jpg)
Example: TBM Lowered into Access Shaft
![Page 11: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/11.jpg)
Example: TBM Lowering into the Access Shaft
![Page 12: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/12.jpg)
Underwater workUnderwater workAir lift mucking Air lift mucking Blast & excavateBlast & excavatePrefab structurePrefab structureLower by bargeLower by bargeAnchor w/ Anchor w/ underwater underwater concreteconcreteGPS System GPS System TBM DockingTBM DockingFillingFilling
“01” - Intake No. 3 Shafts & TunnelIntake Riser (under design)
![Page 13: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/13.jpg)
Crane/Excavation Barge – Dredging Pipe
“01” - Intake No. 3 Shafts & Tunnel
![Page 14: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/14.jpg)
![Page 15: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/15.jpg)
![Page 16: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/16.jpg)
Technical Challenge - Underwater Blasting
Fig. 1
Underwater Blasting Using Remote Controlled Frame With Charges
Fig. 2
Air Mirror Over Charge Field To Reduce Peak Overpressure
“01” - Intake No. 3 Shafts & Tunnel
![Page 17: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/17.jpg)
Rock Excavation
Blasting with shaped charges
Airlift mucking
Underwater placement of excavated materials
Monitoring with ROV and Sonar (fish and location)
“01” - Intake No. 3 Shafts & Tunnel
![Page 18: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/18.jpg)
WATER TREATMENT
FACILITY
INTAKE SHAFT
ACCESS SHAFT
INTAKE TUNNEL
“02”- Intake No. 3 Connector Tunnel
INTAKE No. 2 CONNECTION
INTAKE 1
INTAKE 2
WATER TREATMENT
FACILITY(Existing)
![Page 19: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/19.jpg)
Intake Pumping Station No. 2
Intake No. 2
Intake No. 1
Intake Pumping Station No. 1
Connector Tunnel Stub
Tunnel
Intake No. 3
![Page 20: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/20.jpg)
Renda Pacific (Design-Bid-Build) ~ $42 million
Access Shaft (IPS-3 Surge Shaft)~ 450’ deep26’ interior diameter
Tunnel ~2578’ longHorseshoeDrill & Blast
“02”- Intake No. 3 Connector Tunnel
![Page 21: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/21.jpg)
“02” - Intake No. 3 Connector Tunnel
1st Blast – October 7, 2009
![Page 22: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/22.jpg)
1st Blast – October 7, 2009
“02” - Intake No. 3 Connector Tunnel
![Page 23: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/23.jpg)
“02” - Intake No. 3 Shafts & Tunnel“02”- Intake No. 3 Connector Tunnel
Current Progress – 290 feet excavated
![Page 24: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/24.jpg)
WATER TREATMENT
FACILITY
INTAKE RISER
ACCESS SHAFT
INTAKE TUNNEL
INTAKE No. 2 CONNECTION
“05” - Intake No. 2 Connection & Modifications
INTAKE No. 2 CONNECTION & MODIFICATIONS
INTAKE 1
INTAKE 2
WATER TREATMENT
FACILITY(Existing)
![Page 25: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/25.jpg)
Intake Pumping Station No. 2
Intake No. 2
Intake No. 1
Intake Pumping Station No. 1
Connector Tunnel Stub
Tunnel
Intake No. 3
![Page 26: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/26.jpg)
Barnard (Design-Bid-Build) ~ $30 million
Access Shaft (Isolation Gate)~ 380’ deep 22’ interior diameter
Isolation Gate12’ w x 14’ h stainless steel
Tunnel ~500’ longHorseshoeDrill & Blast
Inlet Modifications
“05” - Intake No. 2 Connection & Modifications
![Page 27: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/27.jpg)
Close quarters…
Work adjacent to operational Intake Pumping Station No. 1 and No. 2
“05” Intake No. 2 Connection & Modifications
![Page 28: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/28.jpg)
Looking Up Access Shaft Thru Galloway – 26 March 2009
“05” Intake No. 2 Connection & Modifications
![Page 29: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/29.jpg)
“05” Intake No. 2 Connection & Modifications
![Page 30: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/30.jpg)
“05” Intake No. 2 Connection & Modifications
![Page 31: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/31.jpg)
Isolation Gate – December 2009
“05” Intake No. 2 Connection & Modifications
![Page 32: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/32.jpg)
Gate Guide Rails – Stainless Steel
“05” Intake No. 2 Connection & Modifications
![Page 33: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/33.jpg)
Isolation Gate
“05” Intake No. 2 Connection & Modifications
![Page 34: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/34.jpg)
“05” Intake No. 2 Connection & Modifications
Hemispherical Cap
![Page 35: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/35.jpg)
“05” - Intake No. 2 Connection & Modifications
![Page 36: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/36.jpg)
“05” Intake No. 2 Connection & Modifications
Intake No. 2 – Dewatered Forebay (South)
![Page 37: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/37.jpg)
“05” Intake No. 2 Connection & Modifications
Intake No. 2 – Dewatered Tunnel (~1000 gpm inflow)
![Page 38: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/38.jpg)
“05” Intake No. 2 Connection & Modifications
Intake No. 2 - Quagga Colonization
typical
![Page 39: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/39.jpg)
Project LocationProject LocationLake Mead National Recreation AreaLake Mead National Recreation Area
![Page 40: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/40.jpg)
StakeholdersStakeholdersBoaters, divers, jet skiers, fishermenBoaters, divers, jet skiers, fishermenMarinas, concessions and other park vendorsMarinas, concessions and other park vendorsNational Park ServiceNational Park ServiceBike trail usersBike trail usersDelivery/contractor staffDelivery/contractor staffAir traffic over project siteAir traffic over project siteRescue personnelRescue personnelSNWA Operations, security, managementSNWA Operations, security, managementTrade media, local mediaTrade media, local mediaContracting communityContracting community
![Page 41: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/41.jpg)
Contractor Outreach Tours
![Page 42: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/42.jpg)
Trade and Mainstream Media Attention
•ENR•Tunnels and Tunneling •LV Review-Journal/Sun•Popular Mechanics•Southwest Contractor•Tunnel Business•Bloomberg News
![Page 43: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/43.jpg)
River Mountains Loop Trail Box Culvert
![Page 44: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/44.jpg)
Additional Borings
Geotech drilling on Lake Mead and on land
![Page 45: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/45.jpg)
ATTENTION LAKE MEAD VESSEL OPERATORS AND MARINAS
RESEARCHAREA
Contractors for the Southern Nevada Water
Authority will be performing underwater geological research activities near Saddle Island and Black
Island.
Thank you for your cooperation.
Questions? Contact SNWA at
702-862-3405
Drilling barges may be located in the research
area from November 2008 through ________ 2009.
Please maintain a 100-yard distance from
the barges and equipment at all times.
ResearchArea
![Page 46: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/46.jpg)
Project Schedule
“01” - Intake No. 3 Shafts & TunnelCavern/Stub/Starter Complete 5/26/2010TBM Lowering 8/2010TBM Tunneling Begins 11/2010TBM Tunnel to Intake Complete Q4/2012Final Completion Q1/2013
“02” - Intake No. 3 Connector TunnelFinal Completion 7/27/2012
“05” - Intake No. 2 Connection & ModificationsIPS-2 Shut Down Complete 1/21/2010Final Completion Q2/2010
![Page 47: TBM Assembly Onsite - Nevada](https://reader031.fdocuments.net/reader031/viewer/2022020622/61ed3852bad54c3dbb09c185/html5/thumbnails/47.jpg)
Deferred Contracts
Intake No. 3 Pumping Station
Pumping station forebay and well shaft excavation, build-out, chlorine building construction, yard piping
Future
Substation and permanent power supply (by CRC)
69/13.8 kV Electrical substation, pre-purchase of equipment, 69 kV Duct bank
Future
Discharge pipeline ~2,130 feet of 144-inch and diameter discharge pipeline, ~4,050 feet of 24-inch diameter potable water pipeline, etc.