Stabilization vs.Stabilization vs.Rip-Out-And-Replace/RemoveRip-Out-And-Replace/Remove
Project OptionsProject Options– Remove unstable towers to roof levelRemove unstable towers to roof level– Stabilize towersStabilize towers
ConsiderationsConsiderations– CostCost
Stabilization ½ cost of removalStabilization ½ cost of removal
– AestheticsAesthetics Stabilization maintains all aestheticsStabilization maintains all aesthetics
Previous attempts at both repair and safety stabilization
Mast Climber with pipe for best access
Professional Drilling Contractor for almost 500 holes
Coordinated Access
Restoration Specialist
Drilling continues with stabilization mesh in place
Installation of Cintec cement based anchors – lengths 19-36”
Anchor location designations
Anchor Inflation
Completed Project