Takeda Ireland Ltd Grange CastleSurveillance Assessment ReportISO 50001:2011Assessment Date: 23rd May 2017
Confidence, Assurance and Certainty
Prepared for: Takeda Ireland Ltd Grange Castle
Prepared by: Dermot Gibbons
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 2 of 11
ASSESSMENT DETAILS
Client Details
Company Name Takeda Ireland Ltd Grange Castle
ManagementRepresentative
Aileen Stack
Company Address Grange Castle International Business Park, Nangor Road, Dublin 22, Ireland
Date of Assessment 23-05-2017
Location ofAssessment
Takeda Ireland, Grange Castle, Dublin, Ireland.
Objective ofAssessment
To confirm the extent of conformity of the system to the ManagementSystems ISO 50001:2011, to evaluate the capability of the managementsystems, to ensure conformity to statutory, regulatory and contractualrequirements, to identify potential OFI and to evaluate the effectiveness ofthe system to achieve organisational objectives.
Assessment Details
Type of Assessment Surveillance
Standard(s) used inassessment
ISO 50001:2011
Scheme specificrequirements
None
Scope of certification The manufacture of active pharmaceutical ingredients (API)
EA Code ISO 50001 - 13 NACE Code
Current Exclusions None
No. of Employees inScope
80
Assessment Team Dermot Gibbons
Distribution list forAssessment Report
Donal Brady – [email protected] Stack - [email protected]
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 3 of 11
Assessment Summary
Opening meetingThe assessment commenced with a review and confirmation of the assessment plan, the objectives,criteria, and scope of the assessment. The assessor provided an overview of Certification Europe’scomplaints and appeals procedures, acceptable use of certification documents and marks andconfirmed the basis of Certification Europe's confidentiality policy. The audit methodology andcategorisation of non-conformities was summarised, and the assessor checked relevant procedures forworking on site.
FindingsThe assessment is based upon a sample of the company’s activities, as they were observed by theassessor, and therefore the findings detailed in this report do not purport to include, nor do theyinclude, all possible non-conformances which may exist within the system, either during or at any timeprior to, or subsequent to, the assessment.The findings of the assessment are detailed in the Tables below.
Limitations to completing assessment including deviations from audit planNone, The audit guides are thankd for their hospitality and professional approach to the audit process.
Review of scopeThe scope of certification was reviewed and was deemed not appropriate for the organisation. Basedon the requirements of ISO 50003 and as a result of the output of the most recent energy review, theorganisation have decided to amend the scope of its certification.
The new scope of certification as outlined in the energy review and management system manual is:
The electricity and gas usage within the site boundaries of the Takeda Grange Castle facility.
Assessment ObjectivesThe objectives of the assessment were fulfilled.
Auditees
The following staff acted as assessment guides, attended meetings or were interviewed during theassessment:
Attendees at opening meeting:Donal BradyAileen StackMasuJi HamasumiMichael O'DonnellAuditees:Aileen StackAttendees at closing meeting:Donal BradyAileen StackMasuJi HamasumiMichael O'Donnell
Accompanying Persons
None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 4 of 11
EXECUTIVE SUMMARY
Summary of Nonconformities
Clause/Control Category NC No.
4.4.3 - ISO 50001 - Energy planning (Energy review) NC2 TT959
Assessment ConclusionOn the basis of the evidence identified above, the assessor has determined that the client’s managementsystem continues to meet the needs of the organisation and conforms to the requirements of ISO50001:2011, although non-conformities have been identified which require corrective action.Please complete the attached OPF10-1 (Corrective Action Plan) form and return [email protected] within 10 days of receipt of report.
Next Assessment Details
Next Assessment Type Surveillance
Next Assessment Date 8th May 2018
No. of Days of NextAssessment
1
Location(s) of NextAssessment
Takeda Ireland, Grange Castle, Dublin, Ireland.
Signed on behalf ofCertification Europe
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 5 of 11
BUSINESS UPDATE & REVIEW OF PREVIOUS FINDINGS
Activity Assessed: Business Update & Review of Previous Findings
The energy review has been updated considerably since 2016 to take into consideration the 24 houroperations of the facility. The current energy review is better and more appropriate to theorganisations needs in many respects to the 2016 energy review. A new nonconformity was raised withregard to the current energy review. Several of the items required in the current energy review arepresent in other parts of the management system. However, to meet the requirements of the standardthese must be documented in the energy review.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 6 of 11
SUMMARY OF CONFORMITY
Activity Assessed: General Requirements, Scope & Policy
Clause: 4.1 - ISO 50001 - General requirements, 4.2.1 - ISO 50001 - Management responsibility (Topmanagement), 4.3 - ISO 50001 - Energy policy
Narrative:
The general requirements of the management system are outlined on the energy system file section 4.1.These were reviewed by the auditor and are adequately outlined. The energy policy POL025 asdisplayed on the EDMS document control system & notice board was reviewed against therequirements of the standard without issue. The roles and responsibilities for the management systemare adequately outlined on the energy system file, where the Engineering Director has been identifiedas the management representative.
Activity Assessed: Training
Clause: 4.5.2 - ISO 50001 - Implementation and operation (Competence training and awareness)
Narrative:
The training requirements for the management system and those affecting significant energy use areidentified on the EnMS overview document for each SEU. The training needs requirements andcompetency assessment is based on training on the P1 Gas & HVAC SOP (SOP - Eng - Util - 032 r4)were reviewed for Utilities technician, BMS Controller, and the Maintenance Engineer. The trainingneeds requirements can be seen on the Training Report.
Activity Assessed: Management Review
Clause: 4.7 - ISO 50001 - Management review
Narrative:
The management review process as outlined in the energy systems file and the presentation andminutes dated March 2017 were reviewed where the organisation has shown a 3% improvement inenergy performance in 2016.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 7 of 11
Activity Assessed: Design & Procurement
Clause: 4.5.6 - ISO 50001 - Implementation and operation (Design), 4.5.7 - ISO 50001 - Implementationand operation (Procurement of energy services products equipment and energy )
Narrative:
The Purchasing process of for assessing energy usage over the planed expected lifetime is outlined inthe Energy Management System manual section 4.6.5. The design process for the Ninlaro new productintroduction for the P2 production building was discussed with the audit guides as outlined in theProject scope template document and project files. There is also an energy efficient design projectexecution plan PR-422 in place for the project. The procurement requirements for the project areoutlined via the manual document section 4.5.7 and the EDMS project scope document.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 8 of 11
INSTANCES OF NONCONFORMITY REQUIRING ACTION
Code Index: NC1 = Major nonconformity; NC2 = Minor nonconformity
NC No.: TT959
Activity Assessed: Energy Review
Clause: 4.4.3 - ISO 50001 - Energy planning (Energy review)
Date of Nonconformity: 23-07-2017
Proposed Corrective Actions to be Submitted by: 23-07-2017
Findings:
The current energy review document does not outline following required outputs from the energyplanning process.
Evidence:
The items missing from the current energy planning process include:
The predicted energy usage for the upcoming period (retained in the monitoring andmeasurement spread sheets).The energy baselineThe Energy performance indicators in place.The SEU listing as outlined in the energy review is different than those outlined on the EnPIspread sheet. The spread sheet requires updating.The SEU spreadsheet needs to be updated to include the HDD variables into the HVAC & GasEnPI’sThe HTF relevant variable is not currently stated. (The HTF relevant variable was included in lastyear’s energy review).
Category: NC2
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 9 of 11
SUMMARY
Conclusion
On the basis of the evidence identified above, the assessor has determined that the client’s
management system continues to meet the needs of the organisation and conforms to the
requirements of ISO 50001:2011, although non-conformities have been identified which require
corrective action.
Please complete the attached OPF10-1 (Corrective Action Plan) form and return to
[email protected] within 10 days of receipt of report.
Confidentiality
Certification Europe maintains strict confidentiality with regard to client technical and commercial
information and all details relating to the assessment and certification process, including all Assessment
Reports. Please ask for our confidentiality policy statement should you require further details.
Signed on behalf of Certification Europe
Dermot Gibbons
Lead Assessor
Date: 4th July 2017
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 10 of 11
ASSESSMENT PLAN
Assessment Plan (V1.0)
Type of Assessment Surveillance
Standards (Criteria) ISO 50001:2011
Objective
To confirm the extent of conformity of the system to the Management
Systems ISO 50001:2011, to evaluate the capability of the management
systems, to ensure conformity to statutory, regulatory and contractual
requirements, to identify potential OFI and to evaluate the effectiveness of
the system to achieve organisational objectives.
Location(s) Takeda Ireland, Grange Castle, Dublin, Ireland.
Date of Assessment 8th May 2018
Number of Days of
Next Assessment1
Assessor Dermot Gibbons
Technical Expert n/a
Clause Activity Time Auditee
Opening Meeting 9:30
Business Update, review of findings from theprevious audit.
10:00
General Requirements, Scope & Policy 10:30
Energy Review / Monitoring & Measurement
11:00
Lunch 13:00 - 13:45
Internal Audit, Corrective & Preventive Action. 13:45
Procurement & Design 14:45
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Takeda Ireland Ltd Grange Castle - Surveillance - ISO 50001:2011
Page 11 of 11
Clause Activity Time Auditee
Management Review 15:30
Closing Meeting 16:45 Management Team
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Optien Ltd Internal Audit Report 16/10/2017
Internal Audit Scope P1 HVAC system Audit Attendees:
Aileen Stack
Richard Morrison
Completion Date:
11/10/2017
ISO:50001 Clause Area of focus Audit Trail Comments Action
4.4.2 Legal and other
requirements
Are there any legal or other
requirements identified for
this significant energy user?
Legal register
and evaluation
of compliance
SI 346 of 2006 was not located in the
legal register which deals with Air
conditioning regulations the site have
good HVAC maintenance practices due
to the GMP nature of the HVAC
systems but the legislation should be
included in the legal register.
Include SI:346 in the Pegasis legal register
and complete an evaluation of compliance to
the statutory instrument
4.4.3 Energy Review
Is there a comprehensive
understanding of the energy
usage and energy drivers of
this significant energy user
Energy Technical
file and Energy
Systems file
Breakdown of SEU's completed and
follows the process for the
identification of SEU's. The HVAC
electricity is 19% and is deemed a
significant energy user and includes
actual and annualised energy
performance chart for analysis None
4.4.3 Energy Review
Opportunities for
improvement
Energy
Opportunities
list, Energy
technical file
There is an opportunity for heat
recovery included in the register but
this has not been deemed cost
effective. The site could consider
setback of the HVAC during plant
turnaround
Consider including the setback of HVAC
equipment in the P1 building during periods
of turnaround
4.4.5 Energy
Performance Indicators
Are the EnPI's related to the
energy drivers?
Energy Technical
file
HVAC EnPI included Actual and
Annualised energy consumption, EII
and CUSUM. There has been a greater
than expected energy consumption for
July and August 2017 where the metric
showed 10% and 15% greater than
expected usage. This is to be discussed
following the last energy team meeting
Raise a Non conformance for the HVAC
energy consumption for July and August in
order to understand the driver behind the
increased energy consumption of HVAC
4.4.6 Energy
Management System
Action Plans
Is there an improvement
project in place for this SEU?
Energy System
File None None
4.5.5 Operational
control
Is there a process in place to
control this SEU
Daily rounds and
readings
Daily rounds and readings take place
for the HVAC. Brendan Timmons was
interviewed to discuss HVAC
operational controls. There are 115
HVAC work orders throughout the site
including condition monitoring. On
AHU-03, it appears that there is a
probe error on TT-03-01 which is a
similar issue identified last year.
Raise a Non Conformance for HVAC to
determine the root cause of the repeat
failure of the valve CVM-03-01 which had
been identified in 2016 as an issue and
resolved through the non conformance
system previously
4.5.5 Operational
control
Are there operating
parameters outlined in the
SOP?
TM-09-011
HVAC training
module
There is a comprehensive training slide
deck in place to train personnel on
HVAC and includes operating
parameters. There is also an SOP ENG-
UTIL-032 Operation and Maintenance
of HVAC Systems None
4.5.2 Competence
training and awareness
Are the personnel identified in
the energy aspects review
trained in this SOP
Training material
and training
records
The training matrix was reviewed and
the training record for TM-09-011 was
reviewed for Patrick Murray. He was
trained on the 8th January 2016. It was
noted that there is no training records
for the training manuals as they are
not covered by the training
management system (EDMS)
Consider updating the ISO50001 training
matrix to have the training manuals as
support materials for site staff (for reference
only) as there are no training manuals
maintained for these manuals. This will
resolve the current issue of not having
training records for these manuals.
4.5.7 Procurement
Is there a focus on energy in
the service contract N/A None None
4.6.1 Monitoring,
measurement and
analysis
Are the energy drivers used as
part of the performance
indicators to identify energy
performance slippage
Monthly Energy
Report
Yes the EnPI report incorporates
operating hours as a driver as
identified in the energy review None
4.6.1 Monitoring,
measurement and
analysis
Is there an opportunity to
improve measurement of the
significant energy user? N/A None None
4.6.1 Monitoring,
measurement and
analysis
Has there been any
excursions in performance of
the SEU?
Energy Technical
file
Yes for July and August 2017 and the
reason for this is currently not known.
As identified earlier, Need to raise non
conformance for HVAC as July and August
energy performance was greater than
expected and need to investigate why.
1
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28
Optien Ltd Internal Audit Report 16/10/2017
ISO:50001 Clause Area of focus Audit Trail Comments Action
4.6.1 Monitoring,
measurement and
analysis
Has there been an assessment
of the effectiveness of the
action plans in achieving the
objectives and targets?
Management
Review None None
4.6.3 Internal Audits
Are there any open items
from the previous internal
audit
Previous Internal
Audit Report
All items from the previous HVAC audit
were reviewed and the actions were
all addressed. An SEAI audit of
operational control of HVAC is
currently ongoing and could be
included in the audit schedule None
4.6.4 Nonconformities,
correction, corrective
action and preventive
action
Are there any open non
conformities
Non-
conformities log
Previous non conformance had been
addressed and closed out None
4.6.5 Control of
Records
Are the records associated
with energy management
easily retrievable
Observation
throughout the
audit
The documents and records are easily
retrievable and hard copies are also
available in the EnMS folder None
Other Comments: The management system is managing the HVAC system quiet well. There are three opportunities to improve as follows:
1. The legal register needs to be updated to include SI346 of 2006 and complete an evaluation of compliance to the statutory
instrument.
2. Raise a non-conformance for the temperature transmitter TT-03-01 on AHU 3 which was suspected of being faulty during the audit
in 2016 and again in 2017 following the closure of the issue in 2016. The non conformance should address the root cause of the
recurring probe or valve failure.
3. Raise a Non conformance for the HVAC energy consumption for July and August in order to understand the driver behind the
increased energy consumption of HVAC.
4. Consider changing the status of the training manuals as support or reference materials as these are not included currently in the
EDMS system.
2
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 08-03-2018:03:35:28