Status and Prospects of Taipower’s Offshore Wind Power Department of Renewable Energy Taiwan power Company 2016. 08.26

Transcript of Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461,...

Page 1: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Status and Prospects of

Taipower’s Offshore

Wind Power

Department of Renewable Energy

Taiwan power Company

2016. 08.26

Page 2: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

CONTENTS

1.Taipower profile

2. Offshore Wind Potential in Taiwan

3. National Target for Wind Energy

4. Current Taipower’s Offshore Wind Power Development

5. Future Planning

6.Challenges

7. Summary

2

Page 3: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

3

Date of Establishment:May 1 ,1946

Total Assets:NT$ 1,935.5 billion

Capital Stock:NT$ 330 billion

Stocks:Government 94% , Others

6%

Number of Employees:26,659

Customers:13.6 (million)

Installed Capacity:41.04GW

Energy Sales:205.6 TWh

Taipower headquarters

(Note:Figures calculated up to December 2015)

Page 4: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

抽蓄水力

260, 6%燃油

333, 8%

燃煤

760, 19%

燃氣

1,064, 26%

核能

514 13%

再生能源

211, 5%再生能源

191, 5%

民營燃煤

310, 8%

民營燃氣

461, 11%

購電

962, 23%

Total:41.04 GW(Including IPP, Excluding Cogen)

Taiwan Power 2015 System- Installed Capacity

4

Gas Nuclear

Coal

Oil PS Hydro

Renewable

Purchased

Gas

Coal

Renewable

Data time:12/31,2015

Page 5: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

抽蓄水力

30 ,1%燃油

103, 5%

燃煤

571 ,26%

燃氣

591 ,27%

核能

351 ,16%

再生能源

45, 2%再生能源

48, 2%

汽電共生

62, 3%民營燃煤

212, 10%

民營燃氣

178 ,8%

購電

500, 23 %

Total:21.91TWh (Including IPP, Excluding Cogen)

5

Data time:12/31,2015

Taiwan Power 2015 System- Power Generation

Gas

Gas Coal

Coal

Nuclear

Purchased

Oil

Renewable Renewable

Cogen

PS Hydro

Page 6: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

6

Shallow Water (5-20 m) • Area: 1,779.2 km2

• Potential: 9 GW

• Feasible: 1.2 GW

Deep Water (20-50 m)

• Area: 6,547 km2

• Potential: 48 GW

• Feasible: 5 GW

Deeper Water (> 50 m) • Potential: 90 GW

• Feasible: 9 GW

Ref. “Wind Resource Assessment Handbook,” ITRI, 2011

Pacific

Ocean

Contour simulated by NCAR WRF 3.0 model

CF:35 ~ 37% (3,240hrs)

Page 7: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Year 2013 2015 2020 2025

MW Turbines MW MW MW Turbines

Onshore 614 311 647 1,200 1,200 450

Offshore 0 0 0 520 3,000 600

Total 614 311 647 1,720 4,200 1,050

Thousand Wind Turbines Project

Short-term:4 demonstration offshore wind turbines by 2016.

Mid-term:onshore 1,200MW, offshore 520MW by 2020.

Long-term:onshore 1,200MW, offshore 3,000MW by 2025.

1,050

311

Capacity

Turbines

7

Page 8: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

8

Onland wind Offshore wind Solar PV Geothermal

1,200 1,000

3,000

560

20,000

50 200

Target of Renewable Energy by 2025

Unit:MW

Taipower Government

Our vision : Champion of all enterprises producing green energy in

Taiwan

Page 9: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Strategy Planning, Feasibility Study & Acquiring

Permit : Department of Renewable Energy

EIA : Department of Environmental Protection

Grid Connection : Department of System

Planning

Tender and Project Management : Department of

Construction

Construction Supervision : Marine Wind Power

Construction Office

Operation & Maintenance : Offshore Wind

Power Station

R & D : Taiwan Power Research Institute

9

Page 10: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

10

Potential Sites of Offshore Wind Power

Short-term Plan (By 2020)

Phase Ⅰ Changhua (110MW)

Mid-term Plan (2020~2025)

Phase Ⅱ--- Changhua No.26 Lot

(812MW)

Long-term Plan (2026~2030)

Penghu (150MW)

Phase Ⅲ---

--- Changhua No.27 Lot (588MW)

--- Changhua Extended Lot (154MW)

Changhua

Penghu

Changhua

Page 11: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

11

Offshore Wind Farm Phase 1 Project

Awarded the Offshore Demonstration Incentive

Program in Jan. 2013.

Met mast constructed in Dec. 2015.

•Water depth : 15m

•Height : 97m

Two demonstration turbines built by 2020.

•Capacity : at least 5MW each

Demonstration wind farm commissioned by 2020.

Page 12: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

12

Offshore Wind Farm Phase 1 Project

• Capacity: 108MW~110 MW (22-30 turbines)

• Unit Capacity: 3.6MW~6.0MW

• Water Depth: 15-26 m

• Yield Per Year: 340GWh

• Investment: NT$19.5 billion (US$650 million)

• Completion:June 2020

Page 13: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Prevailing

wind

direction

800m

550m

Unit capacity No. of units Transverse

spacing(m)

Longitudinal

spacing(m)

3.6 MW 30 500 800

5 MW 22 550 900

6 MW 18 500 1,100

Optimal spacing of wind turbines

Considering the trade-off between the cost

of foundations, submarine cables, fishery

compensation and the benefit of power

generation, figure shown for 5MW case.

Layout of the offshore wind-farm

13

Page 14: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Milestone Month/year

Project approval Mar./ 2015

EIA approval Jun./ 2015

General consultant

tender award Jan./ 2016

Construction tender

award Jun./ 2017

Completion Jun./ 2020

14

Schedule of Offshore Wind Power Phase 1 Project

Page 15: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

• Statistics of wind data

15

Station Average

speed (m/s)

Main wind direction

Max. speed (m/s)

漢寶 (50m)

7.44 NNE 39.7

彰工 EAST

8.28 NNE 39.3

彰工 WEST

8.44 NNE 39.6

漢寶(50m)

彰工EAST(70m)

彰工WEST(70m)

Extreme wind speed

50-year-return period at 90m high

Speed type

(m/s) 彰工station Proposed site

3 sec. 64.5 72.8

10 min. average 53.9 60.9

15Storm Threshold

卡玫基颱風

薔蜜颱風

鳳凰颱風

如麗颱風

辛樂克颱風

Wind data statistics of planning site

Page 16: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Unit capacity : 3.6MW~6MW.

Considering the severe environment with typhoons

and earthquakes in Taiwan strait, design level

compliance with IEC Class I .

Wind turbines Recommended: Siemens SWT-4.0-120 (4.0 MW)

Areva M5000-135 (5.0 MW)

REpower 6M+ (6.1 MW)

General Electric G128-5.0 (4.1 MW)

Gamesa G128-5.0 (5.0 MW)

Alstom Haliade (6.0 MW)

Siemens SWT-6.0-154 (6.0 MW)

16

Consideration of offshore wind turbine

Page 17: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Three kinds of foundation include tripod, group-piles

and jacket foundation are chosen. The final type will

be decided by the general consultant.

17

jacket tripod group-piles

Consideration of foundation

Page 18: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

台電公司

風機公司

岸上辦公室

SCADA

大型零件維修

定期、不定期維護

即時監測

風場安全

燈標雷達、海岸巡防

操作支援

18

Located near by Changhua Fishing Port

Operation and Maintenance

Page 19: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

19

Location Capacity Area Budget (billion)

Phase 2 Project

Zone 26 812MW 119km2 NT$150.3 (US$4.7)

Penghu Project

Penghu Offshore

140MW 30km2 NT$23.7 (US$0.7)

Phase 3 Project

Zone 27 588MW 93km2 NT$144.8 (US$4.5) Additional

Southern 154MW 30km2

Total 1694MW 272km2 NT$318.5 (US$9.9)

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

2023 2024 2025 2026 2027

2024 2025 2026 2027 2028 2029 2030

Phase 2 Project

Penghu Project

Phase 3 Project

Page 20: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Penghu Offshore Wind Farm Project

40M 22M

15M

The nearest distant from onshore is 5.7kM.

Zone26

Zone27

15.3km

9.3km

Demo. Offshore Project

Offshore Substation

Additional Southern Offshore Wind Farm Project

Offshore Substation

20

Page 21: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Local installation vessels are lack.

Local supply chain capability isn’t enough.

There is no certificated port or wharf for offshore

wind farm construction.

Local marine technicians are lack.

The negotiation between developer and fishermen

group is not proceeding smoothly.

21

Page 22: Taipower’s Offshore€¦ · 211, 5% 再生能源 191, 5% 民營燃煤 310, 8% 民營燃氣 461, 11% 購電 962, 23% Total:41.04 GW (Including IPP, Excluding Cogen) Taiwan Power

Taiwan strait has the best offshore wind

resources in the world (CF ≈ 37%), and the most

hard environment together.

Taipower plans to install 1.8GW of offshore

wind power capacity and invest around NT$330

billion (US$ 10 billion) in offshore wind projects

by 2030.

Though there are lots of challenges ahead,

Taipower is confident to cope with the technical

difficulties of OWP, while the government

should help solving the non- technical ones, i.e.

the social and environmental problems.

22