2/2/2016 1 Tack Coat Best Practices Greg Harder, PE Regional Engineer Asphalt Institute Tully, NY Purpose of Tack Coats Terminology Consequences of Poor Bond Relative Cost for Tack Coat Tack Coat Field Operations Manuals of Practice Best Practices Surface Preparation Truck Setup Research on Bond Strength Testing Tack Coat Best Practices Outline

Transcript of Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment...

Page 1: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

1

Tack Coat Best Practices

Greg Harder, PERegional EngineerAsphalt Institute

Tully, NY

• Purpose of Tack Coats

• Terminology

• Consequences of Poor Bond

• Relative Cost for Tack Coat

• Tack Coat Field Operations• Manuals of Practice

• Best Practices• Surface Preparation• Truck Setup

• Research on Bond Strength                                       Testing

Tack Coat Best Practices Outline

Page 2: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

2

• Materials

• Traditional• New Materials

• Selection

• Tack Coat Challenges• Contractor• Agency

• Spray Pavers

• Review and Summary

• Common Tack Coat Questions

• Areas of Known Agreement

Tack Coat Best Practices Outline

• To promote the bond between pavement layers.

• Prevent slippage/ shoving failures• Full bond is vital for structural performance of the pavement. 

• When bonded, all layers working together.• Critical that tack materials are applied          uniformly at appropriate application                       rate

• Apply tack coat on all surfaces                   including vertical surfaces.                         

Purpose of Tack Coats

4

Why do we use Tack Coats?

Page 3: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

3

Far too frequent practices

• Condition of Existing Pavement  

• Tack Coat Application Rate

• Residual Binder Content

• Proper Distributor Operation

• Emulsion Break and Set Times

Key Factors for Tack Coat Success

6

Page 4: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

4

Terminology

• Tack Coat—sprayed application of liquid asphalt upon an existing asphalt or Portland cement concrete pavement which may or may not have been milled before an overlay, or between layers of fresh asphalt concrete.  

• Original Emulsion (emulsified asphalt)—an undiluted emulsion which consists of a mixture of paving grade binder, water, and an emulsifying agent. 

• Diluted Emulsion—an emulsion that has been diluted with additional water.  

• Critical to control 

• 1:1 typical (original emulsion: added water)

• Residual Asphalt—the remaining asphalt after an emulsion has set typically 57‐70 percent. 

• Tack Coat Break—the moment when water separates enough from the asphalt showing a color change from brown to black.  

• Tack Coat Set (cure)—when all the water has evaporated, leaving only the residual asphalt.  Some refer to this as completely broken.

Terminology

Page 5: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

5

Emulsions are asphalt droplets suspended in water • Breaking• Contact with surface changes pH; reducing charge

• Setting• Evaporation leads to coalescence• Original asphalt characteristics return

Emulsion Breaking & Setting 

Consequences of Poor Bonding

• Poor pavement performance

• Slippage cracks

• Shoving

• Early fatigue cracking

• Bottom up

• Top down

• Costly pavement repairs

• Repair of isolated area relatively inexpensive

• Removal and replacement of a portion or the entire pavement structure is very expensive

• Shorter than expected pavement life can be devastating for agency budgets

Page 6: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

6

Days later!

Courtesy of Road Science

• Layer independence• Reduced fatigue life

• Increased rutting

• Slippage

• Shoving

• Compaction difficulty

Consequences of Poor Bonding

Direction of traffic?

Page 7: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

7

Courtesy of Rich May

Tension

Stress Distribution

Soil Subgrade

Aggregate Base

Shear Transfer?

Pavement Behavior

Compression

Load Distributed by Tire

½” Deflection,60# Load

¼” Deflection, 160# Load

Fully BondedUnbonded

Bonding Demonstration

Page 8: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

8

• 5 unbonded layers deflected 4x more than 5 bonded with the same loading.

• 2 bonded layers had less deflection than 5 unbonded with the same loading.

• 5 bonded layers with over 2½x the load deflected half as much as 5 unbonded.

Bonding Demonstration Highlights

15

• May and King:• 10% bond loss = 50% less fatigue life

• Roffe and Chaignon• No bond = 60% loss of life

• Brown and Brunton• No Bond = 75% loss of life• 30% bond loss = 70% loss of life

Loss of Fatigue Life Research

Page 9: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

9

8 – 10 years (est.) Interstate Pavement

Courtesy of MODOT

Cores Showing Debonding

Bonding Failures

Courtesy of MODOT

Page 10: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

10

Cost of Tack Coat•New or Reconstruction

• About 0.1‐0.2% of Project Total• About 1.0‐1.5% of Pavement Total Cost

•Mill and Overlay• About 1.0‐2.0% of Project Total• About 1.0‐2.5% of Pavement Total Cost

What Does It Cost?

• Assume no inflation for materials

• Estimated traffic control

• Used project plans for thicknesses

• Used bid tabs for:• Milling

• Material costs

• Replaced pavement markings

Estimated Cost of Bond Failure in Only the Top Lift

30‐100% of OriginalPavement Costs

Page 11: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

11

• Emulsified Asphalt• Most common option

• SS‐1, SS‐1H

• CSS‐1, CSS‐1H

• RS‐1, RS‐1H, RS‐2

• CRS‐1, CRS‐2

• PMAE 

• PG Graded Binders• Neat Binders

• PG 58‐28

• PG 64‐22

• PG 67‐22

• Polymer Modified 

• Reduced or Non‐tracking Emulsions

Common Tack Coat Materials

States ‐ Reduced Tracking Tack Mat’ls

CA

AZ

CO

NM

TX

OKAR

LA

MO KY

AL GA

FL

VA

OH

MI

VTAK

MT

NV

MEWA

OR

UT

KS

ID

WY

ND

SD

MN

NE

WI

IA

IL IN

MS

TN

SC

NC

WV

PA

NY

CTNJDEMD

DC

MANH

RI

HI

PR

22

Page 12: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

12

• Dilution• Verify if it is allowed.• If allowed, where?

• Supplier only?

• Contractor?

• Control amount of water added. • 1:1 typical (Original Emulsion: Added Water)

• Use acceptable/approved water.• Terminal added or field diluted.

• Always add water to emulsion.

Handling of Emulsions

23

Tack Coat Field Operations

Page 13: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

13

• Asphalt Institute• MS‐4 The Asphalt Manual, 7th Edition (2007)

• MS‐16 Asphalt Pavement Preservation and Maintenance, 4th Edition (2009)

• MS‐19 Basic Asphalt Emulsion Manual, 4th Edition (2008)

• MS‐22 Construction of Hot Mix Asphalt Pavements, 2nd

Edition 

• Comments• AI has a long history of promoting the proper use of tack coats.

Manuals of Practice

• QIP‐128,Tack Coat Best Practices, NAPA  (2013)

• Hot‐Mix Asphalt Paving, US Army Corp of Engineers (2000)

• Airfield Asphalt Pavement Construction Best Practice Manual, NCAT (2008)

• Tack Coat Guidelines, Caltrans (2009)

• Tack Coats: How and what to apply! Colorado Asphalt Pavement Association (CAPA) (2011)

• Guide for Using Prime and Tack Coats, CFLHD (2005)

• Best Practices for Applying Undiluted Emulsified Asphalt Tack Coats, CAPA (2013)

Manuals of Practice

Page 14: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

14

Tack Coat Application

• Contractor• Variable application rates• Consistency of application• Tack coat pick‐up or tracking by construction vehicles

• Breaking/setting time prior to paving

• Agency• Acceptance (method or performance)• Bond quality testing• Dilution?• Visual inspection• Application rate measurement

Tack Coat Challenges

Page 15: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

15

• Surfaces need to be clean and dry.• Uniform application.

• All surfaces are tacked.• Tack should not be tracked off the road.

Best Practices

• Match application to conditions.

• Materials

• Residual rate

• Verify application rate.

• Resist tacking too far ahead of paver.

Best Practices

Page 16: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

16

Distributor Truck Setup

• Liquid temperature

• Monitor and match to material

• Calibrate distributor truck• Spray bar height• Spray bar pressure • Nozzle selection• Nozzle angle • Thermometers

• Volumeter

• Application rate

Distributor Truck Setup

Page 17: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

17

• There are three primary methods of determining field application rates.

• Determination by volume.• Determination by weight or mass.• Determination by direct measurement, ASTM D2995

Calculating field application rates

• Field Measurement of Application Rate• Longitudinally

• Transversely

• Units of Gallons/Yard2 (Liters/Meter2)

Direct Measurement using ASTM D2995

Photos courtesy of Dr. Louay Mohamad

Page 18: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

18

• Method A—Weighing Pads• Pre‐weigh pads• Secure pads to surface• Apply tack coat• Reweigh pads• Calculate application rate

Direct Measurement using ASTM D2995

Page 19: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

19

• Method B—Volume‐Based Calculations

• Spray tack coat into containers for a set time period

• Determine volume collected for each nozzle

• Calculate transverse uniformity

• Calculate longitudinal rate incorporating truck’s velocity

Direct Measurement using ASTM D2995

Photo courtesy of TxDOT, Maintenance Division

Nozzle Selection

Page 20: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

20

• Consult with distributor truck manufacturer to match the material to the nozzle.

• ONE SIZE DOES NOT FIT ALL

39

Nozzle Selection

Effect of Nozzle Orientation

Proper nozzle angle of 15‐30% assures proper overlap between nozzles without interference of tack streams.

Page 21: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

21

Spray Bar/Nozzles

Nozzles are clogged, buttriple overlap covering the gap.

Note: not a tack coat, but principle applies.

Page 22: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

22

• Check truck setup.• Spray bar height (~12”)

• Appropriate nozzles

• Nozzle orientation (15‐30°)

• Check application rate gauge in truck

• Check application temperature

• Collect samples.

• Know the desired application and residual rates.

• Visually inspect application

• Verify application. • Volume 

• Mass

• ASTM D2995

Key Items for Inspectors

43

44

Page 23: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

23

• Materials

• Emulsion

• Paving grade asphalt

• Field/Laboratory Bond Testing• Shear Testing• Torsion Testing• Pull‐Off Testing                                                   (tension)nsion)

• Cyclic

Testing Methods

• Shear Testing• Lab test• Quick • Repeatable• Most widely promoted• Uses common lab equipment

• Cleanly ranks materials

• Torsional Testing• Lab or field test• Quick• Poorer repeatability (manually ran)

• Tension Testing• Lab or field test• Quick• Repeatable• Cleanly ranks materials• Used in Texas and Kansas

• Cyclic Testing• Lab test• More time consuming• Repeatable• Cleanly ranks materialsrials

Comments on Testing Options

Page 24: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

24

• What Type of Bond Testing?

• Shear• Torsion• Pull off • Cyclic 

• All have advantages and disadvantages

• Further research and acceptance will likely lead to a generally preferred method.

Common Tack Coat Questions

Review and Summary

Page 25: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

25

• Experts commonly disagree

• “Do I still need to tack…”• Milled Surface

• “Fresh” Pavement

• Late season/cooler days

• Asphalt Institute recommends tacking all surfaces

Common Tack Coat Questions

• “When can I pave on the emulsion?”

• Has emulsion broken?

• Does it need to be set?

• Asphalt Institute recommends paving begin after the emulsion has broken.

• “How can I prevent tack pull‐up/tracking?”• Make sure tack coat is broken

• Use emulsions with hard base asphalt (CSS‐1h)

• Use a proprietary reduced‐tracking emulsion

• Use a spray paver

Common Tack Coat Questions

Page 26: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

26

Pictures courtesy of Road ScienceTM

Tracking and Pickup

51

Spray Pavers

• Spray pavers are an engineered system that consists of a paver with built‐in emulsion application systems that applies tack just prior to asphalt laydown.

• Emulsions used in spray pavers are designed to perform without break/set.

• No tack coat tracking or pull‐up

Page 27: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

27

53

Roadtec SP 200 Spray Paver

Courtesy of Roadtec

Page 28: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

28

Vögele: Spray Jet

Courtesy of Road Science

• No tracking of the tack• Better bonding of overlays 

• Increased Overlay life• Reduce Rutting• Reduce Cracking

• Improved bond = easier compaction

Purported Spray Paver Benefits 

Page 29: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

29

• What is the optimal aplication rate?• Surface type• Surface condition

• Asphalt Institute recommended ranges

Common Tack Coat Questions

Surface Type Residual Application Rate (gsy)

New Asphalt 0.020 – 0.045

Existing Asphalt 0.040 ‐ 0.070

Milled Surface 0.040 – 0.080

Portland Cement Concrete 0.030 – 0.050

• When to Re‐Tack?

• Tracking • Contamination

Re‐Tack when in doubt.

• Is Dilution okay?• Follow state specs• Verify dilution amount

• Can not be used to “stretch” tack as residual 

value is key.

Limit dilution to supplier.

Common Tack Coat Questions

Page 30: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

30

• Layer Bonding is Vital• Surface Preparation 

• Clean • Dry

• Milling Improves Field Performance• Shear• Cleaning

Areas of Known Agreement

• Application Quality Vital• Proper Rate• Consistency

• Distributor Truck • Setup• Calibration/Verification• Maintenance

• Tacking of Longitudinal Joints• Bonding• Confinement 

Areas of Known Agreement

Page 31: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

31

• Tack Coat Rate Depends on Surface Condition• Fresh • Weathered

• Raveled • Milled

• Treat Tack as Separate Pay Item vs. Incidental Item

• Need for Research • Field Performance

• Field Testing• Bond strength• Application amount

Areas of Known Agreement

Successful Tack Coat

The Ultimate Goal:

Uniform tack coat coverage

Page 32: Tack CoatBest Practices - pa-asphalt.org Harder -TackCoat-GAH.pdf•Tack Coat Break —the moment when water separates enough from the asphalt showing a color change from brown to

2/2/2016

32

Questions?

Free 4‐hour workshop requested through 

FHWA divisional offices

Free webinar: http://www.asphaltinstitute.org/public/asphalt_academy/webinars/tack‐coat‐best‐practices‐webinar‐recording.dot