TABLE OF CONTENTS - Gujaratgswma.gujarat.gov.in/pfile/DPR/2009-10/Junagadh/Jun_IWMP_6.pdfDetailed...
Transcript of TABLE OF CONTENTS - Gujaratgswma.gujarat.gov.in/pfile/DPR/2009-10/Junagadh/Jun_IWMP_6.pdfDetailed...
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 1
TABLE OF CONTENTS
Chapter -1 Project Background ....................................................................................................................................................................................................................................11
1.1Project Background ................................................................................................................................................................................................................................................................12
Table no.1 : Basic project information .................................................................................................................................................................................................................................12
1.2 Need of Watershed Development Programme .......................................................................................................................................................................................................13
Table no. 2: Weight age of the project ...................................................................................................................................................................................................................................13
Table no. 2.1 Criteria and weight age for selection of watershed ...........................................................................................................................................................................14-15
Table no.3: Watershed information .......................................................................................................................................................................................................................................16
1.3 Other developmental projects/schemes running in the all village .............................................................................................................................................................16
Table no.4: Developmental programmes running in the project area.................................................................................................... ...........................16
Table no. 5: Previous Watershed programmes in the project area ..........................................................................................................................................................................17
Chapter - 2 Project Implementing Agency................................................................................................................................ ....18
Table no. 6: PIA: ............................................................................................................................................................................................................................................................................19
Table no. 7: Staff at PIA level: ..................................................................................................................................................................................................................................................19
2.1. Project Implementing Agency ...........................................................................................................................................................................................................................................20
2.2 About District Watershed Development Unit (DWDU), Junagadh..................................................................................................................................................................20
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 2
2.2.1 The organization and its objectives:...........................................................................................................................................................................................................................20-21
2.2.2 Programmes/project running in the district ................................................................................................................................................................................................................22
2.3 SWOT Analysis of the DWDU:...................................................................................................................................................................................................23
Chapter - 3 Basic Information of the Project Area.......................................................................... ...........................................24
3.1. Geography and Geo-hydrology.....................................................................................................................................................................................................................................25
3.1.1 Land use pattern: .................................................................................................................................................................................................................................................................27
Table no. 8: Land use pattern:................................................................................................................................................................................................................................ .............27
3.1.2 Soil and topography: ......................................................................................................................................................................................................................................... ....... .......28
Table no. 9: Soil type and topography:.................................................................................................................................................................................... ........................................28
Table no. 10: Flood and drought condition:..................................................................................................................................................................................................................29
Table no. 11: Soil Erosion...................................................................................................................................................................................................................................................... 29
Table no. 11.1: Soil Salinity/Alkalinity (Salinity ingress).........................................................................................................................................................................................................................................................................................................................29
Table no. 12: Last six years annual rainfall, maximum & minimum temperature of Junagadh .......................................................... ..................................30
3. 2 Slope............................................................................................................................................................................................................................... ......................................30
Table no. 13: Physiographic and relief ............................................................................................................................................................................................................... ............ 30
3.2.1 Land and Agriculture: ............................................................................................................................................................................................................................... .....................31
Table no. 14: Land ownership details......................................................................................................................................................................................................... ....................31
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 3
Table no. 15: Agriculture.....................................................................................................................................................................................................................................................31
Table no. 16: Crop details: ...........................................................................................................................................................................................................................................................................................................................................................................................................32.
3. 2. 2 Irrigation...................................................................................................................................................................................................................................................... 32
Table no. 17: Irrigation .......................................................................................................................................................................................................................................................33
Table no. 18: Livestock............................................................................................................................. ..........................................................................33
3. 2. 3 Drinking Water...............................................................................................................................................................................................................................................33
Table no. 19 : Drinking water...........................................................................................................................................................................................................................................34
Table no. 20: Details of Common Property Resources..........................................................................................................................................................................................34
3.3 Socio-Economic Profile...........................................................................................................................................................................................................................................35
Table no. 21: Demographic information .....................................................................................................................................................................................................................35
Table no. 22: Literacy rate ..................................................................................................................................................................................................................................................35
3.3.1 Migration Pattern:.......................................................................................................................................................................................................................................................35
Table no. 23: Migration details ........................................................................................................................................................................................................................................ 36
Table no. 24: Poverty ........................................................................................................................................................................................................................................................... 36
3.3.2 Infrastructure facilities:............................................................................................................................................................................................................................................36
Table no. 25: Village infrastructure ................................................................................................................................................................................................................................ 37
Table no. 26: Facilities / HH assets................................................................................................................................................................................................................................. 37
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 4
3. 4. Livelihood pattern:........................................................................................................................................................................................................................................................ 38
Table no. 27: Yearly Income ................................................................................................................................................................................................................................................ 38
Table no.28: Dependence on Forest/CPR .......................................................................................................................................................................................................................38
Table no. 29: Livelihood pattern (Occupational distribution)..............................................................................................................................................................................39
Chapter - 4 Watershed Activities ..............................................................................................................................................................................40
4.1 Watershed act ivies ...............................................................................................................................................................................................41
4.1.1 Scientific Planning:.........................................................................................................................................................................................................................41-47
Table no. 30: Details of Scientific Planning and Inputs in IWMP-6 projects .................................................................................................................................................... 48 - 49
4.2. Institution Building .................................................................................................................................. .......................................................................................................................49
4. 2. 1 Watershed Committee Details......................................................................................................................................................................................................................49
Table no.31.1 - Watershed Committee Details (Patapur)...........................................................................................................................................................................50
Table no. -31.2 -Watershed Committee Details (Khadiya)............................................................................................................................................................................51
Table no. -31.3 - Watershed Committee Details (Dungarpur)....................................................................................................................................................................52
Table no. -31.4 -Watershed Committee Details (Ivnagar)...........................................................................................................................................................................53
Table no. -31.5 - Watershed Committee Details (Palaswa) ...54
Table no. -31.6 - Watershed Committee Details (Vijapur)...55
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 5
4.2.2 Self Help Group .................................................................................................................................................................................................................................................................56
Table no. 32: SHG details..................................................................................................................................................................................................................................................56
4.2.3 User Group:.................................................................................................................. .............................................................................................57
Table no.33 : Name of UG & Major Tasks..............................................................................................................................................................................................................57
Table no. 33.1 : UG details.................................................................................................................................................................................................................................................58
4.3. Physical activities to be undertaken under IWMP-6 Junagadh............................................................................................................................................................58
4.3.1 Entry Point activity (EPA) ....................................................................................................................................................................................................................................58
Table no.34: Entry point activities (EPA) (All financial figures in lakh Rs.)..........................................................................................................................59-61
4.3.2.Watershed Development Works: .......................................................................................................................................................................................................................61
Drainage Line Treatment Plan: .................................................................................................................................................................................................................................. 61
Technical Specification of Check Dam.....................................................................................................................................................................................................................62-70
Technical Details of Percolation Well ............................................................................................................................... ..................................................................................70-71
Table no. 35: Details of activities of preparatory phase (all financial figures in lakh) .........................................................................................................72
Table no.36: Activities related to Surface Water Resources in the Project Areas (all financial figures in lakh)......................................................................73-76
Table no. 37: Activities Related to Recharging Ground Water Resources in Project Areas (all financial figures in lakh)...........................................................................................77
Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the Project Areas ...................................................................................................78-80
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 6
Table no. 38.1: Details of allied / other. Activities in Project Areas...................................................................................................................................................................81-91
Table no.39: Details of engineering structures in watershed works........................................................................................................................................................92-99
Table No. 40: Technical Details /Estimates of Farm Bund.......................................................................................................................................99
Drainage Line Treatment and Water Harvesting: 100
Table No. 40.1: Technical details of Percolation Tank............................................................................................................................. ...................100
Table no.41: Details of activities connected with vegetative cover in watershed works........................................................................................101-106
Table No. 41.6: Details of activities connected with vegetative cover in watershed works-proposed target ...........................................................107
Table No. 42: Technical Details of Afforestation Activities.......................................................................................................................................108
Table No. 42.1: Cost Estimation for afforestation activity.................................................................... .....................................................................108
Micro Enterprise Activities for IWMP-6 Junagadh Watershed Project .
Microenterprise: - 1Paper Dish Bowl Making Unit...................................................................................................................................................................................109-110
Microenterprise :- 2Vermi Composting Unit …………...............................................................................................................................................................................111-112
Microenterprise :- 3 BeckaryUnit ………….................................................................................................................... ....................................................................................113
Production System for IWMP-6 Junagadh Watershed Project
Production System-:1 Papad Making Unit ............................................................................................................ ..........................................................................................114-117
Production System-:2 Detergent Powder Unit................................................................................................................. ..................................................................................118
Production System-:3 Incense Sticks Unit............................................................................................................................. ....................................................................................119
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 7
Production System-:4 Masala Unit............................................................................................................................. ..........................................................................................120
Table No. 43: Details of activities in the CPRs in the project areas ..................................................................................................................122-124
Agriculture Improvement Programme.................................................................................................................................................................125
Training and Exposure visits...........................................................................................................................................................................123
Livelihood Intervention...................................................................................................................................................................................123
Advantages of Agro-Based Activities...........................................................................................................................................................124
Support Needed for Promotion of Micro-Enterprises....................................................................................................................................125
Floriculture......................................................................................................................................................................................................126
4.4. Capacity Building and Institutional collaboration.............................................................................................. .....................................................126
Table no. 44: Institutes Identified for Capacity Building .............................................................................................................................................................................128
Table no. 45: Capacity Building plan for IWMP-6. (Village wise)............................................................................................................................. ..................................129-131
Table no.46: Information, Education and Communication Activities: .................................................................................................................................................132
Chapter - 5 Budgeting.....................................................................................................................................................133
Table no. 47: Budget at a glance............................................................................................................................................................................................................................ 134
Table no. 48: Village component wise budget available under IWMP ..................................................................................................................................................135
Table no. 49: Village wise gap in funds requirement.....................................................................................................................................................................................135
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 8
Table no.50: Details of Convergence of IWMP with other Schemes.................................................................................................................................. .................136-137
Chapter - 6 Expected Outcome.............................................................................................................. ..................................138
6.1 Expected Outcomes ..........................................................................................................................................................................................................................................................139
6.1.1 Employment ..................................................................................................................................................................................................................................................................139
Table no. 51: Employment in Project area ....................................................................................................................................................................................................................139
6.1.2.Migration.............................................................................................................................................................................................................................................................................140
Table no. 52: Details of seasonal migration from project area...........................................................................................................................................................................141
Table no. 53: Details of average ground water table depth in the project areas: (in mtr) ................................................................................................................142
6.1.3 Drinking water ... ..................................................................................................................................................................................................142
Table no. 54: status of drinking water ........................................................................................................................................... ......................143
6.1.4 Crops............................................................................................... ...........................................................................................................143
Table no. 55: Details of crop area and yield in the project area...........................................................................................................................................................................144
6.1.5 Horticulture .....................................................................................................................................................................................................................................................................144
Table no. 56 : Area under horticulture............................................................................................................................................................................................................................114
6.1.6 Vegetative cover ............................................................................................................................................................................................................................................................144
Table no. 57: Forest/vegetative cover.............................................................................................................................................................................................................................145
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 9
6.1.7 Livestock............................................................................................................................................................................................................................................................................145
Table no. 58: Details of livestock in the project areas (for fluids please mention in liters, for solids please mention in kgs. and income in Rs.). …............145
6.1.8 Linkages ...........................................................................................................................................................................................................146
Table no. 59: Backward-Forward linkage...........................................................................................................................................................................................,...........................146
6.2 Logical Framework Analysis......................................................................................................................................................................................................................................147-151
Chapter- 7 Quality and Sustainability Issue..........................................................................................................................152
7.1 Plans for Monitoring and Evaluation............................................................................................................. ......................................153
7.1.1 Vigilance and Monitoring Committees.............................................................................................................................................................154
7.1.2 Research support in watershed management....................................................................................................................................................154
7.1.3 Farmer organization and empowerment...........................................................................................................................................................154
7.1.4 Use of traditional institutions and indigenous knowledge...............................................................................................................................155
7.2 Plans for Project management: ............................................................................................ ...................................................................................................156
7.3 Watershed Development Fund: ...........................................................................................................................................................................................................156
Table no. 60 Details of Watershed Development Fund (WDF)............................................................................................................................................156
7.4 User Charges:.........................................................................................................................................................................................................................................157
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 10
CHAPTER - 1
PROJECT BACKGROUND
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 11
1.1 Project Background
The project IWMP-6 is being implemented in Junagadh taluka of Junagadh district with six villages forming the cluster. The villages are Khadiya,
Dungarpur, Patapur, Ivnagar, Palaswa and Vijapur. The cumulative area proposed to be treated under the project is 4916.10 hectares. Khadiya is the largest
village in the cluster with a proposed area of 1774.50 hectares followed by Palaswa (1055.70), Vijapur (641.60), Ivnagar (504.30), Dungarpur (499.00) and
Patapur (441.00).
The nearest town is Junagadh which is about 10 kms from the nearest village in the project cluster. All the villages are connected by pucca road with
the highway. The major communities residing in the cluster are Ahirs, Patels & Kadiyas. The people mainly depend on agriculture as their main source of
livelihood with 80% of the people engaged in it. Groundnut is the major crop. The current generation of youngsters in the villages generally migrates to
nearby cities like Rajkot, Morbi, Jamnagar and Porbandar for working in the bandhni industries, tile factories, cement factories, and diamond polishing
centers. The land is generally plain and forest area is virtually non-existent in the cluster – IWMP -6.
Water is available for 10-11 months during the year. In our project cluster, drinking water is well available in five villages by virtue of supply from
bore well and well.
Table no. 1: Basic project information
S.R.
No.
Name of
the
project
Villages Gram
Panchayats
Taluka District Area of
the
project
Area
proposed to
be treated
Total
project cost
(Rs. in lakh)
PIA
Name C2K code
1
IWMP-6
Khadiya 120030081830000 Khadiya Junagadh
Junagadh 1774.50 1774.50 212.94 DCF
Junagadh 2 Vijapur 120030081780000 Vijapur 641.60 641.60 76.99
3 Dungarpur 120030081770000 Dungarpur 499.00 499.00 59.88
4 Patapur 120030081810000 Patapur 441.00 441.00 52.92
5 Ivnagar 120030081650000 Ivnagar 504.30 504.30 60.52
6 Palasva 120030081660000 Palasva 1055.70 1055.70 126.68
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 12
1.2 Need of Watershed Development Programme
Watershed Development Programme is selected on the basis of thirteen parameter namely Poverty Index, Percentage of SC/ST, Actual wages,
Percentage of small and marginal farmers, Ground water status, Moisture Index, Area under rain fed agriculture, Drinking water situation in the area,
Percentage of degraded land, Productivity potential of land, Continuity of another watershed that has already developed/treated, Cluster Approach for hilly
terrain. Based on these thirteen parameters a composite ranking has been given to the watershed project as given in Table 2.1.
The total number of families under BPL is 1251, which is more than 30 per cent but less than 40 per cent of total households of the village.
Hence a score of 5 is allotted. The percentage of schedule castes in the village is 20 to 30 per cent to the total population; hence a score of 5 is allotted. Rain
fed agriculture forms the primary occupation of the village. More than 60 per cent of the farmers are small and marginal by nature and the actual wages
earned by the labour is less than the minimum wages hence a composite rank of 3, 5 and 10 are allotted respectively.
Table no. 2: Weightage of the Project
Project
name
Project
type
Weightage
I
ii
iii
iv
V
vi
vii
viii
ix
X
xi
xii
xiii
IWMP-6
5 5 5 5 3 15 5 5 5 10 0 15 10
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 13
Table No.2.1 Criteria and weightage for selection of watershed
S.
No Criteria
Maxi
mum
score
Ranges & scores
I Poverty index (% of poor
to population)
10 Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20
% (2.5)
ii % of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)
iii Actual wages 5 Actual wages are
significantly lower than
minimum wages (5)
Actual wages are
equal to or higher
than minimum wages
(0)
iv % of small and marginal
farmers
10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)
v Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)
vi Moisture index/
DPAP/ DDP Block
15 -66.7 & below (15)
DDP Block
-33.3 to -66.6 (10)
DPAP Block
0 to -33.2 (0)
Non DPAP/ DDP Block
vii Area under rain-fed
agriculture
15 More than 90 % (15) 80 to 90 % (10) 70 to 80% (5) Above 70
%
(Reject)
viii Drinking water 10 No source (10) Problematic village
(7.5)
Partially covered (5) Fully
covered
(0)
ix Degraded land 15 High – above 20 % (15) Medium – 10 to 20 %
(10)
Low- less than 10 % of TGA
(5)
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 14
x Productivity potential of
the land
15 Lands with low production
& where productivity can be
significantly enhanced with
reasonable efforts (15)
Lands with moderate
production & where
productivity can be
enhanced with
reasonable efforts (10)
Lands with high production &
where productivity can be
marginally enhanced with
reasonable efforts (5)
xi Contiguity to another
watershed that has already
been developed/ treated
10 Contiguous to previously
treated watershed &
contiguity within the micro
watersheds in the project
(10)
Contiguity within the
micro watersheds in
the project but non
contiguous to
previously treated
watershed (5)
Neither contiguous to
previously treated watershed
nor contiguity within the
micro watersheds in the
project (0)
xii Cluster approach in the
plains (more than one
contiguous micro-
watersheds in the project)
15 Above 6 micro-watersheds
in cluster (15)
4 to 6 micro
watersheds in cluster
(10)
2 to 4 micro watersheds in
cluster (5)
xiii Cluster approach in the
hills (more than one
contiguous micro-
watersheds in the project)
15 Above 5 micro-watersheds
in cluster (15)
3 to 5 micro
watersheds in cluster
(10)
2 to 3 micro watersheds in
cluster (5)
Total 150 150 90 41 2.5
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 15
Table no. 3: Watershed information
Name of the project No. of watersheds to be
treated
Watershed code Watershed regime/type/order
IWMP-6 16 5G1C4c1g,5G1C4c1f,5G1C4c2b,5G1C4c2a,
5G1C4c3a,5G1C4c3b,5G1C4c2c,5G1C4c2d,
5G1C4c3d,5G1C4c1c,5G1C3b1h,5G1C4c1h,
5G1C4c1j,5G1C4c1g,5G1C4c1d,5G1C3b1e
Milli watershed
1.3 other developmental projects/schemes running in the all village
Table no.4: Developmental programmes running in the project area:
SI no
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of
commencement
Villages covered
Estimated number of
beneficiaries 1 Sakhi Mandal Govt of Gujarat Savings and Employment
2004 6 1685
2 Indira Awas Yojana
CRD
Housing
2005
5
272
3 Sardar Patel Awas Yojana Govt of Gujarat Housing 2005 6 482
4 WASMO
Govt of Gujarat
Drinking water pipeline
2006
3
7300
5 Total Sanitation Campaign Govt of Gujarat Sanitation 2006 6 740
6 NREGS CRD
Employment 2009 6 3020
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 16
Table no. 5:
Previous Watershed programmes in the project area
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 17
CHAPTER - 2
PROJECT IMPLEMENTING AGENCY
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 18
2.1 Project Implementing Agency
The Project Implementing Agency (PIA) is selected by an appropriate mechanism by Gujarat State Watershed Management Agency (GSWMA),
State Level Nodal Agency (SLNA) for Integrated Watershed Management Programme (IWMP) in Gujarat. The PIAs are responsible for implementation of
watershed project. These PIAs may include relevant line departments, autonomous organizations under State/ Central Governments, Government Institutes/
Research bodies, Intermediate Panchayats, Voluntary Organizations (VOs). The PIA for IWMP-6 is Deputy Conservator of Forest, Junagadh.
2.2 About District Watershed Development Unit, (DWDU) Junagadh.
2.2.1 The organization and its objectives:
The District Watershed Development Unit (DWDU), Junagadh is a district level nodal agency and was established on 12th June 2008 under
constitution of Para 30 of new guideline, to oversee for the smooth implementation of watershed projects in the district. The District Development Officer
(DDO) is the chairman of the DWDU. The DWDU has a Multi-Disciplinary Team (MDT) comprising of both experienced and fresh graduates various
backgrounds like engineering, surveying, community mobilization, accounts, and agriculture and data entry operations. The DWDU is headed by the Project
Manager (deputation from Gujarat Forest Department) assisted by a Technical Expert (on contract basis) and MDT's. The remaining staff i.e. MIS
coordinator, System Analyst, Livestock specialist will be recruited very soon. The DWDU Junagadh has its own office in the Training Complex of the
DRDA, located at Sardar Baug.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 19
The functions of DWDU:
a) Take up the over all responsibility of facilitating preparation of strategic and annual action plans for watershed development
projects in the Taluka.
b) Providing professional and technical support to Project Implementing Agencies (PIAs) in planning and execution of watershed
development projects.
c) Develop action plans for capacity building with close involvement of resource organizations to execute the capacity building
action plans.
d) Carry out regular monitoring, evaluation and learning.
e) Ensure smooth flow of funds to watershed development projects.
f) Ensure timely submission of required documents to SLNA/Nodal Agency of the Department at central level.
g) Facilitate and co-ordination with relevant programmes of agriculture, horticulture, rural development, animal husbandry, etc
with watershed development and convergence plans for enhancement of productivity and livelihoods interventions for asset less
persons.
h) Integrate and co-ordinate watershed development projects/plans into district plans of the district planning committees.
I) Establish and maintain the District Level Date Cell and link it to the State Level and National Level Data Centre.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 20
2.2.2 Programmes/projects running in the district
Junagadh district was assigned 428 projects, covering a total of 2, 10,123 hectares, under the Haryali/ Pre- Haryali Watershed Projects.
Completed projects
There were 59 projects under DPAP Batch 1, 2 & 4 covering 29488 hectares. The total grant was 1239.27 lakhs against which a cumulative
expenditure of 1169.22 lakhs was incurred thus resulting in 95% achievement.
There were 44 projects under EAS covering 16202 hectares. The total grant was 834.72lakhs against which a cumulative expenditure of 802.01 lakhs
was incurred thus resulting in 96.08% achievement.
There were 47 projects under State Watershed covering 23500 hectares. The total grant was 275.07 lakhs against which a cumulative expenditure of
275.07 lakhs was incurred thus resulting in100% achievement.
There were 24 projects under IWDP-1 covering 12000 hectares. The total grant was 482.02 lakhs against which a cumulative expenditure of 480.69
lakhs was incurred thus resulting in 99.72% achievement.
Status of Continuing Projects
There are 160 projects under DPAP- 5 to DPAP-12 covering 79043 hectares. The total grant was 1804.89 lakhs against which a cumulative
expenditure of 1556.97 lakhs was incurred thus resulting in 86.26% achievement.
There are 94 projects under IWDP-2 to IWDP-8 covering 49890 hectares. The total grant was 1245.58 lakhs against which a cumulative expenditure
of 1021.94 lakhs was incurred thus resulting in 82.05% achievement.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 21
Total: There are a total of 254 projects under DPAP and IWDP covering 128933 hectares. The total grant was 3050.47 lakhs against which a
cumulative expenditure of 2578.91 lakhs was incurred thus resulting in 84.54% achievement.
Among the ongoing DPAP projects are DPAP – 5 to DPAP – 12 covering 160 projects. The total grant allocation for the ongoing DPAP projects is
Rs 4530 lakhs against which Rs 1786.52 lakhs has been released till date jointly by the Centre and State. The achievement rate is 84.07% against the
total grant released. The Centre and state shared the total cost in 75:25 proportions. The balance fund available as on March 31, 2010 stands at Rs 287.67
lakhs.
2.3 SWOT Analysis of the DWDU
Strength:
(1) Dedicated and experience staffs and MDT team
(2) Independent District Level Nodal Agency.
(3) Strong linkages with national and state level institutions, agricultural universities, Saurashtra University, KVK and NGOs for capacity building and
Technical guidance
(4) Scientific planning in watershed projects with the help of BISAG, Gandhinagar
(5) District level monitoring, coordination Committee
(6) Well establishment of PRIs for social audits for transparency and accountability.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 22
Weakness:
(1) Insufficient funds to complete watershed projects per hectare.
(2) Permanent staff is less in numbers.
(3) No permanent office building.
Opportunities:
(1) Sustainable livelihood generation for landless and asset less persons.
(2) Improvement of socio-economic status of poor.
(3) Awareness generation among the beneficiaries through information, education and communication activities.
(4) Reduction in migration rate.
(5) Usage of new technologies of watershed modeling and GPS for monitoring of watershed activities.
Threats:
(1) Lack of sustainable agricultural development package.
(2) Lack of voluntary contribution and cooperation from local peoples.
(3) Party politics in village leading to multi-interest groups
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 23
Table no. 6: PIA:
SR. No.
Name of project
Details of PIA
1
IWMP-6
Type of organization
Forest Department
Name of Organisation
[ii) Name of organization
IWMP-6 Junagadh
Designation and Address
(iii) Designation & Address
DCF, Sardar baug Junagadh
Telephone
(ivj Telephone
0285-2631182 Fax
(v) Fax
0285-2635582 E-mail
(vi) E-mail
Table no. 7: Staff at PIA level:
SR no
Name
Age
Sex
Designation
Qualification
Experience
Job assigned
Monthly remuneration
1
Mrs. ANITA KARN
37 F DCF, Junagadh IFS 15 years
Project Management
45000
2
Mr. D. J. PANDYA
46 M
Nodal Officer
GFS
23 years
Implementation
&mm M
35000
3
Mr. N. D. Hirani 21 M WDT (Engg.)
Diploma(Civil)
16 months Engineering works
8000
4 Mr. P.G. Hinsu 22 M WDT(Agri.) B.R.S. Agri. 22 months Agriculture 8000
5 Ms. H. J. Rabadiya 23 F WDT( CME) M.Sc (Home Sc) 8 months Community 8000
6 Ms. T. S.Vaja 24 F WDT(Accountant) M.Com. 8 months Accounts 7000
7 Mr. K.A.Dodiya 21 M WDT(Surveyor) Surveyor 3.6 years
Surveying 6000
8 Mr. M. M. Vaghela 26 M WDT(DEO) B.Com.(D.C.S.) 5 year Data Entry 5000
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 24
CHAPTER - 3
BASIC INFORMATION OF PROJECT AREA
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 25
3.1. Geography and Geo-hydrology
3.1.1 Land use pattern:
The net geographical area of the six cluster villages is 4916.10 hectares there is no forest area. About 3076.61 ha of land is under agriculture which is
mostly rain fed. Both Kharif and Rabi crops are taken in the cluster. Of the total available waste land 781.50 ha is cultivable and 1085.88 ha is non-
cultivable. The watershed consists Neem, Pipal, Banyan and Gunda which was mainly broadcasted to stop the spread of desert.
Table no. 8: Land use pattern:
S. No.
Names of villages
Geographical Area of the village
(5+8+9)
Forest Area
(ha) Census book
(as on 1999)
Land under agricultural use
Rainfed area (ha)
Permanent Pastures
Wasteland
Cultivable
Cultivable
Non-cultivable
1 2 3 4 5 6 7 8 9
1
Dungarpur 499.00 0.00 4.72 3.52 0.00 100.00 394.28
2 Ivnagar 504.30 0.00 332.28 188.08 0.00 87.00 89.00
3 Khadiya 1774.50 0.00 1104.10 743.54 0.00 410.00 285.00
4 Palasva 1055.70 0.00 763.04 518.76 0.00 112.00 180.00
5 Patapur 441.00 0.00 306.55 216.48 0.00 50.00 84.45
6 Vijapur 641.60 0.00 565.92 363.68 0.00 22.50 53.15
Total 6 4916.10 0.00 3076.61 2034.06 781.50 1085.88
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 26
3.1.2 Soil and topography
Nearly 92 % of the geographical are is comprised of shallow to medium black soil having depth upto 60-95 cm top soil and 8% is red soil. The soil is
slightly reddish to very brown in surface colour. By large soils are well drained with moderate water holding capacity. From sustainable development
perspectives, what is alarming is the steady decline in the soil quality due to sheet erosion. There has a considerable reduction in the application of farm yard
manure resulting in reduced in moisture retention capacity and porosity in the soils. Generally the organic carbon content is too low. Lack of water
conservation measures at the field and at the community level has led to the acceleration of environmental degradation. The farmers generally depend on
internal resources (seeds etc) as inputs for the next season. The topography of the area is moderate ranging from 0-10 % slope.
Table no. 9: Soil type and topography
S. No. Name of the Agro-climatic zone covers project area
Area in ha Name of village Major soil types
Topography
Type
1
Saurashtra
499.00 Dungarpur
(field to field Survey )
BLACK SOIL & RED SOIL
FLAT 2 504.30 Ivnagar
3 3 1774.50 Khadiya
4 1055.70 Palasva
5 441.00 Patapur
6 641.60 Vijapur
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 27
Table no. 10: Flood and drought condition
SI no
Village
Flood (Incidence)
Drought (Incidence)
1
Dungarpur Nil
Nil
2 Ivnagar Nil 3 Khadiya Nil 4 Palasva Nil 5 Patapur Nil 6 Vijapur Nil
Table no. 11: Soil Erosion
Cause
Type of erosion
Area affected (ha)
Run off (mm/ year]
Average soil loss (Tones/ ha/ year) Water erosion
a
Sheet
1626.83 77866.63 b
Rill
378 3714.67 c
Gully
1152.54 44580.37 d
Ravenous
- -
Sub-Total
3157.37 126161.67
Wind erosion
Total
3157.37
126161.67
Table no. 11.1: Soil Salinity/Alkalinity (Salinity ingress)
Name of the Village Survey Number Soil pH Type of Salinity
(Inherent/Ingress)
Dungarpur
6 to 7.5
In Herent
Ivnagar In Herent
Khadiya In Herent
Palasva In Herent
Patapur In Herent
Vijapur In Herent
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 28
Table: 12. Last six years annual rainfall, maximum and minimum temperature of Junagadh taluka
SR. No.
Year
Rainfall (in mm)
Temperature (°C)
Max.
Max.
Min.
1
2004
1025 34.2 21.0 2
2005
1134 33.4 20.3
3
2006
1092 34.6 20.6 4
2007
1417 33.7 21.2
5
2008
1236 33.2 20.8
6
2009
825 34.6 21.2
3.2 Slope
The slope of the watershed was calculated based on topographic elevation (contours and spot height) from satellite maps and provided by BISAG,
Gandhinagar. These maps will help in recommendation/implementation of suitable land management practices in association of other thematic information.
Table no. 13: Physiographic and relief Project name
Elevation
Slope range (%)
Major streams
Dungarpur 4-6 meters 5-6% -
Ivnagar 5-7 meters 6.5-8% -
Khadiya 3-5 meters 5-6% Local river
Palasva 4.5-6.6 meters 6.5-8% -
Patapur
5-7.5 meters 7-8% Gudajali river
Vijapur 5-6 meters 5-6% -
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 29
3.2.1 Land and Agriculture
The main crops under agriculture are cotton, groundnut, wheat, sorghum, maize and jawar. The land conservation measures such as earthen bunds
and farm bunds in the area will help them to take up a Rabi crop of wheat in the residual moisture.
Table no. 14: Land ownership details
Sr
no Village
Total owned land
Gen OBC SC ST
1 Dungarpur 0 1 0 0
2 Ivnagar 73 27 0 0
3 Khadiya 42 266 0 2
4 Palasva 105 12 0 1
5 Patapur 32 46 0 0
6 Vijapur 36 151 1 2
Table no. 15: Agriculture
S.R. No. Village Net sown area (ha)
One time Two times Three times
1 Dungarpur 10.00 5.00 0.00
2 Ivnagar 208.39 133 0.00
3 Khadiya 4050.80 415.18 0.00
4 Palasva 462.64 50.00 0.00
5 Patapur 306.55 100.55 0.00
6 Vijapur 565.92 280.00 0.00
Total 5604.30 983.73 0.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 30
Table no. 16: Crop details
S.R.
No. Village
Kharif (Monsoon) Rabi (Winter)
Crop 1 Groundnut Kg/Ha Crop 1 Wheat kg/ha
Area(Ha) Production(kg) Productivity Area Production(kg) Productivity
1 Dungarpur 3.52 8500 2414 1.2 8500 7083
2 Ivnagar 188.08 298430 1586 134.00 138080 1030
3 Khadiya 613.48 1369875 1914 333.20 483200 1450
4 Palasva 265.76 496680 1868 185.52 249850 1346
5 Patapur 171.48 409900 2390 135.07 287300 2127
6 Vijapur 313.04 612350 1954 252.24 186400 738
Total 1555.36 31,95,735.00 2054.65 1,041.23 13,53,330.00 1299.74
3.2.2 Irrigation
The irrigated area is 818.82 ha, which is 16.67 % of the total area of the cluster villages. Main source of irrigation is from well, bore well and check
dam. Agriculture is mainly rain fed and water for irrigation during the rest part of the year is available from limited sources in Dungarpur, Khadia, Plasawa,
Patapur, Ivnagar and Vijapur.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 31
Table no. 17: Irrigation
S.R. No.
Village
Source 1 : Canal
Source 2 : Pond/Earthen dam
Source 3 : Check dam
Availability months
Availability months
Net area
Gross area
Availability months
Net area
Gross area
Availability months
Net area
Gross area
1
2 Dungarpur - - - - - - - - -
2
Ivnagar - - -
3 Khadiya - - - - - - 4 30 ha -
4 Palasva - - - - - - 4 9 ha -
5 Patapur - - - - - - 4 18 ha
6 Vijapur - - - - - - - - -
Table no. 18: Livestock
S.R. No.
Village
Buffalo
Cow
Total Milk (Buffalo Cow)
Goat
Sheep
Bullock
Hen
Others
No
Milk
No
Milk
No
Milk
1
Dungarpur 23 81289 19 67151 148440 2 0 0 2 0 17
2 Ivnagar 99 127762 15 19358 147120 2 0 0 53 0 48
3 Khadiya 398 463889 128 149191 613080 75 0 0 278 0 208
4 Palasva 184 277484 54 81436 358920 40 0 0 85 0 86
5 Patapur 94 47667 61 30933 78600 160 0 0 97 0 44
6 Vijapur 306 382360 130 162440 544800 125 0 0 148 0 70
Total 1104 1380451 407 510509 1890960 404 0 0 663 0 473
3.2.2 Drinking water Drinking water is available in all the villages through household pipe connections which are linked through the bore well and well with power
operated machines. The quality of water is also good which has led to a reduction in the number of water borne diseases occurring in the village.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 32
Table no. 19: Drinking water S.R.
No.
Village
Ground water table (mt)
Source of drinking water
Availability in months
Quality
1
2
Dungarpur 12 Water tank
12
Good
2
Ivnagar 9 Pipe connection
12
Good
3 Khadiya 8 Pipe connection
12
Good
4 Palasva 10 Pipe connection
12
Good
5 Patapur 10 Pipe connection
12
Good
6 Vijapur 10 Pipe connection
12
Good
Table no. 20: Details of Common Property Resources
S.R.
No.
Names of
project
CPR
Particulars
Total Area (ha)
Area owned/ In possession of Area available for treatment (ha)
Pvt. persons
Govt.
(Specify
deptt.)
PRI
Any other
(Pl.
Specify)
Pvt.
persons
Govt.
(Specify
deptt.)
PRI Any other
(Pl. Specify)
1 IWMP-6
Wasteland/ degraded land 517 212.24 365.00 - 223 - 65 -
Pastures - - 60.00 - - - 27 -
Orchards 22.56 - - - - - - -
Forest - 0.00 - - - - - -
Village Ponds - 15.00 5.00 - - 4 10 -
Check dams (area treated) - 27.00 - - - 8 38 -
Community Buildings - - 32 - - - 2 -
Weekly Markets - - - - - - - -
Permanent markets - - - - - - - -
Temples/ Places of worship - - - 16 - - - -
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 33
3.3 Socio-Economic Profile
Table no. 21: Demographic information
S.R. No. Village
Population
SC
ST
Total
Male
Female
Total
Male
Female
%
Total
Male
Female
%
1
Dungarpur 3536 1883 1653 1362 720 642 38.52 139 76 63 3.93
2 Ivnagar 2156 1149 1007 969 516 453 44.94 40 19 21 1.85
3 Khadiya 4248 2266 1982 507 267 240 11.93 106 52 54 2.49
4 Palasva 2587 1361 1226 330 179 151 12.75 11 7 4 0.43
5 Patapur 1149 618 531 277 148 129 24.11 24 10 14 2.09
6 Vijapur 2435 1278 1157 140 72 68 5.75 50 26 24 2.05
Table no. 22: Literacy rate
S.R.
No.
Village Literacy
Literacy % above age 14
Literacy % below age 14
Total
Total
%
Male
%
Female
%
1
Dungarpur 1826 51.64 1105 31.25 721 20.39 34.45 17.19
2 Ivnagar 1295 60.06 772 35.80 523 24.25 44.20 15.86
3 Khadiya 2808 66.10 1642 38.65 1166 27.44 49.48 16.62
4 Palasva 1801 69.62 1038 40.12 763 29.50 53.00 16.62
5 Patapur 758 65.97 446 38.82 312 27.15 51.26 34.03
6 Vijapur
1640 67.35 954 39.18 686 28.72 51.25 16.10
3.3.1 Migration Pattern: Migration is moderate in the cluster villages. The main reason of migration is availability of alternatives to agriculture like
diamond polishing, tile making, cement making and wage labour. The youth in the villages generally prefer to work in these occupations because they want
to enjoy the town-life. This is equally evident for those young people who have patriarchal agricultural land. Agriculture seems to lose its sheen to other
non-farm occupations for the youngsters in the villages.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 34
Table no. 23: Migration details
S.R.
No.
Village
Total population
Migration
Migration by months
Main reason for migration
Income during migration /
month
Total
Total
Male
Female
Up to 3 months
3-6 months
More than 6 months
1 Dungarpur 3536 34 21 13 19 5 10
Better
employment
prospects
Rs5000-6000
2
Ivnagar 2156 132 93 39 60 20 52
3 Khadiya 4248 85 59 26 51 13 21
4 Palasva 2587 69 45 24 38 15 16
5 Patapur 1149 44 31 13 26 6 14
6 Vijapur 2435 62 37 25 43 9 10
Table no. 24: Poverty
S.R. No. Village
Total Household
BPL % o f B P L H H
Total Land less
HH
% of land less HH
0-16
0-16
16-20
Total
1
2
Dungarpur 719 176 371 547 76.07 718 99.86
2 Ivnagar 425 150 66 216 50.82 110 25.88
3 Khadiya 932 124 76 200 21.45 400 42.91
4 Palasva 538 43 70 113 21.00 420 78.06
5 Patapur 214 16 80 96 44.85 136 63.55
6 Vijapur 509 55 24 79 15.52 319 62.67
3.3.2 Infrastructure facilities
All the watershed villages are well connected with Junagadh taluka through pucca roads. Each village has electricity connectivity. Nearly 96 per cent
of households in the villages have their personal electric meters. All villages have primary and Secondary school with some facilities like drinking water and
libraries but there is lack of advance & technological facilities like personal computers and R.O. systems for drinking water.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 35
Table no. 25: Village infrastructure
S.R. No.
Village
Pucca road to
the village (Y/N)
Schools
Colleges (Num.)
Post Office (Distance in kms)
Banks (Num.)
Distance from
nearest market
yard
Milk collection
centre (Number)
Milk cooperative (Number)
Other cooperative
s /CBIs (Number)
Any other institution
LP
UP
HS
1
2 Dungarpur Y Y Y Y N 8 1 15 0 1 N N
2
Ivnagar Y Y Y Y N 3 0 10 1 1 N N
3 Khadiya Y Y Y Y N 12 0 12 1 1 N N
4 Palasva Y Y Y Y N 7 0 10 1 1 N N
5 Patapur Y Y Y N N 12 0 12 1 + 2 1 N N
6 Vijapur Y Y Y Y N 12 0 8 1 1 N N
Table no. 26: Facilities / HH assets
S.R. No.
Village
HHs with electricity
HHs with safety
latrines
HHs with phones
HHs with vehicle
HHs with TV set
HHs with cooking
gas
HHs with Drinking
water
HHs with
fridge
Landline
Land line
Mobile
2 -wheeler
4- wheeler
1
2 Dungarpur 671 60 17 531 24 2 474 375 56 12
2
Ivnagar 417 375 20 305 112 2 316 150 385 65
3 Khadiya 918 810 245 844 163 12 780 200 895 89
4 Palasva 537 425 130 503 180 17 480 200 513 82
5 Patapur 213 160 60 198 45 5 185 90 213 17
6 Vijapur 506 400 150 391 137 9 394 394 509 44
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 36
3.4 Livelihood pattern:
The villagers earn their livelihood from animal husbandry, agriculture and wage labour. Another major occupation of the people is business, service
and diamond polishing industries in Junagadh.
Table no. 27: Yearly Income
S.R. No. Village
Agriculture (in Rs.)
Animal husbandry
(in Rs.)
Casual labour
(in Rs.)
Others
(Services&
Business,
Pensioner)
(In Rs.)
Total (in Rs.)
1 Dungarpur 45000 17000 11660600 357600 12076600
2 Ivnagar 3004000 150000 5368100 2696600 11218700
3 Khadiya 10452500 100000 11221000 3905300 126667800
4 Palasva 3458000 246000 7601500 2258200 13563700
5 Patapur 3075000 83000 2278000 248000 5742000
6 Vijapur 4863000 202000 5718000 1747800 12530800
Table no.28: Dependence on Forest/CPR (Not Applicable)
S.R. No. Village Benefit type 1 Benefit type 2 Benefit type 2 Total
income % sells Income % sells Income % sells Income
1 Dungarpur NA
2 Ivnagar NA
3 Khadiya NA
4 Palasva NA
5 Patapur NA
6 Vijapur NA
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 37
Table no. 29: Livelihood pattern (Occupational distribution)
S.R.
No. Village
Total
workforce Agriculture
Animal
husbandry
(AH)
Agriculture
+ AH
Agriculture/
Casual
labour
Services Handicraft/
Business Others(Pensioner)
1 Dungarpur 719 7 1 3 694 4 15 4
2 Ivnagar 433 100 5 8 248 14 52 6
3 Khadiya 959 310 4 27 532 16 58 12
4 Palasva 557 119 9 19 358 11 36 5
5 Patapur 231 78 4 13 118 2 16 0
6 Vijapur 533 190 7 24 261 12 32 7
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 38
CHAPTER - 4
WATERSHED ACTIVITIES
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 39
4.1 Watershed Activities
Watershed management as a strategy has been adapted by Government of India especially in the rain fed regions of semi-arid tropics. These regions
are characterized by low and undepependable rain, low soil fertility, poor infrastructure development, low literacy and high incidence of migration. The
inheritant low fertility of crops results in lower productivity of crops which have a very low biological efficiency.
Several studies have identified that there is a dire need of a systematic and scientific approach to deal with watershed development. The common
guidelines generate a fresh and flexible framework for the next generation watershed development.
4.1.1 Scientific Planning:
I) Cluster Approach
This envisages a broader vision of Geo-hydrological unit which involves treating a cluster of micro-watershed. The project consists of sixteen
micro-watersheds namely 5G1C4c1g, 5G1C4c1f, 5G1C4c2b, 5G1C4c2a, 5G1C4c3a, 5G1C4c3b, 5G1C4c2c, 5G1C4c2d, 5G1C4c3d, 5G1C4c1c,
5G1C3b1h, 5G1C4c1h, 5G1C4c1j, 5G1C4c1g, 5G1C4c1d, 5G1C3b1e as their respective codes.
ii) Base line Survey
(a) Door to Door Survey
The primary data was generated through questionnaire surveys in all the villages. The questionnaire was structured so as to derive the information related
to the objectives set forth. Mostly talked to
• Head of the families
• Mostly females (between 60% and 70%)
• Mostly younger adults (Age group : 25 – 44)
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 40
• High School education
• Sarpanch and Talati of respective Gram Panchayats.
• Farmers, Agricultural labours, Diamond polishing workers, ceramic factory workers etc.
• Cattle Breeders
• Landless labour
The questionnaire was divided into eleven modules through which information is extracted pertaining to
1. Village details
2. Population details
3. Water supply details
4. Water source details within and outside the village
5. Questions about community engagement
6. Questions about Livelihood
7. Awareness about Specific programme: Watershed
8. Desire to do more activities related to occupation
9. Productivity of farms
10. Education details
11. Questions about Land
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 41
The secondary data was obtained through Census reports (2001). Data pertaining to social profile is also collected through Census reports. Secondary
data related to different kinds of capital assets were collected from different departments of Government agencies such as Revenue Office, Primary Health
Center, Regional Marketing Center, Regional Forest Center (Van Sanrakshan Samiti), District Rural development Agency initiative-SGSY Programme
office, working on poverty alleviation, Village Panchyat, other NGOs and development societies etc.
b) Field to field Survey:
Field to field survey was also carried out in the farms, community land, pasture land and land under Gram Panchayat. It also includes the soil
profiles, no of wells in the area, crop taken in the field, cropping pattern, fertilizer used and various sources of irrigation in the field. The details of agriculture
as well as pasture land of the village, where the existing structures and structures to be proposed were note down. Almost all the farmers of the village were
there to support the survey team. The purpose of the survey was also to understand water availability, patterns of water use and peoples’ understanding &
perceptions about both surface and groundwater resources in this area. Village agreements will be done on the basis of such detailed work. This also survey
looked at the pattern of surface and groundwater use and the basic understanding of farmers regarding groundwater recharge and discharge. This
understanding was expected to help in improved planning for any watershed programme and to develop longer-term protocols of groundwater management
in respective areas.
iii) Participatory Rural Appraisal (PRA)
In order to understand the social, economical and political aspect of all selected villages of Junagadh taluka, we conducted Participatory Rural
Appraisal (PRA) exercise with the help of the villagers on 08th
July 2010 and +respectively. It was really a useful tool to appreciate the village in its totality.
We had the opportunity to interact with more than 150 numbers of people in Patapur and 320 in Dungarpur village and vice versa. To reach a concrete
conclusion we requested to few villagers for focused discussion and it was entertained. In majority of the discussion, we listened to them carefully and tried
to appreciate the discussion. Output generated through these exercise is placed below.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 42
(a) Resource Map: - Through resource map we came to know about all the residential pattern of village, community pasture land, farm areas, about the
river etc. It also gave us a fair idea about the pasture land, other land distribution pattern and different resources of the village.
(b) Social Map: - After this exercise we came to know the approximate location of different institution of the village. During this exercise we also had
informal discussions with the participants about the importance of these institutions. Important location pointed out during this exercise was Community
Centre, Panchayat Bhavan, temple, Primary School etc. We cross checked all the location.
(c) Seasonal Diagram: - With this exercise we came to know about the major engagements of villagers across the twelve months of the year. We found
that rain fed agriculture and animal husbandry keep them busy at least for seven to eight months of the year. About drinking water they informed that,
situation in the month of April to June is really difficult.
(d) Crop Pattern: - Agriculture is the primary source of livelihood for more than 75% household. After this exercise we came to know that there are
two major cropping pattern Kharif and partially in Rabi. Under Kharif groundnut and Under Rabi major crops grown are wheat and vegetables.
(e) Income-Expenditure Pot: - Under this exercise we came to know about the different sources of income of villagers and how the money earned by
the villagers is being spent under different heads. It was found that major source of earning among villagers are farming, animal husbandry, different kinds
of business, service etc. Major expenditure component were food, fuel, education of children, medicines, clothes, festivals etc.
One focused group discussion was organized to understand the status of different Self Help Groups operating in the village. This discussion concentrated
around the activities of SHG, terms and conditions of membership, working pattern of different SHG and their role in the development of society and
villages.
Another curiosity in our mind was about the political institution of the village. Apart from different institution’s discussion was concentrated about
gram panchayat issue. Here the major point of discussion was participation of women and deprived section of the society in the decision making process,
their representation in the panchayat. In what manner the panchayat facilitates the process of development and poverty alleviation. In this process its relation
with different institutions of village like Dispensary, Aanganwari, Primary School and High school was also discussed.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 43
The whole purpose was to identify the employment opportunities available during the different seasons in a year, income, expenditure, crisis
management, daily activities and time allotted to each activity, the leisure time of men and women, and market network for agricultural produce etc. In the
gender analysis, an attempt was made to find out the gendered division of labour, the status of women in relation to the right to use, to own and sell different
household properties, the means of production of the household and the role and participation of women in decision-making at intra household and
community levels.
To identify different problems faced by villagers a separate focused discussion was carried out. The villagers were grouped in to different types as
shown below to know all the details of the village in a stipulated time.
Business men and women
Small and marginal farmers
Large farmers
Landless farmers
Women
Gram Panchayat members
Cattle grazing population
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 44
(f) Problem Identification
After analysis the information collected during PRA exercise, the main problems identified are as under:
Poor fertility of farm land
Improper Crop soil and productivity low agricultural
Soil Erosion from Rotation
Almost negligible cultivation of arid fruits
Less use of bio-fertilizers
Less cultivation of vegetables
Low milk production and rearing of non descript breeds
No use of vermin compost
Lack of value addition practices
Lack of purification of Drinking Water
No near by Market
Migration
Sanitation Problems
Less Nutritional Level
Malnutrition in few families
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 45
iv) Use of GIS and remote sensing for planning
Remote sensing and GIS plays an important role in the study of natural resources and helps in planning water resources development. One of the
greatest advantages of using remote sensing data for hydrological investigations and monitoring is its ability to generate information in spatial and temporal
domain, which is very crucial for successful analysis, prediction and validation. Use of various high-tech tools has been promoted & implemented at various
stages of watershed development
a) Prioritization
Geographical Information System (GIS) has been used for prioritization process. Various layer maps were created like Geo-morphological, Soil, BPL
Population, SC/ST population, Ground Water Status, Drinking water situation and Slope percent. These were all given proper weightage according to the
DoLR specification. This helped in prioritization of various watershed areas.
b) Planning
An action plan matrix was been formulated by State Level Nodal Agency(SLNA) taking into account various features like the slope percent, soil depth, soil
texture, soil erosion in the area for wasteland, forest land and agricultural land.
Global positioning System (GPS) was used to identify each and every water conservation structures available in the project area. This will be used to create
a map. Contour Map of vertical interval of 1 meter at a scale of 1:8000 was used for identifying various location specific for soil and water conservation
structures.
c) Hydrological modelling
Hydrology modelling technique has been used for locating drainage, stream length, flow direction, sink-flow accumulation. This model overlaid over
cadastral map held to calculate the catchment area of each structure like the check dam etc. This has helped to remove the human error which generally
occurring while calculating the catchment area of a check dam.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 46
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects
S. No. Scientific criteria/ inputs used Whether scientific
criteria was used
(A) Planning
Cluster approach Yes
Whether technical back-stopping for the project has been arranged? If yes, mention the name of the Institute
Baseline survey Yes
Hydro-geological survey Yes
Contour mapping Yes
Participatory Net Planning (PNP) Yes
Remote sensing data-especially soil/ crop/ run-off cover Yes
Ridge to Valley treatment Yes
Online IT connectivity between
(1) Project and DRDA cell/ZP Yes
(2) DRDA and SLNA Yes
(3) SLNA and DoLR Yes
Availability of GIS layers
1. Cadastral map Yes
2. Village boundaries Yes
3. Drainage Yes
4. Soil (Soil nutrient status)
5. Land use Yes
6. Ground water status Yes
7. Watershed boundaries Yes
8. Activity Yes
Crop simulation models#
Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for high speed soil
nutrient analysis
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 47
Normalized difference vegetation index (NDVI)#
Weather Station
(B) Inputs
1. Bio-pesticides
2. Organic manures Yes
3. Vermincompost Yes
4. Bio-fertilizer Yes
5. Water saving devices
6. Mechanized tools/ implements
7. Bio-fencing Yes
8. Nutrient budgeting
9. Automatic water level recorders & sediment samplers
Any other (please specify)
4.2. Institution Building
I) Watershed Committee (WC)
This is the general body of the residents constituted by Gram sabha of the watershed as well as farmers who own land within the
watershed area registered under society Registration Act 1860. The Gram Sabha meetings were held in first week of July, where the
watershed committees were formed taking in to account all caste, women representation and Gram panchayat members. Both President and
Secretary of WC were selected after the first Watershed Committee meeting was held. The secretary will be a paid functionary of the
watershed committee. The Watershed Committee with the help of the Watershed Development Team (WDT) shall facilitate resource-use
agreements among the user groups based on the principle of equity and sustainability. Capacity building training to the watershed committee will
be provided by WDT member. The watershed committee has a pivotal during various processes like the PRA and overall planning of various points.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 48
4.2.1 Watershed Committee Details.
Table no. 31.1 : Watershed Committee details (Patapur)
Names of
WC
Date of
Registration
as a Society
(dd/mm/
yyyy)
Name
Designatio
n M/F SC
S
T SF MF LF
Land-
less UG
SH
G GP
Educatio
nal
qualificat
ion
Function/s
assigned#
Watershed
committee
Patapur
Under
progress
Lakhubhai H. Dhandhukia President M - - Y Y SSC B,E
Chandubhai M. Dholariya Secretary M - - SSC C,D,I
Kalubhai P. Bhadarka Member M - - Y primary B
Shobhanaben A. Parmar Member F Y - Y primary H
Motiben R. Bhadarka Member F - - Y primary B
Pareshbhai G. Kikani Member M - - Y - H
Govindbhai B. Satani Member M - - Y primary G
B. K. Chocha Forester M - - B.A. D ,E,G,
Lakhmanbhai B. Dhandhukia Member M - - Y primary C,F
Bhagubhai J. Dhandhukia Member F - - Y Y - E,D
Chandrakantbhai V. Vaja Member M - - Y primary I,G
Raniben R. Pampaniya Member F - - Y primary I,G
Polabhai B. Mewala Member M - - primary H
Anjanaben J. Kikani Member F - - Y primary A
Dineshbhai B. Solanki Member M - - Y primary A
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 49
Table no. 31.2: Watershed Committee details (Khadiya)
Names of
WCs
Date of
Registrati
on as a
Society
(dd/mm/
yyyy)
Name
Designatio
n M/F
S
C
S
F MF LF
Land
-less UG
SH
G GP
Any
other
Educatio
nal
qualificat
ion
Function/
s
assigned
#
Water shed
committee
Khadiya
Under
progress
Kalabhai H. Bhadarka President M Y Y T.Y B,E
Rambhai A. Bhadarka Secretary M SSC C,D,I
Zanziben A. Dhola Member F Y Y Primary B
Vinaben J. Chudasama Member F Y Y Primary H
Asuben D. Makrani Member F Y Primary A
Mamtaben R. Chandiya Member F Y Y Y Primary H
Samjubhai D. Dobariya Member M Y Primary G
V. S. Kher Forester M Old SSC D ,E,G,
Dineshbhai G. Karangiya Member M Y Primary C,F
Bhikhabhai M. Chauhan Member M Y Primary E,D
Rajeshbhai A. Dangar Member M Y Primary I,G
Maldebhai K. Ravaliya Member M Y Primary I,G
Mansukhbhai L. Varu Member M Y Primary H
Manojbhia H. Ravaliya Member M Y Primary A
Karabhai K. Dhul Member M Y Primary A
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 50
Table no. 31.3: Watershed Committee details (Dungarpur)
Names of
WCs
Date of
Registration
as a Society
(dd/mm/
yyyy)
Name
Designatio
n M/F
S
C
S
F MF LF
Land
-less
U
G
SH
G GP
Any
other
Educational
qualificatio
n
Function/
s
assigned#
Water shed
committee
Dungarpur
Under
progress
Haribhai P. Parmar President M Y Y HSC B,E
Babubhai K.Gohel Secretary M
Y Y
High
school C,F.
Lalitaben H. Parmar Member M Y Y Y SSC A
Jebunben M. Bloch Member F Primary A
Natubhai R. Kaba Member M Y Primary B,H
Lilaben M. Vanar Member F Y Primary A
Bhanubhai T. Jhala Member M Y Y Primary G
B. K. Chocha Forester F B.A. D,E,G,
Rahimhai H. Bloch Member M Y SSC C,D,I
Vasrambhai R. Virsodiya
Member M Y Y Y Y
High
school E,D
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 51
Table no. 31.4 Watershed Committee details (Ivnagar)
Names of
WCs
Date of
Registrati
on as a
Society
(dd/mm/
yyyy)
Name
Designatio
n M/F SC SF MF LF
Land-
less UG
SH
G GP
Any
other
Educationa
l
qualificatio
n
Function
/s
assigned
#
Watershed
committee
Ivnagar
Under
progress
Vrijlalbhai J. Bhut President M Y HSC B,E
Bharatbhai K. Chavda Secretary M Y SSC C,D,I
Prabhudasbhai T. Makwana Member M Y SSC A
Dhirubhai R. Tank Member M Y Y Primary A
Hansaben H. Parmar Member F Y Y Primary B,H
Jinabhai P. Khoda Member M Y Y Primary A
Kantilal B. Makwana Member M Y Y Primary G
P. T. Kaneriya Forester M B.A. D,E,G,
Rameshbhai V. Parmar Member M Y Y
High
school C,F
Amritlal D. Faldu Member M Y
High
school E,D
Shantaben R. Tilava Member F Y Y primary I,G
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 52
Table no. 31.5: Watershed Committee details (Plasawa)
Names of
WCs
Date of
Registrati
on as a
Society
(dd/mm/
yyyy)
Name
Designatio
n M/F
S
C
S
F MF LF
Land
-less
U
G
SH
G GP
Any
other
Education
al
qualificati
on
Function/s
assigned#
Water shed
committee
Plasawa
Under
progress
Bhikhabhai S. Savaliya President M Y Y HSC B,E
Nikunjbhai V. Gami Secretary M SSC C,D,I
Swatiben M. Maru Member F Y Y Y SSC A
Harsukhbhai H. Dobariya Member M Y Y Primary A
Ramnikbhai P. Maru Member M Y Y Primary B,H
Chetanaben D. Purohit Member F Primary A
Manishaben V. Ajakiya Member F Y Y Primary G
P. T. Kaneriya Forester M B.A. D,E,G,
Mansukhbhai V. Dobariya Member M Y
High
school C,F
Jayentbhai M. Mevada Member M Y Y
High
school E,D
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 53
Table no. 31.6: Watershed Committee details (Vijapur)
Names of
WCs
Date of
Registrati
on as a
Society
(dd/mm/
yyyy)
Name
Designatio
n M/F
S
C
S
F MF LF
Land
-less
U
G
SH
G GP
Any
other
Education
al
qualificati
on
Function
/s
assigned
#
Water shed
committee
Vijapur
Under
progress
Mohanbhai H. Yadav President M Y Y HSC B,E
Rekhaben B. Solanki Secretary F Y SSC C,D,I
Hasrajbhai K.Barvadiya Member M Y Y SSC A
Vijayprakashbhai J.
Sondarva Member M Y Y Primary A
Narmadaben L. Tank Member F Y Primary B,H
Bababhai R. Sindhav Member M Y Y Primary A
Madhuben B. Agravat Member F Y Primary G
B. K. Chocha Forester M B.A. D,E,G,
Samatbhai V. Kalathiya
Member M Y High
school C,F
Parbatbhai A. Rathod
Member M Y High
school E,D
# Functions Assigned, as below
A. PNP and PRA B. Planning
C. Maintenance of Accounts D. Signing of cheques and making payments
E. Supervision of construction activities F. Cost Estimation
G. Verification & Measurement H. Record of labour employed
I. Social Audit J. Any other (please specify).
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 54
4.2.2 : Self Help Group
We believe that the full potential of our watershed work can only be raised if it is supplemented by a microfinance programme.
This is essential if we are to ensure long-term livelihood security to the poor. We are also convinced that no microfinance programme
can be successful until it is tied up with livelihood programmes such as agriculture, dairying, marketing and enterprise development etc.
Thus microfinance and livelihood programmes are complementary to each other and their simultaneous implementation is the key to
poverty alleviation. Incomes rose through livelihood initiatives need to be saved. Of these women are the best custodians. Self Help
Group is motivated, small homogenous group organized together through highly successful of credit and thrift activities. These savings must be
reinvested in livelihood options that in turn raise incomes, setting up various cycles. Generally self help group includes landless and marginal
sized farm women, BPL household, SC/ST women.
Before formation of the Self Help Group’s discussions were held with the women of the village during Participatory Rural Appraisal activities and Focus
Group Discussion. The participants came out with their problems very well.
Table no. 32: SHG detail
S.R. No.
Total no. of registered SHGs No. of members No. of SC/ST in each
category
No. of BPL in each
category
With
only
Men
With only
Women
With
both Total Categories M F Total M F Total M F Total
Total 7 12 13 32
(I) Landless 115 164 279 0 12 12 27 22 49
(ii) SF 20 14 34
(iii) MF 8 2 10
(iv) LF 7 0 7
Total 150 180 330 0 12 12 27 22 49
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 55
4.2.3 : User Group:
These are homogeneous groups of persons having landholding within the watershed area. They are normally formed to manage an activity or asset
on a long term basis. The user group collects user charges from their members. Some of the points which were considered while forming a user group
were:
1) In case of a check dam all the beneficiaries of the individual check dam were involved as user group members.
2) Groundnut grading user groups
3) Paper dish making user groups
4) Vermin composting user groups
5) Animal Husbandry user groups
Focused group discussion was conducted to between the user groups to discuss the above conditions and to select potential members. It was advocated
that each group to formulate certain internal rules and have a feeling of ownership with community spirit.
Table No. 33: The following types of groups were planned to be formed
S.R. No.
Name of User Group
Major Task
1
Animal Husbandry Group
Bringing of new AH technology
Management of New Cattle and their improvement
2 Farm pond/Percolation tank user Group
Equitable sharing of resources
3 Farm bund and Check Dam Group Equitable sharing of resources
4 Nursery Group
Maintenance of nursery plot
Ensure Timely supply of seedling for afforestation.
5 Micro-enterprise developing group Ensuring livelihood opportunities, reducing distress migration
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 56
Table no. 33.1: UG detail
S. R. No.
Total no. of UGs
No. of members
No. of SC/ST in each category
No. of BPL in each category
Men
Women
Both
Total
Categories
M
F
Total
M
F
Total
M
F
Total
1
12
0
7 19
[I] Landless
20
45
52
23
1
24
5
2
7
(ii) SF 48
10
18
(iii) MF 45
1
15
18
(iv) LF 7
1
0
17
120
70
105
23
1
24
5
2
7
4.3. Physical activities to be undertaken under IWMP-6
4.3.1 Entry Point activity (EPA)
EPA activities are certain important works which are in urgent demand of the local community. This helps in establishment of credibility of watershed
Development Team (WDT). It also acts as a rapport building activity of the village community. A group Discussion was conducted with watershed
Development Committee regarding the EPA activity; it was conveyed to the amount of Rs. 23.93 lakh in SIX cluster village of Junagadh cluster was
allotted for Entry Point Activity, which was 4 per cent of total allocated budget. The villagers discussed various activities which they felt is important but
after a brief discussion it was conveyed to them that only those activities can taken, which revive the common natural resources. It was also taken into
priority that there should be an instrument of convergence which will result in sustainability of activities.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 57
Table No. 34: Some of the major activities proposed in Palasava are:
Name of
Villages
Details of activity Amount earmarked for EPA Estimated Cost ( In
lakhs)
Palasava
R.O. Plant in high school
5.06 Lakhs
0.30
Renovation in Gaushala 0.75
Water Tank repairing(1 no) 0.20
Fencing in Smashan Gruh 1.00
Water pipeline 1.90
Plantation 0.45
Solar light 0.45
Total 5.05
Table No. 34.1: Some of the major activities proposed in Vijapur are:
Name of Villages
Details of activity
Amount earmarked for
EPA
Estimated Cost ( In lakhs)
Vijapur
Plantation along road with tree guard (No110) 3.07Lakhs
1.10
Water pipeline(300 rmt) 1.82
Aveda Renovation 0.15
Total 3.07
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 58
Table No. 34.2: Some of the major activities proposed in Patapur are:
Name of Villages Details of activity Amount earmarked for EPA Estimated Cost ( In lakhs)
Patapur
Fencing in Smashangruh
2.11 Lakhs
0.35
Bath place for Smashangruh 1.35
Solar light 0.25
Plantation 0.15
Total 2.10
Table No. 34.3: Some of the major activities proposed in Khadiya are:
Name of Villages Details of activity Amount earmarked for EPA Estimated Cost ( In lakhs)
Khadiya
Water pipeline
8.51 Lakhs
2.05
Aveda Renovation 0.35
Protection wall of Smashangruh 1.90
Water tank (30,000 later) (No.-2) 4.20
Total 8.50
Table No. 34.4: Some of the major activities proposed in Dungarpur are:
Name of Villages Details of activity Amount earmarked for EPA Estimated Cost ( In lakhs)
Dungarpur Bath place for Smashangruh
2.39 Lakhs
1.35
R.O.Plant in primary school (nos.3) 1.00
Total 2.35
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 59
Table No. 34.5: Some of the major activities proposed in Ivnagar are:
Name of Villages Details of activity Amount earmarked for EPA Estimated Cost ( In lakhs)
Ivnagar Repairing of Drinking water pipe line 800rm
2.42 Lakhs 2.42
Total 2.42
4.3.2. Watershed Development Works:
Watershed development works is to be done during implementation phase of watershed. Treatments begin from the highest point of the watershed and move
progressively downwards (ridge to valley), starting with the smallest stream and culminating in the main river of the watershed. Work is location-specific, varying
according to slope and geology as also the size of the stream being treated. The aim is to weave interventions into the contours of nature, not to seek mastery over it.
A net budget of 50 percent is allotted for this work.
Drainage line Treatment Plans
It is very important to treat the undulating part of the land in watershed area to conserve water and soil from erosion. This involves mainly agriculture and pasture
land of that region in the watershed. Various water harvesting and managing structures should build to arrest the erosion and degradation of soil .
1. Check dam
2. Check dam cum cause-way
3. Pakka plug
4. Village pond
5. Protection wall
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 60
CONSTRUCTION OF CHECK DAM
1.0 INTRODUCTION :-
The IWMP scheme consists of a new check dam across river stream local near village PLASAWA of junagadh clusters in JUNAGADH District.
2.0 HISTORY OF THIS SCHEME:-
The preliminary site investigation were carried out in the month of JUNE-2010 and the survey work for the proposed site was carried out in the month july-
2010.During investigation it was found that the flow in river being in-adequate for carrying the water by canal system it was not possible to construct a weir
or storage scheme and check dam is proposed.
3.0 LOCATION AND SELECTION OF SITE :-
The proposed site situated near village Patapur. At the proposed site the river is having20.00 meters horizontal and2.50 meters vertical banks. The site is
suitable for check dam as it is having sufficient No. of wells to be benefited if the check dam is constructed the stream bed comprises of Hard murram is met
at the depth of 1.00 meters from lowest bed level and the banks comprises of soil, S.R. & H.R. Strata. It is assumed that the wells coming within periphery of
half mile from check dam site will be benefited the high flood water not reaming within the banks before construction hence there is over flanking of water
but not damaging any surrounding, If, check dam is constructed across the stream and the flood water over flow but will no damage, surrounding and hence
provision for land acquisition is not made in the detailed estimate, and A.H.F.L. (GPS POINT – N-2127.445,E-7027.479)
4.0 HYDROLOGICAL DATA :-
The catchments area at the proposed site is1.25 Sq.Km. as shown in the index plan. The monsoon flow remaining up to December Month every year during
normal monsoon. The maximum flood discharge is 343.600calculated it comes to success by S.P.F. formula.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 61
SALIENT FEATURES
1. Name of River Local River
2. Catchment area 1.25 Sq.Km.
3. Discharge 343.60 cusecs.
4. Length of check dam 20.00 meters
5. F.S.L. R.L. 99.08 meters
6. Bed Level R.L. 98.08 meters
7. Foundation of body R.L. 96.78 meters
8. Top width of body : 1.00 meters
9. Bottom width of body 2.00 meters
10. Apron width 2.00 meters
11. Top apron R.L. 97.83 meters
12. Foundation of apron R.L. 97.55 meters
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 62
13. L/s. key wall 2.00 meters
14. R/s. key wall 2.00 meters
15. Benefits Rising of water table of area
Coming ½ mile radis. coming ½ mile radis.
16. Irrigation 43 Hect.
17. Estimated quantity Estimated quantity :
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 63
DISCHARGE CALCULATION+
(Stand Project Flood)
Discharge as per S.P.F. = Q = 29.402 (C.A.)0.9232
Where C.A. = Catchment area = 1.25 Km2
Q = 29.0402 (1.25) 0.9232
= 343.6cumecs.
Discharge as per managing formula H Let as assume.F.L. at site is equal to bank level R.L. Meters.
CH. AGL. HFL. F. MD. DIST. AREA
00 99.08 99.08 0.00 0.00 - -
4 98.43 99.08 0.65 0.325 4 0.325
8 97.25 99.08 1.83 0.915 4 0.915
12 97.55 99.08 1.53 0.765 4 0.765
16 99.98 99.08 0.9 0.45 4 0.45
20 99.96 99.08 0.88 0.44 4 0.44
TOTAL 20.0M. 2.895M2
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH Page 64
Area = 2.895 M2 = 31.145 Ft2
Perimeter = 12 M.
Hydraulic mean depth R = A = 2.895 = 0.24 M
P 12
Velocity according to Mannigs formula V = 1 R2/3
S½
N
Where N = co-eff. of Rughecity
= 0.03
R = Hydraulic Mean Depth
= 0.24
S = Bed Slop
I = 0.06
V = 1.35 M/sec.
Discharge Q = A x V
= 2.895 x 1.35
= 3.9Cum / Sec.
= 3.9 x 35.31
= 137.6cusecs.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 65
Calculated and provide check dam with following features.
Due to over flanking of river banks the H.F.L., A.H.F.L. can’t determine and hence calculation regarding A.H.F.L. scour depth, Hydraulic jump, apron,
stability at A.H.F.L. are not
1. Length : 20.00 M.
2. F.S.L. : R.L.99.08 M.
3. Foundation of body : R.L.95.63
4. Apron : 4.00 M
5. Apron top : R.L.97.83 M
6. Apron flood : R.L.98.25
CALCULATION FOR SCOUR DEPTH
Maximum flood discharge = 137.6 cusecs.
Length of check dam = 20.00 M
Discharge per feet run = D = Q = 137.6 = 2.09feet
L 20(3.28)
Scour depth R = 0.9 (d) = 0.9 (2.09)
= 1.88 feet
= 0.56 M.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 66
CALCULATION FOR HYDRAULIC JUMP AND APRON
Flood discharge = 137.6 cusecs.
Length of check dam = 20.00 M
Discharge per feet run = D = Q = 137.6 = 4.195
L 32.8
Difference of head = A.H.F.L. - Bed level
= 100.83 - 98.08
= 2.75m
= 9.02 feet
Now Velocity = V1 = 0.90 2 gh
= 0.90 2 x 32.20 x 9.02
= 21.69 feet / sec
Now d1 = h1 = 9.02 = 0.415 feet
v1 21.69
& d2 = (d1)2 + 4(d1)
2 (v1)
2
2 2 gd1
d2 = (0.415)2 + 4(0.415)
2 (21.69)
2
2 2 x 32.20 x 0.415
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 67
d2 = 3.30 feet.
Now Found Number f = V1 21.69
gd1 32.20 x 0.415
= 1.27 > 1 O.K.
Which is grater thane one.
Hence hydraulic jump will occur.
Now thickness of apron = t = d2 - d1 x w
2 w2-w1
Where w1 = wt. of water = 1.00 t1m3
w2= wt. of masonary = 2.40 t1m3
t = 3.30– 0.415 x 1.00
2
= 1.44feet
LENGTH OF APRON
L = 5 (d2 - d1)
L = 5 (3.30 – 0.415)
= 14.42 feet = 4.39 M
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 68
As site condition provided 4.00 M apron width.
1.NAME OF RIVER /VOKALA :- LOCAL VOKALA
2.LENGTH OF CHECKDAM :- 20.00 MT.
3.CREST LEVEL R.L. :- 99.00 MT.
4.H.F.L. :- 99.08 MT.
5.HEIGHT ABOVE G. L. :- 2.20 MT.
6.TOP WIDTH :- 1.0 MT.
7.BOTTAM WIDTH :- 2.0 MT.
8.SLOPE 1:20
9.CATCHMENT AREA 1.25.00 SQ.KM
1. Percolation well:
It is the structure made in water way of river, vokala or in small stream for harvest the surface run-off water and increase ground water
table and its technical details are under:
1 Increase ground water table
2 Reduce soil erosion
3 Creating a hydraulic head locally which enhances infiltration of surface runoff into the groundwater system.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 69
ITEM NO.:- 1
PERCOLATION WELL EXACAVATION & DEWATERING
Excavation for Well including removing And spreading the excavated stuffs directed with
Lead up to 90m.
(1) in all soils including hard murrum
(2) in soft rock
(3) in hard rock with blasting and chiseling or by shiseling only for finishing.
S.O.R. Page. 102
NO. SOIL ITEM QTY RATE PER AMOUNT
1 MURRUM 0.0M to 1.5M DEPTH 14.42 46.00 CUM. 663.32
2 H.ROCK 1.5M to 3.0M DEPTH 14.42 272.00 CUM. 3922.24
3 H.ROCK 3.0M to 4.5M DEPTH 14.42 272.00 CUM. 3922.24
4 H.ROCK 4.5M to 6.0M DEPTH 14.42 272.00 CUM. 3922.24
5 H.ROCK 6.0M to 7.5M DEPTH 14.42 390.00 CUM. 5623.80
6 H.ROCK 7.5M to 9.0M DEPTH 14.42 403.00 CUM. 5811.26
7 H.ROCK 9.0M to 10.5M DEPTH 14.42 422.00 CUM. 6085.24
8 H.ROCK 10.5M to 12.0M DEPTH 14.42 438.00 CUM. 6315.96
9 H.ROCK 12.0M to 13.5M DEPTH 14.42 489.00 CUM. 7051.38
10 H.ROCK 13.5M to 15.0M DEPTH 14.42 520.00 CUM. 7498.40
TOTAL Rs 50873.76
ADD 2% CONTI. Rs 1017.47
TOTAL Rs 51891.23
SAY Rs 52000.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 70
Table no.35: Details of activities of preparatory phase (All financial figures in lakh Rs.)
S.
No.
Name of
villages
Initiation of
village level
institution
Capacity
building IEC activities
Baseline
survey
Hydro-geological
survey
Identifying
technical support
agencies
Printing DPR
and Mapping
Estimated Cost
(Rs. in lakh)
1 Dungarpur 0.40 2.99 0.75 0.35 0.35 0.40 0.56 5.80
2 Ivnagar 0.45 3.02 0.75 0.33 0.40 0.50 0.60 6.05
3 Khadiya 1.60 10.64 3.15 0.90 0.90 1.89 2.12 21.20
4 Palasva 1.25 6.33 1.30 0.65 0.90 0.91 1.26 12.60
5 Patapur 0.50 2.64 0.40 0.29 0.40 0.50 0.52 5.25
6 Vijapur 0.70 3.84 0.90 0.45 0.50 0.50 0.76 7.65
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 71
Table no.36: Activities related to Surface water resources in Dungarpur (all financial figures in lakh Rs.)
S.
No.
Type of
structures
Proposed target
Augmentation/ repair of existing
structures
Construction of new structures Total target Expected month
& year of
completion
(mm/yyyy)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimated
cost
(Lakhs)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimated
cost
Area to
be
irrigated
(ha)
Storage
capacity
Estimated
cost
1 Pakka plug 0 0 0 0 15 10 10000 7.50 10 10000 7.50
2 check dam 0 0 0 0 1 4 4000 2.00 4 4000 2.00
3
Causeway
cum check
dam
0 0 0 0 1 5 4000 9.50 5 4000 9.50
Total 0 0 0 0 17 19 18000 19.00 19 18000 19.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 72
Table no.36.1: Activities related to Surface water resources in Ivnagar (all financial figures in lakh Rs.)
S. No. Type of
structures
Proposed target
Augmentation/ repair of existing
structures
Construction of new structures Total target Expected
month &
year of
completion
(mm/yyyy)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimated
cost
(Lakhs)
No. Area to
be
irrigate
d (ha)
Storage
capacity
(Cumec)
Estimated
cost
Area to
be
irrigated
(ha)
Storag
e
capacit
y
Estimated
cost
1
Percolation
well 0 0 0 0 1 4 1400 0.52 4 1400 0.52
2
Causeway &
excavation of
streamlet
0 0 0 0 1 5 2000 2.00 5 2000 2.00
3
Causeway
cum check
dam
0 0 0 0 1 6 4500 4.50 6 4500 4.50
Total 0 0 0 0 3 15 7900 7.02 15 7900 7.02
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 73
Table no.36.2: Activities related to Surface water resources in Khadiya (all financial figures in lakh Rs.)
S. No. Type of
structures
Proposed target
Augmentation/ repair of existing
structures
Construction of new structures Total target Expected
month & year
of completion
(mm/yyyy)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimated
cost
(Lakhs)
No. Area to
be
irrigate
d (ha)
Storage
capacity
(Cumec)
Estimated
cost
Area to
be
irrigated
(ha)
Storage
capacity
Estimated
cost
1 Check dam 1 8 3300 2.00 2 10 6000 10.50 18 9300 12.50
2
Causeway
cum check
dam
0 0 0 0 1 5 3000 10.00 5 3000 10.00
3 Causeway 0 0 0 0 4 15 8000 15.00 15 8000 15.00
4 Support wall
in cause way 0 0 0 0 1 1 1000 0.50 1 1000 0.50
Total 1 8 3300 2.00 8 31 18000 36 39 21300 38.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 74
Table no.36.3: Activities related to Surface water resources in Palasawa (all financial figures in lakh Rs.)
S. No. Type of
structures
Proposed target
Augmentation/ repair of existing
structures
Construction of new structures Total target Expected
month & year
of completion
(mm/yyyy)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimated
cost
(Lakhs)
No. Area to
be
irrigate
d (ha)
Storage
capacity
(Cumec)
Estimated
cost
Area to
be
irrigated
(ha)
Storage
capacity
Estimated
cost
1 Causeway 0 0 0 0 1 3 1500 0.50 3 1500 0.50
2
Causeway
cum check
dam
0 0 0 0 3 15 16000 9.48 15 16000 9.48
3 Check dam 0 0 0 0 3 14 9000 7.00 14 9000 7.00
4 Village Pond 3 10 30000 9.75 0 0 0 0 10 30000 9.75
Total 3 10 30000 9.75 7 32 26500 16.98 42 56500 26.73
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 75
Table no.36.4: Activities related to Surface water resources in Patapur (all financial figures in lakh Rs.)
S. No. Type of
structures
Proposed target
Augmentation/ repair of existing
structures
Construction of new structures Total target Expected
month & year
of completion
(mm/yyyy)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimated
cost
(Lakhs)
No. Area to
be
irrigate
d (ha)
Storage
capacity
(Cumec)
Estimated
cost
Area to
be
irrigated
(ha)
Storage
capacity
Estimated
cost
1 Check dam 1 4 3500 2.50 1 5 4500 4.00 9 8000 6.50
2 Causeway 1 3 3200 1.50 1 5 5300 6.00 8 8500 7.50
3 Percolation
Tank 0 0 0 0 1 8 8950 1.25 8 8950 1.25
Total 2 7 6700 4.00 3 18 18750 11.25 25 25450 15.25
Table no.36.5: Activities related to Surface water resources in Vijapur (all financial figures in lakh Rs.)
S. No. Type of
structures
Proposed target
Augmentation/ repair of existing
structures
Construction of new structures Total target Expected
month & year
of completion
(mm/yyyy)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimated
cost
(Lakhs)
No. Area to
be
irrigated
(ha)
Storage
capacity
(Cumec)
Estimat
ed cost
Area to
be
irrigated
(ha)
Storage
capacity
Estimated
cost
1 Check dam 0 0 0 0 1 7 4500 2.80 7 4500 2.80
2 Causeway 1 3 3000 1.50 1 5 4000 2.50 8 7000 4.00
Total 1 3 3000 1.50 2 12 8500 5.30 15 11.50 6.80
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 76
Table no.37: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)
SR.
No.
Name of
Villages
Type of
structures
Proposed target
Augmentation/ repair of
existing recharging structures
Construction of new recharging
structures
Total target
No. Area to
be
irrigated
(ha)
Estimated
cost
No. Area to
be
irrigated
(ha)
Estimated
cost (lakhs)
Area to
be
irrigated
(ha)
Estimated
cost (lakhs)
1 Dungarpur Open wells 0 0 0 3 24 0.75 24 0.75
2 Ivnagar Open wells 0 0 0 16 79 4.00 79 4.00
3 Khadia Open wells 0 0 0 55 123 13.75 123 13.75
4 Plasawa Open wells 0 0 0 4 17 1.00 17 1.00
5 Patapur Open wells 0 0 0 28 87 7.00 87 7.00
6 Vijapur Open wells 0 0 0 23 53 5.75 53 5.75
Total for the Project 0 0 0 129
383 32.25 383 32.25
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 77
Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No. Names of
Villages
Major activities of the SHGs & UGs
Name of activity No. of SHGs involved Average annual income from activity
per SHG (In Rs. Approx)
1 Dungarpur
Mandap Service 1 75000
Horticulture 1 60000
Soda maker unit 1 200000
Detergent Powder 1 75000
Incense Sticks Unit 1 40000
Dairy & Milk processing products 1 250000
2 Ivnagar
Neem Product unit 1 50000
Papad making unit 1 110000
Mandap Service 1 300000
Tutti frutti unit 1 75000
Dairy & Milk processing products 1 250000
3 Khadiya
Buffalo farming 1 160000
Tutti fruit unit 1 100000
Carpenter unit 1 100000
Candle making unit 1 80000
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 78
Potato product 1 90000
Paper dish bowl making 1 70000
Groundnut processing & packaging 2 80000
Papad making unit 2 110000
Mineral water unit 1 70000
Bookstore 1 70000
Soda maker unit 1 70000
Handy craft unit 1 85000
4 Plasava
Dairy & Milk processing products 1 250000
Paper dish making 1 70000
Incense Sticks Unit 1 50000
papad makimg unit 1 80000
Gul kandh making unit 1 50000
Aloevera processing 1 90000
Book binding unit 1 75000
5 Patapur
Papad making unit 1 90000
Paper dish making 1 70000
Pickle making unit 1 80000
Incense Sticks Unit 1 40000
Dairy & Milk processing products 1 250000
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 79
6 Vijapur
Detergent powder 1 60000
Book banding unit 1 60000
Pickle makimg unit 1 80000
Potato making unit 1 70000
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 80
Table 38.1: Details of allied /other activities - PATAPUR
S.
No.
Name of
village Name of activity
Type of land
Executing
agency Target
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
Estimated
cost Expected
month &
year of
completion
(mm/yyyy)
(ii)SHG
(Rs. in
lakh)
(iii) WC
Livelihood Intervention
1 PATAPUR
Kitchen garden Kits Private Community UG/SHG 1.20
Dairy & milk processing products Community SHG 1.25
Paper Dish and Bowl Making Unit Community SHG 1.10
Pickle making unit Community SHG 0.85
Incense Sticks Unit Community SHG 0.90
Total 5.30
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 81
Production System and Microenterprise Development
PATAPUR
Papad making unit Community UG/SHG 1.00
Sprinkler System demo Private UG 1.65
Drip Irrigation Demostration Private UG 1.55
Vermin Composting Private UG 1.20
Veterinary Camp Community UG/SHG 1.45
Total 6.85
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 82
Table 38.2: Details of allied /other activities - KHADIYA
S.
No.
Name of
village
Name of activity Type of land Executing
agency
Target
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Estimated cost Expected
month &
year of
completion
(mm/yyyy)
(ii)SHG (Rs. in lakh)
(iii) WC
Livelihood Intervention
2 KHADIYA
Kitchen garden Kits Community UG/SHG 4.20
Papad making unit Community SHG 2.60
Handicraft unit Community SHG 2.25
Bookstore unit Community SHG 1.85
Carpenter unit Community SHG 1.55
Groundnut Grading Unit Community SHG 4.25
Paper dish-bowl making unit Community SHG 1.60
Sari & Cloth unit Community SHG 1.10
Mineral Water unit Community SHG 1.85
Total 21.25
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 83
Production System and Microenterprise Development
KHADIYA
Auto rickshaw Unit Community UG/SHG 2.00
Book Binding Unit Community SHG 1.00
Buffalo Farming Unit Community SHG 4.50
Potato Product Unit Community SHG 1.00
Soda maker Unit Community SHG 1.75
Veterinary Camp Community 3.20
Vermin Composting Private UG 2.80
Drip Irrigation Demostration Private UG 3.25
Floriculture Private UG 2.25
Horticulture Private UG 3.95
Plant Distribution Community SHG/UG/WC 1.75
Total 27.45
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 84
Table 38.3: Details of allied /other activities – VIJAPUR
S.
No.
Name of
village
Name of activity Type of land Executing
agency
Target
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Estimated
cost
Expected month
& year of
completion
(mm/yyyy) (ii)SHG
(Rs. in
lakh)
(iii) WC
Livelihood Intervention
3 VIJAPUR
Potato product unit Community SHG 1.30
Detergent powder unit Community SHG 1.35
Pickle making unit Community SHG 1.30
Book binding unit Community SHG 0.60
Masala unit Community SHG 1.50
Kitchen garden Kits Private Community UG/SHG/WC 1.60
Total 7.65
Production System and Microenterprise Development
VIJAPUR
Sari & Cloth unit Community UG/SHG 3.00
Veterinary Camp Community UG/WC 2.25
Veterinary kits Community SHG/UG/WC 3.10
Horticulture Private UG 1.60
Total 9.95
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 85
Table 38.4: Details of allied /other activities – PALASVA
S. No. Name of
village
Name of activity Type of land Executing
agency
Target
(I)
Private
(ii) Community (iii)
Others
(pl.
specify)
(I) UG Estimated cost Expected
month &
year of
completion
(mm/yyyy)
(ii)SHG (Rs. in lakh)
(iii) WC
Livelihood Intervention
4 PALASVA
Kitchen garden Kits Community UG/SHG/WC 2.40
Allover processing unit Community SHG 6.00
Paper dish Bowl Making Community SHG 1.60
Book binding unit Community SHG 1.10
Gulkand Making Unit Community SHG 1.25
Total 12.35
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 86
PALASVA
Dairy and Milk Process
Product Community UG/SHG 1.95
Rose Farming Community UG 1.45
Vermin Composting unit Private UG/SHG 2.10
Horticulture Private UG 3.25
Veterinary camp Community 1.50
Drip kits Private UG 2.90
Nursery Private UG/SHG 1.60
Sprinkler System demo Private UG 1.70
Total 16.45
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 87
Table 38.5 : Details of allied /other activities – IVNAGAR
S.
No.
Name of
village
Name of activity
Type of land
Executing
agency Target
(I) Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
Estimated
cost Expected
month &
year of
completion
(mm/yyyy)
(ii)SHG
(Rs. in
lakh)
(iii) WC
Livelihood Intervention
5 IVNAGAR
Dairy and Milk Process Product Community UG/SHG 1.10
Kitchen Garden Kits Community UG/SHG/WC 1.40
Tutti Futti Unit Community UG 0.85
Mandap service unit Community SHG 1.80
Neem Product unit Community SHG 0.90
Total 6.05
Production System and Microenterprise Development
IVNAGAR
Papad Making Unit Community SHG 0.95
Sprinkler System demo Private UG 2.50
Veterinary Camp Private UG/SHG 1.70
Horticulture Private UG 0.95
Lemon Plantation Private UG 0.75
Drip Irrigation demo kits Private UG 1.00
Total 7.85
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 88
Table 38.6 : Details of allied /other activities – DUNGARPUR
S.
No. Name of village Name of activity
Type of land
Executing
agency Target
(I) Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
Estimated
cost Expected
month &
year of
completion
(mm/yyyy)
(ii)SHG
(Rs. in
lakh)
(iii) WC
Livelihood Intervention
6 DUNGARPUR
Incense Sticks Unit Community SHG 0.90
Detergent powder Unit Community SHG 0.90
Mandap Service Unit Community UG/SHG 2.75
Kitchen garden kits Community SHG/WC 1.40
Total 5.95
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 89
Production System and Microenterprise Development
DUNGARPUR
Dairy and Milk Processing Product Community SHG 1.55
Soda maker unit Community SHG 1.10
Chikoo Plantation unit Community UG 0.80
Veterinary camp Private UG 1.60
Horticulture Private UG 0.85
Drip Irrigation demo Private UG 1.10
Sprinkler System demo Private UG 0.80
Total 7.80
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 90
Table no. 39: Details of engineering structures in watershed works: Dungarpur
SR.
No.
Name of
structure
Type of
treatment
Type of land Executing
agency
Target
I) Ridge
area (R)
(ii)
Drainage
line (D)
(iii)
Land
dev
(L)
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
(ii) SHG
(iii) WC
No. of
units
(No./
cu.m./
rmt)
Estimated cost (Rs. in
lakh)
Expected
month &
year of
completion
(mm/yyyy)
M W O T
1 Farm
bunding L P UG/WC 152.4
0.75
2 land
levelling L P UG/WC 11 0.33
3 farm fencing
L P UG/WC 2500 3.12
Total 4.20
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 91
Table no. 39.1: Details of engineering structures in watershed works: Ivnagar
SR.
No.
Name of
structure
Type of
treatment
Type of land Executing
agency
Target
I) Ridge
area (R)
(ii)
Drainage
line (D)
(iii)
Land
dev
(L)
(I)
Privat
e
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
(ii) SHG
(iii) WC
No. of
units
(No./
cu.m./
rmt)
Estimated cost (Rs. in
lakh)
Expected
month &
year of
completi
on
(mm/yyy
y)
M W O T
1 Farm bunding L P UG/WC 2700 1.35
2 land levelling L P UG/WC 80 2.43
3 farm fencing L P UG/WC 5200 6.50
5 .
Total 10.28
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 92
Table no. 39.2: Details of engineering structures in watershed works: Khadiya
SR.
No.
Name of
structure
Type of
treatm
ent
Type of land Executing
agency
Target
I)
Ridge
area
(R)
(ii)
Drainage
line (D)
(iii)
Land
dev
(L)
(I)
Privat
e
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
(ii) SHG
(iii) WC
No. of
units
(No./
cu.m./
rmt) Estimated cost (Rs. in lakh)
Expected
month &
year of
completion
(mm/yyyy)
M W O T
1 Waste weir D L P UG/WC 5 6.84
2 Farm bunding L P UG/WC 20000 10.00
3 land levelling L P UG/WC 509 15.50
4 farm fencing L P UG/WC
20800
26.00
Total 41309 58.34
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 93
Table no. 39.3: Details of engineering structures in watershed works: Palasawa
SR.
No.
Name of
structure
Type of
treatm
ent
Type of land Executing
agency
Target
I)
Ridge
area
(R)
(ii)
Drainag
e line
(D)
(iii)
Land
dev
(L)
(I)
Privat
e
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
(ii) SHG
(iii) WC
No. of
units
(No./
cu.m./
rmt)
Estimated cost (Rs. in
lakh)
Expected
month &
year of
completion
(mm/yyyy)
M W O T
1 Waste weir D L P UG/WC 15 2.28
2 Farm bunding L P UG/WC 4521 2.26
3 land levelling L P UG/WC 8 0.72
4 farm fencing L P UG/WC 23600 29.50
Total 28144 34.76
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 94
Table no. 39.4: Details of engineering structures in watershed works: Patapur
SR.
No.
Name of
structure
Type of
treatme
nt
Type of land Executing
agency
Target
I) Ridge
area (R)
(ii)
Drainage
line (D)
(iii)
Land
dev
(L)
(I)
Privat
e
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
(ii) SHG
(iii) WC
No. of
units
(No./
cu.m./
rmt)
Estimated cost (Rs. in
lakh)
Expected
month &
year of
completion
(mm/yyyy)
M W O T
1 Waste weir R D L P UG/WC 14 2.10
2 Farm bunding L P UG/WC 1626 0.81
3 land levelling L P UG/WC 35 1.06
4 farm fencing L P UG/WC 2100 2.62
Total 3775 6.59
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 95
Table no. 39.5: Details of engineering structures in watershed works: Vijapur
SR.
No.
Name of
structure
Type of
treatm
ent
Type of land Executing
agency
Target
I)
Ridge
area
(R)
(ii)
Drainage
line (D)
(iii)
Land
dev
(L)
(I)
Privat
e
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG
(ii) SHG
(iii) WC
No. of
units
(No./
cu.m./
rmt)
Estimated cost (Rs. in
lakh)
Expected
month &
year of
completion
(mm/yyyy)
M W O T
1 Farm bunding L P UG/WC 3520 1.76
2 land levelling L P UG/WC 83 2.52
3 farm fencing L P UG/WC 5600 7.00
4
Total 11.28
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 96
Table no. 39.6: Details of engineering structures in watershed works (All Village) :
S.
No.
Name of
structures
Type of treatment Type of land Executing
agency
Target
(I)
Ridge
area
(R)
(ii)
Drainage
line
(iii) (I) (ii)
Community
(iii)
Others
(pl.
specify)
(I) UG No. of
units
(No./
cu.m./
rmt)
Estimated cost (Rs.
in lakh)
Expected
month &
year of
completion
(mm/yyyy)
(D)
Land
dev
(L)
Private (ii)SHG
(iii) WC M W O T
1 Waste weir L P UG/WC 74 11.22
2 Farm bunding D L P UG/WC 41301 21.64
3 Land levelling L P UG/WC 1152 35.02
4 Farm fencing L P 86000 107.49
Total: 175.37
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 97
Plains or Flat level:
Farm bunds are constructed on agricultural land with the aim of arresting soil erosion and improving the soil moisture profile. Ideally, bunds on
farms should be made on the contour line. But this creates several problems for farmers. Contour bunds divide the field into irregular sections. In such
a situation, it becomes inconvenient to maneuver bullocks for operations such as plugging and line-sowing. Due to these difficulties, what is normally
practiced in the name of farm bunding is bunding along the field boundaries.
Table No 40: Technical Details/Estimates of Farm Bund
Estimate of cost : Farm Bunding
Particulars Value Unit
Top width 2.00 Mt
U/S Slope 1: 1:1.5
D/S Slope 1: 1:1.5
Max. height 2.00 Mt
Bottom Width 8.00 Mt.
Area of cross section of Farm Bund 10.02 Sq mt
Qty. of earthwork of Farm bund /Meter 10.02 Cumec
Rate /cumec 50.00 Rs.
Total cost of Farm bund per mt. 41.41 RS
Total Length of farm bunding Mt
Cost of Farm bunding Rs
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 98
Drainage line Treatment and water harvesting:
The second tier treatment is the slope treatment. This is generally agricultural land or waste lands. These are generally water conservation or surface
water storage structures. These being highly labour intensive will involve more of manual labour so schemes like National Rural Employment Guarantee
Scheme (NREGS) can be taken. Following structures has been proposed in the project villages.
1. Percolation tank/ Pond
2. Waste Weir
3. Afforestation
B). Percolation Tank: Percolation dams are constructed for recharging groundwater. Such structures are usually made on the upper part of the catchment
area. Water stored here percolates to wells and tube wells located in the lower part of the catchment. Such dams can also be made in the immediate
upstream portion of wells and tube wells. Depending on the capacity of the dam and duration of water storage, the dam can have secondary benefits (such
as pisciculture) that are vital for the livelihood security of marginal farmers and landless labourers.
Table no 40.1. : Technical details of Percolation Tank or village pond
Particulars
Value
Structure Length
900.00
Mt.
Structure Height
2.00
Mt.
Upstream Slope
1:1.5
:1
Downstream Slope
1:1.5
:1
Bund Top Width
2.00
Mt.
Structure Base Width
8.00
Mt.
Structure Cross Section
10.00
SqMt.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 99
Table no.41. : Details of activities connected with vegetative cover in watershed works: Dungarpur
SR.
No.
Name of
village
Name of
structure/
work
Type of treatment Type of land Executing
agency
Target
(I)
Ridge
area
(R)
(ii)
Drainage
line
(iii)
Land
dev.
(L)
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Area
(ha)
No. of
plants
Estimated
cost
Expected
month &
year of
completion
(mm/ yyyy)
1
Dungarpur
Afforestation L C 2 2184 3.00
2 Agro-forestry
Tree guard L p C 1 8000 1.50
Total 4.50
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 100
Table no.41.1: Details of activities connected with vegetative cover in watershed works: Ivnagar
SR.
No.
Name of
village
Name of
structure/
work
Type of treatment Type of land Executing
agency
Target
(I)
Ridge
area
(R)
(ii)
Drainage
line
(iii)
Land
dev.
(L)
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Area
(ha)
No. of
plants
Estimated
cost
Expected
month &
year of
completion
(mm/ yyyy)
1
Ivnagar
Afforestation L C 3.5 1872 4.06
2 Crop. Demo. L C 1 180 1.15
3 Agro forestry
+ tree Guard L P 1 1.60
Total 6.81
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 101
Table no.41.2: Details of activities connected with vegetative cover in watershed works: Khadiya
SR.
No.
Name of
village
Name of
structure/
work
Type of treatment Type of land Executing
agency
Target
(I)
Ridge
area
(R)
(ii)
Drainage
line
(iii)
Land
dev.
(L)
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Area
(ha)
No. of
plants
Estimated
cost
Expected
month &
year of
completion
(mm/ yyyy)
1
Khadiya
Afforestation L C 2.5 4992 4.00
2 Agro forestry
+ tree guard L p 1
1.50
Total 5.50
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 102
Table no.41.3: Details of activities connected with vegetative cover in watershed works: Plasava
SR.
No.
Name of
village
Name of
structure/
work
Type of treatment Type of land Executing
agency
Target
(I)
Ridge
area
(R)
(ii)
Drainage
line
(iii)
Land
dev.
(L)
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Area
(ha)
No. of
plants
Estimated
cost
Expected
month &
year of
completion
(mm/ yyyy)
1
Palasva
Afforestation L C 1.5 3900 4.00
2 Crop. Demo. L C 1 180 1.35
3 Agro forestry
+ tree Guard L p 1
1.20
Total 6.55
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 103
Table no.41.4: Details of activities connected with vegetative cover in watershed works: Patapur
SR.
No.
Name of
village
Name of
structure/
work
Type of treatment Type of land Executing
agency
Target
(I)
Ridge
area
(R)
(ii)
Drainage
line
(iii)
Land
dev.
(L)
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Area
(ha)
No. of
plants
Estimated
cost
Expected
month &
year of
completion
(mm/ yyyy)
1 Patapur Plantation L C 1.5 180 2.00
Total 2.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 104
Table no.41.5: Details of activities connected with vegetative cover in watershed works: Vijapur
SR.
No.
Name of
village
Name of
structure/
work
Type of treatment Type of land Executing
agency
Target
(I)
Ridge
area
(R)
(ii)
Drainage
line
(iii)
Land
dev.
(L)
(I)
Private
(ii)
Community
(iii)
Others
(pl.
specify)
(I) UG Area
(ha)
No. of
plants
Estimated
cost
Expected
month &
year of
completion
(mm/ yyyy)
1
Vijapur
Plantation L C 0.4 185 1.50
2 Agro-Forestry
+ tree Guard L P 2 2.50
Total 4.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 105
Table no. 42. : Details of activities connected with vegetative cover in watershed works – Proposed target
S.
No.
Name of
village Afforestation
Agro
forestry
Crop. Demo
(Plantation)
Total
ha lakh Ha lakh ha lakh ha lakh
1 Dungarpur 2 3.00 1 1.5 3 4.5
2 Ivnagar 3.5 4.06 1.5 1.60 1 1.15 6.15 6.81
3 Khadiya 2.5 4.00 1 1.5 3.5 5.5
4 Palasva 1.5 4.00 1 1.2 1 1.35 3.5 6.55
5 Patapur 1.5 2.00 1.5 2.00
6 Vijapur 2 2.50 0.4 1.5 2.43 4.00
29.36
Table no. 43. Details of activities in the CPRs in the project areas.
Table no. 43.1 Details of activities in the CPRs in the project areas.
Sr. No. Name (s) of the
Villages
CPR particulars Activity Proposed Target
Target area under
the activity (ha.)
Estimated
expenditure (Rs.)
Expected no. of
beneficiaries
1 Dungarpur Afforestation 2184 2 3.00 Community
Agro forestry +Tree
guard
8000 1 1.5 Community
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 106
Table no. 43.2 Details of activities in the CPRs in the project areas.
Sr. No. Name (s) of the
Villages
CPR particulars Activity Proposed Target
Target area under
the activity (ha.)
Estimated
expenditure (Rs.)
Expected no. of
beneficiaries
1
Ivnagar Crop. Demo 180 0.45 1.15 Community
Afforestation 1872 3.5 4.06 Community
Table no. 43.3 Details of activities in the CPRs in the project areas.
Sr. No. Name (s) of the
Villages
CPR particulars Activity Proposed Target
Target area under
the activity (ha.)
Estimated
expenditure (Rs.)
Expected no. of
beneficiaries
1 Khadiya Community
Vermin Composting-2
unit
2 0.50 2.00 UG/SHG
Afforestation 4992 2.5 4.00 Community
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 107
Table no. 43.4 Details of activities in the CPRs in the project areas.
Sr. No. Name (s) of the
Villages
CPR particulars Activity Proposed Target
Target area under
the activity (ha.)
Estimated
expenditure (Rs.)
Expected no. of
beneficiaries
1
Palasva Crop Demo. 180 1 1.35 Community
Afforestation 3900 1.5 4.00 Community
Table no. 43.5 Details of activities in the CPRs in the project areas.
Sr. No. Name (s) of the
Villages
CPR particulars Activity Proposed Target
Target area under
the activity (ha.)
Estimated
expenditure (Rs.)
Expected no. of
beneficiaries
1 Patapur Crop Demo. 180 1.5 2.00 Community
Table no. 43.6 Details of activities in the CPRs in the project areas.
Sr. No. Name (s) of the
Villages
CPR particulars Activity Proposed Target
Target area under
the activity (ha.)
Estimated
expenditure (Rs.)
Expected no. of
beneficiaries
1 Vijapur Plantation 0.4 1.5
Afforestation 4368 2 2.5 Community
Horticulture 2000 1.2 1.60 UG/SHG/WC
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 108
Table 44: Technical Details of Afforestation Activities
Particulars Value Unit
Crop Name
Pelt forum spc.
Plant To Plant Spacing 8.00
mt
Row to Row Spacing
8.00
mt
Pit Length
1.00
mt
Pit Width
1.00
mt
Pit Depth
1.00
mt
No. of Plants
156
Nos.
Plantation Area
1.00
Ha.
No. of Plants for (1 ha )
156
Nos.
Gap Filling
20
%
Table 44.1: Cost Estimation for afforestation activity
S. No.
Description
No.
Lengt h(m.)
Width (m.)
Depth (m.)
Unit
Quantity
Rate
Amount
1
Digging of pits for plants in Ordinary murum
156
1
1
1
Cum
156.00
50
7800
2
Plants saplings for plantation in Govt. pasture area, sapling not less than 30 cm. height
156
Nos.
156.00
10
1560
3
Transportation of plants from nursery to camp site upto 5Km
156
Nos.
156.00
1
156
4
Loading and unloading of plants
156
Nos.
156.00
1
156
5
Rehandling of plants from camp site to actual planting site upto
20Omt.
156
Nos.
156.00
1
156
6
Cost of fertilizer & insecticides incl. application
156
Nos.
156.00
10
1560
7
Weeding and Hoeing two times (Twice in year]
156
Nos.
156.00
2
312
Total
11700
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 109
MICRO ENTERPRISE – 1
PAPER DISH-BOWL MAKING UNIT
Introduction
Paper dish making unit is a low investment activity that has a good market potential in the nearby villages of our cluster. The unit requires very low
amount of capital investment and unskilled workers can easily handle the SHGs &UGs groups. The raw material is laminated paper which is available in
bulk from the nearby market. There is a good level of demand for the product but only a few units are present in Junagadh for manufacturing paper dish
bowls.
Project Cost:
Sr.
No.
Particular Price (Rs.)
A) Machinery and Equipments
1 Machine 30000.00
2 Furniture 15000.00
3 Other instruments 10000.00
TOTAL 55000.00
B) Postage, telephone, stationery, transportation etc 3100.00
Grand Total :- 58100.00
Production Cost (Monthly)
1 Raw Material 2000.00
2 Power fuel charge 500.00
3 Packing 120.00
4 Repairs and maintenance 250.00
5 Unskilled workers 400.00
6 House Rent 500.00
7 Others 200.00
Total : - 3970.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 110
Total Production (Monthly)
Sales price of 1 paper bowl dish – Rs 2.00
Paper bowl dish sheaths (5000) 10000.00
Cost Benefit Ratio (Monthly)
Monthly Selling income 10000.00
Production Cost 3970.00
------------
Total monthly income will be Rs. 6030 6030.00
Benefits:
No training is required to undertake this activity and unskilled workers can easily take up the machine work.
The time taken to roll out paper dish is very less and the quantity churned out per day is high. The machine is
available at cheap prices
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 111
MICRO ENTERPRISE -2
VERMI COMPOSTING
Vermin composting is an eco-friendly technology. Application of vermin-culture technology in the recycling of Seri cultural waste and other
wastes has a tremendous potential. It is estimated that, by recycling (3) times in a year the farmer may get approximately 15 tones of vermin compost
manure.
Vermin composing is a technology of using earthworms as versatile natural bio-reactor for rapid conversion of any organic wastes under value
added manure. The earthworms feed on the wastes of organics origin, which is rich in NPK, micro nutrients, enzymes and vitamins suitable for crop
growth besides number of useful micro organisms.
S. No
Particulars
Quantity
Rate (Rs.)
Amount (Rs.)
1 Super Structure construction with truss with fencing 128750
2 Shade net for covering the roof
750 sqrt mt.
25
18750
3 Binding wire for tying
200 Kg
50
10000
4 Labour charges for erection of sheds
100
100
10000
5 Shovels, spades, crowbars, iron baskets etc
15000
6 Weighing scale (100 kg capacity)
1
2500
2500
7 Cow dung @ 80kg/m3
96 qtl
250
24000
8 Worms
200 kg
70
14000
9 Formation of vermin bed with agro-waste, cow dung and worms
50000
10 Miscellaneous
-
-
3000
11 Training 5000
Total cost
-
-
Rs. 281000
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 112
Returns from vermicomposting (BENEFITS)
1. Sale of vermin compost of 120 tones @ Rs.3000/- per ton
120 X 3000 = 360,000 Rs
2. Sale of worms @ 5 kg per ton of compost and Rs. 50 per kg
600 X 50 = 30,000 Rs
3.Total
3,90,000 Rs/-
Net benefit
1,09,000 Rs/-
Technical Support/Assistance:
To ensure proper technical support for Vermicomposting and smooth functioning of activities the required technical assistance may be taken from
Krishi Vigyan Kendra (KVK's), Dept. of Agriculture, Junagadh.
Advantages:
The importance of a vermicomposting can be well understood. The vermicomposting will provide much needed relief and self-reliance to poor in
the village especially on agriculture depended farmers. Specifically, the advantages are:-
> It will reduce migration during summer season.
> Farmers can purchase and sale of vermincompost at village level, thus doing away with costs incurred by them to carry out these transactions at the
city market.
> It can reduce in overall market prices of fertilizers during the lean season.
> Reduced distress of soil due to chemical fertilizers.
> Improves the physical and chemical health of the soil.
> Improves fertility of soil and thereby increases the crop production.
> Higher incomes per capita.
> Increase employment opportunities at the village level associated with the sale and purchase vermin compost.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 113
MICRO ENTERPRISE - 3 BAKERY UNIT
Introduction
Bakery food items have gained popularity with the youngsters and are now a part of daily snacks in all parts of the country.
The rural pockets have also been influenced by it and bakery products are available in villages through multiple channels. The
demand for these products is rising in the rural areas and in almost all parts of Gujarat, bakery products are consumed on a large
scale.
Freshness, taste and quality are the three important parameters for bakery products. The business is lucrative in our project
cluster due to the availability of raw materials in the villages. We are taking up this activity in Khadiya after repeated discussions
with the villagers through FGD's and PRA's.
Training and exposure visits will be provided to the entrepreneurs at renowned bakeries like Monogynies & Agriculture
university of Gujarat Motibaug -Junagadh.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 114
PRODUCTION SYSTEM - 1
PAPAD MAKING UNIT
For women to become a successful entrepreneur, she needs access to capital, technical and managerial know-how and market. The
essence to empower rural women lies in catalyzing appropriate economic activities at the grass root level and creating new opportunities for
them to earn higher income in order ton improve their standard of living. This objective could be accomplished by establishing that are
based on the locally available resources and preferably indigenous knowledge. SHG, each with 10-15 members, will be motivated and
training will be provided for each micro enterprise activity which will improve the quality of their own lives as well as the lives of those
around them.
Introduction
Papad is delicious & tasteful Snack. It is consumed at hotels, malls, restaurants, homes, shops etc. Papad is a traditional item consumed
in all functions. Traditionally this activity this activity was confined to household papad making but in view of increasing demand and
availability of machinery it has now been development in cottage and small scale sector.
Manufacturing Process
Generally weighed quantity of floor is taken in a mixer. Ingredients required for Papad making are Black gram, oil, sodium carbonate,
flour of Arhar dal. A solution of common salt and carbonates is added in requisite quantity of water and the contents are kneaded at maximum
speed to get a homogenous lump of the dough. After resting the dough for 30 minutes, it is divided into balls. These are pressed into circular
discs. Corn starch can be used as dusting material to prevent stickiness. The papads are usually dried. After drying, it is packed in various size
packing. Lot of 25 or 50 papads is then packed in polythene bags. Papad can be manufactured from different varieties of pulses or there could
be a combination of pulses as well.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 115
Market
Field survey findings indicated that papad industry has good potential in cities like Junagadh, Bhavnagar and Rajkot. There is a good demand for
papads because it is a food product and commonly consumed commodity in all households and hotels. Women entrepreneurs can gainfully take up this
papad unit in their houses but proper packing and distribution network is necessary to sell in bulk quantities.
Production Capacity
Monthly approximately 300 kg papad can be produced.
Static Capital Investments:
A) Land/Infrastructure :
A person can start his activity in his own/ rented house by using Approx. 150 Sq. Ft. carpet area.
Sr. No. Particular Price (Rs.)
B) Machinery and Equipments
1 Mixing and rolling machine 24000.00
2 Weighing machine 3000.00
3 Packing machine 2000.00
4 Set for papad making 1000.00
5 Furniture 5000.00
6 Other instruments 1000.00
TOTAL 36000.00
C) Postage, telephone, stationery, transportation
etc
3000.00
Grand Total :- 39000.00
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 116
D) Production Cost (Monthly)
1 Raw Material 16000.00
2 Power fuel charge 600.00
3 Packing 150.00
4 Repairs and maintenance 250.00
5 Unskilled workers 2100.00
6 House Rent 500.00
7 Others 300.00
Total : - 19900.00
Total Production (Monthly)
1. Papad 300 Kg X Rs. 137/Kg 41100.00
Cost Benefit Ratio (Monthly)
Monthly Selling income 41100.00
Production Cost 19900.00
------------
Total monthly income will be Rs. 21200.00 21200.00
The unit can be taken up by landless, small farmer and land with limited farm labour, thus making it most suitable to the project
villages, and the scheme will be taken up in such a manner that there should be no marketing problem, as they will be consumed
directly by the near by villages or cities. Training will be provided to the beneficiaries and the content is shown below.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 117
Training Content
A. Theoretical
• Introduction to different types of papads.
• Tools and Equipments used in papad making
• The processes involved in papads making.
• Dough making - variations in shapes, size, and flavor.
• The hygiene aspects associated with food products..
• Addresses of the suppliers of raw materials, & packaging materials.
• Development of Market.
B. Practical
• Introduction to the machinery and equipments used.
• Raw materials for papad making – the quality and variety.
• Dough making and the value addition in the form of flavors.
• Bringing about variations in shapes and sizes.
• Papad & Chips making – Practical
• Drying and Preservation
• Cost considerations and waste reduction.
• Deciding Pricing
• Packaging
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 118
PRODUCTION SYSTEM – 2
DETERGENT POWDER UNIT
Introduction:
Washing powder has a special formula of enzymes and achieves oxygen to give outs tending clean clothes while maintaining their texture and color.
Washing & Detergent powder has a perfect formulation that not only gives great clean but also is gentle to both hand & cloth. Its special low leather
formulation works well in top and front landing machines without damaging it and its regular. Usage. Washing powder also helps the user to wash more
number of garments than the traditional washing detergents it tackles tough stains like tea, curry, oil, grease etc. with extreme ease.
Packing Sizes = 100gm , 200gm, 250gm, 500gm, 1kg, 2kg, 5kg. More
Formula: 1) Active Matter
2) Sodium Tri Phosphates (STPP)
3) Other Phosphate
4) Sodium Chloride
5) Perfume
6) Color Brand Name: Detergent
35%w/w Minimum
Lemon /Sky Blue/White & More....
Market :
PRA and FGD indicated that Washing Powder unit has good potential in all cities & villages. There is a big demand for washing powder in
every house. So it is easily sold at both Retailer and Whole seller shops near our cluster. Thus this washing powder unit gets good profit.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 119
PRODUCTION SYSTEM – 3
INCENSE STICKS UNIT
Introduction:
The term Agarbatti originates from the “Agar” or Aloes wood, the original incense which became synonymous with the word and “bathi” meaning
stick. We offer a wide range of incense sticks packets that are available in a pleasing fragrances.
.
Manufacturing system:
The manufacture of Incense is both a science and an art. Varieties of Incense are composed of diverse leaves, flowers, roots, barks, woods, resins,
gums and oils. We employ people from industry who have the best know-how in the field of manufacturing Ince4nse products. These experts are
Equipped with a production setup consisting of latest machines to manufacture, test and pack the finished goods.
We have made arrangements so that extreme winters and monsoons do not affect our production of incense stick our team of perfumers does not
just create a new perfume; they aim to create a sensation. With a large palette of raw materials that allow more. There is no need to higher educated people.
Market:
Focus Group Discussion & Participatory Rural Appraisal & Field Survey finding indicated that Agarbatti unit has good potential in each and
every villages & cities. There is a big demand for Agarbattis because it is commonly used in all temples, households, shops , offices , hotels etc. It has
Get easily market not only in wholesale but also in retail. By analysis we know that this unit gets more profit by less hard work and in lower time.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 120
PRODUCTION SYSTEM – 4
MASALA UNIT
INTRODUCTION:
We are taking up the Masala unit in Vijapur village after discussion with villagers (men & women) through PRA’s and FGD’s. The demand of
this unit is rising in the rural areas and almost in all over district and state. Thus we offer a wide range of Masala Products. Today, we see the wide uses of
different kinds of Masala products in each and every households, restaurants, hotels, wedding party, different kinds of catering service unit etc. It is
available in all types of packing size like 25 gm, 50 gm, 100 gm, 200gm, 400gm, 500gm and more. There is a good demand for Masala unit in every
villages and cities. It is sold at whole sale and retail shops. So the production of Masala unit gets good market and better profit.
PRODUCTION LIST OF DIFFERENT KINDS OF MASALA:
1. Sambhar Masala 9. Amchur Masala
2. Vada Masala 10. Dal Masala
3. Pakoda Masala 11. Pani Puri Masala
4. Phudina Masala 12. Curry Masala
5. Tea Masala 13. Garam Masala
6. Pav bhaji Masala 14. Jal –Jeera Masala
7. Chana Masala 15. Kitchen King Masala
8. .Chat Masala 16. Biriyani Pulav Masala
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 121
AGRICULTURAL IMPROVEMENT PROGRAMME
Our understanding is that without addressing the crucial area of end-use regulation, no amount of rainwater harvesting is going to work. For this the
most important requirement is the working out of a sustainable package of practices for dry land agriculture. This is moreover an alternative to the Green
Revolution, which largely bypassed the dry lands or is completely inappropriate for them. It is believed that the economy must be viewed as a sub-system
of the larger eco-system, which comprises not merely human beings but also natural resources and non-human species.
The watershed village area has seen penetration of Green Revolution (GR) inputs in agriculture, which is the main occupation of the people.
Groundnut that was the main crop of the area is becoming completely unviable because of high pesticide costs. Despite excessive use of pesticides,
pestilence remains an intractable problem. The inputs available to them are often sub-quality. For example, local dealers dispose of expired pesticides to
illiterate farmers. Farmers are in general suffering because of high input costs. However, their problem is that they perceive no alternative to the GR
package. What is worse, the catchment areas have suffered severe denudation of forest cover in recent years. This has raised the rate of soil erosion and
surface runoff. Biodiversity has also been adversely affected. There is a fodder and fuel crisis in the area. Within this context, our attempt (see Figure
below) is to forge several new links within the elements of the natural resource base of the area (climate, rain fed agriculture, wastelands, forests, and crop
residues, animal and human wastes and decentralized energy sources). With soil and water conservation technologies, surface runoff is minimized which
improves the level of soil moisture. Loss of essential soil nutrients is also reduced and harvested runoff is recycled to agricultural land through water
harvesting structures. The utilization of soil moisture through vegetative systems strengthens the flows of fodder, firewood. Non-woody biomass from the
regenerated forests and commons, as well as part of the crop residues, is returned to the soil through microbial decomposition. Re vegetation of the
commons also provides material for direct incorporation into soil as green manure.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 122
These are the major components in the agricultural programme to be carried out in the Programme:
Seed distribution
Seed multiplication
Trials and Demonstrations
Screening of new varieties
Popularization of a package of agricultural practices
Floriculture
Horticultural plantation
Non Pesticide Management
Vermicomposting
Phoenix/date palm plantation along the stream banks on farm bunds
Jatropha plantation along fencing and on wastelands
Afforestation
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 123
Our effort has been to introduce a complete alternative to hybrid seeds and the Green Revolution package and practices as listed above. As a trial of the
recommended practice of intercropping of different crops, farmers of the project area were chosen for Front Line Demonstrations (FLDs). These
demonstrations attempt to make certain type of crop varieties popular again by showing the possibility of intercropping with a cash crop. The model, thus,
attempts to show the households the possibility of getting some extra cash income while ensuring food security. In collaboration with ICRISAT,
Hyderabad, Junagarh Agricultural University, KVK-Kodinar, Junagadh, we will carry out trials of composite varieties of different crops as trail or
demonstration plot. Seeds of varieties identified as suitable to the area will be disseminated to more than 100 farmers in watershed villages. Then attempt is
to a comparative assessment of some of these varieties based on a detailed feedback obtained from the farmers of the area. This feedback will be then
provided to scientists who devised these seeds.
Training and Exposure visits
A large group of people, consisting mainly of women dairy farmers who will take loans for purchase of cattle, will visit the successful dairy
cooperatives under the Amul Dairy, Dudhsagar dairy and Banas dairy. These cooperatives were chosen mainly for the reason that many of the successful
dairy farmers in these areas are small farmers belonging to various communities. These dairies had also built up their business on the hard work of women
farmers who had taken loans from the SHGs run by the cooperative union to buy cattle. The interaction will be helpful as dairy co-operative members in
other district will make them to understand how those women, with a similar background, had been able to build up a good livelihood option revolving
around the dairy.
Training addressing the issue of infertility in animals will be provided to beneficiary group. Three day training cum exposure visit will be organized
for the team and some farmers to the BAIF organization. The visit will provide a first hand view of the options open to dry land farmers to ensure the
availability of good quality fodder. The farmers who had adopted such practices demonstrated how it could help in cutting down the cost of feed
concentrates.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 124
One day training on azolla cultivation, as a means of providing high protein feed to livestock, will be organized by KVK. Scientist from the KVK
will demonstrate the simple method by which azolla could be grown in the backyard of farmers. Demonstration pits are expected to set up in the
demonstration plot of farmers.
Livelihood Intervention Promotion of micro-enterprises and various income generation activities is an important aspect of empowerment. Although it is extremely difficult
to find remunerative self employment, there are enormous untapped opportunities in the rural sector. These include both on-farm and off-farm
opportunities. Typically families living below poverty line, SC, ST and landless in a cluster of villages are motivated to take part in holistic development
through livelihood opportunities through multidisciplinary interventions.
Advantages of Agro-Based Activities:
While promoting various income generation activities, agro-based activities have advantages because of the following reasons:
1. Target groups are acquainted with most of the basic skills.
2. Easy access to inputs.
3. No problems of marketing, as most of the outputs are locally consumed as food.
4. As over 50-60 % of the rural families own land and livestock, income generation activities can be initiated immediately without heavy capital
investment.
5. Risk of failure due to improper technology, poor quality, low demand and poor price recovery are very low. Hence, the chances of success are high.
6. Infrastructure required for promotion of on-farm activities has been very well established. Hence, the entrepreneurs can progress even in backward
regions,
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 125
Which are deprived of regular power supply and electronic information connectivity. It is therefore advantageous to tap all the opportunities to promote
various on-farm activities. The experience has confirmed that the best strategy to promote income generation activities through SHGs is to analyze the on-
going agro-based activities undertaken by the members and introduce suitable interventions to enhance the production. There are also excellent
opportunities to improve post production management of the produce through grading, storage, processing and marketing.
Various micro-enterprises activities through UG and Self Help Groups will be promoted. The list of micro-enterprises taken up by various SHGs is
presented below. Among these activities, agriculture followed by animal husbandry, Khadi making units and food processing. However, over a period of
time, agriculture, animal husbandry and food processing supersede the trade as many individuals participate in enhancing their production at the family
level and try to organize themselves to market them collectively. Other activities such as production of utility items, construction related activities,
handicrafts and Moti work find it difficult to sustain due to poor marketing infrastructure, lack market and competition from other sources.
Support Needed for Promotion of Micro-enterprises
Following support is needed to promote micro-enterprises through women SHGs.
1. Motivation of the target communities, particularly women and landless farmers
2. Formation of Self Help Groups and their Federations
3. Gender sensitization
4. Training and capacity building
5. Micro-finance. Provision of credit facilities and linkage with banks
6. Development of infrastructure, particularly through the SHG Federations to provide necessary support services and marketing
7. Trade networking and establishment of market outlets
8. Village level Information Centre: The multi-disciplinary team interacted with the SHGs and User groups to explore the potentials for development of
various enterprises and extend necessary support for dissemination of technologies, procurement of inputs, and training of members and establishment of
linkage with the market. There should be some agency to provide guidance to the entrepreneurs as and when needed.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 126
The selected production activities for the watershed villages follow the above-mentioned process, and are selected in such a way that they should be:
economically viable
environmentally sustainable
socially equitable
energy efficient
employment generation
For any policy or resolution to be passed
Enhanced control due to
Floriculture
Floriculture industry a lucrative business comprising traditional flowers , cut flowers, pot plants, dry floral crafts and planting materials, besides
value-added products like bouquets, garlands, floral baskets, floral concretes, pot-pourii and oils. It has proved to be a highly profitable agro-business
generating maximum returns per unit area. Flowers like Rose, Marigold, and ------ can be profitably cultivated. Rose and marigold fetch very high prices in
the local market and many farmers in their homestead gardens. This can be a good alternative and economic crop for the small stakeholders. The per unit
returns from marigold and rose is expected to be very high.
4.4 Capacity building and Institutional collaboration
Watershed management and development requires the collaboration of a wide range of farmers’ organizations as well as extension and research
institutions at various levels. This gives implementers access a wider technical resource base, creates better information flows and encourages mutual
learning. Watersheds serve as a confluence between lands and communities, providing ample opportunities for members to share complementary expertise.
A watershed contains producers (farmers), possibly actors that add value to produce, traders and consumers information, and education institutions to test
their joint efforts to make a difference. Watersheds can be also a good ground for learning and demonstration of expertise.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 127
Scope of capacity building at Project Villages
Income Generation Activities
o Stitching
o Food Processing
o Post Harvest management practices Fodder development and Management
o Gram Vatika
Crop Information
Meteorological Information
Alternative Land Use Plan
Improved and Scientific agriculture practices
Scientific planning of Soil and Moisture conservation
Information dissemination on Audio/Video
Dairy Development and Management
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 128
Table no. 44: Institutes Identified for Capacity Building
S.No
Organisation
Training Modules
1
Krishi Vigyan Kendra, Junagadh Better farming practices
2
Junagadh Agricultural University soil conservation
3 SPIPA Implementation and Monitoring of watershed projects
4 IRMA Sustainable Livelihoods Governance, Natural Resource Management
5 AKRSP Participatory methods in planning and implementation of watershed projects
6 Anarde Foundation Community Based Activities,
7 BISAG, Gandhinagar GIS in planning
8 BAIF Microenterprise Planning
Early and ongoing stakeholder collaboration and communication in capacity building is also important from the point
viewpoint of “leveling the playing field” in anticipation of disputes that may arise. Filling strategic skills/capacity gaps supports
Integrated Water resources Management, facilitates dispute resolution, and builds practical understanding of the scope of sustainable
natural resource development challenges and opportunities
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 129
Table no. 45: Capacity Building plan
S. No. Village Project Stakeholders Total no. of
persons
No. of persons to be
trained
No. of training
programmes Estimated cost(lakh)
1 Dungarpur
PIA 2 2 1 0.12
WDTs 6 6 4 0.50
UGs 10 7 1 0.70
SHGs 50 40 1 1.05
WCs 10 10 1 0.50
GPs 5 5 1 0.12
Total 2.99
Table no. 45.1: Capacity Building plan
S. No. Village Project Stakeholders Total no. of
persons
No. of persons to be
trained
No. of training
programmes Estimated cost(lakh)
1 Ivnagar
PIA 2 2 1 0.12
WDTs 6 6 4 0.50
UGs 30 21 1 0.75
SHGs 24 16 1 1.05
WCs 13 13 1 0.50
GPs 4 4 1 0.10
Total 3.02
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 130
Table no. 45.2: Capacity Building plan
S. No. Village Project Stakeholders Total no. of
persons
No. of persons to be
trained
No. of training
programmes Estimated cost(lakh)
1 Khadiya
PIA 2 2 1 0.12
WDTs 6 6 4 0.80
UGs 85 65 2 3.15
SHGs 125 105 2 4.72
WCs 14 14 2 1.65
GPs 5 5 1 0.20
Total 10.64
Table no. 45.3: Capacity Building plan
S. No. Village Project Stakeholders Total no. of
persons
No. of persons to be
trained
No. of training
programmes Estimated cost(lakh)
1 Palasva
PIA 2 2 1 0.12
WDTs 6 6 4 0.80
UGs 34 22 2 1.86
SHGs 85 65 2 2.85
WCs 10 10 1 0.50
GPs 5 5 1 0.20
Total 6.33
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 131
Table no. 45.4: Capacity Building plan
S. No. Village Project Stakeholders Total no. of
persons
No. of persons to be
trained
No. of training
programmes
Estimated
cost(lakh)
1 Patapur
PIA 2 2 1 0.12
WDTs 6 6 4 0.40
UGs 12 6 1 0.70
SHGs 55 35 1 0.92
WCs 15 15 1 0.40
GPs 4 4 1 0.10
Total 2.64
Table no. 45.5: Capacity Building plan
S. No. Village Project Stakeholders Total no. of
persons
No. of persons to be
trained
No. of training
programmes
Estimated
cost(lakh)
1 Vijapur
PIA 2 2 1 0.12
WDTs 6 6 4 0.50
UGs 45 20 1 1.10
SHGs 55 35 1 1.52
WCs 10 10 1 0.40
GPs 3 3 1 0.20
Total 3.84
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 132
Table no.46: Information, Education and Communication Activities
S. No. Activity Executing agency Estimated expenditure
(Rs.) Outcome
1 Street plays Local artists 1.40
Awareness generation and making
beneficiaries accountable for
sustainable development
2 Video shows IWMP-6 Junagadh 1.80
3 Wall paintings/ Focussed
Group discussion
IWMP-6 Junagadh 1.45
4 Pamphlets and posters IWMP-6 Junagadh 1.32
5 Banners and hoardings IWMP-6 Junagadh 1.28
Total: 7.25
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 133
CHAPTER - 5
BUDGETING
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 134
Budgeting
Table no. 47: Budget at a glance
Budget Component
% of the Budget
Rs in Lacs
Net Project Cost
100
589.92
-Administrative Costs
10
58.99
-Monitoring
1
5.89
-Evaluation
1
5.89
Preparatory phase:
-Entry point activities
4
23.59
-Institution and capacity building
5
29.49
-Detailed Project Report (DPR)
1
5.89
Watershed Works Phase:
-Watershed Development works,
50
294.96
-Livelihood activities for the asset less persons,
10
58.99
-Production system and micro enterprises
13
76.68
Consolidation Phase
5
29.49
Total
100
589.92
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 135
Table no. 48: Village wise- component wise budget available under IWMP
Sr.no Village Activity
EPA Institution
and CB
DPR Watershed
development
Work
Livelihood
for asset less
Production system
and
Microenterprises
Consolidation Total
1 Dungarpur 2.39 2.99 0.59 29.94 5.98 7.78 2.99 52.66
2 Ivnagar 2.42 3.02 0.60 30.26 6.05 7.86 3.02 53.23
3 Khadiya 8.51 10.64 2.12 106.47 21.29 27.68 10.64 187.35
4 Palasva 5.06 6.33 1.26 63.34 12.66 16.46 6.33 111.44
5 Patapur 2.11 2.64 0.52 26.46 5.29 6.87 2.64 46.53
6 Vijapur 3.07 3.84 0.76 38.49 7.69 10.00 3.84 67.69
Table no. 49: Village wise gap in funds requirement
Sr.no Village Total cost requirement Total funds available
under IWMP
Gap in funds
requirement
1 Dungarpur 59.06 59.88 -0.82
2 Ivnagar 58.27 60.52 -2.25
3 Khadiya 221.73 212.94 8.79
4 Palasva 131.90 126.68 5.22
5 Patapur 57.23 52.92 4.31
6 Vijapur 66.50 76.99 -10.49
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 136
Table no.50: Details of Convergence of IWMP with other Schemes
S. No. Village Activity to be carried out
Fund made available to
IWMP due to
convergence (Rs. in lakh)
Reference no. of
activity/ task/ structure
in DPR
Level at which decision
for convergence was
taken
1 Khadiya Farm Fencing 2.79 N.R.E.G.A. Dist level
Land Leveling 6.00 N.R.E.G.A. Dist Level
Total 8.79
2 Palaswa Farm Fencing 1.72 N.R.E.G.A. Dist level
Land leveling 3.50 N.R.E.G.A. Dist level
Total 5.22
3 Patapur Farm Fencing 1.75 N.R.E.G.A. Dist level
Land Leveling 2.56 N.R.E.G.A. Dist Level
Total 4.31 N.R.E.G.A. Dist Level
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 137
CHAPTER - 6
EXPECTED OUTCOMES
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 138
6.1 Expected Outcomes
6.1.1 Employment
This programme also aims simultaneously to improve the living conditions of the abutting user communities. Employment opportunities will be
created to the people living in the watershed through different soil and water conservation activities and livelihood activities. Self employment
would be created by providing the people with cash support in the form of direct livelihood activities like agriculture, animal husbandry and
enterprise development.
Table no. 51: Employment in Project area
1 2 3 4
S.
No.
Names of
the
villages
Wage employment Self employment
No. of man days No. of beneficiaries No. of beneficiaries
SC ST Others Women Total SC ST Others Wome
n
Total SC ST Other
s
Wome
n
Total
1
2
3
4
5
6
Dungarpur
Ivnagar
Khadiya
Palasava
Patapur
Vijapur
2500
1320
5650
2530
815
1460
1200
2000
1362
1160
210
365
100000
89600
216000
185000
70000
118000
48600
52600
88000
82500
42550
64800
152300
210000
311012
271190
113575
184625
160
141
510
428
212
300
59
65
73
85
90
49
960
550
1200
820
425
690
563
460
630
400
205
367
1742
1216
2413
1733
932
1406
80
95
225
180
120
168
30
42
50
40
35
48
325
410
500
455
236
385
210
180
400
245
156
195
618
727
1175
920
547
769
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 139
6.1.2 Migration
WSD can open up new opportunities for households to both intensify and extensity production, for example through:
• Increasing the frequency of cultivation – new water harvesting structures often permits cultivation of a second crop, or ‘life-saving’
irrigation of a main crop.
• Adopting new technologies, such as improved varieties of staple crops, higher levels of input use and higher yields; shifts to the cultivation
of higher value crops in the project areas expected.
• Expansion of cultivated areas – soil and water conservation interventions can bring new land into production.
All of the above tend to generate increased demands for labour. These may be provided initially from farm family sources and subsequently
by hired labour.
Employment opportunities in the local area as mentioned above will ensure lessening seasonal migration from the area.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 140
Table no. 52: Details of seasonal migration from Project area:
Sr.
No.
Name of the village No. of persons migrating No. of days per
year of migration
Pre-project Expected post project Pre-project Expected post project
1 Dungarpur 34 20 >150 Up to 3 month
2 Ivnagar 132 82 >150 Up to 3 month
3 Khadiya 85 42 >150 Up to 3 month
4 Palaswa 69 32 >150 Up to 3 month
5 Patapur 44 21 >150 Up to 3 month
6 Vijapur 62 25 >150 Up to 3 month
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 141
Table no. 53: Details of average ground water table depth in the project areas (in meters):
6.1.3: Drinking water
Drinking water is available in all the villages through household pipeline connection which are linked through the bore well and open well with power
operated machines. WASMO has constructed a water tank to provide water facility in three villages of IWMP-6.As a result of the watershed activities, it is expected
that the quality and quantity of drinking water would improve and will be available to villagers from well constructed downstream of check dams.
Sr.
No.
Name of the
village Sources Pre-Project
level Expected Increase/Decrease
(post project)
1 Dungarpur Well
&
Bore well
12 3 mtrs increase
2 Ivnagar 09 3 mtrs increase
3 Khadiya 08 2 mtrs increase
4 Palaswa 10 3 mtrs increase
5 Patapur 10 3 mtrs increase
6 Vijapur 10 3 mtrs increase
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 142
Table no. 54: Status of Drinking water:
Village Name
Availability of drinking water
(no. of months in a year)
Quality of drinking
water Comments
Pre-Project Expected Post
Project
Pre-Project Expected
Post
Project
Dungarpur
Ivnagar
Khadiya
Palasava
Patapur
Vijapur
Drinking water
supply from
open well, bore
well, pipe
connection &
WASMO
Water available
from Check
dams and wells
above it.
Potable Potable
6.1.4: Crops:
Agriculture primarily depends upon water. The surface water is scanty due to low rainfall and lower level of which is not suitable for crop
production. All this can change with the integrated land and water management during the watershed development project. The planned farm bunds
would help in increases of groundwater level and preserve some moisture in the soil. This will help in additional are coming under cultivation and
increasing productivity too. The farmers can take more than one season of crops. Different varieties of crops can be taken.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 143
Table no. 55: Details of crop area and yield in the project areas
Name of village
Dungarpur
Ivnagar
Khadiya
Palasava
Patapur
Vijapur
Name of crops
Kharif
Pre-project
Expected Post-project
Area (ha)
Average Yield (Qtl) per ha.
Area (ha)
Average Yield per
ha
(Qtl)
Groundnut
1555.36
20.54 2000 25.50
Rabi
Wheat
1041.23 12.99 1500 18.00
6.1.5 Horticulture
Table no. 56: Area under horticulture
S.No.
Name of Village
Existing area under horticulture (Ha)
Area under horticulture proposed to be covered through IWMP(Ha) 1
Dungarpur 0
0
2 Ivnagar 4 5
3 Khadiya 5 12
4 Palasava 4 10
5 Patapur 10 5
6 Vijapur 5 4
6.1.6 Vegetative cover
There is negligible area under tree cover. The cluster consists of only Juliflora Prosopis, Neem, Nilgiri and other forest trees. Trees like Neem and Gunda are
seen on few farm boundaries. It is planned that 25 ha land to be covered under new plantation in both villages.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 144
Table no. 57: Forest/vegetative cover
S.No.
Name of Village
Existing area under tree cover (ha)
Area under tree cover proposed
1
Dungarpur 3 10
2 Ivnagar 3 4
3 Khadiya 10 29
4 Palasava 5 8
5 Patapur 2 2
6 Vijapur 6 8
6.1.7 Livestock
The village has quite a good of livestock population. These include cows, bullocks, buffaloes, goats, and sheep. The interventions like provision of
good quality cows and buffaloes. The establishment of Dairy & Milk products in the village. It is expected that the post project period would see a
substantial increase in livestock population and yield from them.
Table no. 58: Details of livestock in the project areas (for fluids please mention in liters, solids in kg and income in Rs.)
S.No.
Name of Village
Type of Animal
Pre-Project
Expected Post-project
Remarks
No.
Yield
Income
No.
Yield
Income
1
2
3
4
5
6
Dungarpur
Ivnagar
Khadiya
Palasava
Patapur
Vijapur
Milch-animals
Cow (per animal/day)
Cowfper animal/day)
407 6.50 150 450 9 250
Buffalo(per animal/day)
(Buffalo per animal/day)
1104 10 300 1400 14 500
Goat(Meat:Rs/kg)
Draught Purpose animals
404 450 700 500 650 1000
Sheep(Meat:Rs/kg)
Camel
0 0 0 0 0 0
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 145
6.1.8: Linkages
The direct livelihood activities need good forward and backward support. Without such support system the activities may fail to deliver the desired results. These
linkages would involve credit, machinery, input supply, marketing, etc.
Table no. 59: Backward-Forward linkages
Project
Type of Marketing Facility
Pre-project
(no.)
During the project (no.)
Post-project (no.)
Dungarpur
Ivnagar
Khadiya
Palasava
Patapur
Vijapur
Backward linkages
Seed certification
Seed supply system
1
1
Fertilizer supply system
Pesticide supply system
l_ Credit institutions
-
Bank-1
Bank-1
Water supply
SSNL
Well
Well
Extension services
KVK
KVK
Nurseries
Tools/machinery suppliers
-
Price Support system
Labour
Any other (please specify)
Forward linkages
Harvesting/threshing machinery
Storage (including cold storage)
Transport facilities
Markets / Mandis
Collective marketing system
Collective marketing system Agro and other Industries
Papad processing/packaging-5
5
Milk and other collection centers
9
Milk collection centre-9
11
Labour
Any other (please specify)
Vermin-compost unit-1
6
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 146
6.2 Logical Framework Analysis
Narrative Summary Indicators Source of verification Assumptions
Goal:
Sustainable Development and conservation
of natural resources with the help of Peoples
Participation
Increased Agricultural Production and
overall development
Increase in contribution of agricultural
income to the household income
Objective 1
Increase soil moisture content
1.1 Less Uncertainty in Agricultural
Production
1.2 Farmers take two
crops in a year
1.1 Discussion with
Villagers/Farmers
1.2 Soil testing
1.3 Physical verification
Repair and Maintenance and
taking care of conservation
structures
Output
Soil moisture content will increase
1.1 Clear growth of vegetation cover
1.2 Certainty in Khariff ,Rabi crop
Discussion with
Villagers/Farmers
Time to time take care of
structures
Activities
1.1 Farm bunding
1-2 Crop rotation
1-3 Mulching
1.1 550 Ha
1.2 225 Ha
1.3 315
1.1 Physical verification
1.2 Records in asset register
1.3 Interferences from GIS
maps at different times
1.4 Measurement Book
1.1 Money spent on right
time
1.2 Proper scientific methods
used
1-3 Workers are ready
1.4 Fields are free from crops
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 147
Objective 2
Increase irrigation potential
2.1 Increased irrigated area
2.2 Increase in Land value
2.3 More uncultivable lands to be
brought under agriculture and new
plantations
2.1 Revenue records
2.2 Patwari map
2.3 Maps from GIS
2.1 Judicious use of water
2.2 Accessibility to common
and forest lands increased
with removal of
encroachments and resolution
of conflicts.
Output
Increased irrigation water
2.1 Increased water table in wells
2.2 Increase in flow period of streams
2.1 Physical verification
2.2 Records in asset register
2.3 Interferences from GIS
maps at different times
2.4 Promotion of better
Irrigation practices like drip
irrigation
2.2 Structures full to its
capacity
2.3 Good amount of rainfall
received
Activities
2.1 Earthen dams
2.2 Percolation tank
2.3 Village ponds
2.4 Check dams
2-1 Nos.
2-2 No
2-3 No
2.1 Physical verification
2.2 Records in asset register
2.3 Interferences from GIS
maps at different times
2.1 Good amount of rainfall
2.1 Size according to
catchment and storage volume
calculation
2.3 No seepage from structure
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 148
Objective 3
To improve Soil Quality
3.1 Agriculture based livelihood income
generation activities
3.2 Promotion of organic farming
practices
3.1 Physical verification
3.1 Availability of
waste/mulching material
Output
Quality of Soil improved
3.1 Agriculture production will Increase
3.2 Plantation of fruits and forest
species
3.1 Physical verification
3.2 Market Survey
3.3 Soil testing
3.1 Composting material used
and refilled according to farm
requirement
3.2 Use it in right time
Activities
3.1 Composting
3.2 Application of Farm yard manure
3.3 Use of FYM enriched with Route
Phosphate and Bio-Fertilizers
3.1 Nos.
3.2
3.3
Physical verification
3.1 People ready for voluntary
contribution for Biogas
Structure
3.2 Available of cow dung at
right time
3.3 Proper maintenance of
structures
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 149
Objective 4
To increase fodder availability
4.1 Increase in the proportion of
households having more security of
fodder
4.2 Reduction in drudgery of fodder
collection especially women
4.1 Survey(Pre and
Post)
4.1 Quality of management of
common property resources
4.2 Proper distribution of
seedling and take care.
Out put
Increased fodder availability
4.1 Health of live stock improved
4.2 Expected increase in cattle
population
4.3 promotion of dairy development
among communities
4.1 Expenditure on
seedling from register
4.2 List of beneficiaries
from the register
4.1 Proper seedling
4.2 Proper care and
maintenance
Activities
4.1 Pasture land and grassland will be
developed.
4.2 On farm bunds selected local species
and fodder crops
4.1 Rs. Spent on fodder
4.2 Verification on farm bunds
4.1 WC's Reports
4.2 Expenditure Register
4.3 Resolution in WC's
4.4 Physical verification
4.1 Peoples participating
4.2 Proper variety Selection
4.3 Social fencing
Objective 5
5.1 People's participation/women's socio-
political and economic empowerment in
watershed for income generation activities
5.1 Women participation enhanced in
decision-making of GVCs.
Project to be implemented and
managed in a democratic and
participatory way ensuring
equity.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 150
Output
5.1 Community Mobilized
5.2 Community Trained
5.3 Better standard of living
5.1 Maintenance of assets and
records by the villagers themselves.
5.1 Frequent meetings
5.2 Training register
5.3 Increased
participation
5.1 Proper training provided
5.2 No biasness in villages
Activities
5.1 Formation and strengthening of village
institutions like women's SHG
groups/WC/UGs and WCs through
awareness programmes
5.2 Formation of fodder banks to increase
fodder security and promote dung
development
5.3 Capacity building of SHG leaders and
accounts members /farmers/UGs/WCs
through workshop/meetings
5.4 Income generation activities.
5.5 Awareness campaign
5.1 Increased awareness amongst
women about village resources.
5.2 Women participation enhanced in
decision-making of GVCs.
5.3 Farmers adopt organic farming
practices
5.4 Increased household income
5.5 Improved access to credit to
livelihood purposes.
5.6 Gender sensitization of UGs and
WCs to increase inclusiveness of group
decision making.
5.1 Farmable socio-cultural
conditions at the village
5.2 Checking registers of
SHGs
5.3 Checking passbook of
groups
5.4 Physical verification of
income generation activities
5.5 Posters/banners/meeting
register
5.1 No influence of any
external agency
5.2 Smooth flow of funds
5.3 Access to appropriate
technology
5.4 People's Participation and
positive perception towards
the programme
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 151
CHAPTER - 7
QUALITY AND SUSTAINABILITY ISSUES
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 152
Quality and Sustainability Issues
7.1 Plans for Monitoring and Evaluation
A Web-based GIS System is being developed for monitoring and evaluating the project in its planning & implementation phases.
The system would be available on a public domain and can be accessed by all the stakeholders of the project. The system shows the
entire state of Gujarat and all of those areas selected over the next 18 years. Filtering allows the user to zoom onto one particular
project. Details related to soil type, Land-use classification, inhabitation etc., can be obtained village-wise. Furthermore, survey-number
wise details related to ownership, irrigation source, yield etc., can also be accessed by the users of the system. This system is being used
for pooling up the details obtained from the DPR. In other words, the DPR is made available online in the form of a database which will
help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment
etc., for further treatment and planning. The system would also show the satellite imageries of various years from the project inception
stage to the project closing stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective
measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the
project.
Yet another component of the Web-based GIS system is the Mobile based Monitoring & Evaluation System, which will help the ground staff alias
WDTs (Watershed Development Team) to transmit information from the ground level to the central server. Also, any higher-up official in charge of the
project can obtain information regarding the project area on their mobile phone by means of an SMS. The system works in the following manner. The
WDT equipped with a GPS instrument marks the latitude-longitude information of various treatment areas during the DPR. The probable sites are then
transferred onto the central server. During the works phase, any progress in the treatment area is reported to the server by means of an SMS by the
WDT. Similarly, any nodal officer or higher-up official can view the progress in a project by means of summarized reports generated over frequent
periods of time.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 153
7.1.1Vigilance and Monitoring Committees
1. For every work sanctioned under the Scheme, there should be a local vigilance and monitoring committee, composed of members of the locality or
village where the work is undertaken, to monitor the progress and quality of work while it is in progress. The Gram Sabha will elect the members of this
committee and ensure that SC/STs and women are represented on it.
2. The Implementing Agency should apprise this committee of estimates regarding the work, time frame and quality parameters. The final report of the
committee should be attached along with the Completion Certificate of the work, and should also be placed at the next meeting of the Gram Sabha in the
Panchayat where work has been executed.
3. Local beneficiary committees may also be constituted for effective articulation of their entitlements and their access to them. The PIA members will be
responsible for ensuring that local monitoring committees/beneficiary committees are constituted.
7.1.2 Research support in watershed management
Watershed management requires the support of research. Watershed projects will be used as on-farm sites for research designed and implemented with
significant involvement of farmers and extension workers to produce site-specific technological solutions. This leads to problems in adoption and up-
scaling of research findings within specific watersheds. There is also the question of up-scaling technologies and approaches beyond a designated
watershed. At the same time, researchers will be able to relate research activities to the real problems facing farmers or to capture the locally developed or
modified technologies. Yet there is a need to give technologies appropriate technical and scientific definition and to disseminate them widely.
7.1.3 Farmer organization and empowerment
The management of natural resources requires strong and effective farmer organizations. Such organizations empower farmers and create a good
foundation for the transfer, adoption and use of information on new technologies. They also help in negotiating for inputs at favorable prices.
Strong farmers’ organizations can be a conduct for services that meet felt needs. These needs include information to improve production and
marketing, credit, and demand driven approaches that ensure ownership and sustainability of interventions.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 154
Farmers’ organization allows the use of participatory approaches that recognize local capacity and indigenous knowledge. It incorporates the
aspirations and perceptions that influence decision-making, while giving farmers an important role in planning and implementation of watershed
management activities. Such participation is important for the success, continuity and sustainability of the resource management programmes.
Often a successful watershed knits together many aspects of the people’s lives apart from purely technical issues. Many conservation and basic
group production initiatives have widened into a social movement dealing with matters such as weddings, funerals, care for the elderly and the
disadvantaged, and other issues in the community.
The initial natural resources focus also widens into a set of integrated activities such as the improvement of houses, provision of water and
electricity, acquisition of improved tools, seeds and livestock, all in the name of watershed management.
Empowerment of farmers therefore allows farmers to demand services and to ensure the continued role of the state in supporting watershed
development.
7.1.4 Use of traditional institutions and indigenous knowledge
Experience has shown that to effectively reach the farmers and to create viable watershed management options, it is important to respect indigenous
knowledge and combine it with the formal modern science and technology. Local traditional institutions should be part and parcel of the process. For
instance, there is a lot of under-used indigenous knowledge about climate, soils, biodiversity and other production conditions that confront farmers. A lot of
research findings are abstract to extension providers and farmers alike. Such findings need to be married with indigenous knowledge and disseminated in a
language that farmers and members of traditional institutions can understand.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 155
7.2 Plans for Project management:
The Project management of any watershed programme is very important. It mainly depends upon the community organization and the village level
institutes. In all villages, watershed committee and various self help & user groups have been formulated for post project operation and maintenance of
assets created during project period. Major emphasis will be on equity and sustainable benefit of the project even after implementation stage. A proper
link-up will be built during project period with various institutes and capacity building organization. They will act as a major kingpin during post
implementation for scaling up the successful experience during project.
7.3 Watershed Development Fund:
Such contributions will promote feeling of “ownership” of the programme among stakeholders. This will contribute to sustainable outcomes in the long-
term. The voluntary contributions are saved in the Watershed Development Fund (WDF) that is to be used for repair, maintenance and use of assets created
on common land. The contribution of it will comes mainly fund the following:
Table No. 60. Details of Watershed Development Fund (WDF)
Sl. No
Financial Details
Percent Contribution
1
Natural Resource Management
For General
10%
For SC/ST
5%
2
For Intensive Agriculture, Horticulture and animal Husbandry
For General
40%
For SC/ST
20%
It is planned that for SC/ST, BPL population the contribution will be taken in form of voluntary labour and the fund for labour will be diverted to the WDF.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 156
7.4 User Charges:
Various user groups will be formed in village. These user groups will collect user charges according to the designated rules formed during the
formation of user group. These funds will be transferred to the WDF funds as per these formulated rules. The secretary of watershed committee (WC) will
maintain the records of all activities.
WATERSHED DEVELOPMENT TEAM-JUNAGADH
Detailed Project Report – I.W.M.P.-6, JUNAGADH PAGE 157
CHAPTER – 8
MAPS