TA Readiness Program

12
Copyright © 2005 CPM Solutions Ltd. All rights reserved. TURNAROUND READINESS ASSESSMENT PROGRAM Turnaround Readiness Assessment Introduction Interview Schedule Assessment Performance Charts & Graphs Action Items Welcome - please refer to the workshop-seminar exercise workbook for instructions on conducting a Turnaround Readiness Assessment using this Turnaround Readiness Assessment Program tool. Remember, it's the 'What-ifs' that determine the readiness of any project. (Strategic Planning) For additional information please contact: [email protected] For technical assistance or additional information please contact: CPM Solutions Ltd. Email: [email protected] Bus: 604-294-1577 Ext: 119

description

TA Readiness Program

Transcript of TA Readiness Program

Page 1: TA Readiness Program

Copyright © 2005 CPM Solutions Ltd. All rights reserved.

TURNAROUND READINESS ASSESSMENT PROGRAMTurnaround Readiness Assessment Introduction

Interview Schedule

Assessment

Performance

Charts & Graphs

Action Items

Welcome - please refer to the workshop-seminar exercise workbook for instructions on conducting a Turnaround Readiness Assessment using this Turnaround Readiness Assessment Program tool.

Remember, it's the 'What-ifs' that determine the readiness of any project. (Strategic Planning)

For additional information please contact:[email protected] technical assistance or additional information please contact:CPM Solutions Ltd.Email: [email protected]: 604-294-1577 Ext: 119

Page 2: TA Readiness Program

SCHEDULE Copyright © 2005 CPM Solutions Ltd. All rights reserved.

MODULE MODULES TO BE ASSESSED DATE TIME DEPARTMENT NAME PHONE STATUS

1 RISK COST BENEFIT ANALYSIS 29-May-07 1:00 PM Turnaround Leader Scheduled

2 TURNAROUND STRATEGY PLAN 29-May-07 1:00 PM Turnaround Leader Tentative

2.1 Safety / Environment Strategy 31-May-07 11:00 AM Safety Return

2.2 Operations Strategy 29-May-07 3:00 PM Operations Scheduled

2.3 Execution Strategy 29-May-07 2:00 PM Execution Scheduled

2.4 Inspection Strategy 29-May-07 10:00 AM Inspection Scheduled

2.5 Logistics Strategy 29-May-07 9:00 AM Logistics Scheduled

2.6 Administration Strategy 30-May-07 11:00 AM Administration Scheduled

3 WORKLIST MANAGEMENT 31-May-07 8:00 AM Planning Complete

4 MATERIALS MANAGEMENT 30-May-07 8:00 AM Materials Re-Schedule

5 WORK PACKAGE PLANNING 31-May-07 9:00 AM Planning Tentative

6 SCHEDULING 31-May-07 10:00 AM Planning Scheduled

7 CONTRACTING 30-May-07 10:00 AM Contracting Tentative

8 RESOURCE MANAGEMENT 31-May-07 10:00 AM Scheduling Scheduled

[Assessment]

TURNAROUND READINESS ASSESSMENT PROGRAMTurnaround Readiness Assessment Interview Schedule

Page 3: TA Readiness Program
Page 4: TA Readiness Program

STATUS Copyright © 2005 CPM Solutions Ltd. All rights reserved.

MODULE MODULE ACTIVITIES ASSESSED √ ♦ ال ASSESSMENT COMMENTS

1 RISK COST BENEFIT ANALYSIS

1.1 Has a Turnaround Leader been established as the person responsible for deciding what work is performed? √1.2 Are work orders created for each worklist item? √1.3 Is there a formal worklist item approval process? √1.4 Has a worklist cut-off date been established? √1.5 Is the worklist cut-off date past? If so…will another date be set? √1.6 Is there a formal closure process utilized on this turnaround? ال1.7 Are cost estimates available for each worklist item? ♦1.8 Is there a risk management matrix being used to determine consequence and probability? √1.9 Is there a worklist priority system being used? ال1.10 Is each asset (equipment) identified by a criticality code related to the impact on business? √1.11 Are codes established to track worklist items deferred until the next turnaround? ♦1.12 Has a risk management team been established? ♦1.13 Is every worklist item reviewed for risk cost benefit? √1.14 Is inspection involved in the risk cost benefit analysis? ♦1.15 Is engineering involved in the risk cost benefit analysis? √1.16 Is there a work type that identifies worklist items that are approved after the cut-off date? √2 TURNAROUND STRATEGY PLAN

2.1 Have the turnaround key performance indicators and targets been established? √2.2 Were lessons learned from previous turnarounds incorporated into the planning schedule? √2.3 Has the Planning Schedule been developed for the Planning Stage of the turnaround? √2.4 Are weekly planning status update meetings being held? √2.5 Have the turnaround organization charts been established? √2.6 Have the turnaround roles and responsibilities been established? ♦2.7 Has a budget been established to include labour hour estimates, materials, indirects and purchase orders? ♦2.8 Has training and orientation or training schedule been developed? ♦2.9 Is there a document control process in place? √2.10 Does each turnaround team member have a planning stage binder? √2.11 Is the turnaround date flexible? √2.12 Has a strategy been put in place incase the turnaround date has to be moved? ال2.13 Has the outage been determined by Production Accounting (Market)? √2.14 Is a strategy in place to manage project work? ♦2.15 Is a communication plan established? √2.16 Is a meeting schedule established that includes an agenda, who attends, where, etc.? ♦2.17 Is there a strategy for measuring and trending performance? √2.18 Has a management of change process been established? √

2.1.1 Safety / Environment Strategy

2.1.1.1 Has a safety company been contracted to oversee all aspects of safety? √2.1.1.2 Has a safety strategy been developed? ♦2.1.1.3 Has a safety plan been developed? √2.1.1.3 How well is the saftey plan being executed? ♦2.1.1.3 Is there a risk management process in place for analyzing all planned work activities for safety issues? √2.1.1.4 Is there a plan in place to mobilize safety personnel and equipment? ♦2.1.1.5 Are roles and responsibilities for safety personnel available? √2.1.1.6 Has a safety organization chart been developed? √2.1.1.7 Has a safety / environment handbook been developed for this specific turnaround? ♦2.1.1.8 Has a safety / environment orientation been developed? √2.1.1.9 Is there an evacuation procedure in place? ♦2.1.1.10 Has a company safety representative been assigned to the turnaround? √2.1.1.11 Is a strategy in place for covering manholes, sewers, vents, etc.? √2.1.1.12 Is a strategy in place for onsite daily testing and calibrating of equipment? √2.1.1.13 Is a strategy in place for mobilizing equipment and additional resources if required? ♦2.1.1.14 Is a strategy in place for insulation removal and disposal? √2.1.1.15 Is a strategy in place for NORMS testing? √2.1.1.16 Is a strategy in place for pre-job safety review? √2.1.1.17 Is a strategy in place for spill containment? √

[Performance]

TURNAROUND READINESS ASSESSMENT PROGRAMTurnaround Readiness Assessment Questionnaire

TOP (click the left-hand column - / + symbols to expand or collapse structure)

Page 5: TA Readiness Program

2.1.1.18 Has a wash pad been established? √2.1.1.19 Is there a strategy in place for safety to review the dynamic execution schedule prior to each shift? √2.1.1.20 Has a lock-out / tag-out procedure been established? ♦2.1.1.21 Has the MSDS system been updated and available for execution? √2.1.1.22 Has Operations been orientated by Safety on the safe work permit procedures? √2.1.2 Operations Strategy

2.1.2.1 Has Operations established a shutdown / startup strategy? √2.1.2.2 Has Operations established a strategy for cleaning? √2.1.2.3 Has Operations established a strategy of 'What-if" scenarios? ♦2.1.2.4 Has Operations established a shutdown / startup schedule of activities? ♦2.1.2.5 Has Operations identified support resources required? ♦2.1.2.6 Has Operations identified containment and tankage required? √2.1.2.7 Has Operations been orientated on the management of the detailed work execution schedule? ♦2.1.2.8 Does Operations have a strategy to manage changes in their shutdown activities, i.e., longer duration? ♦2.1.2.9 Has Operations established an organization chart with roles and responsibilities for this turnaround? √2.1.2.10 Has Operations established radio protocol? √2.1.2.11 Has Operations identified all work they wish to include in the turnaround, i.e., valves, leaks, etc. ♦2.1.2.12 Has Operations flagged with colored tape the valves to be repaired, replaced, overhauled, etc. ♦2.1.2.13 Has Operations determined what level of safety involvement and responsibility they have with Safety? √2.1.2.14 Has Operations dedicated resources to planning for work package development? ♦2.1.2.15 Has Operations worked with Safety to determine evacuation procedures? √2.1.2.16 Has Operations established their working schedule for execution? √2.1.2.17 Does Operations have a blind list established? ♦2.1.2.18 Has Operations inventoried the blinds on-hand? √2.1.2.19 Has Operations hung blind tags? ال2.1.2.20 Has Operations established a blinding procedure? ♦2.1.2.21 Does Operations have a temporary line list established? ال2.1.2.22 Has Operations established a permitting process supported by procedures? √2.1.2.23 Has Operations prepared an orientation for the permitting process? ♦2.1.2.24 Has Operations prepared an plan for Vacuum Trucks ال2.1.3 Execution Strategy

2.1.3.1 Has an execution strategy been developed? ال2.1.3.2 Has the execution plan been developed? ال2.1.3.3 Has Operations worked with the execution supervision to establish or orientate them on the strategy? ال2.1.3.4 Are 'What-if" scenarios included in the execution strategy? ال2.1.3.5 Have cleaning, circulation and cooling strategies been established? ♦2.1.3.6 Have equipment criticality and priorities been established? ♦2.1.3.7 Has a Work Breakdown Structure been determined? √2.1.3.8 Is there a strategy to have execution supervision mobilized early enough to review the execution strategy? ♦2.1.3.9 Have crane surveys been determined and established? ال2.1.3.10 Have critical areas, confined space, congested areas been determined? ♦2.1.3.11 Has flagging for off-limit areas been determined and established? ال2.1.3.12 Is there a plan to orientate execution forces on the safe work permit procedure? √2.1.3.13 Has Operations and Execution agreed on 'who' is responsible for managing the execution work? √2.1.3.14 Has Operations established a PSV execution team or strategy? √2.1.3.15 Have Turnaround Information Manuals been developed for Execution? ♦2.1.3.16 Has Operations worked with Execution to determine scaffolding requirements? ♦2.1.3.17 Has Execution surveyed the jobs that may require hoarding? ♦2.1.3.18 Has Execution surveyed confined space, vessel entry, and hoisting work? ال2.1.3.19 Has Execution reviewed the work that requires equipment rentals and placement, i.e., welders, cranes, etc.? ال2.1.3.20 Has Execution established a strategy for weather related problems? ♦2.1.3.21 Has Execution established a strategy for power, air, water, etc. requirements? √2.1.3.21 Has Execution established a plan for power, air, water, etc. requirements? ال2.1.3.22 Has Execution established a strategy for lifting and hoisting, i.e., equipment, placement, structures, etc.? ال2.1.3.23 Has Execution established a plan for lifting and hoisting, i.e., equipment, placement, structures, etc.? ال2.1.3.24 Has Execution been orientated in the management and control of the daily shift schedule? ال2.1.3.25 Has Execution reviewed and approved all mobilization and logistics strategies and plans? ♦2.1.3.26 Has Execution reviewed and approved all safety and environment strategies and plans? ♦2.1.3.27 Has Execution reviewed and approved materials, consumables, etc.? ال2.1.3.28 Has Execution established hot-bolting procedures? ♦2.1.3.29 Has Execution reviewed and approved all pre-turnaround work activities? ♦2.1.3.30 Has Execution established or agreed to the execution shifting? √

Page 6: TA Readiness Program

2.1.4 Inspection Strategy

2.1.4.1 Has an Inspection strategy been established? √2.1.4.2 Has an Inspection plan been established? √2.1.4.3 How well is the plan being executed? ♦2.1.4.4 Has the Inspection department determined resource requirements and mobilization schedule? √2.1.4.5 Has Inspection established their filing and document control process? √2.1.4.6 Has Inspection developed an orientation for execution forces? ♦2.1.4.7 Has Inspection identified all work including potential (found) work? √2.1.4.8 Has Inspection established a strategy for found work? √2.1.4.9 Has Inspection established a plan for found work? ♦2.1.4.10 Has Inspection established the QA/QC requirements? ♦2.1.4.11 Has Inspection determined their logistics plan and requirements? √2.1.4.12 Has Inspection determined hold-points and testing procedures? ال2.1.4.13 Has Inspection established a method of tracking the status of each inspection during Execution Phase? √2.1.4.14 Are Inspection and Test Plans developed for each related work activity? √2.1.4.15 Has the Inspection department determined the welding procedures and Welder testing process? ♦2.1.4.16 Has Inspection worked with Operations, Execution and Planning to develop the execution schedule? √2.1.5 Logistics Strategy

2.1.5.1 Has a logistics plan been established? √2.1.5.2 Has a logistics strategy been develop? √2.1.5.3 Is there a plot plan showing traffic, walking, restricted areas, smoking areas, etc.? √2.1.5.4 Is there a plot plan showing buildings, trailers, laydown areas, etc? √2.1.5.5 Is there a mobilization / demobilization plan for equipment, services, etc. ♦2.1.5.6 Is there a strategy for transportation? ♦2.1.5.7 Is there a strategy for subsistence, hotel, camp, etc.? √2.1.5.8 Is there a strategy for weather related issues, i.e., shelters, heaters, etc.? √2.1.5.9 Have smoking areas been established? √2.1.5.10 Have smoking policies been established? √2.1.5.11 Have power, telephone, water, etc. requirements been established? ♦2.1.5.12 Have roadways been cleared for heavy equipment hauling? √2.1.5.13 Has signage been established? √2.1.5.14 Have hot-shot strategies been established? ♦2.1.5.15 Have PSV management, shipping, crating, transportation, receiving, etc. been established? ال2.1.5.16 Have barricaded, fences, etc. been determined, erected or established? ♦2.1.5.17 Have fuel, water, equipment tracking sheet been established √2.1.5.18 Have radio communication strategies been established √2.1.5.19 Have logistics tracking forms been created? √2.1.6 Administration Strategy

2.1.6.1 Is there an administrative strategy in place to control costs? √2.1.6.2 Is there a method in place to capture real-time costs? ♦2.1.6.3 Has a service company been contracted to manage costs? √2.1.6.4 Is there an administrative strategy in place for timekeeping, payroll, invoice management, etc.? √2.1.6.5 Is there an administrative plan in place for timekeeping, payroll, invoice management, etc.? ♦2.1.6.6 How well is the execution plan working? ♦2.1.6.7 Are performance management methods integrated into the cost / administrative strategy? √2.1.6.8 Have cost reports and reporting mechanisms been established? ♦2.1.6.9 Have costing and administrative duties been defined and assigned? ♦2.1.6.10 Is there a strategy to capture Green Cards for ProAct Entry and reporting? √

3 WORKLIST MANAGEMENT

3.1 Have all worklist items been identified on a control sheet or management software? √3.2 Is the control and management of the worklist items assigned to a key person? √3.3 Have work types been assigned to worklist items to determine when they were approved, i.e., Normal, Late? √3.4 Have worklist items been categorized by work type, i.e., routine, turnaround, project, etc.? √3.5 Have worklist items been prioritized? √3.6 Can worklist items be filtered, sorted, grouped, etc. by requestor, date, priority, area, etc.? √3.7 Does a library of worklist items exist by equipment type, unit or area specific to a process? √3.8 Have worklist items all been assigned to someone with the responsibility of planning and estimating? √3.9 Is the worklist available to everyone to view (read-only)? √3.10 Does the worklist have provisions for cost estimates? √3.11 Does the worklist have provisions for progressing status? √4 MATERIALS MANAGEMENT / SUPPLY CHAIN

4.1 Is there a formal defined materials management process in place? ♦

Page 7: TA Readiness Program

4.2 Is there a clear communication method between materials management and planning? √4.3 Is there a data management process in place between the scheduling software, CMMS and materials? ال4.4 Are laydown areas identified and established? ♦4.5 Have shipping and receiving methods been established? ♦4.6 Have long-lead delivery and critical items been identified? √4.7 Have all consumable requirements been identified? ال4.8 Have tool rental and tool requirements been identified? ♦4.9 Have tool and materials trailers / tents / warehouses etc. been identified? ♦4.10 Has the materials management group prepared an organization chart with roles and responsibilities? ال4.11 Have strategies been determined for 'What-if' materials for potential found work? √4.12 Have all services and rental equipment been determined and established? ♦4.13 Is there a bag and tag system in place for each worklist item? ♦4.14 Has materials management prepared an orientation for execution supervision? √4.15 Has materials management been orientated on the execution schedule management methods? √4.16 Has materials management established their cost / payment tracking system and performance reports? √4.17 Has materials management identified resource requirements, logistics, transportation, etc.? ♦4.18 Has materials management determined the responsibilities of the contractor and execution forces? √4.19 Has materials management determined a strategy for material traceability? √5.1 WORK PACKAGE PLANNING - OPEX

5.1.1 Has a planning trailer or office been established? √5.1.2 Does Planning have sufficient resources, office equipment, computers, administration assistance, etc.? √5.1.3 Do Field Planners have planning and estimating forms? √5.1.4 Is there a Planning Organization Chart? √5.1.5 Are the Planner roles and responsibilities defined and recorded? √5.1.6 Has the Planned Job Package filing system been established? √5.1.7 Are the Planners tracking Planned Job Package development status? √5.1.8 Is the status of Planned Job Packages sufficient to ensure completion in time for scheduling? ♦5.1.9 Is planning based on benchmark estimates? √5.1.10 Does planning include programming (scheduling) parameters, i.e., shifting, function codes, restrictions, etc.? ال5.1.11 Does planning include productivity factors for various activities or crafts? √5.1.12 Does planning include 'What-if' scenarios for potential or found work? √5.1.13 Is planning and estimating accomplished with the assistance of all departments? √5.1.14 Are individual worklist item plan job activities entered into a the scheduling software? √5.1.15 Do all worklist plan job activities include resources, crafts, tool, materials, equipment, services, etc.? √5.1.16 Are library files of worklist standard job plans available? √5.1.17 Is previous history (actual hours) available for planning of worklist items? ال5.1.18 Have planning responsibilities been established for the execution stage, i.e., planning found work? √5.1.19 Have Planner responsibilities been established for the execution stage, i.e., updates, shifting, reports? √5.1.20 Have Planner shift schedules been determined for the execution stage? √5.1.21 Is a Planner assigned to the backshift (nightshift)? √5.1.22 Has the Planner prepared and/or conducted an orientation for execution supervision? √5.1.23 Have planned job package books been assembled for execution supervision? ♦5.1.24 Have planned job package document controls been established? √5.2 WORK PACKAGE PLANNING - CAPEX

5.2.1 Has a planning trailer or office been established? √5.2.2 Does Planning have sufficient resources, office equipment, computers, administration assistance, etc.? √5.2.3 Do Field Planners have planning and estimating forms? √5.2.4 Is there a Planning Organization Chart? ♦5.2.5 Are the Planner roles and responsibilities defined and recorded? √5.2.6 Has the Planned Job Package filing system been established? √5.2.7 Are the Planners tracking Planned Job Package development status? √5.2.8 Is the status of Planned Job Packages sufficient to ensure completion in time for scheduling? ال5.2.9 Is planning based on benchmark estimates? √5.2.10 Does planning include programming (scheduling) parameters, i.e., shifting, function codes, restrictions, etc.? ال5.2.11 Does planning include productivity factors for various activities or crafts? √5.2.12 Does planning include 'What-if' scenarios for potential or found work? √5.2.13 Is planning and estimating accomplished with the assistance of all departments? ♦5.2.14 Are individual worklist item plan job activities entered into a the scheduling software? ♦5.2.15 Do all worklist plan job activities include resources, crafts, tool, materials, equipment, services, etc.? √5.2.16 Are library files of worklist standard job plans available? √5.2.17 Is previous history (actual hours) available for planning of worklist items? √5.2.18 Have planning responsibilities been established for the execution stage, i.e., planning found work? √

Page 8: TA Readiness Program

5.2.19 Have Planner responsibilities been established for the execution stage, i.e., updates, shifting, reports? ♦5.2.20 Have Planner shift schedules been determined for the execution stage? ال5.2.21 Is a Planner assigned to the backshift (nightshift)? √5.2.22 Has the Planner prepared and/or conducted an orientation for execution supervision? ال5.2.23 Have planned job package books been assembled for execution supervision? ♦5.2.24 Have planned job package document controls been established? √6 SCHEDULING

6.1 Has the scheduling software been established? √6.2 Has someone been assigned the responsibility of schedule management? √6.3 Has an electronic backup system been implemented for the schedule? √6.4 Have all scheduling parameters been determined, i.e., shifting, loading, productivity factors, etc.? ♦6.5 Has the Work Breakdown Structure been determined and outlined on the project schedule? ♦6.6 Is there only one project schedule for all work to be performed including project work? √6.7 Has the reporting system been established and reports designed? ال6.8 Has a scheduling methodology been established to ensure a flexible dynamic execution schedule? √6.9 Have 'What-if' scenarios been completed, i.e., shifting, equipment priority, performance, resources? ال6.10 Has scheduling prepared an orientation? ♦6.11 Has each department been involved in the development of the project schedule? ♦6.12 Has each department reviewed and approved the project schedule or method of schedule development? ال6.13 Have schedule status update methods been determined and approved? ♦6.14 Has the contractor been involved or reviewed the schedule? ال6.15 Have schedule simulations been completed? ال6.16 Have all critical jobs, or potential critical jobs, been identified? ♦6.17 Have all worklist items been prioritized? ال6.18 Has any work been flagged for work that can be executed in spite of poor weather? √7 CONTRACTING

7.1 Has a contracting strategy been established? √7.2 Has a contracting plan been established? √7.3 How well is the contracting plan being executed? ♦7.4 Has a prime contractor been determined? √7.5 Have all contractors been determined and established? ♦7.6 Have contractors been involved been given an orientation on the status of the turnaround project? √7.7 Have contractors established their organization charts with roles and responsibilities? ♦7.8 Have contractors provided their safety and quality programs for review? √7.9 Have contractors established their logistic requirements, i.e. trailers, transportation, mobilization schedule? ♦7.1 Have contractors established their administration procedures, requirements, force reporting, etc. ال7.1 Have contractors identified their entrance permit and equipment mobilization requirements? ♦7.11 Have contractors determined their communication systems, radios, computers, office equipment, etc.? ♦7.12 Have contractors determined their strategy for 'What-if' scenarios, i.e., resource restrictions, breakdowns? √7.13 Have contractors determined their requirements for water, steam, air, chemicals, gas, etc.? √7.14 Have contractors determined their strategy for equipment management, fueling, relocation, barriers, etc.? √7.15 Has each contractor determined their training requirements or training plans? ♦7.16 Has each contractor determined their QC strategy? √7.17 Has each contractor determined their performance reporting and management strategy? √7.18 Has each contractor established their orientation process, have they included the owner / client? √7.19 Has each contractor established their meeting and communication plan / methods? ♦7.20 Is the contractor aware of the field change management system? ♦8 RESOURCE MANAGEMENT

8.1 Has a resource management strategy been determined and implemented? ال8.2 Have all resource requirements been determined? ال8.3 Have resource contingencies been determined? ♦8.4 Have resource roles and responsibilities been identified? ♦8.5 Have resource training requirements been established? √8.6 Have labor relations procedures been defined? √8.7 Have resource orientations been established? ♦8.8 Have resource certification procedures and document details been established? √8.9 Have resource corrective action systems been put in place? ال8.10 Has a resource layoff system been established? ال8.11 Have resource performance measurement systems been established? √

Page 9: TA Readiness Program

RATINGS Copyright © 2005 CPM Solutions Ltd. All rights reserved.

MODULE MODULES ASSESSED WEIGHT SCORE STATUS ACTION RESPONSIBILITY DUE DATE

1 RISK COST BENEFIT ANALYSIS 15% 11% On Track

2 TURNAROUND STRATEGY PLAN 5% 4% On Track

2.1 Safety / Environment Strategy 5% 4% On Track

2.2 Operations Strategy 5% 3% Behind

2.3 Execution Strategy 5% 2% Behind

2.4 Inspection Strategy 5% 3% Behind

2.5 Logistics Strategy 5% 3% Behind

2.6 Administration Strategy 5% 3% Behind

3 WORKLIST MANAGEMENT 5% 5% Ready

4 MATERIALS MANAGEMENT 10% 6% Behind

5A WORK PACKAGE PLANNING - OPEX 5% 3% Behind

5B WORK PACKAGE PLANNING - CAPEX 5% 4% On Track

6 SCHEDULING 15% 8% Behind

7 CONTRACTING 5% 4% On Track

8 RESOURCE MANAGEMENT 5% 3% Behind

POSSIBLE TOTAL 100% 67% Behind READY FOR EXECUTION?

[Charts & Graphs]

TURNAROUND READINESS ASSESSMENT PROGRAMTurnaround Project Performance (Complete grey shaded cells only)

Page 10: TA Readiness Program
Page 11: TA Readiness Program

Copyright © 2005 CPM Solutions Ltd. All rights reserved.

Turnaround Readiness Assessment Program Weighting by Phase and Element

Turnaround Readiness Assessment Program Score Results by Phase and Element

[Action Items]

TURNAROUND READINESS ASSESSMENT PROGRAMTurnaround Readiness Assessment Charts & Graphs

RISK COST BENEFIT ANALYSIS; 15%

TURNAROUND STRATEGY PLAN; 5%

Safety / Environment Strategy; 5%

Operations Strategy; 5%

Execution Strategy; 5%

Inspection Strategy; 5%Logistics Strategy; 5%

Administration Strategy; 5%WORKLIST MANAGEMENT; 5%MATERIALS MANAGEMENT; 10%

WORK PACKAGE PLANNING - OPEX; 5%

WORK PACKAGE PLANNING - CAPEX; 5%

SCHEDULING; 15%

CONTRACTING; 5%RESOURCE MANAGEMENT; 5%

RISK COST BENEFIT ANALYSIS

TURNAROUND STRATEGY PLAN

Safety / Environment Strategy

Operations Strategy

Execution Strategy

Inspection Strategy

Logistics Strategy

Administration Strategy

WORKLIST MANAGEMENT

MATERIALS MANAGEMENT

WORK PACKAGE PLANNING - OPEX

WORK PACKAGE PLANNING - CAPEX

SCHEDULING

CONTRACTING

RESOURCE MANAGEMENT

TU

RN

AR

OU

ND

ST

RA

TE

GY

PLA

N

Saf

ety

/ Env

iron

men

t Str

ateg

y

Op

era

tion

s S

trat

egy

Ex

ecut

ion

Str

ateg

y

Ins

pect

ion

Str

ateg

y

Log

istic

s S

trat

egy

Adm

inis

trat

ion

Str

ateg

y

WO

RK

LIS

T M

AN

AG

EM

EN

T

MA

TE

RIA

LS M

AN

AG

EM

EN

T

WO

RK

PA

CK

AG

E P

LA

NN

ING

- O

PE

X

WO

RK

PA

CK

AG

E P

LAN

NIN

G -

CA

PE

X

SC

HE

DU

LIN

G

CO

NT

RA

CT

ING

RE

SO

UR

CE

MA

NA

GE

ME

NT

PO

SS

IBLE

TO

TA

L

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

5% 5% 5% 5% 5% 5% 5% 5%10%

5% 5%

15%

5% 5%

100%

4% 4% 3% 2% 3% 3% 3% 5% 6% 3% 4% 8% 4% 3% 67%

Weight (Possible Score) Actual Score