T000633A EIS Addendum v04 - Toronto · scale 1:50 mh 132-072-1 bh1 trench support pipes temporary...

5
LS LS LS LS LS HW 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 61 6 617 618 619 620 621 622 623 624 625 6 26 627 628 629 630 631 632 633 634 635 636 637 638 639 640 64 1 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 6 6 2 663 664 665 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 836 837 842 843 844 845 846 847 848 849 850 85 1 852 853 854 855 856 857 85 9 860 86 1 862 863 86 4 8 6 5 866 86 7 868 869 8 70 871 872 8 73 858 876 877 878 87 9 880 88 1 882 88 3 884 885 886 887 88 8 889 890 891 892 89 3 894 895 89 6 897 898 899 90 0 901 90 2 903 90 5 906 907 908 91 0 911 E G r oup o f S u m ac G F C D B A 70 71 - 7 3 75 - 77 7 8 79 80 8 2 6 7 6( c l u mp ) 6 7 3 6 72 67 0 6 71 6 6 9 665 6 6 4 653 64 3 64 2 641 640 639 6 3 8 637 634 6 3 3 631 623 622 3 2 4 H 6 1413 13 12 15 14 1407 1408 1409 1410 7 1412 1411 1415 1414 5 9 WI L S ON AVE O L D YO R K M I L L S R D YONGE ST YONGE ST WI L S ON AV E OLD YONGE ST MASON BLVD DE VERE GDNS HARLEY AVE DONI NO AVE DONWOODS DR BR O OK F I EL D R D I VO R R D DUNSTER AVE YONGE BLVD YONGE BLVD YO R K M I LL S R D MASON BLVD CRES VI EW EAST R D M A H G N I R D N A S S E R C L L E B P M A C CRE S PL YMBRI DGE R D S D O O W N O D T R C N A H S A L G C M S E R C W E I V T S A E T S E G N O Y D L O D R E G D I R K R O Y D R E G D I R K R O Y CRT MCGLASHAN CR T DON I NO KEY PLAN (NOT TO SCALE) I VOR RD DON RI VER T S L L I M DON RI VER DON RIVER GOL F C OU R S E DON VA L LE Y G OL F C OU R S E DON VA L LE Y PARK MILLS YORK V.B. 17ECS-LU-03TT REHABILITATION PLAN C6 O.O. 1236-16-06-09 N N S EE D R A W I NG C 7 M A T C H L I N E S EE D R A W I NG C 5 M A T C H L I NE BY-PASS PUMPING PLAN 2 PIPES DISCHARGE TEMPORARY MI N 300mm MIN 150mm MIN 150mm MIN 150mm 1 WEST DON SANITARY TRUNK SEWER MI N 150mm 250mm SAN SEWER TEMPORARY PLUG COMPOUND #2 PUMPING SEWER SANITARY CONC 250mm PIPE SUCTION TEMPORARY STORM SEWER 250mm UNK FLOOD LINE TRCA REGULATORY MH132-071-1 FENCE CONSTRUCTION FENCE CONSTRUCTION WE S T B ANK DONR I V E R TREE AROUND BUTTERNUT BUFFER ZONE MEMORIAL TREE SERVICE YARD TO GOLF COURSE EXISTING ACCESS RESTRICTION WEIGHT BRIDGE WITH 7t COURSE ACCESS EXISTING GOLF LINE FLOOD REGULATORY TRCA TT C P A R K I NG L O T MH132-070-1 BEHIND CIPP DIA SAN SEWER GROUT 1200mm HYDRO TORONTO DO N R I V E R WE S TBR AN C H C A LEGEND: A ACTIVE CONNECTION CAPPED CONNECTION C REHABILITATED SEWER TO BE SANITARY TRUNK 1200mm CONC REHABILITATED SEWER TO BE SANITARY TRUNK 1200mm CONC NOTES: 1 08/21/2018 ISSUED FOR TENDER SIGNED INITIAL REVISIONS DATE No. DESIGN: DATE: SCALE: DRAFTING: CHECK: DRAWING NUMBER: CONTRACT No. Water ENGINEERING & CONSTRUCTION SERVICES JOHN KELLY, P. ENG. LINEAR UNDERGROUND INFRASTRUCTURE DIRECTOR, WILLIAM SHEA, P.ENG. A.H. 1:500 DIRECTOR, DISTRIBUTION AND COLLECTION GRAHAM HARDING, P.ENG. DIRECTOR, MANAGEMENT WATER INFRASTRUCTURE LIMITS WORKING SW I.E. 125.05m SAN MH4463312111 NO TEMPORARY ASPHALT LOAD DISTRIBUTING COVER, STEEL PLATES OR SIMILAR F43 F44 F45 F46 F47 F48 F49 F50 F51 F52 F53 F54 F55 F56 F57 F59 F60 F61 F62 F63 F64 F65 F66 F67 F68 F69 F72 F73 F74 F75 F76 F77 F78 F79 F80 F82 F83 F84 F86 F87 F88 F89 F90 DWG S2 FOR DETAILS PIPE BRIDGE, SEE SEE DWG S1 FOR DETAILS THROUGH DON RIVER ACCESS FOR HEAVY VEHICLES PROPOSED CONSTRUCTION SEE DETAIL 1 TRAFFIC CROSSING FROM VEHICULAR PIPES TO PROTECT BURY BYPASS DISCHARGE PIPES PROPOSED NOTES: ANY MOVEMENT. STEEL PLATES MUST BE DESIGNED TO WITHSTAND H-20 TRAFFIC LOADING WITHOUT 1. 100% SPMDD MATERIAL COMPACTED TO SAND OR FINE GRANULAR SCALE 1:10 TEMPORARY DISCHARGE PIPES CROSS - SECTION FOR BURIED AND GATE CHAINLINK FENCE REINSTALL REMOVE AND ENGINEER OF ONTARIO. PROPOSED BYPASS PUMPING TO BE DESIGNED AND STAMPED BY A PROFESSIONAL 3. THE CITY WHEREVER REQUIRED. APPURTENANCES AS REQUIRED FOR BYPASS PUMPING SYSTEM AT NO EXTRA COST TO CONTRACTOR TO SUPPLY ALL NECCESSARY AIR VALVES, ISOLATION VALVES AND 2. REFER TO DWG C12 AND C13 FOR IRRIGATION SYSTEM, OMITTED FOR CLARITY. 1. AND LAYDOWN AREA GRAVEL ACCESS ROAD PROPOSED TEMPORARY AND LAYDOWN AREA GRAVEL ACCESS ROAD PROPOSED TEMPORARY GRAVEL ACCESS ROAD PROPOSED TEMPORARY DISCHARGE PIPE TEMPORARY F91 F92 F93 F95 F94 F96 F97 F98 F99 F104 F106 F107 F108 F109 F112 F113 F114 F115 F116 F117 F118 F119 F121 F122 F123 F102 F105 F110 F111 F70 F71 F81 F85 F100 F120 F124 F125 F58 F103 EXISTING ASPHALT PATH F101 F126 F127 F128 F129 F130 F131 F132 F133 F134 F135 F136 F137 F138 F139 PATH ASPHALT EXISTING LINE FLOOD 5 YEAR TRCA AUGUST 21, 2018

Transcript of T000633A EIS Addendum v04 - Toronto · scale 1:50 mh 132-072-1 bh1 trench support pipes temporary...

  • LS

    LS

    LS

    LS

    LS

    HW

    601

    602

    603

    604

    605

    606

    607

    608

    609

    610

    611

    612

    613

    6146

    15

    616

    617

    61861

    9

    620

    621

    622

    623

    624

    625

    626

    627

    628

    629

    630

    631

    632

    633

    634

    635

    636

    637

    638

    639

    640

    641

    642

    643

    644

    645646

    647

    648

    649

    650

    651

    652

    653

    654

    655

    656

    657

    658

    659

    660

    661

    662

    663

    664

    665

    739

    740

    741

    742743

    744

    745

    746

    747

    748

    749

    750

    751

    752

    753

    754

    755

    756

    757

    758759

    760

    761

    762

    763

    836

    837

    842

    843

    844

    845

    846

    847

    848849

    850

    851

    852

    853

    854855

    856

    857

    859

    860861862

    863

    864

    865

    866867

    868

    869870

    871

    872

    873

    858

    876877

    878

    879

    880

    881882

    883

    884

    885

    886

    887

    888

    889890

    891

    892

    893894

    895

    896897

    898899900

    901

    902

    903

    905

    906

    907908

    910

    911

    E

    Group of Sumac

    G

    F

    CD

    B

    A

    70

    71-73

    75-77

    78

    7980

    82

    676 (clu

    mp)

    673

    672

    670

    671

    669

    665

    664

    653

    643

    642

    641

    640

    639

    638

    637

    634

    633

    631

    623

    622

    3

    2

    4

    H

    61413

    13

    1215

    14

    14071408

    14091410

    7

    1412

    14111415

    1414

    5

    9

    WILS

    ON A

    VE

    OLD Y

    ORK M

    ILLS R

    D

    YO

    NG

    E

    ST

    YO

    NG

    E

    ST

    WILSO

    N AV

    E

    OL

    D

    YO

    NGE ST

    MAS

    ON

    BL

    VD

    DE

    VERE

    GD

    NS

    HARLEY

    AVE

    DO

    NIN

    O

    AV

    E DONWOODS DR

    BROO

    KFIEL

    D RD

    IVOR RD

    DU

    NSTER

    AVE

    YO

    NG

    E

    BL

    VD

    YO

    NGE BL

    VD

    YORK MILLS RD

    MAS

    ON

    BLV

    D

    CR

    ES

    VIE

    WE

    AS

    T

    RD

    MA

    HG

    NIR

    DN

    AS

    SE

    RC

    LL

    EB

    PM

    AC

    CRES

    PLY

    MBRID

    GE

    RD

    SD

    OO

    WN

    O

    D

    TRC NAHSALGCM

    SERC WEIVTSAE

    TS

    EG

    NO

    Y

    D

    LO

    DR EGDI

    R KROY

    DR

    EG

    DIR

    KR

    OY

    CRTMCGLASHAN

    CRTD

    ONIN

    O

    KEY PLAN(NOT TO SCALE)

    IVO

    R

    RD

    DO

    N

    RIV

    ER

    TS LLIM

    DO

    N

    RIV

    ER

    DON RIVER

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    PARKMILLSYORK

    V.B. 17ECS-LU-03TT

    REHABILITATION

    PLAN

    C6

    O.O.

    1236-16-06-09

    N

    N

    SE

    E D

    RA

    WIN

    G C

    7M

    AT

    CH LIN

    E

    SE

    E D

    RA

    WIN

    G C

    5M

    AT

    CH LIN

    E

    BY-PASS PUMPING PLAN 2

    PIPESDISCHARGE TEMPORARY

    MIN 300

    mm

    MIN 150mm MIN 150mm MIN 150mm

    1

    WEST DON SANITARY TRUNK SEWER

    MIN 150

    mm

    250mm SAN SEWER TEMPORARY PLUG

    COMPOUND #2PUMPING

    SEWER SANITARY CONC 250mm

    PIPESUCTION

    TEMPORARY

    STORM SEWER 250mm UNK

    FLOOD LINETRCA REGULATORY

    MH132-071-1

    FENCECONSTRUCTION

    FENCECONSTRUCTION

    WEST BANK

    DON RIVER

    TREEAROUND BUTTERNUTBUFFER ZONE

    MEMORIAL TREE

    SERVICE YARDTO GOLF COURSEEXISTING ACCESS

    RESTRICTIONWEIGHTBRIDGE WITH 7tCOURSE ACCESSEXISTING GOLF

    LINEFLOOD REGULATORYTRCA

    TTC PARKING LOT

    MH132-070-1

    BEHIND CIPPDIA SAN SEWERGROUT 1200mm

    HYDROTORONTO

    DO

    N RIV

    ER W

    EST B

    RANC

    H

    C

    A

    LEGEND:

    A ACTIVE CONNECTION

    CAPPED CONNECTIONC

    REHABILITATED SEWER TO BE SANITARY TRUNK 1200mm CONC

    REHABILITATEDSEWER TO BE SANITARY TRUNK 1200mm CONC

    NOTES:

    1 08/21/2018 ISSUED FOR TENDER

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE:

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    CONTRACT No.

    WaterENGINEERING & CONSTRUCTION SERVICES

    JOHN KELLY, P. ENG.

    LINEAR UNDERGROUND INFRASTRUCTURE

    DIRECTOR,

    WILLIAM SHEA, P.ENG.A.H.

    1:500DIRECTOR,

    DISTRIBUTION AND COLLECTION

    GRAHAM HARDING, P.ENG.

    DIRECTOR,

    MANAGEMENTWATER INFRASTRUCTURE

    LIMITSWORKING

    SW I.E. 125.05m SAN MH4463312111

    NO TEMPORARY ASPHALT LOAD DISTRIBUTING COVER,

    STEEL PLATES OR SIMILAR

    F43

    F44

    F45F46

    F47

    F48

    F49

    F50

    F51

    F52

    F53F54

    F55

    F56

    F57

    F59

    F60

    F61F62

    F63

    F64

    F65F66

    F67

    F68F69

    F72

    F73F74

    F75

    F76

    F77

    F78

    F79

    F80

    F82

    F83

    F84

    F86F87

    F88

    F89

    F90

    DWG S2 FOR DETAILSPIPE BRIDGE, SEE

    SEE DWG S1 FOR DETAILSTHROUGH DON RIVER

    ACCESS FOR HEAVY VEHICLESPROPOSED CONSTRUCTION

    SEE DETAIL 1TRAFFIC CROSSING

    FROM VEHICULAR PIPES TO PROTECT

    BURY BYPASS

    DISCHARGE PIPESPROPOSED

    NOTES:

    ANY MOVEMENT.STEEL PLATES MUST BE DESIGNED TO WITHSTAND H-20 TRAFFIC LOADING WITHOUT 1.

    100% SPMDD MATERIAL COMPACTED TO

    SAND OR FINE GRANULAR

    SCALE 1:10

    TEMPORARY DISCHARGE PIPES

    CROSS - SECTION FOR BURIEDAND GATECHAINLINK FENCE REINSTALL REMOVE AND

    ENGINEER OF ONTARIO.PROPOSED BYPASS PUMPING TO BE DESIGNED AND STAMPED BY A PROFESSIONAL 3.

    THE CITY WHEREVER REQUIRED.APPURTENANCES AS REQUIRED FOR BYPASS PUMPING SYSTEM AT NO EXTRA COST TO CONTRACTOR TO SUPPLY ALL NECCESSARY AIR VALVES, ISOLATION VALVES AND 2.

    REFER TO DWG C12 AND C13 FOR IRRIGATION SYSTEM, OMITTED FOR CLARITY.1.

    AND LAYDOWN AREAGRAVEL ACCESS ROADPROPOSED TEMPORARY

    AND LAYDOWN AREAGRAVEL ACCESS ROADPROPOSED TEMPORARY

    GRAVEL ACCESS ROADPROPOSED TEMPORARY

    DISCHARGE PIPETEMPORARY

    F91

    F92

    F93

    F95

    F94

    F96

    F97

    F98

    F99

    F104

    F106

    F107

    F108

    F109

    F112

    F113

    F114

    F115

    F116

    F117

    F118

    F119

    F121F122

    F123

    F102

    F105

    F110

    F111

    F70

    F71

    F81

    F85

    F100

    F120

    F124

    F125

    F58

    F103

    EXISTING ASPHALT PATH

    F101

    F126F127F128

    F129

    F130F131

    F132

    F133

    F134

    F135

    F136

    F137

    F138

    F139

    PATH ASPHALTEXISTING

    LINEFLOOD 5 YEARTRCA

    AUGUST 21, 2018

  • 666

    667

    668

    669

    670

    671

    672

    673

    674

    675

    676

    677

    679680

    681

    682

    683684

    686

    687

    688 690

    691692

    693

    694695

    696697

    699

    700

    701

    703

    704

    717

    720

    721

    722 723

    724

    725 726

    727

    728

    729

    730

    731

    732733734

    735

    736

    737

    738

    739

    740

    742

    745

    839

    841

    971

    677

    685

    689

    698

    702

    705

    706

    707708

    709

    710

    711712

    713

    714

    715

    716718

    840970

    719

    WILS

    ON A

    VE

    OLD Y

    ORK M

    ILLS R

    D

    YO

    NG

    E

    ST

    YO

    NG

    E

    ST

    WILSO

    N AV

    E

    OL

    D

    YO

    NGE ST

    MAS

    ON

    BL

    VD

    DE

    VERE

    GD

    NS

    HARLEY

    AVE

    DO

    NIN

    O

    AV

    E DONWOODS DR

    BROO

    KFIEL

    D RD

    IVOR RD

    DU

    NSTER

    AVE

    YO

    NG

    E

    BL

    VD

    YO

    NGE BL

    VD

    YORK MILLS RD

    MAS

    ON

    BLV

    D

    CR

    ES

    VIE

    WE

    AS

    T

    RD

    MA

    HG

    NIR

    DN

    AS

    SE

    RC

    LL

    EB

    PM

    AC

    CRES

    PLY

    MBRID

    GE

    RD

    SD

    OO

    WN

    O

    D

    TRC NAHSALGCM

    SERC WEIVTSAE

    TS

    EG

    NO

    Y

    D

    LO

    DR EGDI

    R KROY

    DR

    EG

    DIR

    KR

    OY

    CRTMCGLASHAN

    CRTD

    ONIN

    O

    KEY PLAN(NOT TO SCALE)

    IVO

    R

    RD

    DO

    N

    RIV

    ER

    TS LLIM

    DO

    N

    RIV

    ER

    DON RIVER

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    PARKMILLSYORK

    V.B. 17ECS-LU-03TT

    REHABILITATION

    PLAN

    C7

    O.O.

    1236-16-06-10

    N

    N

    SE

    E D

    RA

    WIN

    G C

    6M

    AT

    CH LIN

    E

    COMPOUND #1PUMPING

    BY-PASS PUMPING PLAN 3

    LEGEND:

    LINEFLOOD REGULATORYTRCA

    LINEFLOOD

    REGULATORYTRCA

    SECTION A

    FLOW

    FLOW

    GRASSRIM ELEV. 135.43660mm DIA. COVER

    INV. ELEV. 128.00

    SANITARY TUNNEL1800mm DIA. CONC.

    SANITARY SEWER1200mm DIA CONC.

    INV. ELEV. 127.95

    660mm

    840mm

    1830mm

    A

    LADDER RUNGS

    WEST DON SANITARY TRUNK SEWER

    MH132-073-1SUCTION MH

    GOLF COURSEDON VALLEY

    POND

    1200mm CONC SANITARY TRUNK SEWER

    LOCAL DITCH

    SEWER1200mm

    TEMPORARY PLUG

    APPROX. PLATFORM EL. 130.02

    AFTERWARDS, SEE DETAIL 1WITH NEW APPURTENANCES

    BYPASS PUMPING AND REPLACEREMOVE MH APPURTENANCES FOR

    1EXISTING SANITARY SEWER MH132-073-1

    SCALE 1:50

    MH 132-072-1

    BH1

    TRENCH SUPPORT

    PIPESTEMPORARY SUCTION

    FENCECONSTRUCTION

    ASPHALT WALKWAYEXISTING

    FENCECONSTRUCTION

    REHABILITATEDSEWER TO BE SANITARY TRUNK 1200mm CONC

    NOTES:

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE:

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    CONTRACT No.

    WaterENGINEERING & CONSTRUCTION SERVICES

    JOHN KELLY, P. ENG.

    LINEAR UNDERGROUND INFRASTRUCTURE

    DIRECTOR,

    WILLIAM SHEA, P.ENG.A.H.

    1:500DIRECTOR,

    DISTRIBUTION AND COLLECTION

    GRAHAM HARDING, P.ENG.

    DIRECTOR,

    MANAGEMENTWATER INFRASTRUCTURE

    1 08/21/2018 ISSUED FOR TENDER

    CONTRACTORS DESIGN)TRENCH SUPPORT (AS PER

    SEE DWG C20 FOR DETAILSLADDER AND PLATFORM

    PUMPING AND INSTALL NEWAND PLATFORM FOR BYPASS

    REMOVE LADDER RUNGS

    PIPESDISCHARGETEMPORARY

    NOTE 4REMOVE AND REPLACE, SEE

    3105

    mm

    CONSTRUCTION TO LOCAL DITCH WITHIN CONSTRUCTION LIMITS.CONTRACTOR TO DISCHARGE DEWATERING/ UNWATERING FROM MH132-073-1 5.

    PER OPSD 401.010 AND INSTALL NEW CHARCOAL ODOUR CONTROL UNDER COVER.RISER AND TAPERED TOP AS PER OPSD 701.030, REPLACE FRAME AND COVER AS GAIN LARGER ACCESS FOR BYPASS PIPES AND REPLACE WITH NEW 1200mm DIA, REMOVE COVER, FRAME, CHARCOAL ODOUR CONTROL, RISER AND PCC-CONE TO 4.

    PROFESSIONAL ENGINEER OF ONTARIO.PROPOSED BYPASS PUMPING TO BE DESIGNED AND STAMPED BY A 3.

    COST TO THE CITY WHEREVER REQUIRED.APPURTENANCES AS REQUIRED FOR BYPASS PUMPING SYSTEM AT NO EXTRA CONTRACTOR TO SUPPLY ALL NECCESSARY AIR VALVES, ISOLATION VALVES AND 2.

    REFER TO DWG C12 AND C13 FOR IRRIGATION SYSTEM, OMITTED FOR CLARITY.1.

    EX. ASPHALT PATHGRAVEL ACCESS ROAD TO CONNECT PROPOSED

    ACCESS ROADPROPOSED GRAVEL

    LAYDOWN AREAGRAVEL ACCESS ROAD AND PROPOSED TEMPORARY

    LAYDOWN AREAGRAVEL ACCESS ROAD AND PROPOSED TEMPORARY

    F140

    F141F142

    F143

    F144

    F146F147

    F148

    F149

    F145

    F150

    F151

    F152F153F154

    F155

    F156

    F157F158G159

    F160 F161 F162

    F163

    F164F165

    F166 F167

    F168

    F169

    ASPHALT WALKWAYEXISTING

    EXISTING ASPHALT PATH

    AUGUST 21, 2018

  • LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    HW

    T

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    LS

    HW

    HW

    HW

    HW

    WV

    WV

    LS

    LS

    1310

    974

    975

    976

    977

    978

    980981

    982983

    984985

    986987

    988989

    990991

    992993

    994995

    996997

    998

    999

    1000

    1301

    1302

    768

    769

    783

    794

    795796797

    801802803

    804

    807

    810811812

    813

    814

    815

    816

    817818

    819820

    821822

    824

    825

    826

    827828

    875

    1303

    1304

    1307

    1308

    1309

    1311

    1314

    1316

    1318

    1319

    1320

    132113

    22

    1323

    1324

    1325

    1326

    1327

    1328

    1329

    1330

    133113

    32

    1333

    1334

    1335

    1336

    1337

    1338

    1339

    1340

    1341

    1348

    1349

    1350

    1351

    1352

    1305

    Group of Sumac

    664

    653

    643

    642

    641

    640

    639

    638

    637

    634

    633

    631

    623

    622

    H

    WILS

    ON A

    VE

    OLD Y

    ORK M

    ILLS R

    D

    YO

    NG

    E

    ST

    YO

    NG

    E

    ST

    WILSO

    N AV

    E

    OL

    D

    YO

    NGE ST

    MAS

    ON

    BL

    VD

    DE

    VERE

    GD

    NS

    HARLEY

    AVE

    DO

    NIN

    O

    AV

    E DONWOODS DR

    BROO

    KFIEL

    D RD

    IVOR RD

    DU

    NSTER

    AVE

    YO

    NG

    E

    BL

    VD

    YO

    NGE BL

    VD

    YORK MILLS RD

    MAS

    ON

    BLV

    D

    CR

    ES

    VIE

    WE

    AS

    T

    RD

    MA

    HG

    NIR

    DN

    AS

    SE

    RC

    LL

    EB

    PM

    AC

    CRES

    PLY

    MBRID

    GE

    RD

    SD

    OO

    WN

    O

    D

    TRC NAHSALGCM

    SERC WEIVTSAE

    TS

    EG

    NO

    Y

    D

    LO

    DR EGDI

    R KROY

    DR

    EG

    DIR

    KR

    OY

    CRTMCGLASHAN

    CRTD

    ONIN

    O

    KEY PLAN(NOT TO SCALE)

    IVO

    R

    RD

    DO

    N

    RIV

    ER

    TS LLIM

    DO

    N

    RIV

    ER

    DON RIVER

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    PARKMILLSYORK

    7

    3

    4021

    4015

    V.B. 17ECS-LU-03TT

    REHABILITATION

    PLAN

    C8

    O.O.

    1236-16-06-11

    N

    N

    LINEFLOOD REGULATORYTRCA

    LINEFLOOD REGULATORYTRCA

    RNFP REGULATORY LIMIT

    RNFP REGULATORY LIMIT

    LINEFLOOD REGULATORYTRCA

    LINEFLOOD REGULATORYTRCA

    DON RIVER

    DON

    RIVE

    R

    WEST DON SANITARY TRUNK SEWER

    MH132-068-1

    MH132-069-1

    LINEFLOOD REGULATORYTRCA

    EROSION AND SEDIMENT CONTROL PLAN 1

    WILSO

    N A

    VE

    YO

    NGE S

    T

    OLD Y

    ORK

    MILLS R

    D

    TTC PARKING LOT

    MH4461612379SAN

    MH4460712384SAN

    CONSTRUCTION ACCESS

    FENCECONSTRUCTION

    FENCECONSTRUCTION

    FENCECONSTRUCTION

    ACCESSCONSTRUCTION

    FENCECONSTRUCTION

    BRIDGE UNDER

    BARRIER SAND BAG

    ROW OF

    NON-WOVEN GEOTEXTILEWITH METAL STAKES AND

    AS PER OPSD 219.130HEAVY DUTY SILT FENCE

    NON-WOVEN GEOTEXTILEWITH METAL STAKES ANDAS PER OPSD 219.130HEAVY DUTY SILT FENCE

    STN (SOUTH)SUBWAYYORK MILLS

    EROSION AND SEDIMENT CONTROL NOTES:

    FLOODPLAIN NOTES:

    THAN DURING A 2 YEAR STORM.FLOODED MORE FREQUENTLYPORTION OF CONSTRUCTION AREA EXPECTED TO BE 1.

    OR SPILL I.E. FUEL TANKS, UNTETHERED EQUIPMENT ETC.THAT WOULD HAVE CAPACITY TO CAUSE AN OBSTRUCTION TO FLOW CONTINGENCY PLAN: REMOVE ALL ITEMS FROM REGIONAL FLOODPLANARISE, THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWINGFAVORABLE WEATHER CONDITIONS. SHOULD AN UNEXPECTED STORMIN ADVANCE TO ENSURE THAT WORKS ARE CONDUCTED DURINGTHE CONTRACTOR SHALL MONITOR THE WEATHER SEVERAL DAYS3.

    OPERATION.TO THE ENVIRONMENT OCCUR AS RESULT OF CONTRACTOR'SDURING FLOODING EVENTS SUCH THAT NO SPILLSTEMPORARY BYPASS SYSTEM MUST BE PROTECTED 4.

    INSPECTION OF THE SITE PROTECTION MUST BE CONDUCTED .INSTALLED THE URBAN FORESTRY STAFF MUST BE NOTIFIED AND ANONCE ALL TREE PROTECTION MEASURES HAVE BEEN6.

    TORONTO URBAN FORESTRY SERVICES.ANY QUESTIONS SHOULD BE DIRECTED TO CITY OF7.

    MEMORIAL TREE

    OUTSIDE OF LIMITS OF CONSTRUCTION.STAGING, MATERIAL STOCK PILES, PARKING, ETC. PARK AREA NOT TO BE USED FOR CONSTRUCTION9.

    REQUIRED AND WORK TO BE COMPLETED IN MINIMUM TIME FRAMES.TEMPORARY FENCING TO BE REMOVED WHEN NO LONGER10.

    TREE PROTECTION NOTES:

    TRCA FLOOD FORECAST WEBPAGE).(CALL TRCA'S 24 HR FLOOD LINE AT 416-661-6514 MONITORFORECAST AND WARNING SYSTEMPROJECT CONTRACTOR SHALL MONITOR TRCA'S FLOOD 2.

    IDENTIFIED AS TPZ MUST REMAIN UNDISTURBED AT ALL TIMES.VEHICLES OR EQUIPMENT IS PERMITTED WITHIN TPZ. THE AREA(S)OR MATERIAL OR FILL IS PERMITTED. NO MOVEMENT OR STORAGE OFPROTECTION ZONE (TPZ), NO ROOT CUTTING IS PERMITTED, NO STORAGE TREATMENTS IS PERMITTED WITHIN THE AREA IDENTIFIED AS TREENO CONSTRUCTION ACTIVITY INCLUDING GRADE CHANGES, SURFACE2.

    WITH CLEAN NATIVE TOPSOIL.HAND TRIMMED BY QUALIFIED ARBORIST AND BACKFILLEDBRANCHES CUT DURING CONSTRUCTION ACTIVITIES WILL BE ZONE EXTEND INTO THE CONSTRUCTION LIMITS. ROOTS AND /ORTREE WILL REQUIRE PRUNING AS THEIR TREE PROTECTION3.

    TO CONDUCTING ANY SPECIFIED WORK.FORESTRY SERVICES NO LESS THAN 48 HOURS PRIOR THE ARBORIST / TREE PROFESSIONAL MUST CONTACTACCORDANCE WITH GOOD ARBORICULTURAL STANDARDS.PRUNING OF TREE ROOTS AND BRANCHES MUST BE INAS APPROVED BY URBAN FORESTRY SERVICES. ALLBY A QUALIFIED ARBORIST OR OTHER TREE PROFESSIONAL PLAN WHICH REQUIRE PRUNING MUST BE PRUNEDTHE TREE PROTECTION ZONE(S) INDICATED ON THISANY ROOTS OR BRANCHES WHICH EXTEND BEYOND4.

    OUTLINED IN THE ARBORIST REPORT PREPARED BY LGL LIMITED.MUST BE IN ACCORDANCE WITH THE RECOMMENDATIONSPROTECTION OF THE TREES INDICATED ON THIS PLAN5.

    OF CONSTRUCTION.WILL BE RE-GRADED TO ORIGINAL SURFACE UPON COMPLETIONCONSTRUCTION. ANY GRADE DISTURBANCES ( I.E. TRENCHING)EXISTING GRADE TO BE MAINTAINED DURING AND AFTER 8.

    PIPE TRENCH OR CONSTRUCTION PART ARE TO REMAIN.TREE STUMPS FROM CUT TREES NOT WITHIN12.

    DO

    N RIV

    ER W

    EST B

    RA

    NC

    H

    WES

    T BR

    ANCH

    DON

    RIVE

    R

    DON RIVER WEST BRANCH

    THE RAVINE & NATURAL FEATURE PROTECTION BY-LAW

    RNFP 0608OFFENCE CONTINUES.RAVINE PERMIT CONDITIONS IS LIABLE TO A MAXIMUM FINE OF NOT MORE THAN $10,000 FOR EACH DAY OR PART OF A DAY THAT THE AND/OR A SPECIAL FINE OF $100,000. A PERSON CONVICTED OF A CONTINUING OFFENCE, INCLUDING FAILURE TO COMPLY WITH $100,000 FOR EACH TREE DESTROYED, A MAXIMUM FINE OF $100,000 FOR ANY OTHER OFFENCE COMMITTED UNDER THIS CHAPTER, CITY. A PERSON CONVICTED OF AN OFFENCE UNDER THIS BY- LAW IS LIABLE TO A MINIMUM FINE OF $500 AND A MAXIMUM FINE OF SUBJECT TO FINES, AND THE LANDOWNER MAY BE ORDERED BY THE COURT TO RESTORE THE AREA TO THE SATISFACTION OF THE CONVICTIONS OF OFFENCES RESPECTING THE REGULATIONS IN THE RAVINE & NATURAL FEATURE PROTECTION BY-LAW ARE

    THE GENERAL MANAGER OF PARKS, FORESTRY & RECREATION.ALTERED, WITHOUT WRITTEN AUTHORISATION FROM URBAN FORESTRY RAVINE & NATURAL FEATURE PROTECTION, ON BEHALF OF UNDER THIS BY-LAW PROTECTED TREES MAY NOT BE REMOVED, INJURED OR DESTROYED, AND PROTECTED GRADES MAY NOT BE

    DUMPING OF REFUSE AND CHANGES TO GRADE WITHIN PROTECTED AREAS DEFINED IN SCHEDULE A.THE INJURY AND DESTRUCTION OF TREES,

    , CHAPTER 658 OF THE CITY OF TORONTO MUNICIPAL CODE REGULATES RAVINE & NATURAL FEATURE PROTECTION BY-LAWTHE

    NON-WOVEN GEOTEXTILEWITH METAL STAKES ANDAS PER OPSD 219.130HEAVY DUTY SILT FENCE

    NON-WOVEN GEOTEXTILEWITH METAL STAKES ANDAS PER OPSD 219.130HEAVY DUTY SILT FENCE

    SE

    E D

    RA

    WIN

    G C

    9M

    AT

    CH LIN

    E

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE:

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    CONTRACT No.

    WaterENGINEERING & CONSTRUCTION SERVICES

    JOHN KELLY, P. ENG.

    LINEAR UNDERGROUND INFRASTRUCTURE

    DIRECTOR,

    WILLIAM SHEA, P.ENG.A.H.

    1:500DIRECTOR,

    DISTRIBUTION AND COLLECTION

    GRAHAM HARDING, P.ENG.

    DIRECTOR,

    MANAGEMENTWATER INFRASTRUCTURE

    1 08/21/2018 ISSUED FOR TENDER

    PARKJOLLY MILLER

    ACCESS ROADPROPOSED TEMPORARY

    SERVICES PRIOR TO THE REMOVAL OF THE TREE PROTECTION BARRIERS. THE BARRIER. WRITTEN NOTICE MUST BE PROVIDED TO URBAN FORESTRY A SIGN AS ON DETAIL 2 DRAWING C30 MUST BE ATTACHED TO ALL SIDES OF UNTIL ALL SITE ACTIVITIES INCLUDING LANDSCAPING ARE COMPLETE.THE TREE PROTECTION BARRIERS MUST REMAIN IN EFFECTIVE CONDITIONNOTICE PROVIDED TO CITY OF TORONTO, URBAN FORESTRY SERVICES. BARRIERS SPECIFIED ON THIS PLAN MUST BE INSTALLED AND WRITTENPRIOR TO COMMENCEMENT OF ANY SITE ACTIVITY THE TREE PROTECTION1.

    TO THE WRITTEN APPROVAL OF URBAN FORESTRY.CONSULTATION WITH CONTRACT ADMINISTRATOR AND BE SUBJECTTO BE REMOVED SHALL BE DETERMINED THROUGH ONSITE THE NEED FOR ADDITIONAL TREE REMOVALS BEYOND THOSE SHOWN 11.

    CONSTRUCTION FENCE

    CATCH BASIN, TYP OF 2 CONTROL DEVICE IN

    INSTALL SEDIMENT

    BARRIER UNDER BRIDGEROW OF SAND BAG

    LINEFLOOD 5 YEARTRCA

    FLOOD LINETRCA 5 YEAR

    AUGUST 21, 2018

    MATCHED.ALL GRADES WITHIN THE REGULATORY FLOOD PLAIN WILL BE MAINTAINED OR 7.

    PROVIDE SPILL CONTAINMENT CONTROLL.CONDUCTED IN DESIGNATED AREAS A MINIMUM 30m AWAY FROM THE WATER. DRAINS OR WATERBODIES. VEHICLE REFUELING AND MAINTENANCE MUST BE OR OTHER DELETERIOUS SUBSTANCES INTO NEARBY DITCHES, SWALES, STORM CONTROLLED TO PREVENT ENTRY OF PETROLEUM PRODUCTS, DEBRIS, CONCRETE ALL CONSTRUCTION ACTIVITIES INCLUDING MAINTENANCE PROCEDURES WILL BE 6.

    USED AS NECESSARY.IMMEDIATELY CONTACTED. ADDITIONAL ESC MEASURES TO BE KEPT ON SITE AND THE TORONTO REGION CONSERVATION AUTHORITY ENFORCEMENT OFFICE TO BE BE IMPLEMENTED IMMEDIATELY TO MINIMIZE POTENTIAL ECOLOGICAL IMPACTS AND THE RELEASE OF A DELETERIOUS SUBSTANCE, THEN ALTERNATIVE MEASURES MUST THE PRESCRIBED MEASURES ON THE PLANS ARE NOT EFFECTIVE IN PREVENTING CHANGE TO MINIMIZE SEDIMENT LADEN RUNOFF FROM LEAVING THE WORK AREA. IF NOT STATIC AND MAY NEED TO BE UPGRADED/AMENDED AS SITE CONDITIONS THE EROSION AND SEDIMENT CONTROL STRATEGIES OUTLINED ON THE PLANS ARE 5.

    PROGRESSES.TEMPORARILY OR PERMANENTLY STABILIZED OR RESTORED AS THE WORK ALL DISTURBED AREAS WILL BE MINIMIZED TO THE EXTENT POSSIBLE, AND 4.

    AFTER ANY STORM EVENT) AND CLEARED OR REPLACED, AS REQUIRED.ALL SEDIMENTATION AND EROSION CONTROLS ARE TO BE INSPECTED DAILY (AND 3.

    "UNTREATED."AND SHALL BE LOCATED TO PREVENT SURFACE RUNOFF FROM LEAVING THE SITE PLACE PRIOR TO INITIATION OF TOPSOIL STRIPPING OR PRE-GRADING OPERATIONS SEDIMENTATION AND EROSION CONTROLS INCLUDING SILT FENCES ARE TO BE IN 2.

    IDENTIFICATION OF THE DEFICIENCY.CONTROL MEASURES SHALL BE REPAIRED OR REPLACED IMMEDIATELY UPON ENTRY OF SEDIMENT INTO THE WATERWAY. ALL DAMAGED EROSION AND SEDIMENT TO, AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION PHASES, TO PREVENT EROSION AND SEDIMENT CONTROL (ESC) MEASURES SHALL BE IMPLEMENTED PRIOR 1.

    AROUND WORKING AREA OR WITHIN 15m EMBANKMENT.CONTRACTOR IS NOT PERMITTED TO STOCK PILE MATERIALS IN OR 29.

    MADE OF NATURAL FIBERS ONLY WITH NO PLASTIC.EROSION CONTROL BLANKETS SHALL BE 100% BIODEGRADABE AND 28.

    AN ISSUE ARSES. NOTIFY THE TRCA ENFORCEMENT OFFICER AND PROJECT MANAGER IF CONSTRUCTION PROCEEDS. THE ENVIRONMENTAL MONITOR SHALL THE NATURAL ENVIRONMENT ARE EFFECTIVELY MITIGATED AS TO ENSURE THAT ACTIVITIES THAT COULD HAVE A NEGATIVE IMPACT TO AN ENVORONMENTAL MONITOR WILL BE ON SITE AND PROVIDE ADVICE, 27.

    THE OBJECTIVE OF PREVENTING THE RELEASE OF SEDIMENT LADEN WATER.SHALL BE MONITORED FOR EFFECTIVENESS AND MAINTAINED OR REVISED TO MEET DRAIN ONTO DISTURBED SOILS WITHIN WORK AREA. THESE CONTROL MEASURES SENT DIRECTLY TO ANY WATERCOURSE, WETLAND OR FOREST, OR ALLOWED TO DRAIN THROUGH A WELL-VEGETATED AREA. NO DEWATERING EFFLUENT SHALL BE ENVIRONMENT AT LEAST 30m FROM A WATERCOURSE OR WETLAND AND ALLOWED TO ALL DEWATERING/UNWATERING SHALL BE TREATED AND RELEASED TO THE 16.

    ALL CATCH BASINS SHALL BE OUTFITTED WITH SILT TRAPS.15.

    EQUIPMENT, CONSTRUCTION MATERIALS,ETC.OR AN OBSTRUCTION TO FLOW, E.G., FUEL TANKS, PORTAPOTTIES, MACHINERY, REGIONAL STORM FLOOD PLAIN THAT WOULD HAVE THE POTENTIAL TO CAUSE A SPILL STORM ARISE, THE CONTRACTOR WILL REMOVE ALL UNFIXED ITEMS FROM THE CONDUCTED DURING FAVOURABLE WEATHER CONDITIONS. SHOULD AN UNEXPECTED ADVANCE OF THE ONSET OF THE PROJECT TO ENSURE THAT THE WORKS WILL BE THE PROPONENT/CONTRACTOR SHALL MONITOR THE WEATHER SEVERAL DAYS IN 14.

    AND DIRT TRACKING ONTO ROADS.CLEAN OFF TRUCKS AND EQUIPMENT PRIOR TO LEAVING THE SITE TO PREVENT MUD 13.

    (WHEN NECESSARY) OF ROADS ADJACENT TO THE PROJECT.PROVIDE DUST CONTROL AT ALL TIMES INCLUDING THE MAINTENANCE AND CLEANUP 12.

    OF THE CONTRACT ADMINISTRATOR.REMOVED FOLLOWING CONSTRUCTION AND AREAS RESTORED TO THE SATISFACTION ALL EROSION CONTROL AND TEMPORARY ROADS, STRUCTURES AND FACILITIES TO BE 11.

    FUNCTIONAL UNTIL THE SITE IS STABILIZED.SEDIMENTATION AND EROSION CONTROLS ARE TO BE KEPT IN PLACE AND 10.

    LOCATED IN UNPAVED AREAS OR SOFT GROUND CONDITIONS.ACCESS MATS SUCH AS CROSSLAMTM OR APPROVED EQUAL WHERE ACCESS ROAD IS CONTRACTOR SHALL COVER ALL ACCESS ROADS WITH CROSS LAMINATED TIMBER 9.

    MOULD TO CONTOURS. TO BE FILLED ONLY THREE QUARTERS FULL TO ALLOW BAGS TO BE FLEXIBLE TO SAND BAGS TO BE FILLED WITH GRAVEL TO PROVIDE BARRIER FOR DRAINAGE. BAGS 8.

    ACTIVITIES ARE COMPLETED.SET IT ASIDE AND RETURN IT TO THE ORIGINAL LOCATION ONCE CONSTRUCTION THE ORDINARY HIGH WATER MARK. IF MATERIAL IS REMOVED FROM THE WATERBODY, MATERIALS FROM THE BANKS, THE SHORELINE OR THE BED OF THE WATERBODY BELOW MINIMIZE THE REMOVAL OF NATURAL WOODY DEBRIS, ROCKS, SAND, AND OTHER 26.

    COMPACTION AND DISTURBANCE TO ADJACENT AREAS.ESTABLISH SIGLE SITE ENTRY AND EXIT TO THE TEMPORARY BRIDGES TO REDUCE 25.

    REMOVE TEMPORARY BRIDGES BEFORE THE ONSET OF SPRING FRESHET (MTO 2016).24.

    SEDIMENTATION.FOR BRIDGE APPROACHES AND INSTALL IN A MANNER THAT AVOIDS EROSION AND USE ONLY CLEAN MATERIALS (EG. ROCK OR COARSE GRAVEL, FILL, WOOD OR STEEL) 23.

    COMMENCING CONSTRUCTION. PLEASE NOTIFY TRCA ENFORCEMENT OFFICER AND TRCA MANAGER 48 HOURS PRIOR TO 22.

    CONTACT THE TRCA ENFORCEMENT OFFICER AS WELL AS THE PROPONENT. WORKS. SHOULD CONCERN ARISE ON SITE, THE ENVIRONMENTAL MONITOR WILL CONTROLS, DEWATERING OR UNWATERING, RESTORATION AND IN-OR-NEAR WATER MONITOR ALL WORKS, AND IN PARTICULAR WORKS RELATED TO EROSION AND SEDIMENT AS WELL AS ON A REGULAR BASIS, OR FOLLOWING RAIN/ SNOW MELT EVENT TO AN ENVIRONMENTAL MONITOR WILL ATTEND THE SITE TO INSPECT ALL NEW CONTROLS, 21.

    APPROPRIATE EROSION AND SEDIMENT CONTROL.ALL IN WATER AND NEAR WATER WORKS WILL BE CONDUCTED IN THE DRY WITH 20.

    http://trca.us14.list-manage.com/subscribe?u=7037e91abdf362943c155c20f&id=c90ab6ccf9SERVICE AT CONTRACTOR SHALL REGISTER FOR TRCA'S ELECTRONIC FLOOD WARNING MESSAGE 19.

    THE MIGRATORY BIRDS CONVECTION ACT.TREE REMOVALS MUST BE COMPLETED BETWEEN NOVEMBER - MARCH TO COMPLY WITH 18.

    UNLESS APPROVED BY TRCA.NO EQUIPMENT OR VEHICLES ARE PERMITTED TO CROSS THROUGH THE WATECOURSE ALL ACCESS TO THE WORK SITE SHALL BE FROM EITHER SIDE OF THE WATERCOURSE. 17.

  • LS

    LS

    HW

    602

    603

    604

    605

    617

    61861

    9

    620

    622

    623

    624

    626

    627

    628

    629

    630

    631

    634

    635

    636

    637

    638

    639

    640

    641

    642

    643

    649

    650

    651

    652

    653

    654

    655

    656

    657

    658

    659

    660

    661

    662

    663

    664

    665

    916

    917

    918

    919

    920

    739

    740

    741

    742743

    744

    745

    746

    747

    748

    749

    750

    752

    754

    755

    756

    757

    758759

    760

    761

    763

    837

    842

    843

    845

    846

    847

    848849

    850

    853

    854855

    873

    876877

    878

    879

    880

    881882

    883

    884

    885

    886

    887

    888

    889890

    891

    892

    893894

    895

    896897

    898899900

    901

    902

    903

    904

    905

    906

    907908

    909

    910

    911

    912

    E

    G

    F

    CD

    B

    A

    70

    71-73

    75-77

    78

    7980

    82

    676 (clu

    mp)

    673

    672

    670

    671

    669

    665

    664

    WILS

    ON A

    VE

    OLD Y

    ORK M

    ILLS R

    D

    YO

    NG

    E

    ST

    YO

    NG

    E

    ST

    WILSO

    N AV

    E

    OL

    D

    YO

    NGE ST

    MAS

    ON

    BL

    VD

    DE

    VERE

    GD

    NS

    HARLEY

    AVE

    DO

    NIN

    O

    AV

    E DONWOODS DR

    BROO

    KFIEL

    D RD

    IVOR RD

    DU

    NSTER

    AVE

    YO

    NG

    E

    BL

    VD

    YO

    NGE BL

    VD

    YORK MILLS RD

    MAS

    ON

    BLV

    D

    CR

    ES

    VIE

    WE

    AS

    T

    RD

    MA

    HG

    NIR

    DN

    AS

    SE

    RC

    LL

    EB

    PM

    AC

    CRES

    PLY

    MBRID

    GE

    RD

    SD

    OO

    WN

    O

    D

    TRC NAHSALGCM

    SERC WEIVTSAE

    TS

    EG

    NO

    Y

    D

    LO

    DR EGDI

    R KROY

    DR

    EG

    DIR

    KR

    OY

    CRTMCGLASHAN

    CRTD

    ONIN

    O

    KEY PLAN(NOT TO SCALE)

    IVO

    R

    RD

    DO

    N

    RIV

    ER

    TS LLIM

    DO

    N

    RIV

    ER

    DON RIVER

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    PARKMILLSYORK

    V.B. 17ECS-LU-03TT

    REHABILITATION

    PLAN

    C9

    O.O.

    1236-16-06-12

    N

    N

    WEST DON SANITARY TRUNK SEWER

    FLOOD LINETRCA REGULATORY

    MH132-071-1

    SE

    E D

    RA

    WIN

    G C

    10

    MA

    TC

    H LIN

    E

    EROSION AND SEDIMENT CONTROL PLAN 2

    CONSTRUCTION ACCESS

    SERVICE PERSONNELGATE FOR GOLF COURSECONSTRUCTION ACCESS AND

    FLOODPLAIN NOTES: EROSION AND SEDIMENT CONTROL NOTES:

    INSPECTION OF THE SITE PROTECTION MUST BE CONDUCTED .INSTALLED THE URBAN FORESTRY STAFF MUST BE NOTIFIED AND ANONCE ALL TREE PROTECTION MEASURES HAVE BEEN6.

    TORONTO URBAN FORESTRY SERVICES.ANY QUESTIONS SHOULD BE DIRECTED TO CITY OF7.

    OUTSIDE OF LIMITS OF CONSTRUCTION.STAGING, MATERIAL STOCK PILES, PARKING, ETC. PARK AREA NOT TO BE USED FOR CONSTRUCTION9.

    REQUIRED AND WORK TO BE COMPLETED IN MINIMUM TIME FRAMES.TEMPORARY FENCING TO BE REMOVED WHEN NO LONGER10.

    TREE PROTECTION NOTES:

    WITH CLEAN NATIVE TOPSOIL.HAND TRIMMED BY QUALIFIED ARBORIST AND BACKFILLEDBRANCHES CUT DURING CONSTRUCTION ACTIVITIES WILL BE ZONE EXTEND INTO THE CONSTRUCTION LIMITS. ROOTS AND /ORTREE WILL REQUIRE PRUNING AS THEIR TREE PROTECTION3.

    OUTLINED IN THE ARBORIST REPORT PREPARED BY LGL LIMITED.MUST BE IN ACCORDANCE WITH THE RECOMMENDATIONSPROTECTION OF THE TREES INDICATED ON THIS PLAN5.

    OF CONSTRUCTION.WILL BE RE-GRADED TO ORIGINAL SURFACE UPON COMPLETIONCONSTRUCTION. ANY GRADE DISTURBANCES ( I.E. TRENCHING)EXISTING GRADE TO BE MAINTAINED DURING AND AFTER 8.

    DON RIVER WEST BRANCH

    DON RIVER WEST BRANCH

    TREEAROUND BUTTERNUT

    BUFFER ZONE

    RNFP 0608OFFENCE CONTINUES.RAVINE PERMIT CONDITIONS IS LIABLE TO A MAXIMUM FINE OF NOT MORE THAN $10,000 FOR EACH DAY OR PART OF A DAY THAT THE AND/OR A SPECIAL FINE OF $100,000. A PERSON CONVICTED OF A CONTINUING OFFENCE, INCLUDING FAILURE TO COMPLY WITH $100,000 FOR EACH TREE DESTROYED, A MAXIMUM FINE OF $100,000 FOR ANY OTHER OFFENCE COMMITTED UNDER THIS CHAPTER, CITY. A PERSON CONVICTED OF AN OFFENCE UNDER THIS BY- LAW IS LIABLE TO A MINIMUM FINE OF $500 AND A MAXIMUM FINE OF SUBJECT TO FINES, AND THE LANDOWNER MAY BE ORDERED BY THE COURT TO RESTORE THE AREA TO THE SATISFACTION OF THE CONVICTIONS OF OFFENCES RESPECTING THE REGULATIONS IN THE RAVINE & NATURAL FEATURE PROTECTION BY-LAW ARE

    THE GENERAL MANAGER OF PARKS, FORESTRY & RECREATION.ALTERED, WITHOUT WRITTEN AUTHORISATION FROM URBAN FORESTRY RAVINE & NATURAL FEATURE PROTECTION, ON BEHALF OF UNDER THIS BY-LAW PROTECTED TREES MAY NOT BE REMOVED, INJURED OR DESTROYED, AND PROTECTED GRADES MAY NOT BE

    DUMPING OF REFUSE AND CHANGES TO GRADE WITHIN PROTECTED AREAS DEFINED IN SCHEDULE A.THE INJURY AND DESTRUCTION OF TREES,

    , CHAPTER 658 OF THE CITY OF TORONTO MUNICIPAL CODE REGULATES RAVINE & NATURAL FEATURE PROTECTION BY-LAWTHE

    THE RAVINE & NATURAL FEATURE PROTECTION BY-LAW

    SE

    E D

    RA

    WIN

    G C

    8M

    AT

    CH LIN

    E

    NON-WOVEN GEOTEXTILEWITH METAL STAKES AND

    AS PER OPSD 219.130HEAVY DUTY SILT FENCE

    FENCECONSTRUCTION

    RNFP REGULATORY LIMIT

    FENCECONSTRUCTION

    MEMORIAL TREE

    MH132-070-1

    CONSTRUCTION AREA ARE TO REMAIN.TREE STUMPS FROM CUT TREES NOT WITHIN12.

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE:

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    CONTRACT No.

    WaterENGINEERING & CONSTRUCTION SERVICES

    JOHN KELLY, P. ENG.

    LINEAR UNDERGROUND INFRASTRUCTURE

    DIRECTOR,

    WILLIAM SHEA, P.ENG.A.H.

    1:500DIRECTOR,

    DISTRIBUTION AND COLLECTION

    GRAHAM HARDING, P.ENG.

    DIRECTOR,

    MANAGEMENTWATER INFRASTRUCTURE

    1 08/21/2018 ISSUED FOR TENDER

    LIMITSWORKING

    SERVICES PRIOR TO THE REMOVAL OF THE TREE PROTECTION BARRIERS. THE BARRIER. WRITTEN NOTICE MUST BE PROVIDED TO URBAN FORESTRY A SIGN AS ON DETAIL 2 DRAWING C32 MUST BE ATTACHED TO ALL SIDES OF UNTIL ALL SITE ACTIVITIES INCLUDING LANDSCAPING ARE COMPLETE.THE TREE PROTECTION BARRIERS MUST REMAIN IN EFFECTIVE CONDITIONNOTICE PROVIDED TO CITY OF TORONTO, URBAN FORESTRY SERVICES. BARRIERS SPECIFIED ON THIS PLAN MUST BE INSTALLED AND WRITTENPRIOR TO COMMENCEMENT OF ANY SITE ACTIVITY THE TREE PROTECTION1.

    TO THE WRITTEN APPROVAL OF URBAN FORESTRY.CONSULTATION WITH CONTRACT ADMINISTRATOR AND BE SUBJECTTO BE REMOVED SHALL BE DETERMINED THROUGH ONSITE THE NEED FOR ADDITIONAL TREE REMOVALS BEYOND THOSE SHOWN 11.

    IDENTIFIED AS TPZ MUST REMAIN UNDISTURBED AT ALL TIMES.VEHICLES OR EQUIPMENT IS PERMITTED WITHIN TPZ. THE AREA(S)OR MATERIAL OR FILL IS PERMITTED. NO MOVEMENT OR STORAGE OFPROTECTION ZONE (TPZ), NO ROOT CUTTING IS PERMITTED, NO STORAGE TREATMENTS IS PERMITTED WITHIN THE AREA IDENTIFIED AS TREENO CONSTRUCTION ACTIVITY INCLUDING GRADE CHANGES, SURFACE2.

    ENVIRONMENT OCCUR AS RESULT OF CONTRACTOR'S OPERATION.TEMPORARY BYPASS SYSTEM MUST BE PROTECTED DURING FLOODING EVENTS SUCH THAT NO SPILLS TO THE 4.

    UNTETHERED EQUIPMENT ETC.FLOODPLAN THAT WOULD HAVE CAPACITY TO CAUSE AN OBSTRUCTION TO FLOW OR SPILL I.E. FUEL TANKS, CONTRACTOR SHALL IMPLEMENT THE FOLLOWING CONTINGENCY PLAN: REMOVE ALL ITEMS FROM REGIONAL CONDUCTED DURING FAVORABLE WEATHER CONDITIONS. SHOULD AN UNEXPECTED STORM ARISE, THE THE CONTRACTOR SHALL MONITOR THE WEATHER SEVERAL DAYS IN ADVANCE TO ENSURE THAT WORKS ARE 3.

    FLOOD LINE AT 416-661-6514 MONITOR TRCA FLOOD FORECAST WEBPAGE).PROJECT CONTRACTOR SHALL MONITOR TRCA'S FLOOD FORECAST AND WARNING SYSTEM (CALL TRCA'S 24 HR 2.

    STORM.PORTION OF CONSTRUCTION AREA EXPECTED TO BE FLOODED MORE FREQUENTLY THAN DURING A 2 YEAR 1.

    SUPPORTED BY WOOD HOARDINGTO REACH MH COVER LEVELMULTIPLE SAND BAG ROWS

    AND LAYDOWN AREAGRAVEL ACCESS ROAD PROPOSED TEMPORARY

    ACCESS ROADPROPOSED GRAVEL

    SEE DWG C20 FOR DETAILS, TYP OF 4SURFACE SHEET FLOW TO ENTER RIVER

    ROW UNDERNEATH TO PREVENTTIMBER COVER WITH SAND BAG BARRIER

    MINOR RAMP MADE OF CROSS LAMINATED

    48 HOURS PRIOR TO CONDUCTING ANY SPECIFIED WORK.PROFESSIONAL MUST CONTACT FORESTRY SERVICES NO LESS THANGOOD ARBORICULTURAL STANDARDS. THE ARBORIST / TREEPRUNING OF TREE ROOTS AND BRANCHES MUST BE IN ACCORDANCE WITH PROFESSIONAL AS APPROVED BY URBAN FORESTRY SERVICES. ALLMUST BE PRUNED BY A QUALIFIED ARBORIST OR OTHER TREEPROTECTION ZONE(S) INDICATED ON THIS PLAN WHICH REQUIRE PRUNINGANY ROOTS OR BRANCHES WHICH EXTEND BEYOND THE TREE4.

    FLOOD LINETRCA 5 YEAR

    AUGUST 21, 2018

    CONSTRUCTION MATERIALS,ETC.FLOW, E.G., FUEL TANKS, PORTAPOTTIES, MACHINERY, EQUIPMENT, WOULD HAVE THE POTENTIAL TO CAUSE A SPILL OR AN OBSTRUCTION TO ALL UNFIXED ITEMS FROM THE REGIONAL STORM FLOOD PLAIN THAT SHOULD AN UNEXPECTED STORM ARISE, THE CONTRACTOR WILL REMOVE WORKS WILL BE CONDUCTED DURING FAVOURABLE WEATHER CONDITIONS. DAYS IN ADVANCE OF THE ONSET OF THE PROJECT TO ENSURE THAT THE THE PROPONENT/CONTRACTOR SHALL MONITOR THE WEATHER SEVERAL 14.

    PREVENT MUD AND DIRT TRACKING ONTO ROADS.CLEAN OFF TRUCKS AND EQUIPMENT PRIOR TO LEAVING THE SITE TO 13.

    CLEANUP (WHEN NECESSARY) OF ROADS ADJACENT TO THE PROJECT.PROVIDE DUST CONTROL AT ALL TIMES INCLUDING THE MAINTENANCE AND 12.

    RESTORED TO THE SATISFACTION OF THE CONTRACT ADMINISTRATOR.FACILITIES TO BE REMOVED FOLLOWING CONSTRUCTION AND AREAS ALL EROSION CONTROL AND TEMPORARY ROADS, STRUCTURES AND 11.

    FUNCTIONAL UNTIL THE SITE IS STABILIZED.SEDIMENTATION AND EROSION CONTROLS ARE TO BE KEPT IN PLACE AND 10.

    CONDITIONS.WHERE ACCESS ROAD IS LOCATED IN UNPAVED AREAS OR SOFT GROUND TIMBER ACCESS MATS SUCH AS CROSSLAMTM OR APPROVED EQUAL CONTRACTOR SHALL COVER ALL ACCESS ROADS WITH CROSS LAMINATED 9.

    BAGS TO BE FLEXIBLE TO MOULD TO CONTOURS. DRAINAGE. BAGS TO BE FILLED ONLY THREE QUARTERS FULL TO ALLOW SAND BAGS TO BE FILLED WITH GRAVEL TO PROVIDE BARRIER FOR 8.

    OR MATCHED.ALL GRADES WITHIN THE REGULATORY FLOOD PLAIN WILL BE MAINTAINED 7.

    CONTROLL.MINIMUM 30m AWAY FROM THE WATER. PROVIDE SPILL CONTAINMENT AND MAINTENANCE MUST BE CONDUCTED IN DESIGNATED AREAS A DITCHES, SWALES, STORM DRAINS OR WATERBODIES. VEHICLE REFUELING DEBRIS, CONCRETE OR OTHER DELETERIOUS SUBSTANCES INTO NEARBY WILL BE CONTROLLED TO PREVENT ENTRY OF PETROLEUM PRODUCTS, ALL CONSTRUCTION ACTIVITIES INCLUDING MAINTENANCE PROCEDURES 6.

    SITE AND USED AS NECESSARY.BE IMMEDIATELY CONTACTED. ADDITIONAL ESC MEASURES TO BE KEPT ON TORONTO REGION CONSERVATION AUTHORITY ENFORCEMENT OFFICE TO IMMEDIATELY TO MINIMIZE POTENTIAL ECOLOGICAL IMPACTS AND THE SUBSTANCE, THEN ALTERNATIVE MEASURES MUST BE IMPLEMENTED ARE NOT EFFECTIVE IN PREVENTING THE RELEASE OF A DELETERIOUS LEAVING THE WORK AREA. IF THE PRESCRIBED MEASURES ON THE PLANS SITE CONDITIONS CHANGE TO MINIMIZE SEDIMENT LADEN RUNOFF FROM PLANS ARE NOT STATIC AND MAY NEED TO BE UPGRADED/AMENDED AS THE EROSION AND SEDIMENT CONTROL STRATEGIES OUTLINED ON THE 5.

    PROGRESSES.TEMPORARILY OR PERMANENTLY STABILIZED OR RESTORED AS THE WORK ALL DISTURBED AREAS WILL BE MINIMIZED TO THE EXTENT POSSIBLE, AND 4.

    REQUIRED.DAILY (AND AFTER ANY STORM EVENT) AND CLEARED OR REPLACED, AS ALL SEDIMENTATION AND EROSION CONTROLS ARE TO BE INSPECTED 3.

    FROM LEAVING THE SITE "UNTREATED."OPERATIONS AND SHALL BE LOCATED TO PREVENT SURFACE RUNOFF BE IN PLACE PRIOR TO INITIATION OF TOPSOIL STRIPPING OR PRE-GRADING SEDIMENTATION AND EROSION CONTROLS INCLUDING SILT FENCES ARE TO 2.

    THE DEFICIENCY.SHALL BE REPAIRED OR REPLACED IMMEDIATELY UPON IDENTIFICATION OF WATERWAY. ALL DAMAGED EROSION AND SEDIMENT CONTROL MEASURES CONSTRUCTION PHASES, TO PREVENT ENTRY OF SEDIMENT INTO THE IMPLEMENTED PRIOR TO, AND MAINTAINED AT ALL TIMES DURING EROSION AND SEDIMENT CONTROL (ESC) MEASURES SHALL BE 1.

    COMMENCING CONSTRUCTION. AND TRCA MANAGER 48 HOURS PRIOR TO PLEASE NOTIFY TRCA ENFORCEMENT OFFICER 22.

    AS THE PROPONENT. THE TRCA ENFORCEMENT OFFICER AS WELL THE ENVIRONMENTAL MONITOR WILL CONTACT WORKS. SHOULD CONCERN ARISE ON SITE, RESTORATION AND IN-OR-NEAR WATER CONTROLS, DEWATERING OR UNWATERING, WORKS RELATED TO EROSION AND SEDIMENT MONITOR ALL WORKS, AND IN PARTICULAR FOLLOWING RAIN/ SNOW MELT EVENT TO WELL AS ON A REGULAR BASIS, OR THE SITE TO INSPECT ALL NEW CONTROLS, AS AN ENVIRONMENTAL MONITOR WILL ATTEND 21.

    7037e91abdf362943c155c20f&id=c90ab6ccf9http://trca.us14.list-manage.com/subscribe?u= WARNING MESSAGE SERVICE AT CONTRACTOR SHALL REGISTER FOR TRCA'S ELECTRONIC FLOOD 20.

    BAG ROWS AND TO TIE IN WITH SILT FENCES TO BOTH SIDES.SHEET FLOWS INTO RIVER. RAMPS TO BE ON THE TOP OF SAND BRIDGES TO GOLF COURSE TO HAVE MINOR RAMPS TO PREVENT BOTH ENTRY AND EXIT POINTS OF ACCESS 19.

    ACT.APRIL 1 TO COMPLY WITH THE MIGRATORY BIRDS CONVECTION TREE REMOVALS MUST BE COMPLETED BETWEEN AUGUST 1 AND 18.

    TRCA.TO CROSS THROUGH THE WATECOURSE UNLESS APPROVED BY THE WATERCOURSE. NO EQUIPMENT OR VEHICLES ARE PERMITTED ALL ACCESS TO THE WORK SITE SHALL BE FROM EITHER SIDE OF 17.

    PREVENTING THE RELEASE OF SEDIMENT LADEN WATER.AND MAINTAINED OR REVISED TO MEET THE OBJECTIVE OF CONTROL MEASURES SHALL BE MONITORED FOR EFFECTIVENESS DRAIN ONTO DISTURBED SOILS WITHIN WORK AREA. THESE ANY WATERCOURSE, WETLAND OR FOREST, OR ALLOWED TO AREA. NO DEWATERING EFFLUENT SHALL BE SENT DIRECTLY TO WETLAND AND ALLOWED TO DRAIN THROUGH A WELL-VEGETATED TO THE ENVIRONMENT AT LEAST 30m FROM A WATERCOURSE OR ALL DEWATERING/UNWATERING SHALL BE TREATED AND RELEASED 16.

    AS TERRAFIX 270R SILTSACKS OR APPROVED EQUIVALENT.ALL CATCH BASINS SHALL BE OUTFITTED WITH SILT SACKS SUCH 15.

    AROUND WORKING AREA OR WITHIN 15m EMBANKMENT.CONTRACTOR IS NOT PERMITTED TO STOCK PILE MATERIALS IN OR 29.

    MADE OF NATURAL FIBERS ONLY WITH NO PLASTIC.EROSION CONTROL BLANKETS SHALL BE 100% BIODEGRADABE AND 28.

    AN ISSUE ARSES. NOTIFY THE TRCA ENFORCEMENT OFFICER AND PROJECT MANAGER IF CONSTRUCTION PROCEEDS. THE ENVIRONMENTAL MONITOR SHALL THE NATURAL ENVIRONMENT ARE EFFECTIVELY MITIGATED AS TO ENSURE THAT ACTIVITIES THAT COULD HAVE A NEGATIVE IMPACT TO AN ENVORONMENTAL MONITOR WILL BE ON SITE AND PROVIDE ADVICE, 27.

    ACTIVITIES ARE COMPLETED.RETURN IT TO THE ORIGINAL LOCATION ONCE CONSTRUCTION MATERIAL IS REMOVED FROM THE WATERBODY, SET IT ASIDE AND OF THE WATERBODY BELOW THE ORDINARY HIGH WATER MARK. IF AND OTHER MATERIALS FROM THE BANKS, THE SHORELINE OR THE BED MINIMIZE THE REMOVAL OF NATURAL WOODY DEBRIS, ROCKS, SAND, 26.

    TO REDUCE COMPACTION AND DISTURBANCE TO ADJACENT AREAS.ESTABLISH SIGLE SITE ENTRY AND EXIT TO THE TEMPORARY BRIDGES 25.

    FRESHET (MTO 2016).REMOVE TEMPORARY BRIDGES BEFORE THE ONSET OF SPRING 24.

    THAT AVOIDS EROSION AND SEDIMENTATION.WOOD OR STEEL) FOR BRIDGE APPROACHES AND INSTALL IN A MANNER USE ONLY CLEAN MATERIALS (EG. ROCK OR COARSE GRAVEL, FILL, 23.

  • 666

    667

    668

    669

    670

    671

    672

    673

    674

    675

    676

    677

    682

    686

    687

    688 690

    691692

    693

    694695

    696697

    699

    700

    701

    703

    704

    717

    720

    721

    722 723

    724

    725 726

    727

    728

    729

    730

    731

    732733734

    735

    736

    737

    738

    739

    740

    742

    745841

    971

    689

    698

    702

    705

    707709

    710

    713

    714

    716718

    970

    719

    WILS

    ON A

    VE

    OLD Y

    ORK M

    ILLS R

    D

    YO

    NG

    E

    ST

    YO

    NG

    E

    ST

    WILSO

    N AV

    E

    OL

    D

    YO

    NGE ST

    MAS

    ON

    BL

    VD

    DE

    VERE

    GD

    NS

    HARLEY

    AVE

    DO

    NIN

    O

    AV

    E DONWOODS DR

    BROO

    KFIEL

    D RD

    IVOR RD

    DU

    NSTER

    AVE

    YO

    NG

    E

    BL

    VD

    YO

    NGE BL

    VD

    YORK MILLS RD

    MAS

    ON

    BLV

    D

    CR

    ES

    VIE

    WE

    AS

    T

    RD

    MA

    HG

    NIR

    DN

    AS

    SE

    RC

    LL

    EB

    PM

    AC

    CRES

    PLY

    MBRID

    GE

    RD

    SD

    OO

    WN

    O

    D

    TRC NAHSALGCM

    SERC WEIVTSAE

    TS

    EG

    NO

    Y

    D

    LO

    DR EGDI

    R KROY

    DR

    EG

    DIR

    KR

    OY

    CRTMCGLASHAN

    CRTD

    ONIN

    O

    KEY PLAN(NOT TO SCALE)

    IVO

    R

    RD

    DO

    N

    RIV

    ER

    TS LLIM

    DO

    N

    RIV

    ER

    DON RIVER

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    GOLF C

    OURS

    E

    DON

    VALL

    EY

    PARKMILLSYORK

    V.B. 17ECS-LU-03TT

    REHABILITATION

    PLAN

    C10

    O.O.

    1236-16-06-13

    N

    N

    LINEFLOOD REGULATORYTRCA

    LINEFLOOD

    REGULATORYTRCA

    WEST DON SANITARY TRUNK SEWER

    GOLF COURSEDON VALLEY

    POND

    ASPHALT WALKWAY

    MH 132-072-1

    LIMIT O

    F C

    ON

    TR

    AC

    T

    EROSION AND SEDIMENT CONTROL PLAN 3

    NON-WOVEN GEOTEXTILEWITH METAL STAKES ANDAS PER OPSD 219.130HEAVY DUTY SILT FENCE

    FENCECONSTRUCTION

    BH1

    NON-WOVEN GEOTEXTILEWITH METAL STAKES AND

    AS PER OPSD 219.130HEAVY DUTY SILT FENCE

    FENCECONSTRUCTION

    EROSION AND SEDIMENT CONTROL NOTES:

    INSPECTION OF THE SITE PROTECTION MUST BE CONDUCTED .INSTALLED THE URBAN FORESTRY STAFF MUST BE NOTIFIED AND ANONCE ALL TREE PROTECTION MEASURES HAVE BEEN6.

    TORONTO URBAN FORESTRY SERVICES.ANY QUESTIONS SHOULD BE DIRECTED TO CITY OF7.

    OUTSIDE OF LIMITS OF CONSTRUCTION.STAGING, MATERIAL STOCK PILES, PARKING, ETC. PARK AREA NOT TO BE USED FOR CONSTRUCTION9.

    REQUIRED AND WORK TO BE COMPLETED IN MINIMUM TIME FRAMES.TEMPORARY FENCING TO BE REMOVED WHEN NO LONGER10.

    TREE PROTECTION NOTES:

    WITH CLEAN NATIVE TOPSOIL.HAND TRIMMED BY QUALIFIED ARBORIST AND BACKFILLEDBRANCHES CUT DURING CONSTRUCTION ACTIVITIES WILL BE ZONE EXTEND INTO THE CONSTRUCTION LIMITS. ROOTS AND /ORTREE WILL REQUIRE PRUNING AS THEIR TREE PROTECTION3.

    OUTLINED IN THE ARBORIST REPORT PREPARED BY LGL LIMITED.MUST BE IN ACCORDANCE WITH THE RECOMMENDATIONSPROTECTION OF THE TREES INDICATED ON THIS PLAN5.

    OF CONSTRUCTION.WILL BE RE-GRADED TO ORIGINAL SURFACE UPON COMPLETIONCONSTRUCTION. ANY GRADE DISTURBANCES ( I.E. TRENCHING)EXISTING GRADE TO BE MAINTAINED DURING AND AFTER 8.

    PIPE TRENCH OR CONSTRUCTION PART ARE TO REMAIN.TREE STUMPS FROM CUT TREES NOT WITHIN12.

    FLOODPLAIN NOTES:

    RNFP 0608OFFENCE CONTINUES.RAVINE PERMIT CONDITIONS IS LIABLE TO A MAXIMUM FINE OF NOT MORE THAN $10,000 FOR EACH DAY OR PART OF A DAY THAT THE AND/OR A SPECIAL FINE OF $100,000. A PERSON CONVICTED OF A CONTINUING OFFENCE, INCLUDING FAILURE TO COMPLY WITH $100,000 FOR EACH TREE DESTROYED, A MAXIMUM FINE OF $100,000 FOR ANY OTHER OFFENCE COMMITTED UNDER THIS CHAPTER, CITY. A PERSON CONVICTED OF AN OFFENCE UNDER THIS BY- LAW IS LIABLE TO A MINIMUM FINE OF $500 AND A MAXIMUM FINE OF SUBJECT TO FINES, AND THE LANDOWNER MAY BE ORDERED BY THE COURT TO RESTORE THE AREA TO THE SATISFACTION OF THE CONVICTIONS OF OFFENCES RESPECTING THE REGULATIONS IN THE RAVINE & NATURAL FEATURE PROTECTION BY-LAW ARE

    THE GENERAL MANAGER OF PARKS, FORESTRY & RECREATION.ALTERED, WITHOUT WRITTEN AUTHORISATION FROM URBAN FORESTRY RAVINE & NATURAL FEATURE PROTECTION, ON BEHALF OF UNDER THIS BY-LAW PROTECTED TREES MAY NOT BE REMOVED, INJURED OR DESTROYED, AND PROTECTED GRADES MAY NOT BE

    DUMPING OF REFUSE AND CHANGES TO GRADE WITHIN PROTECTED AREAS DEFINED IN SCHEDULE A.THE INJURY AND DESTRUCTION OF TREES,

    , CHAPTER 658 OF THE CITY OF TORONTO MUNICIPAL CODE REGULATES RAVINE & NATURAL FEATURE PROTECTION BY-LAWTHE

    THE RAVINE & NATURAL FEATURE PROTECTION BY-LAW

    SE

    E D

    RA

    WIN

    G C

    9M

    AT

    CH LIN

    E

    BUFFERBUTTERNUT TREE

    BUFFERBUTTERNUT TREE

    DON RIVER WEST BRANCH

    1 08/21/2018 ISSUED FOR TENDER

    SIGNEDINITIALREVISIONSDATENo.

    DESIGN:

    DATE:

    SCALE:

    DRAFTING: CHECK:

    DRAWING

    NUMBER:

    CONTRACT No.

    WaterENGINEERING & CONSTRUCTION SERVICES

    JOHN KELLY, P. ENG.

    LINEAR UNDERGROUND INFRASTRUCTURE

    DIRECTOR,

    WILLIAM SHEA, P.ENG.A.H.

    1:500DIRECTOR,

    DISTRIBUTION AND COLLECTION

    GRAHAM HARDING, P.ENG.

    DIRECTOR,

    MANAGEMENTWATER INFRASTRUCTURE

    TO THE WRITTEN APPROVAL OF URBAN FORESTRY.CONSULTATION WITH CONTRACT ADMINISTRATOR AND BE SUBJECTTO BE REMOVED SHALL BE DETERMINED THROUGH ONSITE THE NEED FOR ADDITIONAL TREE REMOVALS BEYOND THOSE SHOWN 11.

    LOCAL DITCH

    PROTECTION BARRIERS. PRIOR TO THE REMOVAL OF THE TREE PROVIDED TO URBAN FORESTRY SERVICES BARRIER. WRITTEN NOTICE MUST BE C32 MUST BE ATTACHED TO ALL SIDES OF THE COMPLETE. A SIGN AS ON DETAIL 2 DRAWING ACTIVITIES INCLUDING LANDSCAPING ARE EFFECTIVE CONDITION UNTIL ALL SITE TREE PROTECTION BARRIERS MUST REMAIN IN TORONTO, URBAN FORESTRY SERVICES. THE AND WRITTEN NOTICE PROVIDED TO CITY OF SPECIFIED ON THIS PLAN MUST BE INSTALLED ACTIVITY THE TREE PROTECTION BARRIERS PRIOR TO COMMENCEMENT OF ANY SITE 1.

    ALL TIMES.IDENTIFIED AS TPZ MUST REMAIN UNDISTURBED AT EQUIPMENT IS PERMITTED WITHIN TPZ. THE AREA(S) MOVEMENT OR STORAGE OF VEHICLES OR STORAGE OR MATERIAL OR FILL IS PERMITTED. NO ZONE (TPZ), NO ROOT CUTTING IS PERMITTED, NO WITHIN THE AREA IDENTIFIED AS TREE PROTECTION CHANGES, SURFACE TREATMENTS IS PERMITTED NO CONSTRUCTION ACTIVITY INCLUDING GRADE 2.

    TO CONDUCTING ANY SPECIFIED WORK.FORESTRY SERVICES NO LESS THAN 48 HOURS PRIOR THE ARBORIST / TREE PROFESSIONAL MUST CONTACTACCORDANCE WITH GOOD ARBORICULTURAL STANDARDS.PRUNING OF TREE ROOTS AND BRANCHES MUST BE INAS APPROVED BY URBAN FORESTRY SERVICES. ALLBY A QUALIFIED ARBORIST OR OTHER TREE PROFESSIONAL PLAN WHICH REQUIRE PRUNING MUST BE PRUNEDTHE TREE PROTECTION ZONE(S) INDICATED ON THISANY ROOTS OR BRANCHES WHICH EXTEND BEYOND4.

    NO SPILLS TO THE ENVIRONMENT OCCUR AS RESULT OF CONTRACTOR'S OPERATION.TEMPORARY BYPASS SYSTEM MUST BE PROTECTED DURING FLOODING EVENTS SUCH THAT 4.

    EQUIPMENT ETC.CAPACITY TO CAUSE AN OBSTRUCTION TO FLOW OR SPILL I.E. FUEL TANKS, UNTETHERED CONTINGENCY PLAN: REMOVE ALL ITEMS FROM REGIONAL FLOODPLAN THAT WOULD HAVE UNEXPECTED STORM ARISE, THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING THAT WORKS ARE CONDUCTED DURING FAVORABLE WEATHER CONDITIONS. SHOULD AN THE CONTRACTOR SHALL MONITOR THE WEATHER SEVERAL DAYS IN ADVANCE TO ENSURE 3.

    WEBPAGE).(CALL TRCA'S 24 HR FLOOD LINE AT 416-661-6514 MONITOR TRCA FLOOD FORECAST PROJECT CONTRACTOR SHALL MONITOR TRCA'S FLOOD FORECAST AND WARNING SYSTEM 2.

    DURING A 2 YEAR STORM.PORTION OF CONSTRUCTION AREA EXPECTED TO BE FLOODED MORE FREQUENTLY THAN 1.

    ACCESS ROADGRAVELPROPOSED

    ROAD TO EX. ASPHALT PATHCONNECT GRAVEL ACCESS

    CONTRACTOR IS NOT PERMITTED TO STOCK PILE MATERIALS IN OR AROUND WORKING AREA OR WITHIN 15m EMBANKMENT.29.

    EROSION CONTROL BLANKETS SHALL BE 100% BIODEGRADABE AND MADE OF NATURAL FIBERS ONLY WITH NO PLASTIC.28.

    ENVIRONMENTAL MONITOR SHALL NOTIFY THE TRCA ENFORCEMENT OFFICER AND PROJECT MANAGER IF AN ISSUE ARSES. NEGATIVE IMPACT TO THE NATURAL ENVIRONMENT ARE EFFECTIVELY MITIGATED AS CONSTRUCTION PROCEEDS. THE AN ENVORONMENTAL MONITOR WILL BE ON SITE AND PROVIDE ADVICE, TO ENSURE THAT ACTIVITIES THAT COULD HAVE A 27.

    COMPLETED.THE WATERBODY, SET IT ASIDE AND RETURN IT TO THE ORIGINAL LOCATION ONCE CONSTRUCTION ACTIVITIES ARE SHORELINE OR THE BED OF THE WATERBODY BELOW THE ORDINARY HIGH WATER MARK. IF MATERIAL IS REMOVED FROM MINIMIZE THE REMOVAL OF NATURAL WOODY DEBRIS, ROCKS, SAND, AND OTHER MATERIALS FROM THE BANKS, THE 26.

    ADJACENT AREAS.ESTABLISH SIGLE SITE ENTRY AND EXIT TO THE TEMPORARY BRIDGES TO REDUCE COMPACTION AND DISTURBANCE TO 25.

    REMOVE TEMPORARY BRIDGES BEFORE THE ONSET OF SPRING FRESHET (MTO 2016).24.

    INSTALL IN A MANNER THAT AVOIDS EROSION AND SEDIMENTATION.USE ONLY CLEAN MATERIALS (EG. ROCK OR COARSE GRAVEL, FILL, WOOD OR STEEL) FOR BRIDGE APPROACHES AND 23.

    PLEASE NOTIFY TRCA ENFORCEMENT OFFICER AND TRCA MANAGER 48 HOURS PRIOR TO COMMENCING CONSTRUCTION. 22.

    AUGUST 21, 2018

    CONTACT THE TRCA ENFORCEMENT OFFICER AS WELL AS THE PROPONENT. WATER WORKS. SHOULD CONCERN ARISE ON SITE, THE ENVIRONMENTAL MONITOR WILL SEDIMENT CONTROLS, DEWATERING OR UNWATERING, RESTORATION AND IN-OR-NEAR MONITOR ALL WORKS, AND IN PARTICULAR WORKS RELATED TO EROSION AND AS WELL AS ON A REGULAR BASIS, OR FOLLOWING RAIN/ SNOW MELT EVENT TO AN ENVIRONMENTAL MONITOR WILL ATTEND THE SITE TO INSPECT ALL NEW CONTROLS, 21.

    APPROPRIATE EROSION AND SEDIMENT CONTROL.ALL IN WATER AND NEAR WATER WORKS WILL BE CONDUCTED IN THE DRY WITH 20.

    7037e91abdf362943c155c20f&id=c90ab6ccf9SERVICE AT http://trca.us14.list-manage.com/subscribe?u= CONTRACTOR SHALL REGISTER FOR TRCA'S ELECTRONIC FLOOD WARNING MESSAGE 19.

    THE MIGRATORY BIRDS CONVENTION ACT.TREE REMOVALS MUST BE COMPLETED BETWEEN NOVEMBER - MARCH TO COMPLY WITH 18.

    UNLESS APPROVED BY TRCA.NO EQUIPMENT OR VEHICLES ARE PERMITTED TO CROSS THROUGH THE WATECOURSE ALL ACCESS TO THE WORK SITE SHALL BE FROM EITHER SIDE OF THE WATERCOURSE. 17.

    OBJECTIVE OF PREVENTING THE RELEASE OF SEDIMENT LADEN WATER.MONITORED FOR EFFECTIVENESS AND MAINTAINED OR REVISED TO MEET THE DISTURBED SOILS WITHIN WORK AREA. THESE CONTROL MEASURES SHALL BE DIRECTLY TO ANY WATERCOURSE, WETLAND OR FOREST, OR ALLOWED TO DRAIN ONTO DRAIN THROUGH A WELL-VEGETATED AREA. NO DEWATERING EFFLUENT SHALL BE SENT ENVIRONMENT AT LEAST 30m FROM A WATERCOURSE OR WETLAND AND ALLOWED TO ALL DEWATERING/UNWATERING SHALL BE TREATED AND RELEASED TO THE 16.

    ALL CATCH BASINS SHALL BE OUTFITTED WITH SILT TRAPS.15.

    EQUIPMENT, CONSTRUCTION MATERIALS,ETC.OR AN OBSTRUCTION TO FLOW, E.G., FUEL TANKS, PORTAPOTTIES, MACHINERY, REGIONAL STORM FLOOD PLAIN THAT WOULD HAVE THE POTENTIAL TO CAUSE A SPILL STORM ARISE, THE CONTRACTOR WILL REMOVE ALL UNFIXED ITEMS FROM THE CONDUCTED DURING FAVOURABLE WEATHER CONDITIONS. SHOULD AN UNEXPECTED ADVANCE OF THE ONSET OF THE PROJECT TO ENSURE THAT THE WORKS WILL BE THE PROPONENT/CONTRACTOR SHALL MONITOR THE WEATHER SEVERAL DAYS IN 14.

    AND DIRT TRACKING ONTO ROADS.CLEAN OFF TRUCKS AND EQUIPMENT PRIOR TO LEAVING THE SITE TO PREVENT MUD 13.

    (WHEN NECESSARY) OF ROADS ADJACENT TO THE PROJECT.PROVIDE DUST CONTROL AT ALL TIMES INCLUDING THE MAINTENANCE AND CLEANUP 12.

    OF THE CONTRACT ADMINISTRATOR.REMOVED FOLLOWING CONSTRUCTION AND AREAS RESTORED TO THE SATISFACTION ALL EROSION CONTROL AND TEMPORARY ROADS, STRUCTURES AND FACILITIES TO BE 11.

    UNTIL THE SITE IS STABILIZED.SEDIMENTATION AND EROSION CONTROLS ARE TO BE KEPT IN PLACE AND FUNCTIONAL 10.

    LOCATED IN UNPAVED AREAS OR SOFT GROUND CONDITIONS.ACCESS MATS SUCH AS CROSSLAMTM OR APPROVED EQUAL WHERE ACCESS ROAD IS CONTRACTOR SHALL COVER ALL ACCESS ROADS WITH CROSS LAMINATED TIMBER 9.

    CONTOURS.BE FILLED ONLY THREE QUARTERS FULL TO ALLOW BAGS TO BE FLEXIBLE TO MOULD TO SAND BAGS TO BE FILLED WITH GRAVEL TO PROVIDE BARRIER FOR DRAINAGE. BAGS TO 8.

    ALL GRADES WITHIN THE REGULATORY FLOOD PLAIN WILL BE MAINTAINED OR MATCHED.7.

    CONTAINMENT CONTROLL.DESIGNATED AREAS A MINIMUM 30m AWAY FROM THE WATER. PROVIDE SPILL WATERBODIES. VEHICLE REFUELING AND MAINTENANCE MUST BE CONDUCTED IN OTHER DELETERIOUS SUBSTANCES INTO NEARBY DITCHES, SWALES, STORM DRAINS OR CONTROLLED TO PREVENT ENTRY OF PETROLEUM PRODUCTS, DEBRIS, CONCRETE OR ALL CONSTRUCTION ACTIVITIES INCLUDING MAINTENANCE PROCEDURES WILL BE 6.

    AS NECESSARY.IMMEDIATELY CONTACTED. ADDITIONAL ESC MEASURES TO BE KEPT ON SITE AND USED TORONTO REGION CONSERVATION AUTHORITY ENFORCEMENT OFFICE TO BE IMPLEMENTED IMMEDIATELY TO MINIMIZE POTENTIAL ECOLOGICAL IMPACTS AND THE RELEASE OF A DELETERIOUS SUBSTANCE, THEN ALTERNATIVE MEASURES MUST BE PRESCRIBED MEASURES ON THE PLANS ARE NOT EFFECTIVE IN PREVENTING THE MINIMIZE SEDIMENT LADEN RUNOFF FROM LEAVING THE WORK AREA. IF THE STATIC AND MAY NEED TO BE UPGRADED/AMENDED AS SITE CONDITIONS CHANGE TO THE EROSION AND SEDIMENT CONTROL STRATEGIES OUTLINED ON THE PLANS ARE NOT 5.

    PROGRESSES.TEMPORARILY OR PERMANENTLY STABILIZED OR RESTORED AS THE WORK ALL DISTURBED AREAS WILL BE MINIMIZED TO THE EXTENT POSSIBLE, AND 4.

    ANY STORM EVENT) AND CLEARED OR REPLACED, AS REQUIRED.ALL SEDIMENTATION AND EROSION CONTROLS ARE TO BE INSPECTED DAILY (AND AFTER 3.

    BE LOCATED TO PREVENT SURFACE RUNOFF FROM LEAVING THE SITE "UNTREATED."PRIOR TO INITIATION OF TOPSOIL STRIPPING OR PRE-GRADING OPERATIONS AND SHALL SEDIMENTATION AND EROSION CONTROLS INCLUDING SILT FENCES ARE TO BE IN PLACE 2.

    THE DEFICIENCY.MEASURES SHALL BE REPAIRED OR REPLACED IMMEDIATELY UPON IDENTIFICATION OF OF SEDIMENT INTO THE WATERWAY. ALL DAMAGED EROSION AND SEDIMENT CONTROL AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION PHASES, TO PREVENT ENTRY EROSION AND SEDIMENT CONTROL (ESC) MEASURES SHALL BE IMPLEMENTED PRIOR TO, 1.