THE “OTHER” COSTS OF THE “OTHER” COSTS OF THE PROJECT THE PROJECT Things to Consider When Planning New Things to Consider When Planning New Work Work 12 12 th th Annual International Annual International Aboveground Storage Tank Aboveground Storage Tank Conference & Trade Show Conference & Trade Show March 3, 2010 March 3, 2010

Transcript of T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual...

Page 1: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

THE “OTHER” COSTS OF THE THE “OTHER” COSTS OF THE PROJECTPROJECT

Things to Consider When Planning New WorkThings to Consider When Planning New Work

1212thth Annual International Aboveground Annual International Aboveground Storage Tank Conference & Trade ShowStorage Tank Conference & Trade Show

March 3, 2010March 3, 2010

Page 2: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

OVERVIEWOVERVIEW• Planning the Project:

looking at the whole picture

• Project Process & Checklist: what to consider

• Planning Tools and Tips:

Page 3: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PROJECTPLANNING THE PROJECT

Project Progression…

Page 4: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PROJECTPLANNING THE PROJECT

What are “Other” costs…• Product Systems

• Tanks• Piping/Mechanical• Electrical/Controls• Rail• Docks

• Other Costs• Stormwater Management• Fire Protection• Geotechnical/Soils Issues• Permitting/Approvals• Design and Management Fees

Page 5: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PROJECTPLANNING THE PROJECT

Other costs…Focusing on line-item costs can be misleading….

Additional liability comes from potential: • Re-Work $• Schedule Delay $$• Unusable Real Estate Assets $$$• Operations Impact $$$$• Failed Customer Commitments $$$$$

Page 6: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PLANNING THE PROJECTPROJECTDepends on procurement method…• Single-Source EPC• Full-Service Design, Bid & GC• Multiple Design contracts and Construction

contracts• Just build it…now (not recommended)

Page 7: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PLANNING THE PROJECTPROJECT…in 3 steps• Develop a scope• Vet the project• Assemble a Concept Package

• Planning the Project

• Planning Process

• Planning Tools and Tips

Page 8: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PLANNING THE PROJECTPROJECTDevelop a scope…• Written scope of construction

with photos• Flow Diagrams (redlines or

new)• Site Layout• …or any combination of these.

• Planning the Project

• Planning Process

• Planning Tools and Tips

Page 9: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PLANNING THE PROJECTPROJECTVet the project…• with local operations• with permit authorities• with “providers” (rail, pipeline,

harbormasters, etc)• with major vendors (tanks, heaters,

etc)

• Planning the Project

• Planning Process

• Planning Tools and Tips

Page 10: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

PLANNING THE PLANNING THE PROJECTPROJECTAssemble concept package…• Scope of Construction• Site Layout• Cost Estimate• Permit information• Project Schedule

• Planning the Project

• Planning Process

• Planning Tools and Tips

Page 11: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Considerations…• Who can impact my project• Typical permits/approvals• Permit investigation• Internal requirements• Other projects/permits• Useful documents to have• Use a checklist/form

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 12: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Who can impact my project…• City, County, and State• Provider (rail, pipeline, etc)• EPA (or DEP, DENR, EPD, DEQ)• DOT• US CG• US ACE• Marine/Harbor Association• Neighbors/Stakeholders

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 13: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Typical permits/approvals…• Planning/Zoning• Land Disturbance• Stormwater/Water Quality• Fire Dept• Building/Foundation• Air (construction, operation)• NPDES• Rail

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 14: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

What if there is permitting…• Assemble Permit Tracking form • Permit contact, schedule, fee• What is the permit trigger?• Is it admin or technical?• Are there predecessors?• Is it a predecessor to others?• Is permit needed for all, some or

operations only

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 15: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Internal requirements…• Find out what approvals are needed

internally – safety, environmental, operations, etc.

• Is PHA/HAZOP needed? • Assign contact person from the

beginning for each

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 16: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Useful documents to have…• Surveys (ALTA, topo, hydro)• Geotechnical investigations• API 653s and pump data• SPCC and NPDES• 70E Arc Flash/One-lines/Bills• Current/active Permits• Fire-flow tests• Easements/Agreements

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 17: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Use a checklist or form…• Develop a standard checklist for

project planning (or borrow)• Keep track of permits, approvals,

documents, etc

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 18: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Use a checklist or form…• Develop a standard checklist for

project planning (or borrow)• Keep track of permits, approvals,

documents, etc

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING PROCESSPLANNING PROCESS

Page 19: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Tips…• Vet the project – operations, permits,

and providers• Every permit and regulation has a

trigger… Know it.• Plan for the worst (reasonable)• Set aside 10% for construction

contingency

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING TOOLS AND PLANNING TOOLS AND TIPSTIPS

Page 20: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Tips…• Gather documents, now• Know the approvals needed, when

they’re needed, and which comes first• Have a standard Project Plan package

– use it every time

• Planning the Project

• Planning Process

• Planning Tools and Tips

PLANNING TOOLS AND PLANNING TOOLS AND TIPSTIPS

Page 21: T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.