(T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st...
Transcript of (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st...
![Page 1: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/1.jpg)
Auxiliary Dry Cargo Carrier (T-ADC(X))
Captain Doyle KitchinProgram Manager
19 May 1999
Presented to:
14th Annual MachineryMarketing Conference
![Page 2: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/2.jpg)
2
• Background
• Requirements
• Acquisition Strategy
• Point Design
• Additional Program Information
Agenda
![Page 3: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/3.jpg)
LITTORAL
CONUS
CLFShuttle Ships
Battle Group +CLF Station Ship
Concept of OperationsConcept of OperationsLogistics Support For Operations In Littoral AreasLogistics Support For Operations In Littoral Areas
Merchant Ships
Forward Bases
![Page 4: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/4.jpg)
4
Concept of OperationsConcept of OperationsThree Stage Logistics Support TrainThree Stage Logistics Support Train
• Cargo
Merchant Shipping
1st STAGE1st STAGE 2ND STAGE2ND STAGE3RD STAGE3RD STAGE
Forward Bases
Shuttle Ships
• Oilers• Ammunition Ships• Stores Ships
BattleGroup or
AmphibiousReady Group
• Fast Combat Support Ship
• Tankers
Station Ship
![Page 5: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/5.jpg)
5
Concept of OperationsConcept of OperationsTraditional CVBG ResupplyTraditional CVBG Resupply
Resupplyport Station Ships
• AOE-1• AOE-6
CVBG
Station Ship / Shuttle Ship CONOPS
Shuttle Ships•T-AO•T-AE•T-AFS
![Page 6: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/6.jpg)
6
Concept of OperationsConcept of OperationsCombat Logistics Force (CLF)Combat Logistics Force (CLF)
• Station Ships (AOE)• In-Theater Resupply• Operate With Battle Group• Military Crews
![Page 7: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/7.jpg)
7
Concept of OperationsConcept of OperationsCombat Logistics Force (CLF)Combat Logistics Force (CLF)
• Shuttles (TAE, TAFS, TAO)• Resupply Station Ships• Shuttle From Forward/Theater Ports• Civilian Crews & Military Dets (T-Ships)
![Page 8: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/8.jpg)
8
•Cargo Capacity:
156,000 bbls Fuel
1,800 tons Ammo
650 tons Stores
•Length: 754 feet
•Beam: 107 feet
•Speed: 25 knots
•Aircraft: 2 CH-46Ds
•Crew: 25 Officers
470 Enlisted
The Combat Logistics ForceThe Combat Logistics ForceFast Combat Support Ships (AOE)Fast Combat Support Ships (AOE)
![Page 9: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/9.jpg)
9
•Cargo Capacity:
5,500 tons Ammo
•Length: 564 feet
•Beam: 81 feet
•Speed: 20 knots
•Aircraft: 2 CH-46Ds
•Crew: 125 Civilians
24 Military
The Combat Logistics ForceThe Combat Logistics ForceAmmunition Ships (TAE)Ammunition Ships (TAE)
![Page 10: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/10.jpg)
10
•Cargo Capacity:
3,925 tons Stores
•Length: 581 feet
•Beam: 79 feet
•Speed: 20 knots
•Aircraft: 2 CH-46Ds
•Crew: 124 Civilians
48 Military
The Combat Logistics ForceThe Combat Logistics ForceCombat Stores Ships (TAFS)Combat Stores Ships (TAFS)
![Page 11: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/11.jpg)
11
TAO•Cargo Capacity:
159,500 bbls Fuel
•Length: 677 feet
•Beam: 97 feet
•Speed: 20 knots
•Crew:
85 Civilians
23 Military
The Combat Logistics ForceThe Combat Logistics ForceFleet Oilers (TAO)Fleet Oilers (TAO)
![Page 12: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/12.jpg)
AOE-6
TAO
AOE-1
TAFS AE/TAE
0
3
6
9
12
15
18
21
24
27
30
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Num
ber
of S
hips
Problem: AOE-1/Stores/Ammo ShipsReaching End of 35 Year Service Lives
Fiscal Year
Solution: T-ADC(X)
Current SituationCurrent Situation
![Page 13: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/13.jpg)
13
��&XUUHQW�)OHHW
���7�$2
���$2(���DQG���$2(��
��$(�����7$(��$(�����7$(
��7$)6��7$)6
AOE-1TAFS
AE/TAE
BUDGETED EXTENSIONS TADC(X)
03
69
1215
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
Num
ber
of S
hips
����
6KLSV
RequirementRequirementAoA FindingsAoA Findings
��
11
5HFDSLWDOL]HG�)OHHW
���7�$2
���7�$'&�;����7�$'&�;�
���$2(��
����6KLSV
CLF Recapitalization Plan
![Page 14: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/14.jpg)
14
Shipbuilding ProfileShipbuilding Profile
CY 05CY 04CY 03CY 02CY 01CY00
![Page 15: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/15.jpg)
15
T-ADC(X) Mission
•Primary Mission•Deliver Steady Stream of Ammunition and Stores•In Its Shuttle Role - Provide Logistics Lift Capability
•Secondary Mission•Perform Substitute Station Ship Role in Company W/ T-AO
![Page 16: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/16.jpg)
16
T-ADC(X)T-ADC(X)Shuttle/Substitute Station ShipShuttle/Substitute Station Ship
ResupplyPort
Station Ship•AOE-6
CVBG
Station Ship / Shuttle Ship CONOPS
Shuttle Ships•T-AO•T-ADC(X)
SubstituteStation Ship•T-AO•T-ADC(X)
![Page 17: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/17.jpg)
17
Operational Requirements
• Commercially designed and constructed -ABS/USCG/SOLAS
• Full AFS or AE loadout (or 60% of each) plus 18K bblscargo oil
• Simultaneous Operations from 5 transfer stations• Mobility
– Sustained Speed 20 kts, Endurance 14,000 NM @ 20 kts
• Limitations– 210 m LOA, Panamax Beam, 9.5 m full load draft, 41 m air draft
• Navy Standard Underway Replenishment Equipment• Two H-46D/H-60 Helos Hangared
![Page 18: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/18.jpg)
18
Requirements in Excess ofCommercial Practice
• Shock resistance for firefighting, exterior commsand damage control equipment.
• Weather Deck washdown, DECON Station andprotective clothing.
• Degaussing System & NIXIE• T-ship Damage Control and Management System• Navy Aviation Facilities• Navy Exterior Communications
![Page 19: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/19.jpg)
19
T-ADC(X) Acquisition Key Features
• Commercial Ship Acquisition
• Performance Specification
• Innovation in Cargo Flow Efficiency
• Minimize Life-Cycle Cost
• Build the Entire 12 Ship Class Using a Single Design– Requirement for Two Shipyards
• One Competition for the Class of Ships
• Award Lead Ship with Priced Options for 11 FollowShips
![Page 20: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/20.jpg)
FY 99 FY 00 FY 01
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
ACQUISITION STRATEGY APPROVAL
ISSUE RFP TRADE STUDIES
PHASE I PROPOSAL PREP
PHASE I SOURCE SELECTION
CARGO SYSTEMS INTEGRATION DESIGN (UP TO 5 PRIME CONTRACTORS)
ISSUE RFP FOR CONSTRUCTION PROPOSAL PREP
DOWN SELECTION TO SINGLE CONTRACTOR
MS Decision
DETAIL DESIGN AND CONSTRUCTION
2nd Capable Shipyard Identified Not Later Than Contract Design Proposal...
PHASE I
PHASE II
Decision Point
PHASE II PROPOSAL PREP
FY 00 T-ADC(X) ACQUISITION SCHEDULE
![Page 21: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/21.jpg)
21
Phase I
• Award up to 5 Cargo System Integration StudyContracts
• If Teams Form, They Must Be Non-exclusive
• Potential Industry Days– Cargo Handling
– Performance Specification
![Page 22: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/22.jpg)
22
Cargo Handling/Prestaging
Dry Cargo Hold
Cargo Oil
Ship’s Fuel
English MetricLOA 689 ft 210 mBeam 100 ft 30.5 mDraft 28.9 ft 8.9 mFull Load Displacement 35,850 lt 36,416 mtSustained Speed 20 kts 20 ktsMax Dry Cargo Weight 5463 lt 5550 mtPercent AE 26 Ammo (vol) 100% 100%Percent AFS 1 Stores (vol) or 100% or 100%Max Cargo Fuel Weight 3,318 lt 3,371 mtCargo Fuel Volume 25,000 bbl 3,969 m3
T-ADC(X) Point Design
![Page 23: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/23.jpg)
23
Why Do a Point Design?
• Verifies performance requirements areachievable and affordable.
• Tool for assessing early cost / requirementsimpacts.
• Highlights missing/overlooked performancerequirements.
• Intend to provide design and data toindustry as information.
![Page 24: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/24.jpg)
24
Areas forIndustry Innovation
• Material Handling and Cargo Flow Efficiencies– Inventory management and planning aids
– Incorporation of commercial practices and newtechnology
– Flexibility to stow and handle various types of cargo
• Propulsion Systems– Propulsors
– Prime Movers
– Fuel Efficient Design
![Page 25: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/25.jpg)
25
Areas forIndustry Innovation
• Auxiliary Systems– Pumps (Ship System and Cargo)
– Motors
– Materials
– Fluid Systems
– Electrical Systems
• Ship Operations– Integrated Bridge Design
– Environmental Compliance
– Mooring Equipment
– Accommodation ladder
![Page 26: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/26.jpg)
26
Areas forIndustry Innovation
• Hotel Services– Messing and Food Service Design
– Domestic Stores Handling
– HVAC Systems
– Waste Handling Systems
• Corrosion Control– Tank Coating Systems
– Paint Systems
– Cathodic Protection
![Page 27: (T-ADC(X))Concept of Operations Three Stage Logistics Support Train • Cargo Merchant Shipping 1st STAGE 1st STAGE 2ND STAGE2ND STAGE 3RD STAGE3RD STAGE Forward Bases Shuttle Ships](https://reader034.fdocuments.net/reader034/viewer/2022051814/603a53ac3a72b8447b3c00c1/html5/thumbnails/27.jpg)
27
AdditionalProgram Information
• NAVSEA Contracts Directorate Website at
http://www.contracts.hq.navsea.navy.mil/
webdata/acq/infodoc/t-adc(x)/t-adc(x).html
• T-ADC(X) Information Site
http://www.navsea.navy.mil/adcx/pubadcx.html
• T-ADC(X) Intranet Site (The procedure to request access to thissite is provided on the T-ADC(X) Information Site)
http://adcx.navsea.navy.mil/padcx/intranet/home.html