345 kV Cluster System Impact Study TRC August 4, 2011

Appendix H

SYSTEM IMPACT STUDY FINAL REPORT

345 kV Cluster Study

Prepared for:

El Paso Electr ic Company

Prepared by:

TRC Engineers, LLC 249 Western Avenue Augusta, ME 04330

(207) 621-7000

November 2010

Page 2: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

FOREWORD

This report was prepared for the project Interconnection Customer, by System Planning at El Paso Electric Company. Any correspondence concerning this document, including technical and commercial questions should be referred to:

Dennis Malone Manager – System Planning Department

El Paso Electric Company 100 North Stanton

El Paso, Texas 79901 Phone: (915) 543-5757 Fax: (915) 521-4763

Or

David Gutierrez Principal Engineer

El Paso Electric Company 100 North Stanton

El Paso, Texas 79901 Phone: (915) 543-4083 Fax: (915) 521-4763

Page 3: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Table of Contents

EXECUTIVE SUMMARY ......................................................................................................................................... 1 

1.  INTRODUCTION .............................................................................................................................................. 5 

1.1  PERFORMANCE CRITERIA ................................................................................................................................. 5 

2.  STUDY METHODOLOGY .............................................................................................................................. 7 

2.1  ASSUMPTIONS .................................................................................................................................................. 7 2.2  PROCEDURE ..................................................................................................................................................... 7 

2.2.1  Development and Description of Cases ................................................................................................. 7 2.2.2  Contingency List .................................................................................................................................... 9 

3.  STEADY STATE POWER FLOW ANALYSIS ........................................................................................... 10 

3.1  BASE CASE POWER FLOW EVALUATION ........................................................................................................ 10 3.1.1  Pre-Project N-0 Flow Violations ......................................................................................................... 10 3.1.2  Pre-Project N-1 Flow Violations ......................................................................................................... 10 

3.2  CLUSTER CASE POWER FLOW EVALUATION .................................................................................................. 15 3.2.1  Post-Project N-0 Flow Violation ......................................................................................................... 15 3.2.2  Post-Project N-1 Flow Violation ......................................................................................................... 17 

3.3  NETWORK UPGRADES RECOMMENDATIONS .................................................................................................. 22 3.3.1  Post-Project Power Flow System Response Assessments .................................................................... 22 3.3.2  Amrad – Artesia 345 kV Corridor ....................................................................................................... 23 3.3.3  Corona Station ..................................................................................................................................... 23 3.3.4  Arroyo – Newman – Luna upgrades .................................................................................................... 24 3.3.5  Caliente 345/115 kV Transformers ...................................................................................................... 27 3.3.6  Salopek –Arroyo 115 kV Line .............................................................................................................. 29 3.3.7  Lane 115/69 kV Transformer ............................................................................................................... 29 3.3.8  Newman 345/115 kV Transformer ....................................................................................................... 29 3.3.9  Ft. Craig 345 kV Phase Shifting Transformer ..................................................................................... 29 

3.4  POWER FLOW ANALYSIS CONCLUSION .......................................................................................................... 30 

4.  POI POWER FACTOR ASSESSMENT ....................................................................................................... 34 

5.  STEADY STATE VOLTAGE ANALYSIS ................................................................................................... 39 

6.  SHORT-CIRCUIT ANALYSIS ...................................................................................................................... 44 

6.1  SHORT CIRCUIT ANALYSIS MODELING .......................................................................................................... 44 6.2  SHORT CIRCUIT ANALYSIS PROCEDURE ......................................................................................................... 47 6.3  RESULTS OF THE SHORT CIRCUIT ANALYSIS .................................................................................................. 47 6.4  SHORT CIRCUIT ANALYSIS CONCLUSIONS ..................................................................................................... 50 

7.  STABILITY ANALYSIS ................................................................................................................................. 51 

7.1  DYNAMICS MODELING ................................................................................................................................... 51 7.2  NM805W INITIAL ISSUES .............................................................................................................................. 52 7.3  STABILITY ANALYSIS RESULTS ...................................................................................................................... 55 7.4  LOW VOLTAGE RIDE THROUGH ANALYSIS .................................................................................................... 57 7.5  STABILITY ANALYSIS CONCLUSION ............................................................................................................... 58 

8.  COST ESTIMATE ........................................................................................................................................... 59 

9.  DISCLAIMER .................................................................................................................................................. 90 

10.  CONCLUSIONS .............................................................................................................................................. 93 

Page 4: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

List of Figures

Figure 3-1: N-0 345 kV Transmission Reinforcements ................................................................ 16 Figure 3-2: Upgrade recommendation with new 345 kV Corona station ..................................... 24 Figure 3-3: Picante to Vista 115 kV Diagram .............................................................................. 28 Figure 3-4: 345 kV System Upgrades ........................................................................................... 31 Figure 7-1: EPE 345 kV Bus Voltages for Non-Disturbance 20 Second Start ............................. 52 Figure 7-2: EPE 345 kV Bus Voltages for Non-Disturbance 20 Second Start After 2nd NM805W-

Corona 345 kV Transmission Line ....................................................................................... 53 Figure 7-3: EPE 345 kV Bus Frequencies for Fault at Corona and Loss of Both NM805W -

Corona Lines ......................................................................................................................... 54 Figure 7-4: EPE Local Generation Angles for Fault at Corona and Loss of Both NM805W -

Corona Lines ......................................................................................................................... 54 Figure 8-1: Cost Details per Element ............................................................................................ 62 Figure 8-2: ART320W POI Oneline ............................................................................................. 64 Figure 8-3: AA100W POI One-line .............................................................................................. 67 Figure 8-4: NM805W POI and Corona Station One-line ............................................................. 70 Figure 8-5: HL198W POI and Hidalgo Station One-line ............................................................. 73 Figure 8-6: Amrad 345 kV Substation One-line ........................................................................... 75 Figure 8-7: Luna System Upgrade One-line ................................................................................. 77 Figure 8-8: Afton System Upgrade One-line ................................................................................ 79 Figure 8-9: Arroyo System Upgrade One-line .............................................................................. 81 Figure 8-10: South System Upgrade One-line .............................................................................. 83 

Page 5: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

List of Tables

Table 0-1: Cost estimates ................................................................................................................ 4 Table 1-1: EPE and New Mexico Performance Criteria ................................................................. 6 Table 2-1: Breakdown of 345 kV Study Cluster ............................................................................ 9 Table 3-1: Pre-Cluster Projects 2011 N-1 Flow Violations .......................................................... 11 Table 3-2: Pre-Cluster Projects 2012 N-1 Flow Violations .......................................................... 12 Table 3-3: Pre-Cluster Projects 2013 N-1 Flow Violations .......................................................... 13 Table 3-4: Pre-Cluster Projects 2015 N-1 Flow Violations .......................................................... 14 Table 3-5: New 345 kV Transmission Reinforcements for N-0 Flow Violations ........................ 15 Table 3-6: Post-Project N-0 115 kV Flow Violations – Existing Infrastructure .......................... 17 Table 3-7: 2011 N-1 Flow Violations ........................................................................................... 18 Table 3-8: 2012 N-1 Flow Violations ........................................................................................... 19 Table 3-9: 2013 N-1 Flow Violations ........................................................................................... 20 Table 3-10: 2015 N-1 Flow Violations ......................................................................................... 21 Table 3-11: Unsolved contingencies ............................................................................................. 22 Table 3-12: Arroyo – Newman – Luna upgrades ......................................................................... 25 Table 3-13: Remaining 2013 N-1 Flow Violations for all Upgrade Options ............................... 26 Table 3-14: Remaining 2015 N-1 Flow Violations for all Upgrade Options ............................... 26 Table 3-15: Power Flow Analysis Related Network Upgrades .................................................... 32 Table 3-16: Interconnection Transmission Lines ......................................................................... 33 Table 3-17: Recommendation for 345 kV Transmission Line Upgrades ..................................... 33 Table 3-18: Recommendation for 115 kV Transmission Line Upgrades ..................................... 33 Table 4-1: Power Factor at AA100W POI .................................................................................... 35 Table 4-2: Power Factor at AWRT320W POI .............................................................................. 36 Table 4-3: Power Factor at NM805W POI ................................................................................... 37 Table 4-4: Power Factor at HL198W POI .................................................................................... 38 Table 5-1: N-0 Voltage Violations ................................................................................................ 39 Table 5-2: Voltage regulation due to loss of generation at NM805W .......................................... 40 Table 5-3: Voltage regulation due to loss of generation at ART320W ........................................ 41 Table 5-4: Voltage regulation due to loss of generation at LEF ................................................... 42 Table 5-5: System VAR reinforcements ....................................................................................... 42 Table 6-1: Interconnection Transmission Lines ........................................................................... 44 Table 6-2: Proposed 345 kV Transmission Network Upgrades ................................................... 44 Table 6-3: Proposed 115 kV Transmission Network3455 Upgrades ........................................... 45 Table 6-4: Proposed 345/115 kV Transformer Network Upgrade ............................................... 45 Table 6-5: 345 kV Cluster Generator Short Circuit Modeling Data ............................................. 46 Table 6-6: Cluster Study Short Circuit Summary Results ............................................................ 47 Table 7-1: Generator Models Used for Studies ............................................................................ 51 Table 7-2: Stability Base Case Scenarios ..................................................................................... 52 Table 7-3: Contingency List for Stability Studies for both Peak and Off-Peak Cases ................. 55 Table 8-1: Estimated Costs by Interconnection Project ................................................................ 60 Table 8-2: Estimated Costs by Element ........................................................................................ 61 Table 8-3: EPE Interconnection Facilities Costs for ART320W POI .......................................... 63 Table 8-4: Network Upgrades Costs for ART320W POI ............................................................. 65 Table 8-5: EPE Interconnection Facilities Costs for AA100W POI ............................................. 66 

Page 6: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Table 8-6: Network Upgrades Costs for AA100W ....................................................................... 68 Table 8-7: EPE Interconnection Facilities Costs for NM805W POI ........................................... 69 Table 8-8: Network System Upgrades Costs for Corona 345 kV Switching Station ................... 71 Table 8-9: EPE Interconnection Facilities Costs for HL198W POI ............................................. 72 Table 8-10: Network Upgrades Costs for Hidalgo 345 kV Station .............................................. 74 Table 8-11: Network System Upgrades Costs for Amrad 345 kV Substation ............................. 76 Table 8-12: Network System Upgrades Costs for Luna Substation ............................................. 78 Table 8-13: Network System Upgrades Cost for Afton Substation .............................................. 80 Table 8-14: Network System Upgrades Cost for Arroyo Substation ........................................... 82 Table 8-15: Network System Upgrades Cost for South Substation .............................................. 84 Table 8-16: Network System Upgrades Cost for Picante Substation ........................................... 86 Table 8-17: Transmission Network System Upgrades Costs ....................................................... 87 

Appendices

Appendix A 345 KV Cluster Study Statement of Work Appendix B EE 205 Waiver Appendix C Power Flow Contingency List Appendix D Ft. Craig Phase Shifting Transformer – Contingency Analysis Appendix E Worst Case Stability Analysis Results Appendix F Stability Analysis PDF Plots Appendix H 345 kV Cluster Study Network Upgrades - Project Schedule 

Page 7: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC

November 17, 2010 1

345 kV Cluster project System Impact Study

Executive Summary

On June 12, 2009, El Paso Electric (EPE) filed with the Federal Energy Regulatory Commission (FERC) a request for a waiver of the first-come, first-serve study order and permission to study the current interconnectors in the EPE queue1 in two cluster studies. On August 12, 2009, FERC issued an approval of the request waiver2. Therefore, as per the Interconnection Customer request and the approved FERC waiver, EPE and the Interconnection Customers initiated a Feasibility Study to study the impact of the proposed generation on the EPE transmission system. Upon the completion of the Feasibility study, four Interconnection Customers agreed to proceed further and to be included in the 345 kV Cluster System Impact Study (“345 kV Cluster Study”). This report is the result of the 345 kV Cluster Study to examine the impact of interconnecting four Interconnection Customers totaling 1423 MW to the EPE and Southern New Mexico transmission systems. The following Interconnection Customers are part of the 345 kV Cluster Study:

1. ART320W: 320 MW Wind powered project interconnecting on the Artesia/Eddy County 345 kV bus via a 70-mile 345 kV radial line.

2. AA100W: 60 MW and 40 MW wind powered projects interconnecting to the Amrad-Artesia 345 kV Line 65 miles East of Amrad.

3. NM805W: 805 MW wind powered project interconnecting to the Newman/Corona Station 345 kV bus via a 300-mile radial 345 kV line.

4. HL198W: 198 MW wind powered project interconnecting to the Hidalgo 345 kV substation via a 6-mile radial 345 kV line.

Two interconnector projects ahead of these in the EPE queue were included in the study. These interconnectors are:

1. WA495W: 495 MW wind powered project interconnecting on the West Mesa – Arroyo 345 kV line near Ft. Craig.

2. SL99W: 99 MW wind powered project interconnecting on the Springerville – Luna 345 kV line 30 miles from Luna.

The addition of these Interconnection Customers to the model was required to create the base power flow case for the 345 kV Cluster Study. The generation from these two projects was modeled as being delivered to all entities in the Western Electricity Coordinating Council (WECC), while the generation from the 345 kV Cluster was modeled as being delivered to all WECC entities except EPE and those in New Mexico. Therefore, no specific transmission path

1 www.epelectric.com, “Transmission”, “Interconnection Requests” 2 See Appendix B for this Waiver.

Page 8: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC

November 17, 2010 2

for energy sales has been defined, nor does this study guarantee that a transmission path will be available when the Interconnection Customer is placed in service. All proposed reinforcements were required to eliminate the adverse impact of the 345 kV Cluster generation on the EPE and Southern New Mexico transmission systems. El Paso operational issues, practices and standards were considered for every proposed system upgrade. This Study Area was limited to the area between El Paso, TX and Tucson, AZ. Steady State Results Power flow results showed thermal/overload and voltage criteria violations existing on the system before the Cluster Projects were added. These are mainly in Arizona, outside of the study area. Initial power flow analysis, with the Cluster Projects in service, suggested a need for new 345 kV transmission facilities in order to provide secure and reliable power transfer and delivery. With Cluster Projects in service El Paso system has strong tendency for east to west power transfer. Total of 686.2 miles of 345 kV transmission line reinforcements start with one new line from the Eddy County/Artesia HVDC terminal running through the foothills of the Guadalupe and Sacramento Mountains in New Mexico paralleling an existing 345 kV line and terminating at the EPE AMRAD substation. From the AMRAD 345 kV station, one new line would run parallel to the existing Caliente-AMRAD 345 kV line and White Sands Missile Range to a new Corona Switching Station; existing Newman-Picante and Amrad-Caliente 345 kV lines would loop in and out at Corona. New lines would be built from new Corona station to EPE’s Arroyo and from Arroyo to Afton station. Also, two new lines would be built from Luna to South via Hidalgo station. Furthermore, a new 345/115 kV transformer at Picante station, two new115 kV lines from Picante towards Vista station, 105.4 miles of 115 kV transmission line upgrades and voltage support through the system are part of system upgrades. The power flow analysis, with Cluster Projects in service and proposed 345 kV and 115 kV transmission network upgrades in place, showed that thermal, voltage and power factor at Point at Interconnection criteria violations will not occur on the EPE and Southern New Mexico transmission systems. The power flow analysis was conducted for peak and off peak 2011, 2012, 2013 and 2015 cases. Pre-existing and post-project criteria violations still occur in the Arizona area and were not addressed in this study. Short Circuit Results The short circuit analysis was performed without the 345 kV Cluster Study projects modeled and with all other third-party generation projects senior to the 345 kV Cluster Study projects in the study queue in service. This identified the “base case” fault duties of the circuit breakers. The short circuit analysis was performed again with the 345 kV Cluster Study projects and proposed network upgrades modeled in the case. The incremental difference between these two analyses shows the impact of the new Interconnection Customers on the existing current interruption devices in the EPE and Southern New Mexico transmission systems.

Page 9: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC

November 17, 2010 3

Interconnection of 345 kV Cluster Projects, with the recommended reinforcements, will not cause short-circuit currents to exceed the maximum interruption ratings of any existing circuit breaker on the EPE or New Mexico transmission systems. Stability Results System stability was analyzed for contingencies relevant to the Projects POI and Study Area, with and without the 345 kV Cluster Project for peak and off peak base case load conditions. The Interconnectors remained on-line for all system fault simulations, satisfying FERC Order No. 661 Low Voltage Ride Through criteria. The 345 kV Cluster Project addition to the system with proposed transmission reinforcements in place does not pose any concern to Study Area system stability performance. Cost Estimates Good faith cost estimates are presented. The cost estimates are in 2010 dollars (no escalation applied) and are based upon typical construction costs for previously performed similar construction. These costs include all estimated applicable labor and overheads associated with the engineering, design, and construction of these new EPE facilities. These estimates did not include the Generator Interconnection Costs3 for any other Interconnection Customer owned equipment or associated design and engineering except for the Point of Interconnection (POI) interconnection facilities. The estimated total cost for the required upgrades is $929.16 Million. This breaks down to $7.86 Million for the EPE Interconnection Costs4 at the POIs and $921.30 Million for Network Upgrade Costs5. Generator Interconnection Costs have not been estimated as part of this study. Table 0-1 shows the cost breakout per project. Detailed cost estimates are found in Section 8 of this report.

3 Generator Interconnection Costs: cost of facilities paid for by Interconnection Customer and owned and operated by the Interconnection Customer from the generator facilities to the Change of Ownership Point, which is typically at Point of Interconnection substation first dead-end. Not subject to transmission credits. 4 EPE Interconnection Costs: cost of facilities paid for by Interconnection Customer but owned and operated by EPE from the Change of Ownership Point to the Point of Interconnection. Not subject to transmission credits. 5 Network Upgrades Costs: cost of facilities from the Point of Interconnection outward, paid for by the interconnector but owned and operated by EPE. Subject to transmission credits

Page 10: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC

November 17, 2010 4

Table 0-1: Cost estimates

Project Name

Size

(MW)

In Service

Date

Point of Interconnection

EPE Interconnection

Facilities (Millions)

Network Upgrades Pro Rata (Millions)

Total Cost

(Millions)

ART320W 320 9/2011 Artesia (Eddy County HVDC) 345 kV West bus

$0.70 $207.18 $207.88

AA100W 60 40

12/2010 6/2011

65 miles east of Amrad substation on Amrad-Artesia 345 kV line

$0.71 $64.75 $65.46

NM805W 805 12/2011 Corona 345 kV bus

$5.60 $521.18 $526.78

HL198W 99 99

5/2013 5/2015

Hidalgo 345 kV Substation

$0.85 $128.19 $129.04

TOTAL MW

1423 Total Costs $7.86 $921.30 $929.16

The estimated time frame for Engineering, Procurement, and Construction of Network Upgrades is 5 years upon notice to proceed with construction from the Interconnection Customers. The estimated time frame for Engineering, Procurement, and Construction is 2 years for any new POI Substations or expansion at existing substations. Therefore it is not feasible to meet the requested Commercial In-Service Dates as requested by the Interconnection Customers. The cost responsibilities associated with these facilities were handled as per current FERC guidelines and El Paso Electric’s FERC approved Open Access Transmission Tariff (OATT), specifically defined in sections 1.27 (Network Upgrades), and further defined in Section 1 (Definitions) of Attachment M (Large Generator Interconnection Procedures) and per the FERC study request waiver. Conclusion

The system impact study shows that the proposed 345 kV Cluster projects will have an adverse impact on the EPE and Southern New Mexico transmission systems, unless the Network Upgrades are constructed. Additional reinforcements might be needed in Arizona beyond the South station termination point of the 345 kV Network Upgrades. These will have to be addressed by the Interconnection Customers should they continue with the interconnection process.

Page 11: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

5

1. Introduction

The Interconnection Customers are proposing to construct 1423 MW of generation that will interconnect to the EPE 345 kV transmission system. EPE requires that a System Impact Study (SIS) be performed for generation facilities desiring to connect to the El Paso Electric Transmission System. The proposed in-service dates are between December, 2010 and May, 2015.

1.1 Performance Criteria

WECC and North American Electric Reliability Corporation (NERC) standards, as well as the EPE local reliability criteria standards were used to perform this Study. The EPE local reliability standards can be found in Section 4 of EPE’s FERC Form No. 715. The steady state and stability analysis was performed using the GE PSLF Version 17.8 program.

For steady state pre-contingency solutions, transformer tap phase-shifting transformer angle movement and static VAR device switching was allowed. For each contingency studied, all regulating equipment, transformer controls and switched shunts, were fixed at pre-contingency positions. All flows and voltages within the El Paso, New Mexico and Arizona control area, with base voltages of 0.5 kV and above, were monitored.

Pre-contingency flows on lines and transformers are required to remain at or below the normal rating of the system element, and post-contingency flows on system elements must remain at or below the emergency rating. Flows above 100% of an element’s rating, either pre- or post-contingency, are considered violations.

Post-project voltage criteria violations that either exacerbate or improve an existing pre-project violation are not considered an adverse impact to the system.

The performance criteria utilized in monitoring the study area are shown in Table 1-1.

Page 12: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

6

Table 1-1: EPE and New Mexico Performance Criteria

* Taiban Mesa and Guadalupe 345 kV bus voltage must be between 0.95 and 1.10 p.u. under normal and contingency conditions. ** For PNM buses in southern New Mexico the allowable N-1 voltage drop is 7%.

Area Conditions Loading Limits

Voltage (p.u.) Voltage Drop

Application

EPEC

Normal Normal Rating

0.95 - 1.05 69kV and above 0.95 - 1.10 Artesia 345 kV

0.95 - 1.08 Arroyo 345 kV PST source side

0.90 - 1.05 Alamo, Sierra Blanca and Van

Horn 69kV

Contingency Emergency

Rating

0.925 - 1.05 7% 60 kV to 115 kV 0.95 - 1.07 7% Artesia 345kV 0.95 - 1.08 7% Arroyo 345kV PST source side

0.90 - 1.05 Alamo, Sierra Blanca and Van

Horn 69kV

0.95 - 1.05 7% Hidalgo, Luna, or other 345 kV

buses

PNM

Normal ALIS

Normal Rating 0.95-1.05 46 kV and above*

Contingency N-1

Emergency Rating

0.925-1.05 6 %** 46 kV to 115 kV 0.90 – 1.05 6 %** 230 kV and above

Contingency N-2

Emergency Rating

0.90-1.05 10 % 46 kV and above*

Tri- State

Normal ALIS

Normal Rating 0.95-1.05 All buses

Contingency N-1

Emergency Rating

0.90 – 1.10 6 %

Tri-State buses in the PNM Service Area (list provided by

Tri-State)

0.90-1.10 7 % Tri-State buses in southern and northeastern New Mexico (list

provided by Tri-State) Contingency

N-2 Emergency

Rating 0.90-1.10 10%

All buses

Page 13: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

7

2. Study Methodology

2.1 Assumptions

The following assumptions are consistent for all study scenarios unless otherwise noted.

This study assumes that all system expansion projects as planned by area utilities by the year under analysis are completed and that any system improvements required by the interconnections senior to the 345 kV Cluster projects are implemented.

This study did not analyze any transmission service from the interconnection point to any specific point on the grid for the interconnections senior to the 345 kV Cluster projects. It will determine Network Upgrades, if necessary, to deliver the proposed 345 kV Cluster projects generation output into the EPE and Southern New Mexico transmission grid.

2.2 Procedure

The analyses in this study included Steady State, Short Circuit and Stability, as stated in 345 kV Cluster Study Statement of Work in Appendix A. A detailed discussion for each is included in this report. A description of the procedures used to complete the analyses is presented below.

2.2.1 Development and Description of Cases

A 100% peak summer load 2011, 2012, 2013 and 2015 WECC power flow cases were used and modified as listed below to establish a 2011, 2012, 2013 and 2015 benchmark cases without the 345 kV cluster study interconnection projects. In addition, 2011, 2012, 2013 and 2015 off-peak cases were modified to determine any off-peak violations. These cases were loaded to 60% of the peak cases, with the generation dispatched for the load. The Ft. Craig Phase-Shifter set at 10 MW N-S, 60 MW N-S and 201 MW N-S in the peak and 60 MW N-S and 201 MW N-S in the off-peak cases, with Eddy County DC tie operational flows at 200 MW and 0 MW. In all cases, peak and off-peak, all the Cluster Project generation was load dispatched avoiding specific delivery point issues which have not been determined at the time of the study.

Page 14: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

8

Benchmark Cases - 2011 through 2015: The 2011, 2012, 2013 and 2015 benchmark cases included the following existing third party generation:

1. 570 MW of generation (Luna Energy Facility) interconnected at the Luna 345 kV bus and scheduled to the WECC grid.

2. 141 MW of generation (Afton CT) interconnected at the Afton 345 kV Substation and scheduled to PNM through the EPE/PNM control area at the West Mesa 345 kV bus.

3. 160 MW of generation (Pyramid) interconnected at PNM’s Hidalgo 115 kV Substation and scheduled to the WECC grid.

4. 80 MW of generation (Lordsburg) interconnected at PNM’s Lordsburg 115 kV Substation and scheduled to the WECC grid.

5. 94 MW of generation (Afton ST) interconnected at the Afton 345 kV Substation and scheduled to PNM.

6. 495 MW of generation (WA495W) interconnected at FT. CRAIG on the West Mesa – Arroyo 345 kV transmission line and delivered to WECC. Please note that this project is in the SIS study phase and is not included in the FERC approved cluster study waiver.

7. 99 MW of generation (SL99W) interconnected on the Luna – Springerville 345 kV line 30 miles from Luna. Please note that this project is in the SIS study phase and is not included in the FERC approved cluster study waiver.

Page 15: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

9

345 kV Cluster Study Cases - 2011 through 2015: The 2011, 2012, 2013 and 2015 345 kV Cluster Study cases, as shown in Table 2-1, utilized the benchmark cases, described above, with the following generation in service: The ART320W generation output was modeled at a net output of 320 MW with point of interconnection (POI) at Artesia 345 kV bus (in-service 2011). The HL198W generation output was modeled at a net output of 198 MW with POI 4 miles east of Hidalgo 345 kV substation (99 MW in-service 2013; additional 99 MW in-service 2015). The AA100W generation output was modeled at a net output of 100 MW with POI 65 miles east of Amrad 345 kV substation on Amrad-Artesia 345 kV line (100 MW in-service 2011). The NM805W generation output was modeled at a net output of 805 MW with POI at Newman/Corona 345 kV substation (in-service 2011).

Table 2-1: Breakdown of 345 kV Study Cluster

Project Size (MW) In-service 2011 2012 2013 2015

ART320W 320 09/2011 x x x x

AA100W 60 12/2010 x x x x 40 06/2011 x x x x

NM805W 805 12/2011 x x x

HL198W 99 05/2013 x x 99 05/2015 x

2.2.2 Contingency List

All outages (115 kV and above) were modeled in the subsystem files. The list of contingencies used to perform this study can be found in Appendix C. Based on engineering judgment, these contingencies were selected because they represent a good cross section of potential contingencies that would stress the EPE and PNM’s southern New Mexico and southern Arizona systems. Double contingencies were not analyzed in this study.

Page 16: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

10

3. Steady State Power Flow Analysis

3.1 Base Case Power Flow Evaluation

This section documents overloaded facilities prior to the addition of the Cluster projects. The analysis was performed under both normal and contingency conditions.

3.1.1 Pre-Project N-0 Flow Violations

Power flow study results for the EPE and Public Service Company of New Mexico (PNM) areas showed that no overloaded transmission facilities are present under non-contingency system conditions without the 345 kV Cluster Study projects connected.

3.1.2 Pre-Project N-1 Flow Violations

Power flow results for contingency scenarios covering PNM or EPE area show that in many of the scenarios overloads existed prior to the addition of the Cluster projects, as shown in Table 3-1through Table 3-4.

Page 17: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

11

Table 3-1: Pre-Cluster Projects 2011 N-1 Flow Violations

From Bus

kV

To Bus

kV

Ckt ID

Rating (MVA)

Area

Contingency

Off Peak

Peak

W/O Cluster Projects % of

Rating

PROSPER 115 KAFB 115 1 10 156.0 SANDIA_1 115.0 to SANDIA_2 115.0

<100.0 108.3

NORTON_2 115 HERNANDZ 115 1 10 175.0 SAN_JUAN 345.0

to B-A 345.0 <100.0 119.3

PERSON 115 PROSPER 115 1 10 156.0 SANDIA_1 115.0 to SANDIA_2 115.0

<100.0 114.6

ALGODONE 115 BUFORD_T 115 1 10 66.0 BELEN_PG 115.0 to WILLARD 115.0

<100.0 105.3

BELEN_PG 115 WILLARD 115 1 10 30.0 PACHMANN115 to ALGODONE115.0

<100.0 112.0

BLUEWATR 115 PEGS 115 1 10 179.0 PEGS 230.0 to

AMBROSIA 230.0 <100.0 101.0

DONA_ANA 115 LAS_CRUC 115 1 10 159.4 LUNA 115.0 to

MIMBRES 115.0 <100.0 110.4

EL_BUTTE 115 PICACHO 115 1 10 40.0 CABALLOT 115.0 to MIMBRES 115.0

<100.0 119.9

OJO 115 HERNANDZ 115 1 10 183.0 OJO 345.0 to TAOS 345.0

<100.0 108.5

LORDSBRG 69 MD 69 1 10 32.3 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 231.1

OJO 345 OJO 115 1 10 180.0 OJO 345.0 to TAOS 345.0

<100.0 114.1

LUNA 345 LUNA 115 1 10 224.0 LUNA 345.0 to

HIDALGO 345.0 <100.0 106.6

MD 69 MD 115 1 10 40.0 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 114.4

LORDSBRG 69 LORDSBRG 115 1 10 27.0 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 296.2

FT CR PS 345 FT CRAIG 345 1 11 342.0 FT CRAIG 345.0 to

Z345 345.0 103.1 <100.0

Page 18: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

12

Table 3-2: Pre-Cluster Projects 2012 N-1 Flow Violations

From Bus

kV

To Bus

kV

Ckt ID

Rating (MVA)

Area

Contingency

Off Peak

Peak

W/O Cluster Projects % of

Rating ASARCO_T 69 RIO_GRAN 69 1 11 64.7 RG-SUNSET69 2 <100.0 121.2

COPPER 115 PENDALE 115 1 11 159.4 PICANTE 345.0 to NEWMAN 345.0

<100.0 100.9

SUNSET 69 ASARCO_T 69 1 11 64.7 RG-SUNSET69 2 <100.0 120.3

EL_BUTTE 115 PICACHO 115 1 10 40.0 CABALLOT 115.0 to MIMBRES 115.0

<100.0 112.3

OJO 115 HERNANDZ 115 1 10 183.0 OJO 345.0 to TAOS 345.0

<100.0 107.3

LORDSBRG 69 MD 69 1 10 32.3 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 231.1

NORTON_2 115 HERNANDZ 115 1 10 175.0 SAN_JUAN 345.0

to RIOPUERC345.0 <100.0 115.8

MORIARTY 115 BUFORD_T 115 1 10 66.0 BELEN_PG 115.0

to WILLARD 115.0 <100.0 103.6

ALGODONE 115 BUFORD_T 115 1 10 66.0 BELEN_PG 115.0

to WILLARD 115.0 <100.0 116.3

DONA_ANA 115 LAS_CRUC 115 1 10 159.4 LUNA 115.0 to

MIMBRES 115.0 <100.0 111.8

FT CR PS 345 FT CRAIG 345 1 11 342.0 FT CRAIG 345.0

to Z345 345.0 101.4 101.3

OJO 345 OJO 115 1 10 180.0 OJO 345.0 to TAOS 345.0

<100.0 112.9

MD 69 MD 115 1 10 40.0 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 114.1

LORDSBRG 69 LORDSBRG 115 1 10 27.0 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 296.1

LUNA 345 LUNA 115 1 10 224.0 LUNA 345.0 to

HIDALGO 345.0 <100.0 102.8

Page 19: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

13

Table 3-3: Pre-Cluster Projects 2013 N-1 Flow Violations

From Bus

kV

To Bus

kV

Ckt ID

Area

Rating (MVA)

Contingency

Off Peak

Peak

W/O Cluster Projects % of

Rating ASARCO_T 69 RIO_GRAN 69 1 11 64.7 RG-SUNSET69 2 <100.0 124.3

COPPER 115 PENDALE 115 1 11 159.4 PICANTE 345.0 to NEWMAN 345.0

<100.0 105.6

SUNSET 69 ASARCO_T 69 1 11 64.7 RG-SUNSET69 2 <100.0 123.4

WESTMS_1 115 WESTMS_3 115 1 10 131.0 TOME 115.0 to FIRST_ST 115.0

<100.0 107.4

EL_BUTTE 115 PICACHO 115 1 10 40.0 CABALLOT 115.0 to MIMBRES 115.0

<100.0 101.4

OJO 115 HERNANDZ 115 1 10 183.0 OJO 345.0 to TAOS 345.0

<100.0 105.5

LORDSBRG 69 MD 69 1 10 32.3 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 231.5

TURQUOIS 115 HIDALGO 115 1 10 140.0 LUNA 345.00 to LUNA 115.00

<100.0 101.1

NORTON_2 115 HERNANDZ 115 1 10 175.0 SAN_JUAN 345.0 to RIOPUERC345.0

122.2 119.7

BLCKRA_T 115 WESTMS_3 115 1 10 97.0 ENCHNTED 115.0 to B-A 115.0

107.5 112.2

PERSON 115 PROSPER 115 1 10 156.0 SANDIA_1 115.0 to SANDIA_2 115.0

114.7 114.5

PROSPER 115 KAFB 115 1 10 156.0 SANDIA_1 115.0 to SANDIA_2 115.0

108.3 108.2

DONA_ANA 115 LAS_CRUC 115 1 10 159.4 LUNA 115.0 to MIMBRES 115.0

<100.0 107.6

FT CR PS 345 FT CRAIG 345 1 11 495.0 FT CRAIG 345.0 to Z345 345.0

100.2 102.9

OJO 345 OJO 115 1 10 180.0 OJO 345.0 to TAOS 345.0

<100.0 110.8

MD 69 MD 115 1 10 40.0 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 116.0

LORDSBRG 69 LORDSBRG 115 1 10 27.0 HIDALGO 115.0 to LORDSBRG115.0

110.4 296.4

LUNA 345 LUNA 115 1 10 224.0 LUNA 345.0 to HIDALGO 345.0

105.9 105.9

LA_JARA 69 LA_JARA 115 1 10 28.0 ALGODONE 115.0 to SNYSIDRO115.0

105.7 <100.0

Page 20: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

14

Table 3-4: Pre-Cluster Projects 2015 N-1 Flow Violations

From Bus

kV

To Bus

kV

CktID

Area

Rating (MVA)

Contingency

Off Peak

Peak

W/O Cluster Projects % of

Rating

COPPER 115 PENDALE 115 1 11 159.4 PICANTE 345.0 to NEWMAN 345.0

<100.0 110.6

RIO_BOS 69 PADRES 69 1 11 95.6 LANE-AMERICAS 69 <100.0 102.2

PENDALE 115 LANE___# 115 1 11 159.4 PICANTE 345.0 to NEWMAN 345.0

<100.0 102.3

COTTONWT 115 IRVING 115 1 10 200.0 RIOHONDO 115.0 to IRIS 115.0

117.1 117.0

EMBUDO 115 EAST_TAP 115 1 10 159.0 WESTMESA 345.0 to SANDIA 345.0

116.0 125.8

LAWRNCET 115 EAST_TAP 115 1 10 159.0 WESTMESA 345.0 to SANDIA 345.0

102.9 112.4

WESTMS_2 115 S.JOSEPH 115 1 10 322.0 WESTMESA 345.0 to SANDIA 345.0

<100.0 102.1

ENCHNTED 115 B-A 115 1 10 156.0 COTTONWT 115.0 to IRVING 115.0

103.3 106.7

BLUEWATR 115 PEGS 115 1 10 145.0 PEGS 230.0 to AMBROSIA 230.0

109.5 110.8

MD 69 SILVER_C 69 1 10 27.0 TURQUOIS 115.0 to HIDALGO 115.0

<100.0 100.2

HURLEY_# 115 LUNA 115 1 10 131.0 TURQUOIS 115.0 to HIDALGO 115.0

101.5 100.4

LORDSBRG 69 MD 69 1 10 32.3 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 229.5

RIOHONDO 115 IRIS 115 1 10 156.0 COTTONWT 115.0 to IRVING 115.0

151.9 151.8

SAN_JUAN 345 OJ_EAST 345 1 10 717.0 SAN_JUAN 345.0 to RIOPUERC345.0

114.6 126.6

PERSON 115 KAFB 115 1 10 156.0 SANDIA_1 115.0 to SANDIA_2 115.0

113.9 114.4

WESTMS_1 115 CENTRALP 115 1 10 156.0 WESTMESA 345.0 to SANDIA 345.0

<100.0 104.8

RIOHONDO 115 CB108 115 1 10 200.0 COTTONWT 115.0 to IRVING 115.0

110.4 110.2

PACHMANN 115 ALGODONE 115 1 10 60.0 B-A 345.0 to NORTON 345.0

138.4 152.9

DONA_ANA 115 LAS_CRUC 115 1 10 159.4 LUNA 115.0 to MIMBRES 115.0

<100.0 101.5

ASCARATE 115 ASCARATE 69 2 11 70.4 SANTAFE-SUNSET69 <100.0 109.7

WESTMESA 345 WESTMS_1 115 1 10 448.0 WESTMESA 345.00 to WESTMS_2 115.00 Ckt.1

<100.0 100.9

MD 69 MD 115 1 10 40.0 HIDALGO 115.0 to LORDSBRG 115.0

<100.0 120.7

LORDSBRG 69 LORDSBRG 115 1 10 27.0 HIDALGO 115.0 to LORDSBRG 115.0

114.6 296.6

LA_JARA 69 LA_JARA 115 1 10 28.0 ALGODONE 115.0 to SNYSIDRO 115.0

105.7 <100.0

Page 21: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

15

3.2 Cluster Case Power Flow Evaluation

This section documents the facilities most directly affected by the Cluster projects and provides a high-level understanding of the Cluster project’s impact on the transmission line and transformer loading in the Study Area. The analysis was performed under both normal and contingency conditions.

3.2.1 Post-Project N-0 Flow Violation

Power flow study results for the EPE and PNM areas showed that addition of 1423 MW of generation from 345 kV Cluster projects to the existing system would cause various facilities to overload under non-contingency system conditions. New 345 kV transmission infrastructure, listed in Table 3-5, is necessary to eliminate 345 kV overloaded transmission facilities that are present under non-contingency system conditions after addition of the 345 kV Cluster Study projects.

Table 3-5: New 345 kV Transmission Reinforcements for N-0 Flow Violations

From Bus

kV

To Bus

kV

Ckt ID

Length (miles)

Rating (MVA)

Conductor

Type

Year in

service

HIDALGO 345 SOUTH 345 1 160.0 1786.0 3/C 954 ACSR 2011 HIDALGO 345 SOUTH 345 2 160.0 1786.0 3/C 954 ACSR 2011 LUNA 345 HIDALGO 345 2 50.5 1786.0 3/C 954 ACSR 2011

Furthermore, in order to maintain system at its acceptable criteria VAR support was added at: Hidalgo 345 kV, Newman 345 kV, Amrad 345 kV through 345/115/13.2 transformer, NM805 345 kV and 1/3 and 2/3 along the Newman-NM805W 345 kV line.

Page 22: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

16

Figure 3-1: N-0 345 kV Transmission Reinforcements

Page 23: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

17

Furthermore, addition of 1423 MW of generation from 345 kV Cluster projects resulted in N-0 115 kV flow violations, as shown in Table 3-6.

Table 3-6: Post-Project N-0 115 kV Flow Violations – Existing Infrastructure

From Bus

kV

To Bus

kV

Ckt ID

Rating (MVA)

Area

2011

2012

2013

2015

EL_BUTTE 115 PICACHO 115 1 40.0 10 x x x x DONA_ANA 115 PICACHO 115 1 159.4 10 x x x NE1 115 NEWMAN 115 1 117.7 11 x x MILAGRO 115 NEWMAN 115 1 211.0 11 x x x LAS_CRUC 115 ARROYO 115 1 156.6 11 x x x NEWMAN 115 SHEARMAN 115 1 117.7 11 x x SOL 115 VISTA__# 115 1 117.7 11 x x LANE 114 SOL 115 1 117.7 11 x x x DYER 115 AUSTIN_N 115 1 117.7 11 x x SOCORROP 115 EL_BUTTE 115 1 60.0 10 x

Note: Flow violations from the base cases were omitted from this table. x – Denotes overload.

3.2.2 Post-Project N-1 Flow Violation

The 2011 through 2015 power flow analysis results, shown in Table 3-7 through Table 3-10, show several elements being overloaded under contingency conditions; with the 345 kV Cluster Study projects added to the system and suggested N-0 345 kV and 115 kV transmission reinforcements in place.

Page 24: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

18

Table 3-7: 2011 N-1 Flow Violations

Post-Project and N-0 Transmission Reinforcements in service

2011 N-1 Flow Violations After 345 kV and 115 kV N-0 Transmission Reinforcements With Cluster Projects

From Bus kV To Bus kV Ckt ID

Emergency Rating Area Contingency

Off Peak Base

Off Peak

Delta OPK- Base

Peak Base

Peak

Delta Peak- Base

% of Rating % % of Rating %

NEWMAN 345 NEWMAN 115 1 230.0 MVA 11 LUNA 345.0 to AFTON 345.0 Ckt.1 40.8 115.3 74.4 19.8 12.3 -7.5 HIDALGO 345 GREENLEE 345 1 195.6 MVA 11 SPRINGR 345.0 to VL-TAP 345.0 20.8 38.6 17.8 69.6 104.4 34.8 SOL 115 VISTA__# 115 1 159.4 MVA 11 CALIENTE 115.0 to LANE___# 115.0 62.4 82.9 20.5 93.5 101.3 7.8 CABALLOT 115 MIMBERS 115 1 60.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 42.1 64.0 21.9 86.4 106.7 20.3 CABALLOT 115 HOT_SPRG 115 1 60.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 42.1 64.0 21.9 85.6 105.8 20.2 HOT_SPRG 115 CUCHILLO 115 1 52.0 MVA 10 HIDALGO 345.0 to GREENLEE 345.0 43.4 30.5 -12.9 91.7 110.1 18.4 SOCORROP 115 EL_BUTTE 115 1 60.0 MVA 10 HIDALGO 345.0 to GREENLEE 345.0 39.3 64.0 20.7 98.7 140.1 41.5 LUNA 345 HIDALGO 345 1 956.0 MVA 11 LUNA 345.0 to HIDALGO 345.0 Ckt.2 32.1 100.5 68.5 N/A N/A N/A MD 115 HURLEY_# 115 1 131.0 MVA 11 LUNA 345.0 to HIDALGO 345.0 Ckt.1 66.9 49.0 -17.9 78.5 107.5 29.0 HURLEY_# 115 LUNA 115 1 131.0 MVA 11 LUNA 345.0 to HIDALGO 345.0 Ckt.1 69.2 51.4 -17.8 82.4 111.5 29.1 CALIENTE 115 CALIENTE 345 1 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt2 65.5 94.1 19.6 86.8 100.1 14.1 CALIENTE 115 CALIENTE 345 2 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt1 80.1 100.1 14.1 88.3 102.4 14.1

Notes: 1. Results in the table above demonstrate transmission facilities (over)loading comparison among the off peak (Ft. Craig pst at 201 N-S and 60 N-S) and

peak (Ft. Craig pst at 201 N-S with Afton generation off, 60 N-S and 10 N-S) cases; all cases studied with Eddy County DC tie operational flows at 200 MW and 0 MW.

2. NM805 MW is dispatched only in the off peak cases. Hidalgo-South Ckt.1&2, Luna-Hidalgo Ckt.2, and Newman-NM805 transmission additions are present only in the off peak cases.

3. Overloaded elements identified as post-project N-0, as well as pre-project N-1, 2011 flow violations were not included in this table. 4. Overloaded elements which have operating procedure in place were not included in the table.

Page 25: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

19

Table 3-8: 2012 N-1 Flow Violations

Post-Project and N-0 Transmission Reinforcements in service

2012 N-1 Flow Violations After 345 kV and 115 kV N-0 Transmission Reinforcements With Cluster Projects

From Bus kV To Bus kV Ckt ID

Emergency Rating Area Contingency

Off Peak Base

Off Peak

Delta OPK- Base

Peak Base

Peak

Delta Peak- Base

% of Rating % % of Rating %

NEWMAN 345 NEWMAN 115 1 230.0 MVA 11 LUNA 345.0 to AFTON 345.0 34.9 111.0 76.1 24.7 61.7 37.0 ANTHONY 115 NEWMAN 115 1 195.6 MVA 11 NEWMAN 345.0 to ARROYO 345.0 30.5 89.1 58.6 54.6 109.8 55.2 LUNA 345 HIDALGO 345 1 956.0 MVA 11 LUNA 345.0 to HIDALGO 345.0 Ckt.2 32.2 100.1 67.9 36.9 109.8 72.8 SALOPEK 115 ARROYO 115 1 159.4 MVA 11 LAS_CRUC 115.0 to ARROYO 115.0 63.9 84.8 20.9 82.2 102.9 20.7 CABALLOT 115 MIMBERS 115 1 60.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 31.5 60.1 28.6 83.3 103.7 20.4 CABALLOT 115 HOT_SPRG 115 1 60.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 31.5 60.1 28.6 82.4 102.8 20.4 HOT_SPRG 115 CUCHILLO 115 1 52.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 30.8 64.0 33.2 87.1 110.6 23.5 SOCORROP 115 EL_BUTTE 115 1 60.0 MVA 10 SAN_JUAN 345.0 to RIOPUERC 345.0 32.5 80.3 47.8 88.5 128.6 40.0 BLUEWATR 115 PEGS 115 1 145.0 MVA 10 PEGS 230.0 to AMBROSIA 230.0 57.5 60.0 2.5 98.9 101.1 2.2 LANE___# 115 LANE 69 1 100.0 MVA 11 SCOTSDAL 115.0 to VISTA__# 115.0 61.9 86.3 24.4 83.0 108.0 25.0 CALIENTE 115 CALIENTE 345 1 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt2 66.3 95.2 28.9 88.8 117.4 28.6 CALIENTE 115 CALIENTE 345 2 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt1 71.7 102.9 31.2 96.1 127.0 30.9

Notes: 1. Results in the table above demonstrate transmission facilities (over)loading comparison among the off peak (Ft. Craig pst at 201 N-S and 60 N-S) and

peak (Ft. Craig pst at 201 N-S with Afton generation off, 60 N-S and 10 N-S) cases; all cases studied with Eddy County DC tie operational flows at 200 MW and 0 MW.

2. Overloaded elements identified as post-project N-0, as well as pre-project N-1, 2012 flow violations were not included in this table. 3. Overloaded elements which have operating procedure in place were not included in this table.

Page 26: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

20

Table 3-9: 2013 N-1 Flow Violations

Post-Project and N-0 Transmission Reinforcements in service

2013 N-1 Flow Violations After 345 kV and 115 kV N-0 Transmission Reinforcements With Cluster Projects

From Bus kV To Bus kV Ckt ID

Emergency Rating Area Contingency

Off Peak Base

Off Peak

Delta OPK- Base

Peak Base

Peak

Delta Peak- Base

% of Rating % % of Rating %

NEWMAN 345 NEWMAN 115 1 230.0 MVA 11 LUNA 345.0 to AFTON 345.0 Ckt.1 33.5 110.8 77.4 25.0 106.5 81.5 ANTHONY 115 NEWMAN 115 1 195.6 MVA 11 NEWMAN 345.0 to ARROYO 345.0 4.8 49.2 44.4 52.9 104.7 51.8 CABALLOT 115 MIMBERS 115 1 60.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 35.2 67.2 32.0 76.2 100.9 24.8 CABALLOT 115 HOT_SPRG 115 1 60.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 35.4 64.1 28.7 75.4 100.2 24.8 HOT_SPRG 115 CUCHILLO 115 1 52.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 35.3 79.2 43.9 73.6 103.3 29.7 SOCORROP 115 EL_BUTTE 115 1 60.0 MVA 10 SAN_JUAN 345.0 to RIOPUERC 345.0 55.2 107.4 52.2 72.9 119.8 46.9 LUNA 345 HIDALGO 345 1 956.0 MVA 11 LUNA 345.0 to HIDALGO 345.0 Ckt.2 36.5 102.6 66.1 34.0 104.4 70.4 LANE___# 115 LANE 69 1 100.0 MVA 11 SCOTSDAL 115.0 to VISTA__# 115.0 62.0 86.0 24.0 82.1 106.8 24.6 CALIENTE 115 CALIENTE 345 1 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt2 69.4 98.5 29.1 90.2 119.9 29.7 CALIENTE 115 CALIENTE 345 2 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt1 69.9 99.0 29.1 91.1 120.0 29.9

Notes: 1. Results in the table above demonstrate transmission facilities (over)loading comparison among the off peak (Ft. Craig pst at 201 N-S and 60 N-S) and

peak (Ft. Craig pst at 201 N-S with Afton generation off, 60 N-S and 10 N-S) cases; all cases studied with Eddy County DC tie operational flows at 200 MW and 0 MW.

2. Overloaded elements identified as post-project N-0, as well as pre-project N-1, 2013 flow violations were not included in this table. 3. Overloaded elements which have operating procedure in place were not included in this table.

Page 27: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

21

Table 3-10: 2015 N-1 Flow Violations

Post-Project and N-0 Transmission Reinforcements in service

2015 N-1 Flow Violations After 345 kV and 115 kV N-0 Transmission Reinforcements With Cluster Projects

From Bus kV To Bus kV Ckt ID

Emergency Rating Area Contingency

Off Peak Base

Off Peak

Delta OPK- Base

Peak Base

Peak

Delta Peak- Base

% of Rating % % of Rating %

NEWMAN 345 NEWMAN 115 1 230.0 MVA 11 NM805W 345.0 to NM805RS2 345.0 31.4 102.3 70.9 22.7 104.0 81.4 LANE___# 115 LANE 69 1 100.0 MVA 11 SCOTSDAL 115.0 to VISTA__# 115.0 59.2 84.0 24.8 75.2 101.4 26.2 HOT_SPRG 115 CUCHILLO 115 1 52.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 43.3 82.1 52.7 67.0 103.0 36.0 CALIENTE 115 CALIENTE 345 1 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt2 74.9 105.3 30.5 92.4 122.1 28.7 CALIENTE 115 CALIENTE 345 2 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt1 75.5 105.8 30.4 93.3 121.1 28.8

Notes:

1. Results in the table above demonstrate transmission facilities (over)loading comparison among the off peak (Ft. Craig pst at 201 N-S and 60 N-S) and peak (Ft. Craig pst at 201 N-S with Afton generation off, 60 N-S and 10 N-S) cases; all cases studied with Eddy County DC tie operational flows at 200 MW and 0 MW.

2. Overloaded elements identified as post-project N-0, as well as pre-project N-1, 2015 flow violations were not included in this table. 3. Overloaded elements which have operating procedure in place were not included in this table.

Page 28: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

22

The system was unable to solve for contingencies, listed in Table 3-11, in most of the cluster cases. This is an indication that additional reinforcements are needed to address the loss of NM805 MW, relief stress on Neman 345 kV station due to the power transfer push towards the West, and address loss of a Caliente-Amrad 345 kV line.

Table 3-11: Unsolved contingencies

Contingency

Tran AMRAD 115.0 to AMRAD 345.0 Circuit 1 AMRAD_A 13.20 Line CALIENTE 345.0 to AMRAD 345.0 Circuit 1 Line LUNA 345.0 to AFTON 345.0 Circuit 1 Line FT CRAIG 345.0 to VL-TAP 345.0 Circuit 1 Line NEWMAN 345.0 to ARROYO 345.0 Circuit 1 Line NM805W 345.0 to NM805RS2 345.0 Circuit 1 Gen NM805W_G_1-4 34.5 (Loss of 644 MW at NM805W) Gen NM805W_G_1-5 34.5 (Loss of 805 MW at NM805W)

Note: NM805RS1 and NM805RS2 are two reactor stations located 1/3 and 2/3 along the NM805W POI – NM805W 345 kV line.

3.3 Network Upgrades Recommendations

3.3.1 Post-Project Power Flow System Response Assessments

Analysis showed a need for 3rd circuit between Luna and Hidalgo 345 kV stations. Loss of proposed Ckt.2 causes overload of the existing Ckt.1. Furthermore, the analysis showed two major weaknesses as a result of the Cluster projects addition to the system. One is unsatisfactory steady state power flow system response for the loss of parts of the Artesia - Amrad – Caliente 345 kV corridor. Neither Amrad 345 kV is capable of absorbing approximately 400 MW for the loss of Amrad - Caliente 345 kV line nor Amrad – Artesia – Caliente 345 kV corridor is capable of provide sufficient VAR support for the loss of VAR support at Amrad 345 kV bus. Addition of VAR support at Amrad 345 kV bus does not mitigate identified problems. The other is unsatisfactory system response for the sudden loss of 600+ MW coming from NM805W as well as loss of the Newman – Arroyo 345 kV line or parts of the Newman – Afton – Luna 345 kV corridor. Further network upgrades screening analysis was performed on the cases that showed the most severe flow violations as a result of addition of Cluster projects to the system.

Page 29: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

23

3.3.2 Amrad – Artesia 345 kV Corridor Existing Amrad – Artesia corridor, single 345 kV line, is suppose to deliver 620 MW to Amrad 345 kV bus from Eddy County HVDC (existing) tie and ART320W and AA100W (proposed) Interconnectors. Analysis show that system cannot solve for the loss of Amrad – Artesia 345 kV (Ckt 1) line or VAR support at Amrad 345 kV. It is not recommended to have significant radial supply of power, in this case 620 MW. Therefore, recommendation is to have two circuits between Amrad and Artesia 345 kV buses, one of them to be looped in and out at AA100W.

3.3.3 Corona Station

After addition of ART320W and AA100W, Amrad – Caliente single 345 kV line delivers approximately 400 MW to Caliente 345 kV station. Amrad 345 kV is not capable of absorbing those 400 MW for the loss of this line. Recommendation is to have two circuits from Amrad delivering those 400MW. New Corona 345 kV station is proposed to be built 39.7 miles from Amrad 345 kV (16.3 miles from Caliente 345 kV) station, separating existing Amrad – Caliente 345 kV line in two parts: Amrad - Corona and Corona - Caliente. There will be two 345 kV circuits (one new to be built) from Amrad 345 kV station ending at Corona station. Existing Newman – Picante 345 kV line will be looped in and out at new Corona station.

Page 30: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

24

Figure 3-2: Upgrade recommendation with new 345 kV Corona station

black – existing infrastructure; blue – existing infrastructure modified; green – new construction

3.3.4 Arroyo – Newman – Luna upgrades

Several options were explored to address unsatisfactory system response for the sudden loss of 600+ MW coming from NM805W via Newman 345 kV bus as well as loss of the Newman – Arroyo 345 kV line or parts of the Newman – Afton – Luna 345 kV corridor. In order to find the most cost effective solution, the system response was tested by applying one system upgrade at the time and combination of multiple upgrades. Considered upgrades were:

Arroyo – Afton 345 kV line Afton – Luna 345 kV line Ckt.2 Arroyo – Luna 345 kV line Arroyo – Corona 345 kV line Newman – Corona 345 kV line NM805W POI at Corona instead of Newman 345 kV bus Luna – Hidalgo 345 kV line Ckt.3

Analysis showed four most cost-effective upgrade options as possible solutions, as shown in Table 3-12.

Page 31: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

25

Table 3-12: Arroyo – Newman – Luna upgrades

Option 1 Option 2 Option 3 Option 4 NM805W connected to Newman 345 kV Corona 345 kV Corona 345 kV Corona 345 kVLuna – Afton Ckt.2 (57 mi)

x x x

Newman – Corona Ckt.2 (6.5 mi)

x

Arroyo – Corona (36.8 mi)

x x

Arroyo - Afton (25 mi)

x (NRW)

Station Expansion - Newman - Luna - Afton

- Newman - Luna - Afton

- Luna - Arroyo - Afton

- Afton - Arroyo

Line length 57 miles 63.5 miles 94.0 miles 62.0 miles

*NRW – new right of way Taking into consideration station upgradeability, length of lines needed to be constructed and ability to get a right of way access the recommended option is Option 4. Screening analysis showed that there almost identical flow violations regardless which option was chosen, as shown in Table 3-13 and Table 3-13. Salopek – Arroyo 115 kV line showed slight overload for option 4 in 2013 but no overloads in 2015 so it was omitted from the list of overloaded facilities.

Page 32: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

26

Table 3-13: Remaining 2013 N-1 Flow Violations for all Upgrade Options

Post-Project and all above mentioned upgrades in service

Remaining 2013 N-1 Flow Violations for the peak case with Ft. Craig pst at 60 MW With Cluster Projects

From Bus kV To Bus kV Ckt ID

Emergency Rating Area Contingency

Peak Base

Opt. 1

Opt. 2

Opt. 3

Opt. 4

% of Rating 2 SALOPEK 115 ARROYO 115 1 159.4 MVA 11 LAS_CRUC 115.0 to ARROYO115.0 97.1 95.0 93.6 99.0 102.3 LANE___# 115 LANE 69 1 100.0 MVA 11 SCOTSDAL 115.0 to VISTA__# 115.0 82.1 101.4 103.2 102.9 106.6 HOT_SPRG 115 CUCHILLO 115 1 52.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.0 79.5 104.2 104.2 104.6 104.6 CALIENTE 115 CALIENTE 345 1 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt2 91.4 119.9 116.1 116.1 113.7 CALIENTE 115 CALIENTE 345 2 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt1 92.3 121.0 117.1 117.2 114.8

Notes: 1. Results in the table above demonstrate impact on remaining flow violations for all upgrade options (Ft. Craig pst at 60 N-S) 2. Overloaded elements identified as post-project N-0, as well as pre-project N-1, 2013 flow violations were not included in this table. 3. Overloaded elements which have operating procedure in place were not included in this table.

Table 3-14: Remaining 2015 N-1 Flow Violations for all Upgrade Options

Post-Project and all above mentioned upgrades in service

Remaining 2015 N-1 Flow Violations for the peak case with Ft. Craig pst at 60 MW With Cluster Projects

From Bus kV To Bus kV Ckt ID

Emergency Rating Area Contingency

Peak Base

Opt. 1

Opt. 2

Opt. 3

Opt. 4

% of Rating 2 HOT_SPRG 115 CUCHILLO 115 1 52.0 MVA 10 EL_BUTTE 115.0 to PICACHO 115.00 67.6 100.5 100.6 100.4 100.2 LANE___# 115 LANE 69 1 100.0 MVA 11 SCOTSDAL 115.0 to VISTA__# 115.0 75.2 96.0 98.0 97.8 101.0 CALIENTE 115 CALIENTE 345 1 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt2 92.5 114.3 117.0 116.8 120.3 CALIENTE 115 CALIENTE 345 2 240.0 MVA 10 CALIENTE 115 to CALIENTE 345 Ckt1 93.4 115.2 117.9 117.9 121.4

Notes: 1. Results in the table above demonstrate impact on remaining flow violations for all upgrade options (Ft. Craig pst at 60 N-S) 2. Overloaded elements identified as post-project N-0, as well as pre-project N-1, 2015 flow violations were not included in this table. 3. Overloaded elements which have operating procedure in place were not included in this table.

Page 33: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

27

3.3.5 Caliente 345/115 kV Transformers

Loads fed off of Lane and Vista 115 kV stations are electrically very close to the Caliente 345 kV station causing one of Caliente 345/115 kV transformers to overload for the loss of the other one. Recommendation is to add a 2nd 345/115 kV transformer to Picante 345 kV station, which is fairly new and also electrically very close to the mentioned load centers. Furthermore, two brand new 115 kV 556.5 ACSS lines need to be built from Picante 115 kV station towards Vista 115 kV station. Line 1 – To start at Picante and end at Vista station following existing Picante – Biggs – GR – Vista right of way. This line will be 115 kV line with 556.5 ACSS conductor rated at 262 MVA. Line 2 - To start at Picante station, go all the way to Vista station following existing Picante – Biggs – GR – Vista right of way, and be tapped into the existing Scottsdale -Vista 115 kV line where the line heads south into Scottsdale Substation. This will eliminate the existing Vista – Scottsdale 115 kV line (rated at 117 MVA), and create new Picante – Scottsdale 115 kV line. This new line will be down-rated to 117 MVA because of the rating of the existing Vista – Scottsdale line. Figure 3-3 demonstrates proposed 115 kV Picante – Vista upgrades.

Page 34: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

28

Figure 3-3: Picante to Vista 115 kV Diagram

Picante

Caliente

Vista Scottsdale

Sol

GR

Briggs

Pipeline/ Newman

Vista

New Double Circuit 5.5

Reconductor 3.9 Miles

Reconductor 1.7 Miles

Existing Double Circuit 1.7

Reconductor 2 Miles

Reconductor 2.1 Miles

Bring new double circuit from Picante and tap Vista Scottsdale line with one circuit going to Scottsdale and the other terminating at Vista for the following new circuits:

1. Picante - Vista 2. Picante - Scottsdale

Page 35: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

29

3.3.6 Salopek –Arroyo 115 kV Line

The analysis results show that Salopek – Arroyo 115 kV line overloads (to up to 106% of its emergency rating) for the loss of Las Cruces – Arroyo 115 kV line in all 2012 peak cases. This overload shows again in 2013 but only in the peak case when phase shifting transformer is at 60 MW (north to south) and Eddy County HVDC tie supplying 200 MW to the Artesia 345 kV bus. In 2015 results, Salopek – Arroyo 115 kV line does not show overloads for any of the contingencies. Therefore, Salopek – Arroyo line was omitted from the list of overloaded facilities impacted by Cluster projects.

3.3.7 Lane 115/69 kV Transformer

Analysis showed that Lane 115/69 kV transformer, with normal and emergency rating at 100 MVA, overloads for the loss of Afton – Luna 345 kV line, Pendale – Lane 115 kV line, Sparks – Felipe 69 kV line or proposed Scottsdale – Picante 115 kV line to up to 114% of its emergency/normal rating. Lane 115/69 kV transformer showed overloads regarding the proposed solution for the transformer overloads at Caliente. Recommendation is to reevaluate the emergency rating or add another 115/69 kV transformer.

3.3.8 Newman 345/115 kV Transformer

The analysis results show that after all 2011 transmission reinforcements placed in service Newman 345/115 kV transformer overload is still present in off-peak cases when Eddy County HVDC tie in service. The transformer overloads to 102% of its emergency rating for the loss of Luna – Afton 345 kV line. However, this violation is not present in 2012, 2013 and 2015. Therefore, no further actions were taken to mitigate this violation.

3.3.9 Ft. Craig 345 kV Phase Shifting Transformer

2011 base case analysis showed that the existing Ft. Craig 345 kV phase shifting transformer phase angle displacement limit (+34/-34) cannot maintain 201 MW flow from north to south for the loss of Ft. Craig - VL-TAP 345 kV line; planned replacement with the increased lower limit to -50 degrees would be insufficient since it limits flow to 156 MW north to south for the above mentioned contingency. Addition of Cluster projects requires even lower limit. Recommendation is to install a new phase shifting transformer with the angle limit of -80/ +50.

Page 36: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

30

Appendix D demonstrates results for the 2011 peak base case and 2011 through 2015 peak cases with Cluster projects in service for various contingencies; phase shifter controls 201 MW flow north to south.

3.4 Power Flow Analysis Conclusion

Addition of each of the Cluster Projects was carefully monitored during the power flow analysis. Few options were explored in order to find the most suitable and cost-effective solution to address power flow concerns for 345 kV Cluster Study. Recommended system upgrades that eliminate flow violations caused by addition of 1423 MW to the El Paso System are shown in Figure 3-4 and Table 3-15. Recommended 345 kV and 115 kV transmission line reinforcements are shown in Table 3-17 and Table 3-18, respectively. List of Interconnection Transmission Lines with in service dates is shown in Table 3-15. .

Table 3-17: Recommendation for 345 kV Transmission Line Upgrades

From Bus

kV

To Bus

kV

Ckt. ID

Length (miles)

Rating (MVA)

Conductor

AMRAD 345 ARTESIA 345 2 124.0 863.0 2/C 954 ACSRAMRAD 345 CORONA 345 1 39.7 863.0 2/C 954 ACSRAMRAD 345 CORONA 345 2 39.7 863.0 2/C 954 ACSRHIDALGO 345 SOUTH 345 1 160.0 939.0 3/C 954 ACSRHIDALGO 345 SOUTH 345 2 160.0 939.0 3/C 954 ACSRLUNA 345 HIDALGO 345 2 50.5 939.0 3/C 954 ACSRLUNA 345 HIDALGO 345 3 50.5 939.0 3/C 954 ACSRARROYO 345 CORONA 345 1 36.8 939.0 3/C 954 ACSRARROYO 345 AFTON 345 1 25.0 939.0 3/C 954 ACSR

Page 37: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

31

Figure 3-4: 345 kV System Upgrades

Page 38: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

32

Table 3-15: Power Flow Analysis Related Network Upgrades

From Bus

kV

To Bus

kV

Ckt id

Length (miles)

Needed after the addition of In service

AA100W ART320W NM805W HL198W

AMRAD 345 ARTESIA 345 2 124.0 x 2011 AMRAD 345 CORONA 345 1 39.7 x 2011 AMRAD 345 CORONA 345 2 39.7 x 2011 HIDALGO 345 SOUTH 345 1 160.0 x 2011 HIDALGO 345 SOUTH 345 2 160.0 x 2011 LUNA 345 HIDALGO 345 2 50.5 x 2011 LUNA 345 HIDALGO 345 3 50.5 x 2011 PICANTE 345 PICANTE 115 2 x 2011 ARROYO 345 CORONA 345 1 36.8 x 2011 ARROYO 345 AFTON 345 1 25.0 x 2011 DONA ANA 115 PICACHO 115 1 5.0 x 2011 NEWMAN 115 SHEARMAN 115 1 7.3 x 2012 NE1 115 NEWMAN 115 1 2.2 x 2012 SOL 115 VISTA__# 115 1 2.0 x 2012 LANE___# 115 SOL 115 1 2.1 x 2012 MILAGRO 115 NEWMAN 115 1 6.2 x 2012 LAS_CRUC 115 ARROYO 115 1 4.1 x 2012 DYER 115 AUSTIN_N 115 1 2.1 x 2012 SOCORROP 115 EL_BUTTE 115 1 70.0 x 2011 HOT SPRING 115 CUCHILLO 115 1 4.4 x 2012 LANE___# 115 LANE 69 1 x 2012 PICANTE 115 VISTA 115 1 9.3 x 2012 PICANTE 115 VISTA/SCOT 115 1 9.3 x 2012 EL_BUTTE 115 PICACHO 115 1 60.0 2011 DONA ANA 115 LAS_CRUC 115 1 2011

CORONA STATION 345 x 2011

Green highlighted – Base case flow violations not included in Network Upgrades costs; recommendation to upgrade existing lines.

Page 39: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

33

Table 3-16: Interconnection Transmission Lines

From Bus

kV

To Bus

kV

Ckt ID

Length (miles)

Rating (MVA)

Conductor

Type

Year in

service

ARTESIA 345 ART320W 345 1 70.0 939.0 2/C 954 ACSR 2011 CORONA 345 NM805W 345 1 300.0 2427.0 3/C 1590 ACSR 2011 CORONA 345 NM805W 345 2 300.0 2427.0 3/C 1590 ACSR 2011 HIDALGO 345 HL198W 345 1 6.0 717.0 2/C 795 ACSR 2013

Table 3-17: Recommendation for 345 kV Transmission Line Upgrades

From Bus

kV

To Bus

kV

Ckt. ID

Length (miles)

Rating (MVA)

Conductor

AMRAD 345 ARTESIA 345 2 124.0 863.0 2/C 954 ACSRAMRAD 345 CORONA 345 1 39.7 863.0 2/C 954 ACSRAMRAD 345 CORONA 345 2 39.7 863.0 2/C 954 ACSRHIDALGO 345 SOUTH 345 1 160.0 939.0 3/C 954 ACSRHIDALGO 345 SOUTH 345 2 160.0 939.0 3/C 954 ACSRLUNA 345 HIDALGO 345 2 50.5 939.0 3/C 954 ACSRLUNA 345 HIDALGO 345 3 50.5 939.0 3/C 954 ACSRARROYO 345 CORONA 345 1 36.8 939.0 3/C 954 ACSRARROYO 345 AFTON 345 1 25.0 939.0 3/C 954 ACSR

Table 3-18: Recommendation for 115 kV Transmission Line Upgrades

From Bus

kV

To Bus

kV

Length (miles)

Rating (MVA)

Conductor

EL_BUTTE 115 PICACHO 115 60.0 237.0 477 ACSS DONA_ANA 115 PICACHO 115 5 262.0 556.5 ACSS NEWMAN 115 SHEARMAN 115 7.3 262.0 556.5 ACSS NE1 115 NEWMAN 115 2.2 262.0 556.5 ACSS SOL 115 VISTA__# 115 2.0 156.6 556.5 ACSS LANE 115 SOL 115 2.1 262.0 556.5 ACSS MILAGRO 115 NEWMAN 115 6.2 262.0 556.5 ACSS LAS_CRUC 115 ARROYO 115 4.1 262.0 556.5 ACSS DYER 115 AUSTIN_N 115 2.1 262.0 556.5 ACSS SOCORROP 115 EL_BUTTE 115 70 237.0 477 ACSS HOT SPRING 115 CUCHILLO 115 237.0 477 ACSS PICANTE 115 VISTA 115 5.5 262.0 556.5 ACSS PICANTE 115 VISTA/SCOT 115 5.5 262.0 556.5 ACSS

Page 40: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

34

4. POI Power Factor Assessment

The objective was to test if Cluster projects with all proposed facilities in service would be able to maintain power factors at the Point of Interconnection (POI) within the range of 0.95 leading to 0.95 lagging at their respective POI’s as required by FERC 661A order. The results showed that all Cluster projects under proposed reinforcements would satisfy FERC power factor design criteria. The results by study year for each of the Cluster projects can be found in Table 4-1 through Table 4-4.

Page 41: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

35

Table 4-1: Power Factor at AA100W POI

Power factor at AA100W POI  

2011 Peak cases Off peak cases

Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off

Base case (N-0) 0.996 0.992 0.998 0.996 0.997 0.992 0.996 0.994 0.996 0.994AA100W - Artesia (N-1) 0.989 1.000 0.989 0.989 0.989 1 0.999 0.997 0.999 0.997AA100W - Amrad (N-1) 0.997 0.981 0.998 0.999 0.996 0.981 0.998 0.992 0.998 0.992 2012

Peak cases Off peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC on  HVDC off HVDC on  HVDC off HVDC on 

Base case (N-0) 0.994 0.995 0.994 0.994 0.994 0.994 0.993 0.994 0.996 0.994AA100W - Artesia (N-1) 1 0.998 1 0.998 1 0.998 1 0.998 0.999 0.998AA100W - Amrad (N-1) 0.994 0.993 0.994 0.993 0.994 0.992 0.993 0.993 0.998 0.993 2013

Peak cases Peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on 

Base case (N-0) 0.999 0.994 0.993 0.995 0.993 0.995 0.996 0.995 0.993 0.995AA100W - Artesia (N-1) 0.998 0.996 1 0.998 1 0.998 0.999 0.998 0.999 0.998AA100W - Amrad (N-1) 1 0.997 0.993 0.993 0.993 0.993 0.998 0.993 0.993 0.993 2015

Peak cases Peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on 

Base case (N-0) 0.996 0.995 0.996 0.995 0.996 0.995 0.993 0.994 0.993 0.993AA100W - Artesia (N-1) 1 0.998 0.998 0.998 1 0.998 0.999 0.998 0.999 0.998AA100W - Amrad (N-1) 0.998 0.993 0.993 0.993 0.998 0.993 0.993 0.993 0.993 0.987

Page 42: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

36

Table 4-2: Power Factor at AWRT320W POI

Power factor at ART320W POI  

2011 Peak cases Off peak cases

Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off

Base case (N-0) 0.996 0.989 0.995 0.995 0.992 0.988 0.994 0.994 0.994 0.994AA100W - Artesia (N-1) 0.993 0.995 0.995 1 0.997 0.995 1 0.993 1 0.993Artesia - Amrad (N-1) 0.983 0.995 0.987 0.994 0.990 0.995 0.995 0.999 0.995 0.999 2012

Peak cases Off peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC on  HVDC off HVDC on  HVDC off HVDC on 

Base case (N-0) 0.990 0.994 0.990 0.994 0.990 0.994 0.989 0.994 0.994 0.994AA100W - Artesia (N-1) 1 0.999 1 0.999 1 0.999 0.999 0.999 1 0.999Artesia - Amrad (N-1) 0.999 0.994 0.997 0.994 0.999 0.993 0.999 0.993 0.995 0.993 2013

Peak cases Peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on 

Base case (N-0) 0.995 0.981 0.990 0.994 0.990 0.994 0.994 0.994 0.990 0.994AA100W - Artesia (N-1) 0.999 0.994 1 0.999 1 0.999 1 0.999 1 0.999Artesia - Amrad (N-1) 0.988 0.985 0.999 0.994 0.999 0.993 0.995 0.994 0.999 0.994 2015

Peak cases Peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on 

Base case (N-0) 0.994 0.994 0.994 0.994 0.994 0.994 0.989 0.994 0.989 0.998AA100W - Artesia (N-1) 1 0.999 0.999 0.999 1 0.999 1 0.999 1 1Artesia - Amrad (N-1) 0.995 0.994 0.995 0.994 0.995 0.994 0.999 0.993 0.999 0.997

Page 43: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

37

Table 4-3: Power Factor at NM805W POI

Power factor at NM805W POI  

2011 Peak cases Off peak cases

Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off

Base case (N-0) N/A N/A N/A N/A N/A N/A 0.993 0.993 0.993 0.993Corona - RS1 (N-1) N/A N/A N/A N/A N/A N/A 0.981 0.981 0.981 0.981Corona - Amrad (N-1) N/A N/A N/A N/A N/A N/A 0.993 0.993 0.993 0.993Corona - Caliente (N-1) N/A N/A N/A N/A N/A N/A 0.993 0.993 0.993 0.993Corona - Picante (N-1) N/A N/A N/A N/A N/A N/A 0.993 0.993 0.993 0.993Corona - Arroyo (N-1) N/A N/A N/A N/A N/A N/A 0.993 0.993 0.993 0.993Corona - Newman (N-1) N/A N/A N/A N/A N/A N/A 0.993 0.993 0.993 0.993 2012

Peak cases Off peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC on  HVDC off HVDC on  HVDC off HVDC on 

Base case (N-0) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - RS1 (N-1) 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981Corona - Amrad (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Caliente (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Picante (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Arroyo (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Newman (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 2013

Peak cases Peak cases Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on 

Base case (N-0) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - RS1 (N-1) 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981Corona - Amrad (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Caliente (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Picante (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Arroyo (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Newman (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993

Page 44: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

38

Table 4-3: Power Factor at NM805W POI (Continued)

Power factor at NM805W POI 

2015 Peak cases Off peak cases

Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off

Base case (N-0) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - RS1 (N-1) 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981 0.981Corona - Amrad (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Caliente (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Picante (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Arroyo (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993Corona - Newman (N-1) 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993

Table 4-4: Power Factor at HL198W POI

Power factor at HL198W POI  

2013 Peak cases Off peak cases

Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s Ft. Craig Pst @ 10 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 60 n-s HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off HVDC on  HVDC off

Base case (N-0) 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989Hidalgo - Luna Ckt.1 (N-1) 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989Hidalgo - Luna Ckt.2 (N-1) 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989Hidalgo - South (N-1) 0.989 0.989 0.989 0.989 0.989 0.989 0.987 0.987 0.987 0.989Hidalgo - Greenlee (N-1) 0.989 0.989 0.989 0.989 0.989 0.989 0.987 0.987 0.989 0.989

2015 Peak cases Peak cases

Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s Ft. Craig Pst @ 201 n-s HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on  HVDC on 

Base case (N-0) 1 1 0.999 0.999 0.995 1 1 1 1 0.995Hidalgo - Luna Ckt.1 (N-1) 1 1 0.999 0.999 0.995 1 1 1 1 0.995Hidalgo - Luna Ckt.2 (N-1) 1 1 0.999 0.999 0.995 1 1 1 1 0.995Hidalgo - South (N-1) 1 1 0.999 0.999 0.995 1 1 1 1 0.995Hidalgo - Greenlee (N-1) 1 1 0.999 0.999 0.995 1 1 1 1 0.995

Page 45: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

39

5. Steady State Voltage Analysis

A bus voltage delta comparison was performed using the contingency results with and without the 345 kV Cluster Study projects implemented. The established voltage Performance Criterion found in Table 1-1 was used for evaluating voltage impacts. If the acceptable bus voltage criteria under contingency conditions were not exceeded, then the bus voltages monitored were found to be acceptable.

In reviewing the Base Cases, a few voltage violations were found under the steady state N-0 condition and were consistent for all base cases 2011-2015. Worst Base (Pre-Cluster) Case voltage violations were documented in Table 5-1. After reviewing the Post- Cluster Project Cases, no additional N-0 voltage violations were found, while voltage levels at the buses previously identified N-0 pre-project voltage violations stayed very close to or were improved over the pre-project cases values, as shown in Table 5-1.

Table 5-1: N-0 Voltage Violations

Bus Name Voltage Area

Pre-Cluster Project

(pu)

Post-Cluster Project

(pu) FARMER 69 kV 11 0.946 within limits

RGC_LOBO 69 kV 11 0.941 within limits

MIMBERS 115 kV 10 1.051 within limits

MORIARTY 115 kV 10 0.942 0.944

ESTANCIA 115 kV 10 0.942 0.945

TAIBANS 345 kV 10 1.060 1.060

BUFORD_T 115 kV 10 0.944 0.945

BUFORD 115 kV 10 0.943 0.945

SOCORRO 69 kV 11 1.051 within limits

VALLEY 69 kV 11 1.054 1.051

VANBUREN 69 kV 10 0.941 0.941

LA_JARA 115 kV 10 1.053 1.054

YORKCANY 115 kV 10 0.943 within limits

LB_INT 115 kV 10 1.059 1.051

ALAMO 69 kV 11 1.061 1.062

FABENS 69 kV 11 1.054 1.054

FELIPE 69 kV 11 1.051 1.051

GUADALUPE 345 kV 10 1.055 1.056

OJO 345 kV 10 1.051 1.051

TAOS 345 kV 10 1.052 1.052

ARRIBA_T 115 kV 10 1.051 within limits

Page 46: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

40

For contingency (N-1) conditions with the 345 kV Cluster Study projects and transmission reinforcements implemented, bus voltages were monitored for all peak and off peak cases 2011-15. The results show that all bus voltages remained within Criteria EXCEPT for:

Elephant Butte 115 kV bus for the loss of San Juan – Rio Puerco 345 kV line. Recommendation is to install 15 MVAR cap.

Various buses (as shown in Table 5-2) for the partial or entire loss of generation at NM805W, ART320W or LEF; voltages exceeded the acceptable limit specified in Table 1-1. List of affected buses and recommendations to eliminate voltage violations caused by the loss of generation are showed in Table 5-2 through Table 5-4. Necessary transmission reinforcements to maintain system voltage performance within acceptable ranges is shown in Table 5-5.

Table 5-2: Voltage regulation due to loss of generation at NM805W

Contingency Affected

345 kV buses Affected

115 kV buses Recommendation

Loss of 3 or more units (322+ MW) at

NM805W (Cluster project)

Hidalgo HL120W Luna Newman ART320W LEF Amrad B South

Hermanas Hondale Luna Mimbres Hermanat Kindromor Demtap 1 Demgoldt Demtap 2 Amrad Arroyo Joranda Largo Mar Oro Gran Appollos LE 1 Hondale Luna Mimbres

Switch in Luna-Hidalgo 3 x 50 MVAR shunts

Switch in Hidalgo-South 2 x 54 MVAR shunts

Switch in South-Hidalgo 2 x 50 MVAR shunts

Page 47: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

41

Table 5-3: Voltage regulation due to loss of generation at ART320W

Contingency Affected

345 kV buses Affected

115 kV buses Recommendation

Loss of one or more units (161+ MW) at

ART230W (Cluster project)

ART320W Artesia Amrad Afton Newman Arroyo Caliente Picante Corona

Amrad Biggs Coyote Caliente Hatch Holloman Loranda Lane Largo Las Cruces Mar Montwood Pelocano Oro Gran RGC_DC Salopek Scottsdale Pendale Sol Spark Appollos LE 1 White Sands Wrangler Picante Hermanas Hondale Luna Mimbres Alampogpg Alampogcp Dona Ana Hollywood# Picacho Gavilan Ruidoso Hermanas Kindromor Demtap 1 Demgoldt Demtap 2 Airpor_t C-canyon Cox Appolo

Switch in ART320W-Artesia 54 MVAR shunt

Page 48: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

42

Table 5-4: Voltage regulation due to loss of generation at LEF

Contingency Affected

345 kV buses Affected

115 kV buses Recommendation

Loss of LEF (existing generating plant)

Hidalgo HL120W South

Hermanas Hondale Luna Mimbres Hermanat Kindromor Demtap 1 Demgoldt Demtap 2

Switch in Luna-Hidalgo 3 x 50 MVAR shunts

Switch in Hidalgo-South 2 x 54 MVAR shunts

Table 5-5: System VAR reinforcements

Location Controlling kV MVAR In Service Shunts Hidalgo – South Ckt.1 Hidalgo 345 54 2011 Hidalgo – South Ckt.2 Hidalgo 345 54 South – Hidalgo Ckt.1 South 345 50 2011 South – Hidalgo Ckt.2 South 345 50 Luna – Hidalgo Ckt.2 Luna 345 50 2011 Luna – Hidalgo Ckt.3 Luna 345 50 Corona – NM805RS1 Corona 345 54 2011 NM805W – NM805RS2 NM805W 345 54 2011 ART320W – Artesia ART320W 345 54 2011 Artesia – AA100W Artesia 345 50 2011 Artesia – AA100W HVDC terminal 345 2 × -30 2011 El Butte El Butte 115 10 2011 SVDs Hidalgo Hidalgo 345 +50/-100 2011 NM805RS1 NM805RS1 345 +125/-300 2011 NM805RS2 NM805RS2 345 +125/-300 2011 Corona Corona 345 +150/-250 2011

Addition of ART320W causes low voltages at Hidalgo and Greenlee. Therefore, an SVD at Hidalgo 345 kV station is needed. Furthermore, temporary VAR support addition of 50 MVARs at Amrad 345 kV station might be needed if ART320W in service, Eddy County HVDC off and Corona station (Corona-Amrad Ckt. 1&2) NOT built. It is to be expected that voltages at some points along the Corona – NM805W 345 kV line to reach or go slightly above 1.05 p.u. due to extremely long length of the Corona – NM805W line (300 + miles). All the equipment should be carefully selected and to be accounted for such possibilities.

Page 49: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

43

AA100W and ART320W 345 kV station equipment is expected to experience voltages close to 1.05 p.u. since Artesia 345 kV station voltage level is around 1.05 p.u. For all Cluster Projects, it is recommended to keep scheduled voltages on the GSUs low side at 1.0 p.u. Voltage Analysis Conclusions Recommended transmission system reinforcements for the 345 kV Cluster Project resulted in EPE/Cluster Study area transmission network voltage levels within Criteria and/or without significant changes from the pre-project voltage levels.

Page 50: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

44

6. Short-Circuit Analysis

The interconnection of new generating units into a transmission system increases the fault current contribution into the system. Therefore, as part of this “345 kV Cluster SIS”, (SIS) a short circuit analysis was performed to determine if the additional fault current contribution from the new Interconnection Customers into the EPE transmission system will cause any of EPE’s or relevant neighboring transmission system’s existing substation circuit breakers to exceed their interrupting capability ratings.

6.1 Short Circuit Analysis Modeling

Two cases were developed to perform this analysis, one with and one without the “345 kV Cluster Generation”. Any planned or proposed third party generation listed in EPE’s study queue ahead of the 345 kV Cluster Generation were also modeled in the two cases.

A study case that combines projects with interconnection points in the same vicinity within the EPE transmission system that are listed in the EPE Generation Interconnection queue was developed. The SIS case also contains the 345 kV and 115 kV transmission lines and transformers of the proposed system reinforcements which are described below in Table 6-1 through Table 6-4. The modeling data of the Cluster Generation is described in Table 6-5.

Table 6-1: Interconnection Transmission Lines

From Bus

To Bus kV Ckt. ID

Length (mi.)

Line Impedance (pu)

R1 X1 R0 X0 ARTESIA ART320W 345 1 70.0 0.00384 0.03429 0.03169 0.12235

CORONA NM805W 345 1 300.0 0.00575 0.11670 0.10761 0.53060 CORONA NM805W 345 2 300.0 0.00575 0.11670 0.10761 0.53060 HIDALGO HL198W 345 1 6.0 0.00033 0.00294 0.00272 0.01049

Table 6-2: Proposed 345 kV Transmission Network Upgrades

From Bus

To Bus kV Ckt. ID

Length (mi.)

Line Impedance (pu)

R1 X1 R0 X0 AMRAD ARTESIA 345 2 124.0 0.00687 0.06144 0.05678 0.21924 AMRAD CORONA 345 1 39.7 0.00208 0.01949 0.01813 0.06863 AMRAD CORONA 345 2 39.7 0.00208 0.01949 0.01813 0.06863

HIDALGO SOUTH 345 1 160.0 0.00490 0.06330 0.06576 0.28270 HIDALGO SOUTH 345 2 160.0 0.00490 0.06330 0.06576 0.28270

LUNA HIDALGO 345 2 50.5 0.00160 0.02000 0.02155 0.08753 LUNA HIDALGO 345 3 50.5 0.00160 0.02000 0.02155 0.08753

ARROYO CORONA 345 1 36.8 0.00113 0.00113 0.00113 0.00113 ARROYO AFTON 345 1 25.0 0.00080 0.00990 0.02876 0.09563

Page 51: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

45

Table 6-3: Proposed 115 kV Transmission Network3455 Upgrades

From Bus

To Bus kV Ckt. ID

Length (mi.)

Line Impedance (pu)

R1 X1 R0 X0 PICANTE VISTA 115 1 9.3 0.00767 0.04926 0.04901 0.18025 PICANTE VISTA/SCOTSDALE 115 1 9.3 0.00767 0.04926 0.04901 0.18025

Table 6-4: Proposed 345/115 kV Transformer Network Upgrade

Primary Bus

Secondary Bus

Tertiary Winding Config

Zps Zpt Zst

PICANTE 345. kV

PICANTE 115. kV

PICANTE2 13.8 kV

Auto-D, delta lags

0.0011 + j 0.0516

0.0028 + j 0.208

0.0011 + j 0.172

Zps0 Zpt0 Zst0

0.0011 + j 0.0518

0.0011 + j 0.163

0.0011 + j 0.117

The projects included in this SIS were analyzed at their maximum MW output levels. This analysis evaluated the impact of the new generation interconnection projects by comparing fault current levels in the benchmark system (without the Cluster projects) to fault current levels in the system modeling the Cluster Projects at their maximum output level.

Page 52: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

46

Table 6-5: 345 kV Cluster Generator Short Circuit Modeling Data

Project Total

Outpu (MW)

Interconnection Customer

GSU

Unit ID

Pmax (MW)

Qmax (MVAR)

Qmin (MVAR)

Z subtransient

Rating (MVA)

Voltage (kV)

Z subtransient

AA100W 100 P1 60 20 -20 0 +j 0.02133 125/125 345/34.5 0.0037 +j0.1667

P2 40 13 -13 0 +j 0.02133 125/125 345/34.5 0.0037 +j0.1667

ART320W 320 G1 160 53 -53 0 +j 0.01781 200/207 345/34.5 0.0017 +j0.0843

G2 160 53 -53 0 +j 0.01781 200/207 345/34.5 0.0017 +j0.0843

HL198W 198 G1 99 19.5 -19.5 0 +j 0.02112

207/227 345/34.5 0.0017 +j0.0843 G2 99 19.5 -19.5 0 +j 0.02112

NR805W 805

G1 161 53 -53 0 +j 0.01792 175/207 345/34.5 0.0022 + j 0.0900

G2 161 53 -53 0 +j 0.01792 175/207 345/34.5 0.0022 + j 0.0900

G3 161 53 -53 0 +j 0.01792 175/207 345/34.5 0.0022 + j 0.0900

G4 161 53 -53 0 +j 0.01792 175/207 345/34.5 0.0022 + j 0.0900

G5 161 53 -53 0 +j 0.01792 175/207 345/34.5 0.0022 + j 0.0900

Page 53: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

47

6.2 Short Circuit Analysis Procedure

The initial short circuit analysis was performed without the 345 kV Cluster Generation projects modeled and with all other third-party generation projects ahead of the 345 kV Cluster Generation projects in the study queue in service. This identified the “base case” fault duties of the circuit breakers. The short circuit analysis was performed again with the 345 kV Cluster Generation projects actively modeled in the case.

Three phase, two phase, and single-phase line-to-ground faults were simulated at select buses in the El Paso Electric Co. System with terminal voltages at 69 kV and above. The difference between the fault current values in the two cases shows the impact of the Cluster generation on the existing circuit breakers in the EPE system.

Fault currents were monitored at select buses of the EPE Transmission System and relevant buses of the nearby local transmission systems. The resulting fault currents were then compared to the circuit breaker interruption ratings of the breakers at each of the substations.

6.3 Results of the Short Circuit Analysis

The highest short circuit fault currents for the selected buses monitored for impacts are shown below in Table 6-6.

Table 6-6: Cluster Study Short Circuit Summary Results

Bus Fault On:

Lowest Breaker

Rating (kA)1 Fault

Pre Project Current

(Amperes)2

Pre X/R2

Post Project Current

(Amperes)

Post X/R

Delta (Amperes)

% Change

AA100W 345 kV

40

3LG * * 6476.5 22.7

2LG 5831.3 23.2

1LG 5062.7 24.1

Afton 345 kV 40

3LG 9740.1 29.8 13363.6 26.8 3623.5 37.2%

2LG 9593.3 29.0 12796.1 26.1 3202.8 33.4%

1LG 9058.2 27.8 11496.3 24.6 2438.1 26.9%

AMRAD 345 kV

40

3LG 3893.4 10.9 9710 15.9 5816.6 149.4%

2LG 3742.5 14.3 9073 17.7 5330.5 142.4%

1LG 3425.4 16.4 7819 20.3 4393.6 128.3%

AMRAD 115 kV

40

3LG 7664.2 13.7 10608.7 23.1 2944.5 38.4%

2LG 7259 18.6 10111.3 27.6 2852.3 39.3%

1LG 6555.5 21.6 9279.8 31.6 2724.3 41.6%

ARROYO 345 kV

40

3LG 7911.8 14.1 13093.3 20.8 5181.5 65.5%

2LG 7853.6 14.3 12595.8 19.5 4742.2 60.4%

1LG 7543.5 14.5 11464 16.8 3920.5 52.0%

Page 54: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

48

Bus Fault On:

Lowest Breaker

Rating (kA)1 Fault

Pre Project Current

(Amperes)2

Pre X/R2

Post Project Current

(Amperes)

Post X/R

Delta (Amperes)

% Change

ARROYO 115 kV

22

3LG 16858.9 16.8 21252.2 25.7 4393.3 26.1%

2LG 16206.2 17.5 20118.7 25.0 3912.5 24.1%

1LG 15121 18.4 18222.5 23.7 3101.5 20.5%

ART320W 345 kV

40

3LG * * 5881.7 38.1

2LG 5413.1 38.8

1LG 4993.2 39.6

ARTESIA 345 kV

40

3LG 1642.5 9.7 5969.4 15.5 4326.9 263.4%

2LG 1510.5 9.1 5309.4 14.0 3798.9 251.5%

1LG 1048 6.2 4105.6 7.7 3057.6 291.8%

CALIENTE 345 kV

40

3LG 7606 14.9 11205.9 17.4 3599.9 47.3%

2LG 7747.4 18.7 10864 20.1 3116.6 40.2%

1LG 7794.1 19.6 10193.8 22.3 2399.7 30.8%

CALIENTE 115 kV

40

3LG 17949.2 15.6 19659.4 18.6 1710.2 9.5%

2LG 19503.6 18.8 20266.7 21.4 763.1 3.9%

1LG 20200.9 19.0 20509.9 22.4 309 1.5%

CORONA 345 kV

40

3LG * * 13520.3 23.4

2LG 13250 21.2

1LG 12515.3 17.3

DIABLO 345 kV

40

3LG 6304.9 17.6 6691.5 16.7 386.6 6.1%

2LG 6140.2 22.9 6449.5 21.8 309.3 5.0%

1LG 5895.1 25.2 6107.8 24.4 212.7 3.6%

DIABLO 115 kV

31

3LG 21876.9 16.7 23167.1 15.9 1290.2 5.9%

2LG 21967.5 20.8 23001.7 19.9 1034.2 4.7%

1LG 22010.9 22.1 22817.5 21.4 806.6 3.7%

FT CR PST 345 kV

40

3LG 5903.2 17.2 6059.8 17.4 156.6 2.7%

2LG 5792.5 14.8 5933.9 15.1 141.4 2.4%

1LG 4130.1 4.1 4191.3 4.0 61.2 1.5%

FT CRAIG 345 kV

40

3LG 8714.9 13.9 9334.7 13.7 619.8 7.1%

2LG 8134.8 12.5 8658.4 12.4 523.6 6.4%

1LG 5776 6.0 5983.1 5.9 207.1 3.6%

HIDALGO 345 kV

40

3LG 9411 12.4 17653.6 19.8 8242.6 87.6%

2LG 8898.6 19.3 16664.4 29.2 7765.8 87.3%

1LG 7932.5 21.5 14718.3 33.4 6785.8 85.5%

LUNA 345 kV

40

3LG 14093.6 29.9 18693.5 26.9 4599.9 32.6%

2LG 14245.6 37.9 18391.3 34.3 4145.7 29.1%

1LG 14210.4 40.1 17727.4 37.4 3517 24.7%

LUNA 115 kV

20 3LG 10782.7 23.2 11258.2 22.6 475.5 4.4%

2LG 12207.3 30.4 12661.9 29.8 454.6 3.7%

Page 55: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

49

Bus Fault On:

Lowest Breaker

Rating (kA)1 Fault

Pre Project Current

(Amperes)2

Pre X/R2

Post Project Current

(Amperes)

Post X/R

Delta (Amperes)

% Change

1LG 12538.2 29.3 12980.6 28.8 442.4 3.5%

NEWMAN 345 kV

50

3LG 9940.6 24.3 13334.4 25.0 3393.8 34.1%

2LG 10063.9 23.1 13078.8 23.4 3014.9 30.0%

1LG 9809.4 21.4 12312.9 20.8 2503.5 25.5%

NEWMAN 115 kV

50

3LG 33708.8 53.5 37266 50.8 3557.2 10.6%

2LG 39078.0 49.2 42417.5 47.1 3339.5 8.5%

1LG 40821.2 47.6 44061.4 45.6 3240.2 7.9%

NM805W 345 kV

40

3LG * * 11104.5 39.5

2LG 10425.4 39.3

1LG 9614.4 39.2

PICANTE 345 kV

40

3LG 8233.4 17.0 11804.5 18.0 3571.1 43.4%

2LG 8365.5 18.3 11425 20.7 3059.5 36.6%

1LG 8255.5 19.3 10766.5 22.9 2511 30.4%

RIO GRANDE

115 kV 40

3LG 24011.5 20.9 25511.3 19.8 1499.8 6.2%

2LG 24613 21.9 25886.8 20.9 1273.8 5.2%

1LG 25052.7 22.6 26052.6 21.7 999.9 4.0%

RIO GRANDE 69

kV 40

3LG 21656.5 27.8 22283.1 27.0 626.6 2.9%

2LG 24614.7 35.5 25189.5 34.7 574.8 2.3%

1LG 25614.1 34.2 26156.9 33.5 542.8 2.1%

SLPOI 345 kV

40

3LG 9341.1 16.0 10363.2 14.8 1022.1 10.9%

2LG 8680.9 14.5 9538.2 13.6 857.3 9.9%

1LG 6541.6 8.0 6903.3 7.6 361.7 5.5%

SLPOICAP 345 kV

40

3LG 17029.0 8.4 25106.2 5.8 8077.2 47.4%

2LG 15241.4 8.1 21729.8 5.7 6488.4 42.6%

1LG 9201.9 5.5 10534.2 4.8 1332.3 14.5%

SOUTH 345 kV

40

3LG 10353.3 11.5 13812.2 12.6 3458.9 33.4%

2LG 10571.3 15.9 13735.6 17.7 3164.3 29.9%

1LG 9897.7 16.1 12325 18.7 2427.3 24.5%

VL-TAP 345 kV

40

3LG 9558.1 11.4 9912.6 11.2 354.5 3.7%

2LG 8718.0 10.6 9007.6 10.4 289.6 3.3%

1LG 5493.1 5.6 5576.7 5.6 83.6 1.5%

Z345 345 kV 40

3LG 4995.3 57.1 5064.1 56.5 68.8 1.4%

2LG 5169.2 54.7 5227.4 54.2 58.2 1.1%

1LG 5300.8 52.6 5351 52.2 50.2 0.9% Notes: 1) Any NEW circuit breakers required the results of QP1, QP2, or the Cluster Generation will have a 'lowest

breaker ratings' were assumed to be 40kA (highlighted/ RED text). 2) * Faulted bus not available Pre-project.

Page 56: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

50

6.4 Short Circuit Analysis Conclusions

The results of this short circuit study show that the maximum fault current with the Cluster Study projects active do not exceed the breaker interrupting capability of any breaker in the EPE or neighboring transmission system. Therefore no replacement of existing circuit breakers on the EPE transmission systems will be required.

Page 57: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

51

7. Stability Analysis

Stability analysis was performed for peak and off-peak load conditions to determine the impact of the 345 kV Cluster Project on the EPE Transmission System. This analysis evaluated the performance of the system for selected contingencies, provided by EPE, and addressed issues including, but not limited to, transient stability, dynamic stability (i.e. damping) and low voltage ride through. The simulations were conducted with the PSLF power flow and dynamic simulation software, General Electric, Inc. PSLF load flow software package, Version 17.8. Dynamic stability simulations were conducted on peak and off-peak load conditions with the Cluster projects units off and on at full capacity.

7.1 Dynamics Modeling

EPE provided a list of contingencies along with the base cases and dynamic file data base for this part of the study. The Interconnection Customers provided the detailed model data sheets or the parameters to be used. If the parameters were not provided, typical values were then used. Table 7-1 below shows the models used.

Table 7-1: Generator Models Used for Studies

Project Turbine Type Notes PSLF Generic

ART320W GE 2.5 MW Full Converter Model

standard GEWTG

AA100W GE 1.5 MW DFIG Model standard with

PSLF Assume LVRT II

GEWTG

NM805W Siemens

VS 2.3 MW

Full Converter Generator Interconnection Customer

has provided modeling data for PSLF/WECC Generic

Model.

WT4G

HL198W GE 1.5 MW DFIG Model standard with

PSLF Assume LVRT II

GEWTG

Four base cases were used to simulate Peak and Off-Peak conditions and to simulate the time frame for Commercial In-Service Dates (CID). These were modified to include the 345 kV Cluster generation projects and are the same cases that were used for the Steady State Analysis. The analysis compares the system fault simulations before and after the Cluster generation projects are added. The bases cases used are found in Table 7-2.

Page 58: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

52

Table 7-2: Stability Base Case Scenarios

Descriptions

Year Peak Case OFF- Peak Case

Ft Craig PST = 60 MW N-S Ft Craig PST = 60 MW N-S Eddy County HVDC ON Eddy County HVDC ON

2012 X X 2015 X X

7.2 NM805W Initial Issues

The stability analysis showed distinct wave form distortion that was consistent for N-0 or non-disturbance conditions. Figure 7-1 documents the distortion.

Figure 7-1: EPE 345 kV Bus Voltages for Non-Disturbance 20 Second Start

All cluster generation was then load netted and then brought back to the system one project at a time to determine the project responsible for this distortion.

It was determined the generation for NM805W was responsible for the distortion. A number of mitigations were studied and the only solution that will provide satisfactory results is to add second 300-mile 345 kV line from the NM805W Project Site to the POI at Corona. The reason for the distortion is that a resonant RLC circuit is setup by the 300-mile transmission line and the most effective AC solution to correct this is to reduce

Page 59: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

53

the impedance between the NM805W project and the POI. Therefore a second line is added. Figure 7-2 documents the EPE 345 kV bus voltages after the second 345 kV line added. Because of the long length of interconnection transmission lines at Corona, an SVC or STATCOM will be required to mitigate voltage violations due to contingencies. Also the SVC/STACOMS at the two reactor stations need to be sized at +200/-300 MVAR.

Figure 7-2: EPE 345 kV Bus Voltages for Non-Disturbance 20 Second Start After 2nd NM805W- Corona 345 kV Transmission Line

Another solution, that was not studied, is to make the transmission line from NM805W to Corona an HVDC transmission line. This will require an HVDC converter station and the POI and at the NM805W project site. HVDC solution would not only be better technical solution but it might make more economical sense for the Interconnection Customer.

Loss of all the generation whether to a fault or sudden drop in wind speed was carefully studied. Figure 7-3 and Figure 7-4 show the 345 kV bus frequencies and local EPE generator angles for a fault at the proposed Corona Switching Station, clearing in 4 cycles with a trip of both NM805W 345 kV lines. Running the PSLF Worst Case Analysis module on these faults also show that there are not any criteria violations.

Page 60: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

54

Figure 7-3: EPE 345 kV Bus Frequencies for Fault at Corona and Loss of Both NM805W - Corona Lines

Figure 7-4: EPE Local Generation Angles for Fault at Corona and Loss of Both NM805W - Corona Lines

Page 61: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

55

7.3 Stability Analysis Results

System stability was analyzed for seventy-one contingencies, relevant to the Projects POI and Study Area, with and without the 345 kV Cluster Project for peak and off peak base case load conditions. Table 7-3 lists the contingencies studied as well as the results of being stable or unstable. The results show that the area remains stable for all contingencies and for all cases listed in Table 7-3.

Table 7-3: Contingency List for Stability Studies for both Peak and Off-Peak Cases

Fault #

Type Location Duration Trip Results

W/O Cluster

W/Cluster

1 3-Phase Afton 345 kV 4 cycles Afton - Newman 345 KV Stable Stable 2 3-Phase Afton 345 kV 4 cycles Afton - Luna 345 KV Stable Stable 3 3-Phase Afton 345 kV 4 cycles Loss of all Afton Gen Stable Stable 4 3-Phase Afton 345 kV 4 cycles Afton – Arroyo 345 KV N/A Stable 5 3-Phase Amrad 345 kV 4 cycles Amrad 345/115 kV XFMR Stable Stable 6 3-Phase Amrad 345 kV 4 cycles Amrad – AA100W 345 kV N/A Stable 7 3-Phase Amrad 345 kV 4 cycles Amrad – Corona 345 kV N/A Stable 8 3-Phase Amrad 345 kV 4 cycles Amrad – Artesia 345 kV Stable Stable 9 3-Phase Artesia 345 kV 4 cycles Amrad – Artesia 345 kV Stable Stable

10 3-Phase Artesia 345 kV 4 cycles Artesia – AA100W 345 kV N/A Stable 11 3-Phase Artesia 345 kV 4 cycles Artesia – ART320W 345 kV N/A Stable 12 3-Phase Arroyo 345 kV 4 cycles Arroyo – Ft. Craig 345 kV Stable Stable 13 3-Phase Arroyo 345 kV 4 cycles Arroyo – Newman 345 kV Stable Stable 14 3-Phase Arroyo 345 kV 4 cycles Arroyo – Corona 345 kV N/A Stable

15 3-Phase Arroyo 345 kV 4 cycles Arroyo – Afton 345 kV N/A Stable

16 3-Phase Caliente 345 kV 4 cycles Caliente- Corona 345 kV N/A Stable

17 3-Phase Caliente 345 kV 4 cycles Caliente- Picante 345 kV Stable Stable

18 3-Phase Diablo 345 kV 4 cycles Diablo – Luna 345 kV Stable Stable

19 3-Phase Hidalgo 345 kV 4 cycles Hidalgo – Greenlee 345 kV Stable Stable

20 3-Phase Hidalgo 345 kV 4 cycles Hidalgo – Luna #1 345 kV Stable Stable

21 3-Phase Hidalgo 345 kV 4 cycles Hidalgo –South #1 345 kV N/A Stable

22 3-Phase Hidalgo 345 kV 4 cycles Hidalgo – HL198W 345 kV N/A Stable

23 3-Phase Luna 345 kV 4 cycles Luna 345/115 kV XFMR Stable Stable

24 3-Phase Luna 345 kV 4 cycles Luna - Afton 345 kV Stable Stable

25 3-Phase Luna 345 kV 4 cycles Luna – SLPOI345 345 kV Stable Stable

26 3-Phase Luna 345 kV 4 cycles Luna – Hidalgo #1 345 kV Stable Stable

27 3-Phase Luna 345 kV 4 cycles Luna -LEF 345 kV Stable Stable

28 3-Phase Luna 345 kV 4 cycles Luna – Diablo 345 kV Stable Stable

29 3-Phase Newman 345 kV 4 cycles Newman – Arroyo 345 kV Stable Stable

30 3-Phase Newman 345 kV 4 cycles Newman – Afton 345 kV Stable Stable

31 3-Phase Newman 345 kV 4 cycles Newman - Corona 345 kV N/A Stable

32 3-Phase Picante 345 kV 4 cycles Picante – Corona 345 kV N/A Stable

33 3-Phase Picante 345 kV 4 cycles Picante – Caliente 345 kV Stable Stable

34 3-Phase Z345 kV 4 cycles Z345 – Ft. Craig 345 kV Stable Stable

35 No Fault Z345 kV 4 cycles All gen Stable Stable

Page 62: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

56

Fault #

Type Location Duration Trip Results

W/O Cluster

W/Cluster

36 3-Phase VL-TAP 345 kV 4 cycles VL-Tap – Ft. Craig 345 kV Stable Stable

37 3-Phase VL-TAP 345 kV 4 cycles VL-Tap – SLPOI345 345 kV Stable Stable

38 3-Phase VL-TAP 345 kV 4 cycles VL-Tap – Springerville

345 kV Stable Stable

39 3-Phase Ft. Craig 345 kV 4 cycles Ft. Craig – Ft. Craig PST Stable Stable

40 3-Phase Ft. Craig 345 kV 4 cycles Ft. Craig – Arroyo 345 kV Stable Stable

41 3-Phase Ft. Craig 345 kV 4 cycles Ft. Craig – VL-TAP 345 kV Stable Stable

42 3-Phase Ft. Craig 345 kV 4 cycles Ft. Craig – Z345 345 kV Stable Stable

43 3-Phase SLPOI345 345 kV 4 cycles SLPOI345 – Luna 345 kV Stable Stable

44 3-Phase SLPOI345 345 kV 4 cycles SLPOI345 – VL-TAP

345 kV Stable Stable

45 No Fault SLPOI345 345 kV 4 cycles Loss of gen Stable Stable

46 3-Phase Corona 345 kV 4 cycles Corona – Amrad #1 345 kV Stable Stable

47 3-Phase Corona 345 kV 4 cycles Corona – Picante 345 kV Stable Stable

48 3-Phase Corona 345 kV 4 cycles Corona – Newman 345 kV Stable Stable

49 3-Phase Corona 345 kV 4 cycles Corona – Caliente 345 kV Stable Stable

50 3-Phase Corona 345 kV 4 cycles Corona – NM805RS1 #1

345 kV Stable Stable

51 3-Phase Corona 345 kV 4 cycles NM805W- NM805RS2 #1

345 kV Stable Stable

52 No Fault NM805W 345 kV 4 cycles Trip 1/5 of Gen (161 MW) Stable Stable

53 No Fault NM805W 345 kV 4 cycles Trip 2/5 of Gen (322 MW) Stable Stable

54 No Fault NM805W 345 kV 4 cycles Trip 3/5 of Gen (483 MW) Stable Stable

55 No Fault NM805W 345 kV 4 cycles Trip 4/5 of Gen (644 MW) Stable Stable

56 No Fault NM805W 345 kV 4 cycles Trip 4/5 of Gen (805 MW) Stable Stable

57 3-Phase NM805W 345 kV 4 cycles 345/34.5 XFMR #1

(161 MW) Stable Stable

58 3-Phase Corona 345 kV 4 cycles

Corona – NM805RS1 #1 345 kV

Corona – NM805RS1 #2 345 kV

Stable Stable

59 3-Phase ART320W 345 kV 4 cycles ART320W – Artesia 345 kV Stable Stable

60 3-Phase ART320W 345 kV 4 cycles Loss of ½ Generation Stable Stable

61 3-Phase ART320W 345 kV 4 cycles Loss of all generation Stable Stable

62 3-Phase AA100W 345 kV 4 cycles AA100W – Artesia 345 kV Stable Stable

63 3-Phase AA100W 345 kV 4 cycles AA100W – Amrad 345 kV Stable Stable

64 3-Phase AA100W 345 kV 4 cycles AA100W 345/34.5 kV

XFMR Stable Stable

65 No Fault AA100W 345 kV 4 cycles Loss of All Generation Stable Stable

66 3-Phase HL198W 345 kV 4 cycles HL198W – Hidalgo 345 kV Stable Stable

67 No Fault HL198W 345 kV 4 cycles Loss of all Generation Stable Stable

68 3-Phase TEP South 345 kV 4 cycles South – Hidalgo 345 kV #1 Stable Stable

69 3-Phase TEP South 345 kV 4 cycles South – Pinal West 345 kV Stable Stable

70 3-Phase TEP South 345 kV 4 cycles South - Vail Stable Stable

71 No Fault ART320W 345 kV 4 cycles Loss of all generation Stable Stable

Page 63: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

57

The stability plots of these faults can be found in Appendix F. Worst Condition Analysis did not reveal any frequency or voltage criteria violations as the result of the Cluster generation. This output can be found in Appendix E

7.4 Low Voltage Ride Through Analysis

All wind generating plants subject to FERC Order No. 661 must meet the following Low Voltage Ride Through (LVRT) criteria: Wind generating plants are required to remain in-service during three-phase

faults with normal clearing (which is a time period of approximately 4-9 cycles) and single line to ground faults with delayed clearing, and subsequent post-fault voltage recovery to pre-fault voltage unless clearing the fault effectively disconnects the generator from the system. The clearing time requirement for a three-phase fault will be specific to the wind generating plant substation location, as determined and documented by the Transmission Owner for the Transmission District to which the wind generating plant will be interconnected. The maximum clearing time the wind generating plant shall be required to withstand for a three-phase fault shall be 9 cycles, after which, if the fault remains following the location-specific normal clearing time for three-phase faults, the wind generating plant may disconnect from the transmission system. A wind generating plant shall remain interconnected during such a fault on the transmission system for a voltage level as low as zero volts, as measured at the high voltage side of the wind GSU.

This requirement does not apply to faults that would occur between the wind generator terminals and the high side of the GSU.

Wind generating plants may be tripped after the fault period if this action is intended as part of a special protection system.

Wind generating plants may meet the LVRT requirements of this standard by the performance of the generators, or, by installing additional equipment (e.g., Static Var Compensator) within the wind generating plant, or, by a combination of generator performance and additional equipment.

Existing individual generator units that are, or have been, interconnected to the network at the same location at the effective date of the FERC Order No. 661 Appendix G, LVRT Standard, are exempt from meeting the FERC Order No. 661 Appendix G, LVRT Standard, for the remaining life of the existing generation equipment. Existing individual generator units that are replaced are required to meet FERC Order No. 661 Appendix G LVRT Standard.

The fault clearing times used in the stability analysis include relay operating time, breaker operating time, channel time, and breaker failure time, as necessary.

Page 64: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

58

7.4.1 LVRT Results

The ability of the Cluster generation to stay on-line due to contingencies at the Cluster generation POI is a requirement of both the FERC and EPE. From the contingency list in Table 7-3, faults were simulated at all POI’s. The results show that all Cluster Generation remain on-line for faults at their respective POI’s.

7.5 Stability Analysis Conclusion

The study area remains stable and well damped for all the contingencies analyzed. The Cluster Generation remains on-line for all system fault simulations, satisfying FERC Order No. 661 Low Voltage Ride Through (LVRT) criteria.

The 345 kV Cluster Project addition to the system with proposed transmission reinforcements in place does not pose any concern to system stability performance.

Page 65: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

59

8. Cost Estimates

Good faith cost estimates have been determined. The cost estimates are in 2010 dollars (no escalation applied) and are based upon typical construction costs for previously performed similar construction. These estimated costs include all applicable labor and overheads associated with the engineering, design, and construction of these new facilities. These estimates did not include the cost for any other Interconnection Customer owned equipment or associated design and engineering except for those located at the POI’s.

The estimated total cost for the required upgrades is $929.14 Million. This breaks down to $7.86 Million for the EPE Interconnection Cost6 and $921.30 Million for Network Upgrades Cost7. The Generator Interconnection Cost8 estimates are not included. Figure 8-1 shows the cost per element.

The estimated time frame for Engineering, Procurement, and Construction of Network Upgrades is 5 years upon notice to proceed with construction from the Interconnection Customers. The estimated time frame for Engineering, Procurement, and Construction is 2 years for the POI Substations or expansion at existing substations. Therefore; it is not possible to meet the requested Commercial In-Service Dates as requested by the interconnection customers. Appendix H shows the project schedules of all projects. It is assumed that all projects for Network upgrades will start at the same time. Any sequencing will delay the overall completion date. A time frame for permitting all projects assumed best case scenarios. Should the NEPA process be delayed on any section, this will also delay the final completion date.

At this time it is not possible to meet the requested 2011 In-service dates based upon typical times frames allowed in the EPE OATT. Other means of accelerating these projects will have to be discussed during the Facility Study Process. Therefore it is not feasible for Network Upgrades to meet the requested in-service of the Cluster Study Interconnection Customers.

The cost responsibilities associated with these facilities shall be handled as per current FERC guidelines, EPE OATT, and the FERC Waiver.

Tables and one-line diagrams in this section of the report show the 345 kV Cluster Study interconnection projects, their POI, associated EPE Interconnection facilities, Network Upgrades, and estimated costs.

Table 8-1 and

6 EPE Interconnection Cost: Cost of faculties paid for by interconnector but owned and operated by EPE

from the Change of Ownership Point to the Point of Interconnection. Not subject to transmission credits. 7 Network Upgrades Cost: Cost of facilities from the Point of Interconnection outward, paid for by the

interconnector but owned and operated by EPE. Subject to transmission credits. 8 Generator Interconnection Cost: Cost of facilities paid for by interconnector and owned and operated by the

interconnector from the generator faculties to the Change of Ownership Point, which is typically at the Point of Interconnection substation first dead-end. Not subject to transmission credits.

Page 66: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

60

Table 8-2 summarize the costs allocated for each interconnection project and element, respectively. The responsibilities for Network Upgrades are assigned based upon the MW pro rata share of the total 1423 MW injected onto the system. For example if an Interconnection Customer is proposing a 100 MW project, the Interconnection Customer’s Network Upgrades cost will be ratio of 100/1423 times the total cost of Network Upgrades. Table 8-3 through Table 8-16 detail the individual project costs for Network Upgrades.

Table 8-1: Estimated Costs by Interconnection Project

Project Name

Size (MW)

IN-SERVICE

DATE

INTERCONNECTION POINT

EPE Interconnection

Facilities (Millions)

Network Upgrades Pro Rata (Millions)

Total Cost

(Millions)

ART320W 320 9/2011 Artesia (Eddy County HVDC) 345 kV West bus

$0.70 $207.18 $207.88

AA100W 60 40

12/2010 6/2011

65 miles east of Amrad substation on Amrad-Artesia 345 kV line

$0.71 $64.75 $65.46

NM805W 805 12/2011 Corona 345 kV bus $5.60 $521.18 $526.78

HL198W 99 99

5/2013 5/2015

Hidalgo-Luna 345 kV line 4-miles east of Hidalgo Substation

$0.85 $128.19 $129.04

TOTAL MW

1423 Total Costs $7.86 $921.30 $929.16

Page 67: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

61

Table 8-2: Estimated Costs by Element

EPE Interconnection

$ Million

Network Upgrade $ Million

Total

$ Million Artesia Station 0.70 16.42 17.12 Amrad Station - 12.00 12.00 AA100W Station 0.71 9.90 10.61 Corona Station 5.60 71.38 76.98 Picante Station - 13.17 13.17 Afton Station - 4.25 4.25 Arroyo Station - 13.87 13.87 Luna Station - 13.10 13.10 Hidalgo Station 0.85 50.16 51.01 South Station 13.94 13.94 345 kV Line Construction - 694.27 694.27 115 kV Line Construction - 2.62 2.62 115 kV Line Reconductoring - 6.20 6.20

Cost Summary 929.14 Note: Cost estimates differ due to rounding error.

Page 68: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

62

Figure 8-1: Cost Details per Element

Page 69: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

63

Table 8-3: EPE Interconnection Facilities Costs for ART320W POI

Element Description Cost Est. Millions

Artesia/Eddy County POI

EPE Interconnection Facilities located at Artesia/Eddy County POI:

One Set of 345 kV 3-Phase Metering Units and structures

One lot switch and metering structures One lot, grounding, concrete transmission line relaying, communication, and

testing One set of Transmission Line Dead-end Assemblies

for Substation Dead-end

$0.70

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

28 Months

Page 70: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

64

Figure 8-2: ART320W POI One line

Interconnection Customer’s

Point of Interconnection

Interconnection Customer’s 345 kV Transmission Line

70 Miles

Revenue Metering

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

N S

E

W Eddy County/Artesia 345 kV Substation

ART320W (320 MW)

160 MW

34.5/345 kV 227 MVA (Typical)

To 200 MW Eddy County

HVDC Tie

To AA100W

POI 59 Miles

160 MW

M

50 MVAR REACTOR

50 MVAR REACTOR

2 x 30 MVAR CAPACITORS

To AMRAD

124 miles

54 MVAR REACTOR

30 MVAR CAPACITOR

Page 71: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

65

Table 8-4: Network Upgrades Costs for ART320W POI

Element Description Cost Est.

Millions Artesia/Eddy County POI 345 kV Substation

New 345 kV two section Breaker and a half bus Substation at the Artesia/Eddy County 345 kV HVDC Station bus. The new equipment required includes:

Six 345 kV 3000 Amp circuit breakers Twelve 345 kV 3000 Amp disconnect switches One 50 MVAR Shunt Reactor One 30 MVAR Shunt Capacitor Two 345 kV 2000 Amp Line Switches w/Grounding

Switch Two 345 kV 2000 Amp circuit breakers Two 345 kV, 2000 Amp disc. switches Twelve CCVT’s and Structures Four 2000 Amp Line Wave Traps Twenty-one Lightning arresters and Structures Four sets of Transmission Line Dead-end Assemblies

for Substation Dead-end One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$16.42

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

28 Months

Page 72: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

66

Table 8-5: EPE Interconnection Facilities Costs for AA100W POI

Element Description Cost Est.

Millions AA100W POI Radial Interconnection Facilities located on the Amrad-

Artesia 345 kV Line:

One Set of 345 kV 3-Phase Metering Units and structures

One lot switch and metering structures One lot, grounding, concrete transmission line relaying, communication, and

testing One set of Transmission Line Dead-end Assemblies

for Substation Dead-end

$0.71

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

25 Months

Page 73: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

67

Figure 8-3: AA100W POI One-line

Interconnection Customer’s

Point of Interconnection

To AMRAD Substation

65 Miles

34.5/345 kV 125 MVA

Interconnection Customer’s 345 kV Transmission Line

500 Feet

Revenue Metering

Color Code Existing Facilities Network Upgrades Required for Interconnection EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

N S

E

W Guadalupe Mountain

POI 345 kV Substation

60 MW

40 MW

M

AA100W

Optional Connection of new 345 kV

Line if studies require this.

Otherwise line will pass through

substation on way to Amrad

To Artesia

59 miles

Page 74: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

68

Table 8-6: Network Upgrades Costs for AA100W

Element Description Cost Est.

Millions AA100W 345 kV Substation

New two section Breaker and a half bus 345 kV Substation on the Amrad-Artesia 345 kV Line. The new equipment required includes:

Five 345 kV 3000 Amp circuit breakers Ten 345 kV, 3000 Amp switches Three 345 kV 2000 Amp Line Switches w/Grounding

Switch Nine CCVT’s and Structures Two 2000 Amp Line Wave Traps Three sets of Transmission Line Dead-end

Assemblies for Substation Dead-end Nine Lightning arresters and Structures One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$9.90

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

25 Months

Page 75: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

69

Table 8-7: EPE Interconnection Facilities Costs for NM805W POI

Element Description Cost Est.

Millions NM805W POI at Corona Station 345 kV Bus

Radial Interconnection Facilities located at Corona 345 kV Station:

Two Set of 345 kV 3-Phase Metering Units and structures

Two 54 MVAR Reactor shunts Two 345 kV 2000 Amp circuit breakers Two 345 kV, 2000 Amp disc. switches Six Lightning arresters and Structures One lot switch and metering structures One lot, grounding, concrete transmission line relaying, communication, and

testing

$5.60

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

45 Months

Page 76: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

70

Figure 8-4: NM805W POI and Corona Station One-line

Color CodeExisting Facilities Network Upgrades EPE Interconnection Facilities Interconnection Customer Equipment

EPE Corona Switching

Station

To Newman

To Caliente

To Amrad

345 kV

345 kV

To Arroyo

NM805W (300 Miles from Corona)

161 MW

34.5/345 kV 100/133/167 MVA

(Typical)

161 MW

161 MW

161 MW

161 MW

M

100 miles

NM805W Reactor

Station #1

NM805W Reactor

Station #2 Each

SVC/STACOM +125/-300

MVAR (MINIMUM)

FUTURE

Interconnection Customer’s

Point of Interconnection

100 miles

100 miles

Revenue Metering

54 MVAR Reactor

54 MVAR Reactor

54 MVAR Reactor

M

54 MVAR Reactor

To Picante

+150/-250 MVAR SVC

S

E

W

N

Page 77: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

71

Table 8-8: Network System Upgrades Costs for Corona 345 kV Switching Station

Element Description Cost Est. Millions

Corona 345 kV Switching Station

New 345 kV five bay breaker and a half switching station. The new equipment required includes:

Fourteen 345 kV 3000 Amp circuit breakers Twenty-eight 345 kV, 3000 Amp disc. switches Eight 345 kV 2000 Amp Line Switches w/Grounding

Switch Twenty six CCVT’s and Structures Eight 2000 Amp Line Wave Traps Thirty-three Lightning arresters and Structures Eleven sets of Transmission Line Dead-end

Assemblies for Substation Dead-end One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$71.38

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

45 Months

Page 78: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

72

Table 8-9: EPE Interconnection Facilities Costs for HL198W POI

Element Description Cost Est. Millions

HL198W POI at Hidalgo 345 kV Substation

Radial Interconnection Facilities at Hidalgo 345 kV station:

One Set of 345 kV 3-Phase Metering Units and structures

One lot switch and metering structures One lot, grounding, concrete transmission line relaying, communication, and

testing

$0.85

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

44 Months

Page 79: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

73

Figure 8-5: HL198W POI and Hidalgo Station One-line

Color Code Existing Facilities Network Upgrades Required for Interconnection Interconnection Customer Equipment Located at POI Interconnection Customer Equipment

345 kV

345 kV

345/115/13.8 kV

To 115 kV Yard

Line #3 to Luna

50 MVAR REACTOR

50 MVAR REACTOR

EXISTING65 MVAR

REACTOR MOVED TO THIS

POSITION

345/115/13.8 kV

Line #2 to Luna

Line #1 to Luna

M

198 MW Total

Generation

TWO 34.5/345 kV

100/167 MVA

HL198W

Interconnection Customer’s 345 kV Transmission Line

6 Miles

TO GREENLEE

Lines #1 & #2 to TEP South Substation

Revenue Metering

Interconnection Customer’s Point

of Interconnection

Page 80: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

74

Table 8-10: Network Upgrades Costs for Hidalgo 345 kV Station

Element Description Cost Est. Millions

Hidalgo 345 kV Substation

Expand to 345 kV five bay breaker and a half switching station. The new equipment required includes:

Ten 345 kV 3000 Amp circuit breakers Twenty-two 345 kV 3000 Amp switches Five 345 kV 2000 Amp Line Switches w/Grounding

Switch Fourteen CCVT’s and Structures Five 2000 Amp Line Wave Traps Two 345 kV, 50 MVAR Shunt Reactors Two 345 kV 2000 Amp circuit breakers Two 345 kV, 2000 Amp switches Thirteen sets of Transmission Line Dead-end

Assemblies for Substation Dead-end One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$50.16

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

44 Months

Page 81: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

75

Figure 8-6: Amrad 345 kV Substation One-line

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

EPE AMRAD Switching Station

To Corona

345 kV To

AA100W POI

345 kV

345 kV

345/13.2/115 kV To 115 kV Yard

FUTURE

S

E

W

N

Rebuild the 345 kV Ring Bus Station to a New 345 kV Breaker and a half Station on

the North side

Existing 345 kV

To Artesia 80 MVAR

Reactor

80 MVAR Reactor

Existing 345 kV

To Caliente

SVC +25/-50 MVAR

Page 82: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

76

Table 8-11: Network System Upgrades Costs for Amrad 345 kV Substation

Element Description Cost Est.

Millions AMRAD 345 kV Substation

Expand existing 345 kV Yard to three bay Breaker and a Half Scheme The new equipment required includes:

Five 345 kV 3000 Amp circuit breakers Ten 345 kV, 3000 Amp switches Two 345 kV 2000 Amp Line Switches w/Grounding

Switch Nine Lightning arresters and Structures One 80 MVAR Shunt Reactor, with breaker and

disconnect switch Nine CCVT’s and Structures Two 2000 Amp Line Wave Traps Three sets of Transmission Line Dead-end

Assemblies for Substation Dead-end One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$12.00

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

45 Months

Page 83: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

77

Figure 8-7: Luna System Upgrade One-line

To LEF

Color Code Existing Facilities Network Upgrades Required for Interconnection Interconnection Customer Equipment Located at POI Interconnection Customer Equipment

345 kV

345 kV

345/115/13.8 kV

To 115 kV Yard

To Afton

To SL99W

(Springerville) To

Diablo

Line #1 To Hidalgo

Line #2 To Hidalgo

Line #3 To Hidalgo

50 MVAR REACTOR

50 MVAR REACTOR

50 MVAR REACTOR

Page 84: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

78

Table 8-12: Network System Upgrades Costs for Luna Substation

Element Description Cost Est.

Millions Luna Substation

Expand the existing 345 kV yard for connections of two new Luna-Hidalgo 345 kV lines w/ reactor shunts to a new four bay breaker and a half 345 kV yard. The new equipment required includes:

Three 345 KV 3000 Amp Circuit Breakers Three 345 KV Substation Dead-end Structures Six Lightning arresters and Structures Six 345 kV 3000 Amp Switches Two 345 kV 3000 Amp Line Switches with Motor

Operator and ground Switch Two 345 kV, 50 MVAR Shunt Reactors Two 345 kV 2000 Amp circuit breakers Two 345 kV, 2000 Amp switches Six 345 kV CCVT’s and Structures Two 2000 Amp Line Wave Traps One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$13.10

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

32 Months

Page 85: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

79

Figure 8-8: Afton System Upgrade One-line

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

Afton Station

One-line

345 kV

345 kV

S

E

W

N

Existing 345 kV To NEWMAN NEW

345 kV To ARROYO

TO AFTON GENERATION

Existing 345 kV To

LUNA

Page 86: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

80

Table 8-13: Network System Upgrades Cost for Afton Substation

Element Description Cost Est. Millions

Afton Substation

Expand the existing 345 kV yard for connections of a new Arroyo-Afton 345 kV lines a new three bay breaker and a half 345 kV yard. The new equipment required includes:

Two 345 KV 3000 Amp Circuit Breakers Two 345 KV Substation Dead-end Structures Three Lightning arresters and Structures Four 345 kV 3000 Amp Switches One 345 kV 3000 Amp Line Switch with Motor

Operator and ground Switch Three 345 kV CCVT’s and Structures One 2000 Amp Line Wave Trap One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$4.25

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

22 Months

Page 87: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

81

Figure 8-9: Arroyo System Upgrade One-line

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

ARRYO Switching

Station

To 345/115 kV

XFMRs

345 kV

345 kV

S

E

W

N

Rebuild the 345 kV Ring Bus Station to a New 345 kV Breaker and a half Station on

the North side

Existing 345 kV To NEWMAN

NEW 345 kV To

Corona

NEW 345 kV To

Afton

Existing 345 kV To Ft. Craig

Page 88: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

82

Table 8-14: Network System Upgrades Cost for Arroyo Substation

Element Description Cost Est.

Millions Arroyo Substation

Expand the existing 345 kV yard for connections of two new Corona-Arroyo and Arroyo-Afton 345 kV lines to a new four bay breaker and a half 345 kV yard. The new equipment required includes:

Six 345 KV 3000 Amp Circuit Breakers Eight 345 KV Substation Dead-end Structures Nine Lightning arresters and Structures Sixteen 345 kV 3000 Amp Switches Four 345 kV 3000 Amp Line Switches with Motor

Operator and ground Switch Fourteen 345 kV CCVT’s and Structures Two 2000 Amp Line Wave Traps One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$13.87

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

32 Months

Page 89: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

83

Figure 8-10: South System Upgrade One-line

To Pinal West

Color Code Existing Facilities Network Upgrades Required for Interconnection Interconnection Customer Equipment Located at POI Interconnection Customer Equipment

345 kV

345 kV

345/138/13.8 kV

To 138 kV Yard

To VAIL

LINE #1 To HIDALGO

Line #2 To Hidalgo

68 MVAR REACTOR

50 MVAR REACTOR

To 138 kV Yard

50 MVAR REACTOR

345/138/13.8 kV

Page 90: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

84

Table 8-15: Network System Upgrades Cost for South Substation

Element Description Cost Est. Millions

South Substation

Expand the existing 345 kV yard for connections of two new Hidalgo-South 345 kV lines w/ reactor shunts to a new three bay breaker and a half 345 kV yard. The new equipment required includes:

Six 345 KV 3000 Amp Circuit Breakers Four 345 KV Substation Dead-end Structures Twelve Lightning arresters and Structures Four 345 kV 3000 Amp Switches Two 345 kV 3000 Amp Line Switches with Motor

Operator and ground Switch Two 345 kV, 50 MVAR Shunt Reactors Two 345 kV 2000 Amp circuit breakers Two 345 kV, 2000 Amp switches Six 345 kV CCVT’s and Structures Two 2000 Amp Line Wave Traps One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$13.94

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

27 Months

Page 91: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

85

Figure 8-10: Picante System Upgrade One-line

Color Code Existing Facilities Network Upgrades EPE Interconnection Facilities Located at POI Interconnection Customer Equipment

EPE PICANTE Switching Station

To Corona

345 kV

345 kV

S

E W

N

To Caliente

115/345 kV T1

115/345 kV T2

To NEWMAN/PIPELINE

To Global Reach To

Biggs To

Vista

To Scottsdale

115 kV

115 kV

Page 92: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

86

Table 8-16: Network System Upgrades Cost for Picante Substation

Element Description Cost Est.

Millions Picante Substation

Add a 2nd 345/115 kV 224 MVA Autotransformer and Expand the existing 115 kV yard for connections of two new Picante-Vista and Picante-Scottsdale 115 kV lines to a new four bay breaker and a half 115 kV yard. The new equipment required includes:

One 345 KV 3000 Amp Circuit Breaker Seven 115 KV Circuit Breakers One 345 KV and three 115 kV Substation Dead-end

Structures Three 345 kV and twelve 345 kV Lightning arresters

and Structures Sixteen 345 kV 3000 Amp Switches Fourteen 345 kV 3000 Amp Switches One 345 kV and one 115 kV 2000 Amp Line

Switches with Motor Operator and ground Switch Three 345 kV and twelve 115 kV CCVT’s and

Structures Three 115 kV 2000 Amp Line Wave Traps One lot 345 kV bus, insulators, and structural

supports One lot Transmission line relaying, SCADA,

communication, and testing One lot ground grid, misc. grounding, concrete,

conduit, cable trench, and fencing One Control Building including batteries Yard work and driveway

$13.17

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

24 Months

Page 93: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

87

Table 8-17: Transmission Network System Upgrades Costs

Element Description Total miles

Cost Est. Millions

345 kV Transmission

One 345 kV Circuit from Artesia to Amrad Station 124 $105.11

One 345 kV Circuit from Amrad to a New Corona Switching Station

39.7 $33.65

One 345 kV kV Circuit from Corona to Arroyo Station 36.9 $42.34

One 345 kV kV Circuit from Arroyo to Afton Station 25 $28.77

Two 345 kV Circuits from Luna to a Hidalgo Station 100 $116.21

Two 345 kV Circuits from Hidalgo to South Station 320 $368.19

115 kV Transmission

One double circuit 115 kV line from Picante to tapping point towards Vista and Scottsdale

5.5 $2.62

Reconductor Socorrop to Elephant Butte 115 kV line with 477 ACSS 70 $3.85

Reconductor Hot Springs to Cuchillo 115 kV line with 477 ACSS 4.4 $0.24

Reconductor Dona Ana to Picacho 115 kV line with 556.6 ACSS 5.0 $0.32

Reconductor Newman-Sherman 115 kV line with 556.6 ACSS

7.3 $0.47

Reconductor NE1-Newman 115 kV line with 556.6 ACSS

2.2 $0.14

Reconductor Vista tap point to Vista 115 kV line with 556.6 ACSS

1,7 $0.11

Reconductor Sol to Vista 115 kV line with 556.6 ACSS 2.0 $0.13

Reconductor Lane-Sol 115 kV line with 556.6 ACSS 2.0 $0.13

Reconductor Milagro-Newman 115 kV line with 556.6 ACSS

6.2 $0.40

Estimated Time Frame for Engineering, Procurement, Construction, and Commissioning

5 Years

Total Estimate for Transmission Network Upgrades $703.09

345 kV Transmission Network Upgrade estimate assumptions:

all cross country route; Ruling Span = 1,000 ft.; Loading: NESC Medium, NESC Extreme Wind; Maximum operating Temperature 100 deg. Celsius; Access roads includes grading and 5% rock for low spots and paved road crossing access;

Page 94: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

88

OPGW 48 pair centrum design with stainless steel tubes, 0.502 in diameter, 0.3310 lbs/ft, RBS 15,000, design tension 20% RBS under NESC medium initial;

Conductor: 954 kCMIL 54/7 “Cardinal” ACSR, design tension 25% RBS under NESC medium initial;

Steel monopole design with vee-string insulators; Tangent and Angle structures are 105’ AGL, Dead-end Structures are 115’ AGL; Estimate considers 8% of the structures to be dead-end structures between 30

degrees and above, 4% angled structures between (5-30 degrees) and 88% of the structures to be tangent structures between (0-5 degrees);

All structures are galvanized and the estimated cost per pound for steel is $2.00/lb.; Tangent structures are direct buried with concrete backfill. All other structure

types utilize reinforced drilled piers with anchor bolt cages; Geotech includes concrete testing; New construction and no outages associated with any other facilities. Engineering and construction support based on 6% of material and line labor for

345kV single circuit 1-bundled conductor. 90 degree and above dead-end structure types to increase cost by 10%.

115 kV Transmission Network Upgrade estimate assumptions:

all cross country route; Ruling Span = 800 ft.; Loading: NESC Medium, NESC Extreme Wind; Maximum operating Temperature 100 deg. Celsius; Access roads includes grading and 5% rock for low spots and paved road crossing access; (1) OPGW 48 pair centrum design with stainless steel tubes, 0.502 in diameter, 0.3310 lbs/ft,

RBS 15,000, design tension 20% RBS under NESC medium initial; Conductors: 556 kCMIL 26/7 “Dove” ACSS, design tension 25% RBS under NESC medium

initial; Double Circuit: Steel monopole design with tangents (100’ direct embed concrete backfill) with

post insulators, running angles (85’ drilled pier foundations) 15-30 degs. with suspension insulators, dead-ends (90 deg.) (85’ drilled pier foundations) suspension insulators on pole;

Estimate considers 8% of the structures to be dead-end structures between 30 and 90 degrees, 4% angled structures between 5 and 30 degrees and 88% of the structures to be tangent structures between 0 and 5 degrees;

All structures are galvanized and the estimated cost per pound for steel is $2.00/lb.; Geotech includes concrete testing; New construction and no outages associated with any other facilities.

Not Included in Transmission Network Upgrade Estimate:

Any right-of-way clearing costs; Hydrology analysis or scour calculations for construction within a flood plain or

adjacent to any washes, rivers, etc.; Permitting for road or railroad crossings; Siting costs, land acquisition, environmental permitting, biological

assessments/permits, archeological assessments/permits; Temporary construction offices and material lay down yard;

Fencing or access gate materials.

Page 95: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

89

General Cost Assumptions

1. The cost estimates provided are good faith “scoping estimates”.

2. Estimates do not include land or permitting.

3. Interconnection Customer to secure POI site and transfer ownership to EPE.

4. Permitting time frames are not included.

5. Estimates are in 2010 Dollars.

6. Where applicable, the Interconnection Customers are responsible for funding and construction of all transmission facilities from the proposed generator substation to the Points of Interconnection.

7. The Interconnection Customer will supply enough transmission conductor from their last structure outside the POI substation for Termination into the POI substation bus.

8. Interconnection Customers are responsible for Engineering, Procurement, and

Construction for all and any FACTs and other transmission compensation devices at their generation site or along their long interconnecting transmission lines to just outside the POI sites.

9. Special outages will be required for Network Upgrade installation at Artesia/Eddy

County, Luna, Hidalgo and South.

10. 345 kV Transmission lines from Artesia to Amrad to Corona to Newman follow existing line corridors and parallel the existing lines.

11. Costs do not include any requirements beyond South 345 kV station.

12. All transmission line reconductoring is assuming all existing structures are in

good condition and able to support the new conductors.

Page 96: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

90

9. Disclaimer

If any of the project data provided by Interconnection Customers and used in this study varies significantly from the actual data once the 345 kV Cluster generation equipment is installed, the results from this study will need to be verified with the actual data at the Project Interconnection Customer's expense. Additionally, any change in the generation in EPE’s Interconnection Queue that is senior to the 345 kV Cluster Generation may require a re-evaluation of this Study.

Page 97: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

91

10. Conclusions

This 345 kV Cluster Study consisting of Steady State, Short Circuit and Stability Analyses for a net 1423 MW of generation interconnecting on the EPE and Southern New Mexico transmission systems has determined that the Cluster Project will have an adverse, or negative, impact on the EPE and Southern New Mexico transmission systems unless proposed Network Upgrades are constructed. The estimated cost for integrating the 345 kV Cluster Project onto the EPE and Southern New Mexico transmission systems is $935.30 Million and the good faith estimate of the time frame to Engineer, Procure, and Construct all facilities is 5 years. Therefore it is not feasible to complete the Network Upgrades Required for Delivery before the requested in-service dates.

Page 98: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Appendix A

Appendix A 345 KV Cluster Study Statement of Work

Page 99: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

1

345 kV CLUSTER SYSTEM IMPACT STUDY STATEMENT OF WORK

All capitalized terms not defined herein shall have the definitions specified in EPE’s most current Open Access Transmission Tariff (the “OATT”). This Statement of Work is pursuant to the May 5, 2009 MSA between EPE and TRC for additional studies to be conducted.

EPE W/O# TS7600201048 TRC Project # 177451 1. Use PSLF to perform load flow analyses for a System Impact Study (as specified under EPE’s

OATT) on the EPE and affected utilities in the WECC transmission system (“System”) as follows:

1.1. Base case scenarios: 1.1.1. Develop 2011, 2012, 2013 and 2015, base case power flows for each year that will

be studied. Base cases will include heavy (100% peak load) and light load (60% of peak load) scenarios.

1.1.2. Base case scenarios will incorporate variations in the EPE system such as Ft. Craig

phase shifter settings (60 MW N-S, 10 MW N-S , 201 MW N-S for Peak Cases, 201 MW N-S, 60 MW N-S for Off-Peak), Eddy County DC tie operational flows (200 MW or 0 MW), local generator and third party generator configurations. A list of base case scenarios are as follows in Table 1:

Table 1: Base Case Scenarios

Descriptions

Year

Peak Case OFF- Peak Case

Ft Craig PST = 60 MW N-S

Ft Craig PST = 10 MW N-S

Ft Craig PST = 201 MW N-S

(AFTON OFF)

Ft Craig PST = 201 MW N-S

Ft Craig PST = 60 MW N-S

Eddy County HVDC

ON

Eddy County HVDC OFF

Eddy County HVDC

ON

Eddy County HVDC OFF

Eddy County HVDC

ON

Eddy County HVDC OFF

Eddy County HVDC

ON

Eddy County HVDC OFF

Eddy County HVDC ON

Eddy County HVDC OFF

2011 X X X X X X X X X X 2012 X X X X X X X X X X 2013 X X X X X X X X X X 2015 X X X X X X X X X X

1.1.3. Incorporate in the base case system data all generators and required facilities in the

Study queue that are senior to the projects in the Study Cluster. Projects senior to the Study Cluster projects are WA495W and SL99W.

1.1.4. Perform all lines in service and contingency analyses for the base case scenarios to

determine if there are any existing EPE/WECC criteria violations. 1.1.5. Perform stability analyses as required in the SIS using the peak and off peak cases

listed in Table 2.

Table 2: Stability Base Case Scenarios Descriptions

Year Peak Case OFF- Peak Case

Ft Craig PST = 60 MW N-S Ft Craig PST = 60 MW N-S Eddy County HVDC ON Eddy County HVDC ON

2012 X X 2015 X X

Page 100: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

2

1.1.6. Perform short circuit analyses as required in SIS using a 2015 ASPEN case or

appropriate case as provided by EPE. Faults studies will be at EPE’s Newman 115 kV, Rio Grande 115 kV, and Rio Grande 69 kV buses, and all other 345 kV buses on the EPE system.

1.1.7. Document the violations and report back to EPE.

1.2. Proposed 345 kV Cluster Study Cases

Develop generation interconnection Cluster Study heavy load and light load power flow cases that combine projects with interconnection points in the same vicinity within the EPE transmission system that are listed in the EPE Generation Interconnection Study queue. 1.2.1. The Cluster cases with the new generators to be developed are defined as follows

as shown in Table 3: 1.2.1.1. 2011 CLUSTER STUDY GENERATORS:

a. ART320W (320 MW) b. AA100W (100 MW) c. NM805W (805 MW light load only)

1.2.1.2. 2012 CLUSTER STUDY GENERATORS: a. ART320W b. AA100W (100 MW) c. NM805W (805 MW)

1.2.1.3. 2013 CLUSTER STUDY GENERATORS: a. ART320W b. AA100W (100 MW) c. NM805W (805 MW) d. HL198W 1 (99 MW)

1- HL198W will be constructed in 2 phases 99 MW in 2013 and 99 MW in 2015

1.2.1.4. 2015 CLUSTER STUDY GENERATORS: a. ART320W b. AA100W (100 MW) c. NM805W (805 MW) d. HL198W 1 (99 MW)

1- HL198W will be constructed in 2 phases 99 MW in 2013 and 99 MW in 2015.

1.2.1.5. All generation dispatched to Areas 14-73, that is all areas except New Mexico (Area 10) and El Paso (Area 11)

Page 101: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

3

Table 3: 345 kV Cluster Case Scenarios Case Descriptions

Year

Peak Case OFF- Peak Case

Ft Craig PST = 60 MW N-S Ft Craig PST = 10 MW

N-S

Ft Craig PST = 201 MW N-S

(AFTON OFF)

Ft Craig PST = 201 MW S-N

Ft Craig PST =60 MW N-S

Eddy County HVDC ON

Eddy County HVDC OFF

Eddy County

HVDC ON

Eddy County HVDC OFF

Eddy County

HVDC ON

Eddy County HVDC OFF

Eddy County

HVDC ON

Eddy County HVDC OFF

Eddy County

HVDC ON

Eddy County HVDC OFF

2011 ART320W AA100W

ART320W AA100W

ART320W AA100W

ART320W AA100W

ART320W AA100W

ART320W AA100W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

2012 ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

ART320W AA100W NM805W

2013

ART320W AA100W NM805W HL198W1

1- 99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

ART320W AA100W NM805W HL198W1

99MW Only

2015

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

Page 102: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

4

1.2.2. Perform all lines in service and contingency analyses for the cluster cases and

compare the cluster to base case results to determine the EPE/WECC criteria violations due to the study cluster projects.

1.2.2.1 Perform sensitivity analysis by removing each Cluster generator to

determine impact on other remaining Cluster generators. 1.2.3. Perform stability analyses as required in the SIS using the peak and off-peak cases

listed in Table 4.

1.2.3.1. Fault locations for stability analyses for Cluster Generators will be at each POI and no more than 2 buses away to verify Low Voltage Ride Through (LVRT).

1.2.3.2 Study loss of generation for the NM805W and ART320W projects (no fault). 1.2.3.3. Study loss of generation for fault on each generator bus or low voltage side

of transmission step up transformer for projects listed above. 1.2.3.4 Study faults on all new lines required for Network Upgrades as determined

by power flow analysis.

Table 4: 345 kV Cluster Stability Case Scenarios

1.2.4. Perform short circuit analyses as required in SIS using a 2015 ASPEN case or

appropriate case as provided by EPE Case will be modified for Cluster Generation and any Network Upgrades. Faults studied are at EPE’s Newman 115 kV, Rio Grande 115 kV, and Rio Grande 69 kV buses, all other 345 kV buses on the EPE system, and all POI buses of the projects participating in this Cluster SIS.

1.2.5. Begin analysis of the 345 kV Cluster Study with the last year to determine all

required system upgrades. Then proceed to the previous year and remove any interconnection projects not in-service for the year to be studied. This procedure will determine the timing of the required Network Upgrades.

1.2.6. If procedure in 1.2.5. above does not identify which Network Upgrade is responsible

for correcting criteria violations found to be caused by the interconnection projects in the study cluster, sensitivity analyses will be performed by turning generation on and off to determine which project is responsible.

1.2.7. Monitor and document all violations due to the Study Cluster projects. 1.2.8. Work with EPE to determine facilities required to mitigate violations.

Descriptions

Year

Peak Case OFF- Peak Case

Ft Craig PST = 60 MW N-S Ft Craig PST = 60 MW N-S

Eddy County HVDC ON Eddy County HVDC ON

2012 ART320W AA100W NM805W

ART320W AA100W NM805W

2015

ART320W AA100W NM805W HL198W

ART320W AA100W NM805W HL198W

Page 103: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

5

Violations external to the EPE/New Mexico system will be noted and included in the Report, but not mitigated.

1.3. Re-Studies: 1.3.1. If a Re-Study is required to be performed as per Section 7.6 of the LGIP, perform a

Re-Study with the withdrawn generator and its required facilities removed from the case(s). EPE will notify TRC as soon as possible if this occurs so that TRC can stop work on the initial study and begin work on the Re-Study.

1.3.2. As per Section 7.6 of the LGIP, the Re-Study must be completed within 60 calendar

days of the Interconnection Customer being notified. Any cost of the Re-Study will be borne equally by the remaining Interconnection Customers being re-studied in the study cluster.

2. Prepare a non-binding, good faith estimate of cost for Projects in the study cluster to interconnect to

the EPE transmission system, including any required Network Upgrades. 2.1. Assign costs based upon MW pro-rata share as per the FERC Waiver.

3. Prepare a non-binding, good-faith estimate of the estimated time to construct any Network Upgrades

required for Interconnection and Delivery onto the System. This should be in a bar chart form. 4. Data Required:

4.1. Load flow base cases for peak and off peak, from EPE for the time frames required in PSLF

format.

4.1.1. Generator and transmission transformer impedance data as provided by the Developers for use in load flow and short circuit studies.

4.2. Queue table with In-service dates and Points of Interconnection. 4.3. Stability base cases for peak and off-peak, from EPE for the time frames required in PSLF

format.

4.3.1. Generator stability model data sheets in PSLF format for entry into PSLF data base as provided from Developers.

4.4. Short circuit data base for the time frames required in ASPEN format.

5. Deliverables: 5.1. During the Study process, TRC will send EPE a progress report on a regular basis, but no

less than once each week. If the Study time appears to exceed the Study time limit as given in EPE’s OATT in the Large Generator Interconnection Procedures, TRC will notify EPE in a timely manner and give an estimate of completion of the Study.

5.2. A detailed report including:

5.2.1. Executive summary. 5.2.2. The required Network Upgrades for Network Resource Interconnection Service. 5.2.3. Description of the Project load flow analyses. 5.2.4. Short circuit analyses with fault duties and Network upgrades. 5.2.5. Description of Stability analyses.

Page 104: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

6

5.2.6. Explanation of Network upgrades. 5.2.7. Explanation of non-binding, good-faith costs for interconnections and any required

Network upgrades. 5.2.8. Estimated time frame for full integration of the Study Cluster projects onto the

system. 5.3. Original and final Cluster Study base cases, with appropriate “EPC” change files, will be sent

upon completion of Final Report.

6. Cost: 6.1. TRC will perform this Cluster Study on a time and expense basis totaling $360,000. Included

in the cost estimate are travel expenses for two trips to El Paso, if needed. Table 5 lists the estimated time to complete each task.

Table 5: Itemized 345 kV Cluster SIS Time Frames

6.2. Time frame to complete the study will be approximately 16 Weeks. 6.3. If the Study appears to have become difficult and, therefore increasing the Study costs, TRC

will inform EPE immediately with an estimated increase in cost so that approval can be obtained.

7. Billing:

TRC will provide a monthly bill showing detailed hours and expenses charged to each study based on that studies work order number, such work order number to be provided by EPE. Once received, EPE will have 30 days to process and send payment.

8. Signatures

TRC Engineers, LLC. El Paso Electric Company

345 kV Cluster SIS (4 Interconnections) Item Description Hours

1 Base Case, Project Case Prep and Prepare Draw Files 182

2 Contingency Analysis & Determine Network Upgrades 376

3 EPE Meetings Including Prep & Travel Time 112 4 Interconnection and Network Upgrade Estimates

Substation 240 Substation Administrative 50

Transmission 240 Transmission Administrative 50

5 Stability Analysis 188 6 Short Circuit 160 7 Report Writing & Documentation 290 8 Report Review and Comment 40 9 Management Oversight 20 10 Misc. Project Management 60 11 Misc. Admin Assistance 70

Total Study Hours 2078

Page 105: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Appendix B

Appendix B EE 205 Waiver

Page 106: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

100 North Stanton Street El Paso, Texas 79901 (915) 543-5776

June 12, 2009 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: El Paso Electric Company, Docket No. ER09-______

Request for Waiver Authorization Pursuant to Section 205 of the Federal Power Act

Dear Secretary Bose:

Pursuant to Section 205 of the Federal Power Act,1 El Paso Electric Company (“EE”) respectfully requests waiver of the first-come, first-served study order for interconnection requests currently in its queue to allow for two study clusters. A waiver of this type will allow EE to reduce the time required for the study of projects currently in the queue in a manner that will permit it to timely satisfy the State of New Mexico’s diversified renewables portfolio requirement. EE is also working on changes to its Open Access Transmission Tariff (“OATT”) to improve queue processing in favor of a more workable and efficient long-term alternative. This waiver request is the first step in the process and is necessary to allow EE to take immediate action so that it may comply with New Mexico law. EE offers it as the initial phase towards resolution of its queue issues, but one that is intended to be implemented independently from future implementation of a revised tariff.2 At present, EE’s interconnection queue consists of generators requesting the interconnection of almost 5,000 MW of resources, while EE’s total peak load is less than one-third that amount (approximately 1,500 MW).3

1 16 U.S.C. § 824d.

2 The cluster studies proposed here are to apply to existing interconnection requests in the queue as of the date of this filing. Future interconnection requests are to be processed pursuant to the terms of EE’s OATT. As stated above, EE is in the process of developing revised queue-related tariff provisions. 3 EE’s current generator interconnection queue is posted online at www.epelectric.com, “Transmission,” “Interconnection Requests.”

Page 107: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

Secretary, Federal Energy Regulatory Commission P a g e | 2

I. APPLICANT

EE is a vertically integrated electric utility whose primary business is serving native load in far west Texas and southern New Mexico, providing retail electric service to about 350,000 customers in an area of approximately 10,000 square miles. EE is a publicly traded company that is directly owned by its shareholders. It has no parent, subsidiary or affiliate engaged in the energy sector. EE employs approximately 1,000 people who are involved in the generation, transmission, distribution and sale of electricity at retail and wholesale. EE owns distribution facilities through which it provides service to its customers at retail rates and owns transmission facilities over which it offers service under its OATT.

II. STATE-IMPOSED RENEWABLE ENERGY REQUIREMENTS

The State of New Mexico has enacted laws and regulations setting forth minimum requirements for renewable energy.4

III. DESCRIPTION OF PROPOSED WAIVER

Utilities are required to supply increasing percentages of their retail energy sales through a diversified portfolio of renewable energy resources (through a state procurement process). EE is acting under such rules and regulations currently. Effective January 2011, the minimum percentage tiers increase such that 10 percent of utilities’ retail energy sales must come from renewable energy resources, with solar energy comprising at least 20 percent of the renewable mix. EE has conducted a procurement process for its January 2011 renewable obligation, all within the parameters approved by the state. If EE were to study the project chosen and approved through the New Mexico process to satisfy EE’s January 2011 solar requirement within its tariff’s currently-effective first-come, first-served interconnection study approach, the January 2011 deadline will not be met. It is this January 2011 deadline that has triggered EE to seek a waiver from the first-come, first-served processing order set forth in its tariff. EE also is looking at ways it can secure more long-term improvements in its queue processing and management through future tariff changes. The instant filing does not seek any tariff revisions at this time.

EE seeks waiver of the provisions of its Large Generator Interconnection Procedures (LGIP) and associated study agreements5

4 New Mexico Renewable Energy Act (NMSA 1978, Section 62-16-1 et seq), and the New Mexico Public Regulation Commission’s Rule 572, “Renewable Energy as a Source of Electricity” (NMAC 17.9.572).

to study the projects currently in its queue by means of a cluster approach, as follows:

5 EE’s LGIP and associated agreements are found in Attachment M of its OATT. Pursuant to Section 4.1 of EE’s LGIP, the queue position of each interconnection request is to be used to determine the order of performing interconnection studies. Interconnection studies consist of interconnection feasibility studies, interconnection system impact studies and interconnection facility studies. The instant waiver request is a request to waive the “first-come first-served” study order under the tariff. Although EE’s LGIP contains clustering provisions (at Section 4.2) and permits EE to allocate the cost of common upgrades for clustered interconnection studies (at Section 4.1), the tariff does not provide for the type of cluster studies proposed here. EE’s proposed clusters are based upon the nature of the facilities on which interconnection is sought, and is not based upon Queue Position and “Queue Cluster Windows” within the meaning of EE’s currently-effective LGIP. Accordingly, tariff waiver authorization is sought to permit EE to study its interconnection requests within the two types of clusters identified here, and to allocate the

Page 108: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

Secretary, Federal Energy Regulatory Commission P a g e | 3

• Projects seeking interconnection on EE facilities will be studied in one of two clusters,

based on the nature of the EE facilities on which the interconnection is sought: Projects seeking to interconnect on EE’s local system of 115 kV will be studied separately from projects seeking to interconnect on EE’s 345 kV system. This division is practical, efficient, and equitable because the interconnection of projects to EE’s local 115 kV system and the interconnection of projects to EE’s 345 kV transmission have little, if any, impact on one another. Thus, the studies for both clusters will begin at the same time.

• Because projects on EE’s 345 kV system are targeting markets outside of EE’s service

territory (for example, Arizona and California to the west, Colorado to the north), EE will perform the interconnection studies for this cluster in an east-to-west direction, starting with the eastern-most projects (i.e., those in the Amrad-Eddy area), then layering on top the projects to the immediate west (i.e., those in the WestMesa-Arroyo area), then the projects to the far west (i.e., those in the Luna-Hildalgo area). In proceeding in this east-to-west direction, EE will be able to more effectively identify the system impacts of the projects in this cluster because EE’s analysis will move in the same direction as the anticipated power flow from such resources.

• In performing the cluster studies, EE will study all projects in each cluster solely for Network Resource Interconnection Service, and requests that the Commission grant a waiver of the provisions of its LGIP that would otherwise require EE to “concurrently study” each interconnection request for Energy Resource Interconnection Service, upon request, up to the point when an Interconnection Facility Study Agreement is executed. An Energy Resource Interconnection Service study would be meaningless under the circumstances present, where the resources in the queue for interconnection so far surpass the total load on the system (in EE’s case, by over 300 percent). In order for a generator in a cluster to make a meaningful decision on whether to proceed with a project based on the results of the cluster studies, the resource will need to be studied for Network Resource Interconnection Service. Indeed, all projects currently in the queue have requested that EE perform a Network Resource Interconnection Service study.

• Projects subject to the clusters will be accorded a one-time election to affirmatively opt out of the cluster. The election date will be 10 Business Days6 following Commission approval of the instant waiver request.7

cost of common upgrades for such clustered studies. As part of the cluster studies proposed here, EE will not perform optional studies under Section 10 of the LGIP.

For purposes of this waiver, any generator that opts out will retain its queue ranking relative to any other generators that opt out of the

6 “Business Days” as defined in EE’s LGIP. 7 Specifically, the 10 Business Day period will begin to run when EE notifies its Interconnection Customers of Commission approval. Such notification will be made by email and/or fax. This will avoid any complications from the potential that an Interconnection Customer may not learn of the Commission’s issuance until after the 10 Business Day period has lapsed.

Page 109: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

Secretary, Federal Energy Regulatory Commission P a g e | 4

clusters, and will be studied upon completion of the cluster studies. For example, if generators holding queue positions of 5, 10 and 15 opt out of the clusters, they will be studied after the clusters, but will retain their relationship relative to each other such that the generator at queue position 5 will be studied before the generators at queue positions 10 and 15. To be clear, however, by extending an opt-out right under the instant proposal, EE is not committing to immunize such generators from changes to queue processing in the future that may stem from the possible application of future tariff changes.

• Projects for which EE has already completed an Interconnection Feasibility Study for the

resource will continue to be processed according to EE’s OATT, and not clustered under this waiver request. Such projects are far enough along in the study process that to cluster them at this stage would not serve the goal of improving the timeliness and efficiency of the queue process. In implementing this approach, EE is taking into account the Commission’s stated desire to see transmission providers appropriately address differences between existing interconnection requests that are still at an early stage in the interconnection process versus those that are in later stages of the process.8

In making this clustering request, EE is mindful of the Commission’s eagerness to see transmission providers look for ways to address long queues and the lengthy processing times that they create, particularly with the unprecedented demand for new types of generation (namely, renewable generation) and the added stress that such resources have placed on interconnection queues. Interconnection Queuing Practices, 122 FERC ¶ 61,252 at PP 3, 5 (2008). As the Commission as previously stated in approving queue waiver requests, “[W]here good cause for a waiver of limited scope exists, there are no undesirable consequences, and the resultant benefits to customers are evident, we have found that a one-time waiver is appropriate.” California Independent System Operator, 118 FERC ¶61,226 at P 24 (2007), clarified, 120 FERC ¶ 61,180 (2007) (the “Tehachap” case). See also California Independent System Operator, 124 FERC ¶ 61,031 (2008), reh’g denied, 124 FERC ¶ 61,293 at PP 18-21 (2008) (where FERC makes clear that to meet the Tehachap standard of “no undesirable consequences,” the transmission provider need not show that each individual generator in the queue will not experience delay or potential harm as a result of a cluster approach, recognizing that any form of line drawing “would likely satisfy some customers at the expense of others,” and emphasizing that the overriding goal is to address queue backlog through fair criteria.) Good cause exists to grant EE’s waiver request under the circumstances present. EE has developed this one-time waiver request with the standards of Tehachap in mind. There are no undesirable consequences within the meaning of Tehachap; the resultant benefits to customers are evident; and the waiver also serves the important goal of permitting a timely satisfaction of state-imposed diversified renewables portfolio requirements. Further, EE’s proposed clusters are fair and equitable, and are developed based on non-discriminatory factors. The clusters provide

8 Interconnection Queuing Practices, 122 FERC ¶ 61,252 at P 11(2008), and California Independent System Operator, 124 FERC ¶ 61,031 at P 20 (2008) (finding that the CAISO appropriately identified a category of interconnection requests that can be processed efficiently under its existing LGIP process, while waiving the tariff’s queue management process for other earlier-stage interconnection requests).

Page 110: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

Secretary, Federal Energy Regulatory Commission P a g e | 5

for an opportunity for projects in the queue to be processed beginning immediately, within one of two cluster groups, with the goal of improving efficiency and processing time. In addition, the proposal’s protection against undue discrimination is enhanced through the opt-out right provided to all. In short, the cluster proposal satisfies the just and reasonable under Section 205 of the FPA because it would create results that are just and reasonable and not unduly discriminatory, while also serving important Commission policy goals intended to advance the public interest overall. IV. COMMUNICATIONS AND SERVICE

EE requests that all communications regarding this filing be directed to the following individuals and that their names be entered on the official service list maintained by the Secretary: Mary E. Kipp Robin M. Nuschler, Esq. Assistant General Counsel P. O. Box 3895

& Director of FERC Compliance Fairfax, VA 22038-3895 El Paso Electric Company

P.O. Box 982 Tel: (703) 323-0613 El Paso, Texas 79960 Fax: (703) 323-0614

Tel: (915) 543-5776 [email protected] Fax: (915) 521-4747 [email protected]

EE has served a copy of this filing on all of its transmission customers, interconnection customers and state commissions. V. CONCLUSION EE respectfully requests Commission approval of its waiver request as proposed herein.

Respectfully submitted,

/s/ Mary E. Kipp (e-filed) ______________________________

Robin M. Nuschler, Esq. Mary E. Kipp P.O. Box 3895 Assistant General Counsel & Fairfax, VA 22038-3895 Director of FERC Compliance Tel: (202) 487-4412 El Paso Electric Company Fax: (703) 323-0614 100 N. Stanton Street E-mail: [email protected] El Paso, Texas 79901

Tel: (915) 543-5776 Fax: (915) 521-4747 E-mail: [email protected]

Page 111: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Appendix C

Appendix C Power Flow Contingency List

Page 112: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

#  Contingency Selection Criteria: From area 10 to 14; 100 kV to 999 kV  #  0001 ‐ 1999 cont. >>> single line and transformer outages in Areas 10, 11 and 14. #  2000 ‐ 3000 cont. >>> 69 kV and braker failure #  4000+  cont. >>> new project generating units outages # line_1            "Line CHOLLA       500.0 to SAGUARO      500.0 Circuit 1"   1.000  line "CHOLLA       500.00"  "SAGUARO      500.00"  "1 "  1 0  0 line_2            "Line FOURCORN     500.0 to MOENKOPI     500.0 Circuit 1"   1.000  line "FOURCORN     500.00"  "MOENKOPI     500.00"  "1 "  2 0  0 line_3            "Line MOENKOPI     500.0 to YAVAPAI      500.0 Circuit 1"   1.000  line "MOENKOPI     500.00"  "YAVAPAI      500.00"  "1 "  1 0  0 line_5            "Line NAVAJO       500.0 to RACEWAY      500.0 Circuit 1"   1.000  line "NAVAJO       500.00"  "RACEWAY      500.00"  "1 "  1 0  0 line_6            "Line SAGUARO      500.0 to TORTOLIT     500.0 Circuit 1"   1.000  line "SAGUARO      500.00"  "TORTOLIT     500.00"  "1 "  1 0  0 line_7            "Line SAGUARO      500.0 to TORTLIT2     500.0 Circuit 1"   1.000  line "SAGUARO      500.00"  "TORTLIT2     500.00"  "1 "  1 0  0 line_8            "Line YAVAPAI      500.0 to WESTWING     500.0 Circuit 1"   1.000  line "YAVAPAI      500.00"  "WESTWING     500.00"  "1 "  1 0  0 line_10           "Line CHOLLA       345.0 to PNPKAPS      345.0 Circuit 1"   1.000  line "CHOLLA       345.00"  "PNPKAPS      345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_11           "Line CHOLLA       345.0 to PRECHCYN     345.0 Circuit 1"   1.000  line "CHOLLA       345.00"  "PRECHCYN     345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_12           "Line FOURCORN     345.0 to CHOLLA       345.0 Circuit 1"   1.000  line "FOURCORN     345.00"  "CHOLLA       345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_13           "Line FOURCORN     345.0 to CHOLLA       345.0 Circuit 2"   1.000  line "FOURCORN     345.00"  "CHOLLA       345.00"  "2 "  1 0  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_44           "Line SAGUARO      230.0 to CASGRAPS     230.0 Circuit 1"   1.000  line "SAGUARO      230.00"  "CASGRAPS     230.00"  "1 "  1 0  0 line_45           "Line SAGUARO      230.0 to TATMOMLI     230.0 Circuit 1"   1.000  line "SAGUARO      230.00"  "TATMOMLI     230.00"  "1 "  1 0  0 

Page 113: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_46           "Line SNTAROSA     230.0 to TATMOMLI     230.0 Circuit 1"   1.000  line "SNTAROSA     230.00"  "TATMOMLI     230.00"  "1 "  1 0  0 line_47           "Line SNTAROSA     230.0 to DBG          230.0 Circuit 1"   1.000  line "SNTAROSA     230.00"  "DBG          230.00"  "1 "  1 0  0 line_84           "Line SAG.EAST     115.0 to SAG.WEST     115.0 Circuit 1"   1.000  line "SAG.EAST     115.00"  "SAG.WEST     115.00"  "1 "  1 0  0 line_85           "Line SAG.EAST     115.0 to MARANA       115.0 Circuit 1"   1.000  line "SAG.EAST     115.00"  "MARANA       115.00"  "1 "  1 0  0 line_86           "Line SAG.EAST     115.0 to ORACLE       115.0 Circuit 1"   1.000  line "SAG.EAST     115.00"  "ORACLE       115.00"  "1 "  1 0  0 line_87           "Line SAG.WEST     115.0 to SNMANUEL     115.0 Circuit 1"   1.000  line "SAG.WEST     115.00"  "SNMANUEL     115.00"  "1 "  1 0  0 line_88           "Line SAG.WEST     115.0 to EMPIRE       115.0 Circuit 1"   1.000  line "SAG.WEST     115.00"  "EMPIRE       115.00"  "1 "  1 0  0 line_89           "Line SAG.WEST     115.0 to ED‐5         115.0 Circuit 1"   1.000  line "SAG.WEST     115.00"  "ED‐5         115.00"  "1 "  1 0  0 line_90           "Line VLYFARMS     115.0 to ORACLE       115.0 Circuit 1"   1.000  line "VLYFARMS     115.00"  "ORACLE       115.00"  "1 "  1 0  0 line_91           "Line BOOTHILL     115.0 to ADAMS        115.0 Circuit 1"   1.000  line "BOOTHILL     115.00"  "ADAMS        115.00"  "1 "  1 0  0 line_92           "Line BOOTHILL     115.0 to MURAL        115.0 Circuit 1"   1.000  line "BOOTHILL     115.00"  "MURAL        115.00"  "1 "  1 0  0 line_93           "Line CORONADO     500.0 to CHOLLA       500.0 Circuit 1"   1.000  line "CORONADO     500.00"  "CHOLLA       500.00"  "1 "  1 0  0 line_94           "Line CORONADO     500.0 to SILVERKG     500.0 Circuit 1"   1.000  line "CORONADO     500.00"  "SILVERKG     500.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_100          "Line SILVERKG     500.0 to BROWNING     500.0 Circuit 1"   1.000  line "SILVERKG     500.00"  "BROWNING     500.00"  "1 "  1 0  0 line_122          "Line ELLISON      115.0 to 83.9E3NT     115.0 Circuit 1"   1.000  line "ELLISON      115.00"  "83.9E3NT     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_123          "Line FRAZIER      115.0 to MOONSHIN     115.0 Circuit 1"   1.000 

Page 114: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "FRAZIER      115.00"  "MOONSHIN     115.00"  "1 "  1 0  0 line_124          "Line FRAZIER      115.0 to ROOSEVLT     115.0 Circuit 1"   1.000  line "FRAZIER      115.00"  "ROOSEVLT     115.00"  "1 "  1 0  0 line_125          "Line GOLDFELD     115.0 to HORSMESA     115.0 Circuit 1"   1.000  line "GOLDFELD     115.00"  "HORSMESA     115.00"  "1 "  1 0  0 line_126          "Line GOLDFELD     115.0 to MRMNFLAT     115.0 Circuit 1"   1.000  line "GOLDFELD     115.00"  "MRMNFLAT     115.00"  "1 "  1 0  0 line_127          "Line GOLDFELD     115.0 to CARRELTP     115.0 Circuit 1"   1.000  line "GOLDFELD     115.00"  "CARRELTP     115.00"  "1 "  1 0  0 line_128          "Line HAYDENAZ     115.0 to ASARCOTP     115.0 Circuit 1"   1.000  line "HAYDENAZ     115.00"  "ASARCOTP     115.00"  "1 "  1 0  0 line_129          "Line HAYDENAZ     115.0 to KEARNYTP     115.0 Circuit 1"   1.000  line "HAYDENAZ     115.00"  "KEARNYTP     115.00"  "1 "  1 0  0 line_130          "Line HORSMESA     115.0 to FRAZIER      115.0 Circuit 1"   1.000  line "HORSMESA     115.00"  "FRAZIER      115.00"  "1 "  1 0  0 line_131          "Line HORSMESA     115.0 to MRMNFLAT     115.0 Circuit 1"   1.000  line "HORSMESA     115.00"  "MRMNFLAT     115.00"  "1 "  1 0  0 line_132          "Line KEARNYTP     115.0 to MORRISAZ     115.0 Circuit 1"   1.000  line "KEARNYTP     115.00"  "MORRISAZ     115.00"  "1 "  1 0  0 line_133          "Line KNOLL        115.0 to MORRISAZ     115.0 Circuit 1"   1.000  line "KNOLL        115.00"  "MORRISAZ     115.00"  "1 "  1 0  0 line_134          "Line MIAMI        115.0 to PINAL        115.0 Circuit 1"   1.000  line "MIAMI        115.00"  "PINAL        115.00"  "1 "  1 0  0 line_135          "Line MIAMI        115.0 to PINTOVLY     115.0 Circuit 1"   1.000  line "MIAMI        115.00"  "PINTOVLY     115.00"  "1 "  1 0  0 line_136          "Line MIAMI        115.0 to 83.9E3NT     115.0 Circuit 1"   1.000  line "MIAMI        115.00"  "83.9E3NT     115.00"  "1 "  1 0  0 line_137          "Line MOONSHIN     115.0 to PINAL        115.0 Circuit 1"   1.000  line "MOONSHIN     115.00"  "PINAL        115.00"  "1 "  1 0  0 line_138          "Line MOONSHIN     115.0 to 83.5E3NT     115.0 Circuit 1"   1.000  line "MOONSHIN     115.00"  "83.5E3NT     115.00"  "1 "  1 0  0 line_139          "Line OAKFLAT      115.0 to SILVERT1     115.0 Circuit 1"   1.000 

Page 115: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "OAKFLAT      115.00"  "SILVERT1     115.00"  "1 "  1 0  0 line_140          "Line PINAL        115.0 to SILVERT1     115.0 Circuit 1"   1.000  line "PINAL        115.00"  "SILVERT1     115.00"  "1 "  1 0  0 line_141          "Line RAY          115.0 to KNOLL        115.0 Circuit 1"   1.000  line "RAY          115.00"  "KNOLL        115.00"  "1 "  1 0  0 line_143          "Line REFINERY     115.0 to 83.5E3NT     115.0 Circuit 1"   1.000  line "REFINERY     115.00"  "83.5E3NT     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_153          "Line SNYDHLAZ     115.0 to SNYDHILL     115.0 Circuit 1"   1.000  line "SNYDHLAZ     115.00"  "SNYDHILL     115.00"  "1 "  1 0  0  line_192          "Line GREENLEE     345.0 to WINCHSTR     345.0 Circuit 1"   1.000  line "GREENLEE     345.00"  "WINCHSTR     345.00"  "1 "  1 0  0 line_193          "Line GREENLEE     345.0 to COPPERVR     345.0 Circuit 1"   1.000  line "GREENLEE     345.00"  "COPPERVR     345.00"  "1 "  1 0  0 line_194          "Line MCKINLEY     345.0 to SPRINGR      345.0 Circuit 1"   1.000  line "MCKINLEY     345.00"  "SPRINGR      345.00"  "1 "  1 0  0 line_195          "Line MCKINLEY     345.0 to SPRINGR      345.0 Circuit 2"   1.000  line "MCKINLEY     345.00"  "SPRINGR      345.00"  "2 "  1 0  0 line_196          "Line SOUTH        345.0 to GATEWAY      345.0 Circuit 1"   1.000  line "SOUTH        345.00"  "GATEWAY      345.00"  "1 "  1 0  0 line_197          "Line SOUTH        345.0 to GATEWAY      345.0 Circuit 2"   1.000  line "SOUTH        345.00"  "GATEWAY      345.00"  "2 "  1 0  0 line_198          "Line SPRINGR      345.0 to CORONADO     345.0 Circuit 1"   1.000  line "SPRINGR      345.00"  "CORONADO     345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_199          "Line SPRINGR      345.0 to GREENLEE     345.0 Circuit 1"   1.000  line "SPRINGR      345.00"  "GREENLEE     345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_200          "Line SPRINGR      345.0 to VAIL2        345.0 Circuit 1"   1.000  line "SPRINGR      345.00"  "VAIL2        345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_201          "Line VAIL         345.0 to SOUTH        345.0 Circuit 1"   1.000  line "VAIL         345.00"  "SOUTH        345.00"  "1 "  1 0  

Page 116: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_202          "Line WESTWING     345.0 to SOUTH        345.0 Circuit 1"   1.000  line "WESTWING     345.00"  "SOUTH        345.00"  "1 "  1 0  0 line_203          "Line WESTWING     345.0 to PINALWES     345.0 Circuit 1"   1.000  line "WESTWING     345.00"  "PINALWES     345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_204          "Line WINCHSTR     345.0 to VAIL         345.0 Circuit 1"   1.000  line "WINCHSTR     345.00"  "VAIL         345.00"  "1 "  1 0  0 line_205          "Line PINALWES     345.0 to SOUTH        345.0 Circuit 1"   1.000  line "PINALWES     345.00"  "SOUTH        345.00"  "1 "  1 0  0 line_206          "Line DMP          138.0 to N. LOOP      138.0 Circuit 1"   1.000  line "DMP          138.00"  "N. LOOP      138.00"  "1 "  1 0  0 line_207          "Line DMP          138.0 to NE.LOOP      138.0 Circuit 1"   1.000  line "DMP          138.00"  "NE.LOOP      138.00"  "1 "  1 0  0 line_208          "Line DMP          138.0 to SN.CRUZ      138.0 Circuit 1"   1.000  line "DMP          138.00"  "SN.CRUZ      138.00"  "1 "  1 0  0 line_209          "Line DREXEL       138.0 to IRVNGTN      138.0 Circuit 1"   1.000  line "DREXEL       138.00"  "IRVNGTN      138.00"  "1 "  1 0  0 line_210          "Line DREXEL       138.0 to MIDVALE      138.0 Circuit 1"   1.000  line "DREXEL       138.00"  "MIDVALE      138.00"  "1 "  1 0  0 line_211          "Line E. LOOP      138.0 to NE.LOOP      138.0 Circuit 1"   1.000  line "E. LOOP      138.00"  "NE.LOOP      138.00"  "1 "  1 0  0 line_212          "Line E. LOOP      138.0 to ROBERTS      138.0 Circuit 1"   1.000  line "E. LOOP      138.00"  "ROBERTS      138.00"  "1 "  1 0  0 line_213          "Line E. LOOP      138.0 to LOSREALS     138.0 Circuit 1"   1.000  line "E. LOOP      138.00"  "LOSREALS     138.00"  "1 "  1 0  0 line_214          "Line E. LOOP      138.0 to PANTANO      138.0 Circuit 1"   1.000  line "E. LOOP      138.00"  "PANTANO      138.00"  "1 "  1 0  0 line_215          "Line IRVNGTN      138.0 to SOUTH        138.0 Circuit 1"   1.000  line "IRVNGTN      138.00"  "SOUTH        138.00"  "1 "  1 0  0 line_216          "Line IRVNGTN      138.0 to TUCSON       138.0 Circuit 1"   1.000  line "IRVNGTN      138.00"  "TUCSON       138.00"  "1 "  1 0  0 line_217          "Line IRVNGTN      138.0 to VAIL         138.0 Circuit 2"   1.000 

Page 117: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "IRVNGTN      138.00"  "VAIL         138.00"  "2 "  1 0  0 line_218          "Line IRVNGTN      138.0 to RBWILMOT     138.0 Circuit 1"   1.000  line "IRVNGTN      138.00"  "RBWILMOT     138.00"  "1 "  1 0  0 line_219          "Line IRVNGTN      138.0 to TECHPARK     138.0 Circuit 1"   1.000  line "IRVNGTN      138.00"  "TECHPARK     138.00"  "1 "  1 0  0 line_220          "Line MIDVALE      138.0 to SPNC_TP      138.0 Circuit 1"   1.000  line "MIDVALE      138.00"  "SPNC_TP      138.00"  "1 "  1 0  0 line_221          "Line N. LOOP      138.0 to RILLITO      138.0 Circuit 1"   1.000  line "N. LOOP      138.00"  "RILLITO      138.00"  "1 "  1 0  0 line_222          "Line N. LOOP      138.0 to WESTINA      138.0 Circuit 1"   1.000  line "N. LOOP      138.00"  "WESTINA      138.00"  "1 "  1 0  0 line_223          "Line NE.LOOP      138.0 to RILLITO      138.0 Circuit 1"   1.000  line "NE.LOOP      138.00"  "RILLITO      138.00"  "1 "  1 0  0 line_224          "Line RANVISTO     138.0 to LACANADA     138.0 Circuit 1"   1.000  line "RANVISTO     138.00"  "LACANADA     138.00"  "1 "  1 0  0 line_225          "Line RANVISTO     138.0 to CATALINA     138.0 Circuit 1"   1.000  line "RANVISTO     138.00"  "CATALINA     138.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_226          "Line RILLITO      138.0 to LACANADA     138.0 Circuit 1"   1.000  line "RILLITO      138.00"  "LACANADA     138.00"  "1 "  1 0  0 line_227          "Line S.TRAIL      138.0 to ROBERTS      138.0 Circuit 1"   1.000  line "S.TRAIL      138.00"  "ROBERTS      138.00"  "1 "  1 0  0 line_228          "Line SN.CRUZ      138.0 to IRVNGTN      138.0 Circuit 1"   1.000  line "SN.CRUZ      138.00"  "IRVNGTN      138.00"  "1 "  1 0  0 line_229          "Line SNYDER       138.0 to E. LOOP      138.0 Circuit 1"   1.000  line "SNYDER       138.00"  "E. LOOP      138.00"  "1 "  1 0  0 line_230          "Line SNYDER       138.0 to NE.LOOP      138.0 Circuit 1"   1.000  line "SNYDER       138.00"  "NE.LOOP      138.00"  "1 "  1 0  0 line_231          "Line SOUTH        138.0 to MIDVALE      138.0 Circuit 1"   1.000  line "SOUTH        138.00"  "MIDVALE      138.00"  "1 "  1 0  0 line_232          "Line SOUTH        138.0 to ASARCO       138.0 Circuit 1"   1.000  line "SOUTH        138.00"  "ASARCO       138.00"  "1 "  1 0  

Page 118: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_233          "Line SOUTH        138.0 to CYPRUS       138.0 Circuit 1"   1.000  line "SOUTH        138.00"  "CYPRUS       138.00"  "1 "  1 0  0 line_234          "Line SOUTH        138.0 to GREENVLY     138.0 Circuit 1"   1.000  line "SOUTH        138.00"  "GREENVLY     138.00"  "1 "  1 0  0 line_235          "Line SOUTH        138.0 to SPNC_TP      138.0 Circuit 1"   1.000  line "SOUTH        138.00"  "SPNC_TP      138.00"  "1 "  1 0  0 line_236          "Line TORTOLIT     138.0 to N. LOOP      138.0 Circuit 1"   1.000  line "TORTOLIT     138.00"  "N. LOOP      138.00"  "1 "  1 0  0 line_237          "Line TORTOLIT     138.0 to N. LOOP      138.0 Circuit 2"   1.000  line "TORTOLIT     138.00"  "N. LOOP      138.00"  "2 "  1 0  0 line_238          "Line TWNTYSEC     138.0 to E. LOOP      138.0 Circuit 1"   1.000  line "TWNTYSEC     138.00"  "E. LOOP      138.00"  "1 "  1 0  0 line_239          "Line TWNTYSEC     138.0 to IRVNGTN      138.0 Circuit 1"   1.000  line "TWNTYSEC     138.00"  "IRVNGTN      138.00"  "1 "  1 0  0 line_240          "Line VAIL         138.0 to S.TRAIL      138.0 Circuit 1"   1.000  line "VAIL         138.00"  "S.TRAIL      138.00"  "1 "  1 0  0 line_241          "Line VAIL         138.0 to FT.HUACH     138.0 Circuit 1"   1.000  line "VAIL         138.00"  "FT.HUACH     138.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_242          "Line RBWILMOT     138.0 to VAIL         138.0 Circuit 1"   1.000  line "RBWILMOT     138.00"  "VAIL         138.00"  "1 "  1 0  0 line_243          "Line LOSREALS     138.0 to VAIL         138.0 Circuit 1"   1.000  line "LOSREALS     138.00"  "VAIL         138.00"  "1 "  1 0  0 line_244          "Line PANTANO      138.0 to LOSREALS     138.0 Circuit 1"   1.000  line "PANTANO      138.00"  "LOSREALS     138.00"  "1 "  1 0  0 line_245          "Line CANOARCH     138.0 to CYPRUS       138.0 Circuit 1"   1.000  line "CANOARCH     138.00"  "CYPRUS       138.00"  "1 "  1 0  0 line_246          "Line GREENVLY     138.0 to CANOARCH     138.0 Circuit 1"   1.000  line "GREENVLY     138.00"  "CANOARCH     138.00"  "1 "  1 0  0 line_247          "Line GREENVLY     138.0 to CYPRUS       138.0 Circuit 1"   1.000  line "GREENVLY     138.00"  "CYPRUS       138.00"  "1 "  1 0  

Page 119: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_248          "Line TECHPARK     138.0 to VAIL         138.0 Circuit 1"   1.000  line "TECHPARK     138.00"  "VAIL         138.00"  "1 "  1 0  0 line_249          "Line SPNCER       138.0 to SPNC_TP      138.0 Circuit 1"   1.000  line "SPNCER       138.00"  "SPNC_TP      138.00"  "1 "  1 0  0 line_250          "Line KANTOR       115.0 to CANEZ        115.0 Circuit 1"   1.000  line "KANTOR       115.00"  "CANEZ        115.00"  "1 "  1 0  0 line_251          "Line CANEZ        115.0 to SONOITA      115.0 Circuit 1"   1.000  line "CANEZ        115.00"  "SONOITA      115.00"  "1 "  1 0  0 line_252          "Line SONOITA      115.0 to VALNCIA      115.0 Circuit 1"   1.000  line "SONOITA      115.00"  "VALNCIA      115.00"  "1 "  1 0  0 line_253          "Line GATEWAY      115.0 to VALNCIA      115.0 Circuit 1"   1.000  line "GATEWAY      115.00"  "VALNCIA      115.00"  "1 "  1 0  0 line_254          "Line COPPERVR     230.0 to FRISCO       230.0 Circuit 1"   1.000  line "COPPERVR     230.00"  "FRISCO       230.00"  "1 "  1 0  0 line_255          "Line APACHE       230.0 to BUTERFLD     230.0 Circuit 1"   1.000  line "APACHE       230.00"  "BUTERFLD     230.00"  "1 "  1 0  0 line_256          "Line APACHE       230.0 to RED TAIL     230.0 Circuit 1"   1.000  line "APACHE       230.00"  "RED TAIL     230.00"  "1 "  1 0  0 line_257          "Line APACHE       230.0 to WINCHSTR     230.0 Circuit 1"   1.000  line "APACHE       230.00"  "WINCHSTR     230.00"  "1 "  1 0  0 line_258          "Line AVRA         115.0 to MARANA       115.0 Circuit 1"   1.000  line "AVRA         115.00"  "MARANA       115.00"  "1 "  1 0  0 line_259          "Line AVRA         115.0 to SNDARIO      115.0 Circuit 1"   1.000  line "AVRA         115.00"  "SNDARIO      115.00"  "1 "  1 0  0 line_260          "Line BICKNELL     345.0 to VAIL         345.0 Circuit 1"   1.000  line "BICKNELL     345.00"  "VAIL         345.00"  "1 "  1 0  0 line_261          "Line BICKNELL     115.0 to THREEPNT     115.0 Circuit 1"   1.000  line "BICKNELL     115.00"  "THREEPNT     115.00"  "1 "  1 0  0 line_262          "Line BUTERFLD     230.0 to SAN RAF      230.0 Circuit 1"   1.000  line "BUTERFLD     230.00"  "SAN RAF      230.00"  "1 "  1 0  0 line_263          "Line DOSCONDO     230.0 to HACKBERY     230.0 Circuit 1"   1.000  line "DOSCONDO     230.00"  "HACKBERY     230.00"  "1 "  1 0  

Page 120: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_264          "Line MARANA       115.0 to RATTLSNK     115.0 Circuit 1"   1.000  line "MARANA       115.00"  "RATTLSNK     115.00"  "1 "  1 0  0 line_265          "Line MORENCI      230.0 to GREEN‐AE     230.0 Circuit 1"   1.000  line "MORENCI      230.00"  "GREEN‐AE     230.00"  "1 "  1 0  0 line_266          "Line MORENCI      230.0 to PD‐MORNC     230.0 Circuit 1"   1.000  line "MORENCI      230.00"  "PD‐MORNC     230.00"  "1 "  1 0  0 line_267          "Line PD‐MORNC     230.0 to FRISCO       230.0 Circuit 1"   1.000  line "PD‐MORNC     230.00"  "FRISCO       230.00"  "1 "  1 0  0 line_268          "Line RED TAIL     230.0 to DOSCONDO     230.0 Circuit 1"   1.000  line "RED TAIL     230.00"  "DOSCONDO     230.00"  "1 "  1 0  0 line_269          "Line THREEPNT     115.0 to SNDARIO      115.0 Circuit 1"   1.000  line "THREEPNT     115.00"  "SNDARIO      115.00"  "1 "  1 0  0 line_270          "Line HACKBERY     230.0 to MORENCI      230.0 Circuit 1"   1.000  line "HACKBERY     230.00"  "MORENCI      230.00"  "1 "  1 0  0 line_271          "Line SAHUARIT     230.0 to BICKNELL     230.0 Circuit 1"   1.000  line "SAHUARIT     230.00"  "BICKNELL     230.00"  "1 "  1 0  0 line_318          "Line ORACLE       115.0 to ORACLEAZ     115.0 Circuit 1"   1.000  line "ORACLE       115.00"  "ORACLEAZ     115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_327          "Line TUCSON       115.0 to DEL BAC      115.0 Circuit 1"   1.000  line "TUCSON       115.00"  "DEL BAC      115.00"  "1 "  1 0  0 line_328          "Line TUCSON       115.0 to ORACLE       115.0 Circuit 1"   1.000  line "TUCSON       115.00"  "ORACLE       115.00"  "1 "  1 0  0 line_346          "Line BLACKMTN     115.0 to BLKMTNAZ     115.0 Circuit 1"   1.000  line "BLACKMTN     115.00"  "BLKMTNAZ     115.00"  "1 "  1 0  0 line_347          "Line BLACKMTN     115.0 to DEL BAC      115.0 Circuit 1"   1.000  line "BLACKMTN     115.00"  "DEL BAC      115.00"  "1 "  1 0  0 line_348          "Line BLACKMTN     115.0 to SNYDHILL     115.0 Circuit 1"   1.000  line "BLACKMTN     115.00"  "SNYDHILL     115.00"  "1 "  1 0  0 line_349          "Line BRADY        115.0 to BRADYAZ      115.0 Circuit 1"   1.000  line "BRADY        115.00"  "BRADYAZ      115.00"  "1 "  1 0  0 

Page 121: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_350          "Line BRADY        115.0 to PICACHOW     115.0 Circuit 1"   1.000  line "BRADY        115.00"  "PICACHOW     115.00"  "1 "  1 0  0 line_351          "Line BRAWLEY      115.0 to BRAWLYAZ     115.0 Circuit 1"   1.000  line "BRAWLEY      115.00"  "BRAWLYAZ     115.00"  "1 "  1 0  0 line_352          "Line BRAWLEY      115.0 to SANXAVER     115.0 Circuit 1"   1.000  line "BRAWLEY      115.00"  "SANXAVER     115.00"  "1 "  1 0  0 #line_353          "Line HARCUVAR     230.0 to HARCU AZ     230.0 Circuit 1"   1.000 # line "HARCUVAR     230.00"  "HARCU AZ     230.00"  "1 "  1 0  #0 #line_354          "Line HARCUVAR     230.0 to HASSYTAP     230.0 Circuit 1"   1.000 # line "HARCUVAR     230.00"  "HASSYTAP     230.00"  "1 "  1 0  #0 line_355          "Line N.WADDEL     230.0 to RACEWAY      230.0 Circuit 1"   1.000  line "N.WADDEL     230.00"  "RACEWAY      230.00"  "1 "  1 0  0 line_356          "Line PICACHOW     115.0 to PICACHAZ     115.0 Circuit 1"   1.000  line "PICACHOW     115.00"  "PICACHAZ     115.00"  "1 "  1 0  0 line_357          "Line PICACHOW     115.0 to RED ROCK     115.0 Circuit 1"   1.000  line "PICACHOW     115.00"  "RED ROCK     115.00"  "1 "  1 0  0 line_358          "Line RATTLSNK     115.0 to TUCSON       115.0 Circuit 1"   1.000  line "RATTLSNK     115.00"  "TUCSON       115.00"  "1 "  1 0  0 line_359          "Line RATTLSNK     115.0 to TWINPEAK     115.0 Circuit 1"   1.000  line "RATTLSNK     115.00"  "TWINPEAK     115.00"  "1 "  1 0  0 line_360          "Line RED ROCK     115.0 to SAG.EAST     115.0 Circuit 1"   1.000  line "RED ROCK     115.00"  "SAG.EAST     115.00"  "1 "  1 0  0 line_361          "Line RED ROCK     115.0 to REDRCKAZ     115.0 Circuit 1"   1.000  line "RED ROCK     115.00"  "REDRCKAZ     115.00"  "1 "  1 0  0 line_362          "Line SANDARIO     115.0 to SANDARAZ     115.0 Circuit 1"   1.000  line "SANDARIO     115.00"  "SANDARAZ     115.00"  "1 "  1 0  0 line_363          "Line SANDARIO     115.0 to BRAWLEY      115.0 Circuit 1"   1.000  line "SANDARIO     115.00"  "BRAWLEY      115.00"  "1 "  1 0  0 line_364          "Line SANXAVER     115.0 to SANXAVAZ     115.0 Circuit 1"   1.000  line "SANXAVER     115.00"  "SANXAVAZ     115.00"  "1 "  1 0  0 line_365          "Line SANXAVER     115.0 to SNYDHILL     115.0 Circuit 1"   1.000  line "SANXAVER     115.00"  "SNYDHILL     115.00"  "1 "  1 0  0 

Page 122: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_367          "Line TWINPEAK     115.0 to TWINPKAZ     115.0 Circuit 1"   1.000  line "TWINPEAK     115.00"  "TWINPKAZ     115.00"  "1 "  1 0  0 line_368          "Line TWINPEAK     115.0 to SANDARIO     115.0 Circuit 1"   1.000  line "TWINPEAK     115.00"  "SANDARIO     115.00"  "1 "  1 0  0 line_369          "Line NOGALES      115.0 to KANTOR       115.0 Circuit 1"   1.000  line "NOGALES      115.00"  "KANTOR       115.00"  "1 "  1 0  0 line_391          "Line SHIPROCK     115.0 to FRUITAP      115.0 Circuit 1"   1.000  line "SHIPROCK     115.00"  "FRUITAP      115.00"  "1 "  1 0  0 line_392          "Line SHIPROCK     115.0 to MESA FM      115.0 Circuit 1"   1.000  line "SHIPROCK     115.00"  "MESA FM      115.00"  "1 "  1 0  0 line_393          "Line SHIPROCK     345.0 to FOURCORN     345.0 Circuit 1"   1.000  line "SHIPROCK     345.00"  "FOURCORN     345.00"  "1 "  1 0  0 line_395          "Line SHIPROCK     500.0 to MOENKOPI     500.0 Circuit 1"   1.000  line "SHIPROCK     500.00"  "MOENKOPI     500.00"  "1 "  2 0  0 line_396          "Line ANIMAS       115.0 to MESA FM      115.0 Circuit 1"   1.000  line "ANIMAS       115.00"  "MESA FM      115.00"  "1 "  1 0  0 line_397          "Line ANIMAS       115.0 to SULLIVAN     115.0 Circuit 1"   1.000  line "ANIMAS       115.00"  "SULLIVAN     115.00"  "1 "  1 0  0 line_398          "Line BERGIN       115.0 to FOOTHILS     115.0 Circuit 1"   1.000  line "BERGIN       115.00"  "FOOTHILS     115.00"  "1 "  1 0  0 line_399          "Line BERGIN       115.0 to SAN JUAN     115.0 Circuit 1"   1.000  line "BERGIN       115.00"  "SAN JUAN     115.00"  "1 "  1 0  0 line_400          "Line FOOTHILS     115.0 to HOODMESA     115.0 Circuit 1"   1.000  line "FOOTHILS     115.00"  "HOODMESA     115.00"  "1 "  1 0  0 line_401          "Line FRUITAP      115.0 to FRUITLND     115.0 Circuit 1"   1.000  line "FRUITAP      115.00"  "FRUITLND     115.00"  "1 "  1 0  0 line_402          "Line FRUITAP      115.0 to HOODMESA     115.0 Circuit 1"   1.000  line "FRUITAP      115.00"  "HOODMESA     115.00"  "1 "  1 0  0 line_403          "Line GLADETAP     115.0 to HOODMESA     115.0 Circuit 1"   1.000  line "GLADETAP     115.00"  "HOODMESA     115.00"  "1 "  1 0  0 line_404          "Line GLADETAP     115.0 to LAPLATA      115.0 Circuit 1"   1.000  line "GLADETAP     115.00"  "LAPLATA      115.00"  "1 "  1 0  0 

Page 123: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_405          "Line HOODMESA     115.0 to SULLIVAN     115.0 Circuit 1"   1.000  line "HOODMESA     115.00"  "SULLIVAN     115.00"  "1 "  1 0  0 line_406          "Line NAVAJO       115.0 to SAN JUAN     115.0 Circuit 1"   1.000  line "NAVAJO       115.00"  "SAN JUAN     115.00"  "1 "  1 0  0 line_407          "Line TS5          500.0 to RACEWAY      500.0 Circuit 1"   1.000  line "TS5          500.00"  "RACEWAY      500.00"  "1 "  1 0  0 line_408          "Line RACEWAY      230.0 to WESTWNGW     230.0 Circuit 2"   1.000  line "RACEWAY      230.00"  "WESTWNGW     230.00"  "2 "  1 0  0 line_409          "Line CHOLLA       500.0 to SILVERKG     500.0 Circuit 1"   1.000  line "CHOLLA       500.00"  "SILVERKG     500.00"  "1 "  1 0  0 line_410          "Line SILVERKG     500.0 to SAGUARO      500.0 Circuit 1"   1.000  line "SILVERKG     500.00"  "SAGUARO      500.00"  "1 "  1 0  0 line_411          "Line FOURCORN     500.0 to FCW          500.0 Circuit 1"   1.000  line "FOURCORN     500.00"  "FCW          500.00"  "1 "  1 0  0 line_412          "Line MOENKOPI     500.0 to RME          500.0 Circuit 1"   1.000  line "MOENKOPI     500.00"  "RME          500.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_413          "Line NAVAJO       500.0 to RME          500.0 Circuit 1"   1.000  line "NAVAJO       500.00"  "RME          500.00"  "1 "  1 0  0 line_414          "Line DRPP         500.0 to FCW          500.0 Circuit 1"   1.000  line "DRPP         500.00"  "FCW          500.00"  "1 "  1 0  0 line_415          "Line DRPP         500.0 to FCW          500.0 Circuit 2"   1.000  line "DRPP         500.00"  "FCW          500.00"  "2 "  1 0  0 line_416          "Line RME          500.0 to FCW          500.0 Circuit 1"   1.000  line "RME          500.00"  "FCW          500.00"  "1 "  1 0  0 line_417          "Line SAGUARO      500.0 to TORTOLIT     500.0 Circuit 2"   1.000  line "SAGUARO      500.00"  "TORTOLIT     500.00"  "2 "  1 0  0 line_418          "Line RACEWAY      500.0 to PNPKAPS      500.0 Circuit r1"   1.000  line "RACEWAY      500.00"  "PNPKAPS      500.00"  "r1"  1 0  0 line_419          "Line DEERVALY     230.0 to WESTWNGE     230.0 Circuit 1"   1.000  line "DEERVALY     230.00"  "WESTWNGE     230.00"  "1 "  1 0  0 line_420          "Line WESTWNGW     230.0 to WESTWNGE     230.0 Circuit 1"   1.000  line "WESTWNGW     230.00"  "WESTWNGE     230.00"  "1 "  1 0  

Page 124: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_421          "Line RACEWAY      230.0 to WESTWNGE     230.0 Circuit 1"   1.000  line "RACEWAY      230.00"  "WESTWNGE     230.00"  "1 "  1 0  0 line_422          "Line SES          500.0 to BROWNING     500.0 Circuit 1"   1.000  line "SES          500.00"  "BROWNING     500.00"  "1 "  1 0  0 line_423          "Line PINAL_S      500.0 to SES          500.0 Circuit 1"   1.000  line "PINAL_S      500.00"  "SES          500.00"  "1 "  1 0  0 line_424          "Line PINAL_S      500.0 to TORTOLIT     500.0 Circuit 1"   1.000  line "PINAL_S      500.00"  "TORTOLIT     500.00"  "1 "  1 0  0 line_425          "Line SNTAROSA     500.0 to SES          500.0 Circuit 1"   1.000  line "SNTAROSA     500.00"  "SES          500.00"  "1 "  1 0  0 line_426          "Line SNTAROSA     500.0 to PINAL_S      500.0 Circuit 1"   1.000  line "SNTAROSA     500.00"  "PINAL_S      500.00"  "1 "  1 0  0 line_427          "Line TORTOLIT     138.0 to RILLITO      138.0 Circuit 1"   1.000  line "TORTOLIT     138.00"  "RILLITO      138.00"  "1 "  1 0  0 line_428          "Line NE.LOOP      138.0 to NELP_SVC     138.0 Circuit 1"   1.000  line "NE.LOOP      138.00"  "NELP_SVC     138.00"  "1 "  1 0  0 line_429          "Line TORTOLIT     138.0 to RANVISTO     138.0 Circuit 1"   1.000  line "TORTOLIT     138.00"  "RANVISTO     138.00"  "1 "  1 0  0 line_430          "Line TUCSON       138.0 to DELCERRO     138.0 Circuit 1"   1.000  line "TUCSON       138.00"  "DELCERRO     138.00"  "1 "  1 0  0 line_431          "Line DELCERRO     138.0 to WESTINA      138.0 Circuit 1"   1.000  line "DELCERRO     138.00"  "WESTINA      138.00"  "1 "  1 0  0 line_432          "Line SAG.EAST     115.0 to NAVISKA      115.0 Circuit 1"   1.000  line "SAG.EAST     115.00"  "NAVISKA      115.00"  "1 "  1 0  0 line_433          "Line SNMANUEL     115.0 to HAYDENAZ     115.0 Circuit 1"   1.000  line "SNMANUEL     115.00"  "HAYDENAZ     115.00"  "1 "  1 0  0 line_434          "Line APACHE       115.0 to SNMANUEL     115.0 Circuit 1"   1.000  line "APACHE       115.00"  "SNMANUEL     115.00"  "1 "  1 0  0 line_435          "Line BUTERFLD     230.0 to G.SLOAN      230.0 Circuit 1"   1.000  line "BUTERFLD     230.00"  "G.SLOAN      230.00"  "1 "  1 0  0 line_436          "Line PANTANO      230.0 to NEWTUCSN     230.0 Circuit 1"   1.000  line "PANTANO      230.00"  "NEWTUCSN     230.00"  "1 "  1 0  

Page 125: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_437          "Line THREEPNT     115.0 to VALEN‐SW     115.0 Circuit 1"   1.000  line "THREEPNT     115.00"  "VALEN‐SW     115.00"  "1 "  1 0  0 line_438          "Line VALEN‐SW     115.0 to SAN JOAQ     115.0 Circuit 1"   1.000  line "VALEN‐SW     115.00"  "SAN JOAQ     115.00"  "1 "  1 0  0 line_439          "Line VALEN‐SW     115.0 to BLACKMTN     115.0 Circuit 1"   1.000  line "VALEN‐SW     115.00"  "BLACKMTN     115.00"  "1 "  1 0  0 line_440          "Line SNDARIO      115.0 to SAN JOAQ     115.0 Circuit 1"   1.000  line "SNDARIO      115.00"  "SAN JOAQ     115.00"  "1 "  1 0  0 line_441          "Line SNDARIO      115.0 to BRAWLEY      115.0 Circuit 1"   1.000  line "SNDARIO      115.00"  "BRAWLEY      115.00"  "1 "  1 0  0 line_442          "Line G.SLOAN      230.0 to PANTANO      230.0 Circuit 1"   1.000  line "G.SLOAN      230.00"  "PANTANO      230.00"  "1 "  1 0  0 line_443          "Line S.BRKRCH     115.0 to SNMANUEL     115.0 Circuit 1"   1.000  line "S.BRKRCH     115.00"  "SNMANUEL     115.00"  "1 "  1 0  0 line_444          "Line NAVISKA      115.0 to ADONIS       115.0 Circuit 1"   1.000  line "NAVISKA      115.00"  "ADONIS       115.00"  "1 "  1 0  0 line_445          "Line THRNYDLE     115.0 to CAMdeMAN     115.0 Circuit 1"   1.000  line "THRNYDLE     115.00"  "CAMdeMAN     115.00"  "1 "  1 0  0 line_446          "Line PICTROCK     115.0 to TWINPEAK     115.0 Circuit 1"   1.000  line "PICTROCK     115.00"  "TWINPEAK     115.00"  "1 "  1 0  0 line_447          "Line ADONIS       115.0 to THRNYDLE     115.0 Circuit 1"   1.000  line "ADONIS       115.00"  "THRNYDLE     115.00"  "1 "  1 0  0 line_448          "Line NEWTUCSN     230.0 to SAHUARIT     230.0 Circuit 1"   1.000  line "NEWTUCSN     230.00"  "SAHUARIT     230.00"  "1 "  1 0  0 line_449          "Line CAMdeMAN     115.0 to PICTROCK     115.0 Circuit 1"   1.000  line "CAMdeMAN     115.00"  "PICTROCK     115.00"  "1 "  1 0  0 line_450          "Line ORACLE       115.0 to S.BRKRCH     115.0 Circuit 1"   1.000  line "ORACLE       115.00"  "S.BRKRCH     115.00"  "1 "  1 0  0 line_451          "Line ALA_5        115.0 to ORO_GRAN     115.0 Circuit 1"   1.000  line "ALA_5        115.00"  "ORO_GRAN     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_452          "Line AMRAD        115.0 to LARGO        115.0 Circuit 1"   1.000 

Page 126: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "AMRAD        115.00"  "LARGO        115.00"  "1 "  1 0  0 line_453          "Line AMRAD        345.0 to ARTESIA      345.0 Circuit 1"   1.000  line "AMRAD        345.00"  "ARTESIA      345.00"  "1 "  1 0  0 line_454          "Line ANTHONY      115.0 to BORDER       115.0 Circuit 1"   1.000  line "ANTHONY      115.00"  "BORDER       115.00"  "1 "  1 0  0 line_455          "Line ANTHONY      115.0 to MONTOYA      115.0 Circuit 1"   1.000  line "ANTHONY      115.00"  "MONTOYA      115.00"  "1 "  1 0  0 line_456          "Line ANTHONY      115.0 to NEWMAN       115.0 Circuit 1"   1.000  line "ANTHONY      115.00"  "NEWMAN       115.00"  "1 "  1 0  0 line_457          "Line ANTHONY      115.0 to SALOPEK      115.0 Circuit 1"   1.000  line "ANTHONY      115.00"  "SALOPEK      115.00"  "1 "  1 0  0 line_458          "Line ASCARATE     115.0 to COPPER       115.0 Circuit 1"   1.000  line "ASCARATE     115.00"  "COPPER       115.00"  "1 "  1 0  0 line_459          "Line ASCARATE     115.0 to RIVERENA     115.0 Circuit 1"   1.000  line "ASCARATE     115.00"  "RIVERENA     115.00"  "1 "  1 0  0 line_460          "Line AUSTIN_N     115.0 to MARLOW       115.0 Circuit 1"   1.000  line "AUSTIN_N     115.00"  "MARLOW       115.00"  "1 "  1 0  0 line_461          "Line AUSTIN_N     115.0 to MARLOW       115.0 Circuit 2"   1.000  line "AUSTIN_N     115.00"  "MARLOW       115.00"  "2 "  1 0  0 line_462          "Line BUTERFLD     115.0 to FT._BLIS     115.0 Circuit 1"   1.000  line "BUTERFLD     115.00"  "FT._BLIS     115.00"  "1 "  1 0  0 line_463          "Line CALIENTE     115.0 to LANE___#     115.0 Circuit 1"   1.000  line "CALIENTE     115.00"  "LANE___#     115.00"  "1 "  1 0  0 line_464          "Line CALIENTE     115.0 to VISTA__#     115.0 Circuit 1"   1.000  line "CALIENTE     115.00"  "VISTA__#     115.00"  "1 "  1 0  0 line_465          "Line CALIENTE     345.0 to AMRAD        345.0 Circuit 1"   1.000  line "CALIENTE     345.00"  "AMRAD        345.00"  "1 "  1 0  0 line_466          "Line CALIENTE     345.0 to NEWMAN       345.0 Circuit 1"   1.000  line "CALIENTE     345.00"  "NEWMAN       345.00"  "1 "  1 0  0 line_467          "Line CHAPARAL     115.0 to ORO_GRAN     115.0 Circuit 1"   1.000  line "CHAPARAL     115.00"  "ORO_GRAN     115.00"  "1 "  1 0  0 line_468          "Line COPPER       115.0 to LANE___#     115.0 Circuit 1"   1.000 

Page 127: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "COPPER       115.00"  "LANE___#     115.00"  "1 "  1 0  0 line_469          "Line COPPER       115.0 to PENDALE      115.0 Circuit 1"   1.000  line "COPPER       115.00"  "PENDALE      115.00"  "1 "  1 0  0 line_470          "Line COYOTE       115.0 to CALIENTE     115.0 Circuit 1"   1.000  line "COYOTE       115.00"  "CALIENTE     115.00"  "1 "  1 0  0 line_471          "Line COYOTE       115.0 to CALIENTE     115.0 Circuit 2"   1.000  line "COYOTE       115.00"  "CALIENTE     115.00"  "2 "  1 0  0 line_472          "Line COYOTE       115.0 to RGC_DC       115.0 Circuit 1"   1.000  line "COYOTE       115.00"  "RGC_DC       115.00"  "1 "  1 0  0 line_473          "Line CROMO        115.0 to RIO_GRAN     115.0 Circuit 1"   1.000  line "CROMO        115.00"  "RIO_GRAN     115.00"  "1 "  1 0  0 line_474          "Line DIABLO       115.0 to RIO_GRAN     115.0 Circuit 1"   1.000  line "DIABLO       115.00"  "RIO_GRAN     115.00"  "1 "  1 0  0 line_475          "Line DIABLO       115.0 to RIO_GRAN     115.0 Circuit 2"   1.000  line "DIABLO       115.00"  "RIO_GRAN     115.00"  "2 "  1 0  0 line_476          "Line DIABLO       115.0 to INSURG       115.0 Circuit 1"   1.000  line "DIABLO       115.00"  "INSURG       115.00"  "1 "  1 0  0 line_477          "Line DYER         115.0 to AUSTIN_N     115.0 Circuit 1"   1.000  line "DYER         115.00"  "AUSTIN_N     115.00"  "1 "  1 0  0 line_478          "Line DYER         115.0 to SHEARMAN     115.0 Circuit 1"   1.000  line "DYER         115.00"  "SHEARMAN     115.00"  "1 "  1 0  0 line_479          "Line BIGGS        115.0 to GR           115.0 Circuit 1"   1.000  line "BIGGS        115.00"  "GR           115.00"  "1 "  1 0  0 line_480          "Line FT._BLIS     115.0 to AUSTIN_N     115.0 Circuit 1"   1.000  line "FT._BLIS     115.00"  "AUSTIN_N     115.00"  "1 "  1 0  0 line_481          "Line GR           115.0 to VISTA__#     115.0 Circuit 1"   1.000  line "GR           115.00"  "VISTA__#     115.00"  "1 "  1 0  0 line_482          "Line HATCH        115.0 to ARROYO       115.0 Circuit 1"   1.000  line "HATCH        115.00"  "ARROYO       115.00"  "1 "  1 0  0 line_483          "Line HATCH        115.0 to JORNADA      115.0 Circuit 1"   1.000  line "HATCH        115.00"  "JORNADA      115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 

Page 128: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_484          "Line HOLLOMAN     115.0 to LARGO        115.0 Circuit 1"   1.000  line "HOLLOMAN     115.00"  "LARGO        115.00"  "1 "  1 0  0 line_485          "Line HORIZON      115.0 to MONTWOOD     115.0 Circuit 1"   1.000  line "HORIZON      115.00"  "MONTWOOD     115.00"  "1 "  1 0  0 line_486          "Line JORNADA      115.0 to ARROYO       115.0 Circuit 1"   1.000  line "JORNADA      115.00"  "ARROYO       115.00"  "1 "  1 0  0 line_487          "Line LANE___#     115.0 to WRANGLER     115.0 Circuit 1"   1.000  line "LANE___#     115.00"  "WRANGLER     115.00"  "1 "  1 0  0 line_488          "Line LAS_CRUC     115.0 to ARROYO       115.0 Circuit 1"   1.000  line "LAS_CRUC     115.00"  "ARROYO       115.00"  "1 "  1 0  0 line_489          "Line LAS_CRUC     115.0 to SALOPEK      115.0 Circuit 1"   1.000  line "LAS_CRUC     115.00"  "SALOPEK      115.00"  "1 "  1 0  0 line_490          "Line LUNA         345.0 to DIABLO       345.0 Circuit 1"   1.000  line "LUNA         345.00"  "DIABLO       345.00"  "1 "  1 0  0 line_491          "Line LUNA         345.0 to HIDALGO      345.0 Circuit 1"   1.000  line "LUNA         345.00"  "HIDALGO      345.00"  "1 "  1 0  0 line_492          "Line LUNA         345.0 to AFTON        345.0 Circuit 1"   1.000  line "LUNA         345.00"  "AFTON        345.00"  "1 "  1 0  0 line_493          "Line MAR          115.0 to LARGO        115.0 Circuit 1"   1.000  line "MAR          115.00"  "LARGO        115.00"  "1 "  1 0  0 line_494          "Line MARLOW       115.0 to TROWBRIG     115.0 Circuit 1"   1.000  line "MARLOW       115.00"  "TROWBRIG     115.00"  "1 "  1 0  0 line_495          "Line MARLOW       115.0 to TROWBRIG     115.0 Circuit 2"   1.000  line "MARLOW       115.00"  "TROWBRIG     115.00"  "2 "  1 0  0 line_496          "Line ASCARATE     115.0 to TROWBRIG     115.0 Circuit 2"   1.000  line "ASCARATE     115.00"  "TROWBRIG     115.00"  "2 "  1 0  0 line_497          "Line MESA___#     115.0 to AUSTIN_N     115.0 Circuit 1"   1.000  line "MESA___#     115.00"  "AUSTIN_N     115.00"  "1 "  1 0  0 line_498          "Line MESA___#     115.0 to RIO_GRAN     115.0 Circuit 1"   1.000  line "MESA___#     115.00"  "RIO_GRAN     115.00"  "1 "  1 0  0 line_499          "Line MILAGRO      115.0 to NEWMAN       115.0 Circuit 1"   1.000  line "MILAGRO      115.00"  "NEWMAN       115.00"  "1 "  1 0  0 

Page 129: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_500          "Line MILAGRO      115.0 to NEWMAN       115.0 Circuit 2"   1.000  line "MILAGRO      115.00"  "NEWMAN       115.00"  "2 "  1 0  0 line_501          "Line MILAGRO      115.0 to LEO          115.0 Circuit 1"   1.000  line "MILAGRO      115.00"  "LEO          115.00"  "1 "  1 0  0 line_502          "Line NEWMAN       115.0 to BUTERFLD     115.0 Circuit 1"   1.000  line "NEWMAN       115.00"  "BUTERFLD     115.00"  "1 "  1 0  0 line_503          "Line NEWMAN       115.0 to CHAPARAL     115.0 Circuit 1"   1.000  line "NEWMAN       115.00"  "CHAPARAL     115.00"  "1 "  1 0  0 line_504          "Line NEWMAN       115.0 to CROMO        115.0 Circuit 1"   1.000  line "NEWMAN       115.00"  "CROMO        115.00"  "1 "  1 0  0 line_505          "Line NEWMAN       115.0 to SHEARMAN     115.0 Circuit 1"   1.000  line "NEWMAN       115.00"  "SHEARMAN     115.00"  "1 "  1 0  0 line_506          "Line NEWMAN       345.0 to ARROYO       345.0 Circuit 1"   1.000  line "NEWMAN       345.00"  "ARROYO       345.00"  "1 "  1 0  0 line_507          "Line NEWMAN       345.0 to AFTON        345.0 Circuit 1"   1.000  line "NEWMAN       345.00"  "AFTON        345.00"  "1 "  1 0  0 line_508          "Line NE1          115.0 to NEWMAN       115.0 Circuit 1"   1.000  line "NE1          115.00"  "NEWMAN       115.00"  "1 "  1 0  0 line_509          "Line PELICANO     115.0 to HORIZON      115.0 Circuit 1"   1.000  line "PELICANO     115.00"  "HORIZON      115.00"  "1 "  1 0  0 line_510          "Line PELICANO     115.0 to MONTWOOD     115.0 Circuit 1"   1.000  line "PELICANO     115.00"  "MONTWOOD     115.00"  "1 "  1 0  0 line_511          "Line RIPLEY       115.0 to THORN        115.0 Circuit 1"   1.000  line "RIPLEY       115.00"  "THORN        115.00"  "1 "  1 0  0 line_512          "Line MONTWOOD     115.0 to CALIENTE     115.0 Circuit 1"   1.000  line "MONTWOOD     115.00"  "CALIENTE     115.00"  "1 "  1 0  0 line_513          "Line MONTWOOD     115.0 to COYOTE       115.0 Circuit 1"   1.000  line "MONTWOOD     115.00"  "COYOTE       115.00"  "1 "  1 0  0 line_514          "Line ORO_GRAN     115.0 to AMRAD        115.0 Circuit 1"   1.000  line "ORO_GRAN     115.00"  "AMRAD        115.00"  "1 "  1 0  0 line_515          "Line RIO_GRAN     115.0 to THORN        115.0 Circuit 1"   1.000  line "RIO_GRAN     115.00"  "THORN        115.00"  "1 "  1 0  0 

Page 130: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_516          "Line RIO_GRAN     115.0 to RIPLEY       115.0 Circuit 1"   1.000  line "RIO_GRAN     115.00"  "RIPLEY       115.00"  "1 "  1 0  0 line_517          "Line SALOPEK      115.0 to ARROYO       115.0 Circuit 1"   1.000  line "SALOPEK      115.00"  "ARROYO       115.00"  "1 "  1 0  0 line_518          "Line SANTA_T      115.0 to DIABLO       115.0 Circuit 1"   1.000  line "SANTA_T      115.00"  "DIABLO       115.00"  "1 "  1 0  0 line_519          "Line SANTA_T      115.0 to MONTOYA      115.0 Circuit 1"   1.000  line "SANTA_T      115.00"  "MONTOYA      115.00"  "1 "  1 0  0 line_520          "Line SANTA_T      115.0 to NW2          115.0 Circuit 1"   1.000  line "SANTA_T      115.00"  "NW2          115.00"  "1 "  1 0  0 line_521          "Line SCOTSDAL     115.0 to VISTA__#     115.0 Circuit 1"   1.000  line "SCOTSDAL     115.00"  "VISTA__#     115.00"  "1 "  1 0  0 line_522          "Line PENDALE      115.0 to LANE___#     115.0 Circuit 1"   1.000  line "PENDALE      115.00"  "LANE___#     115.00"  "1 "  1 0  0 line_523          "Line SOL          115.0 to LANE___#     115.0 Circuit 1"   1.000  line "SOL          115.00"  "LANE___#     115.00"  "1 "  1 0  0 line_524          "Line SOL          115.0 to VISTA__#     115.0 Circuit 1"   1.000  line "SOL          115.00"  "VISTA__#     115.00"  "1 "  1 0  0 line_525          "Line SPARKS       115.0 to HORIZON      115.0 Circuit 1"   1.000  line "SPARKS       115.00"  "HORIZON      115.00"  "1 "  1 0  0 line_526          "Line SUNSET_N     115.0 to ASCARATE     115.0 Circuit 1"   1.000  line "SUNSET_N     115.00"  "ASCARATE     115.00"  "1 "  1 0  0 line_527          "Line SUNSET_N     115.0 to RIO_GRAN     115.0 Circuit 1"   1.000  line "SUNSET_N     115.00"  "RIO_GRAN     115.00"  "1 "  1 0  0 line_528          "Line SUNSET_N     115.0 to RIO_GRAN     115.0 Circuit 2"   1.000  line "SUNSET_N     115.00"  "RIO_GRAN     115.00"  "2 "  1 0  0 line_529          "Line TALAVERA     115.0 to ANTHONY      115.0 Circuit 1"   1.000  line "TALAVERA     115.00"  "ANTHONY      115.00"  "1 "  1 0  0 line_530          "Line THORN        115.0 to MONTOYA      115.0 Circuit 1"   1.000  line "THORN        115.00"  "MONTOYA      115.00"  "1 "  1 0  0 line_531          "Line TROWBRIG     115.0 to ASCARATE     115.0 Circuit 1"   1.000  line "TROWBRIG     115.00"  "ASCARATE     115.00"  "1 "  1 0  0 

Page 131: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_532          "Line NW2          115.0 to DIABLO       115.0 Circuit 1"   1.000  line "NW2          115.00"  "DIABLO       115.00"  "1 "  1 0  0 line_533          "Line WHITE_SA     115.0 to ALA_5        115.0 Circuit 1"   1.000  line "WHITE_SA     115.00"  "ALA_5        115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_534          "Line WRANGLER     115.0 to SPARKS       115.0 Circuit 1"   1.000  line "WRANGLER     115.00"  "SPARKS       115.00"  "1 "  1 0  0 line_535          "Line WRANGLER     115.0 to SPARKS       115.0 Circuit 2"   1.000  line "WRANGLER     115.00"  "SPARKS       115.00"  "2 "  1 0  0 line_536          "Line AEP          115.0 to AZTECAS      115.0 Circuit 1"   1.000  line "AEP          115.00"  "AZTECAS      115.00"  "1 "  1 0  0 line_537          "Line AEP          115.0 to REA2         115.0 Circuit 1"   1.000  line "AEP          115.00"  "REA2         115.00"  "1 "  1 0  0 line_538          "Line CHAMIZAL     115.0 to COLEGIO      115.0 Circuit 1"   1.000  line "CHAMIZAL     115.00"  "COLEGIO      115.00"  "1 "  1 0  0 line_539          "Line CHAMIZAL     115.0 to RIVERENA     115.0 Circuit 1"   1.000  line "CHAMIZAL     115.00"  "RIVERENA     115.00"  "1 "  1 0  0 line_540          "Line CHAVENA      115.0 to AZTECAS      115.0 Circuit 1"   1.000  line "CHAVENA      115.00"  "AZTECAS      115.00"  "1 "  1 0  0 line_541          "Line COLEGIO      115.0 to CHAVENA      115.0 Circuit 1"   1.000  line "COLEGIO      115.00"  "CHAVENA      115.00"  "1 "  1 0  0 line_542          "Line COLEGIO      115.0 to FTS          115.0 Circuit 1"   1.000  line "COLEGIO      115.00"  "FTS          115.00"  "1 "  1 0  0 line_543          "Line FTS          115.0 to TEC          115.0 Circuit 1"   1.000  line "FTS          115.00"  "TEC          115.00"  "1 "  1 0  0 line_544          "Line INSURG       115.0 to CHAMIZAL     115.0 Circuit 1"   1.000  line "INSURG       115.00"  "CHAMIZAL     115.00"  "1 "  1 0  0 line_545          "Line INSURG       115.0 to CHAVENA      115.0 Circuit 1"   1.000  line "INSURG       115.00"  "CHAVENA      115.00"  "1 "  1 0  0 line_546          "Line REA2         115.0 to AZTECAS      115.0 Circuit 1"   1.000  line "REA2         115.00"  "AZTECAS      115.00"  "1 "  1 0  0 line_547          "Line REA2         115.0 to INSURG       115.0 Circuit 1"   1.000  line "REA2         115.00"  "INSURG       115.00"  "1 "  1 0  

Page 132: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_548          "Line ALCAZAR      115.0 to SANDIA_2     115.0 Circuit 1"   1.000  line "ALCAZAR      115.00"  "SANDIA_2     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_549          "Line ALLISONT     115.0 to ALLISON#     115.0 Circuit 1"   1.000  line "ALLISONT     115.00"  "ALLISON#     115.00"  "1 "  1 0  0 line_550          "Line ALLISONT     115.0 to GAMERCO      115.0 Circuit 1"   1.000  line "ALLISONT     115.00"  "GAMERCO      115.00"  "1 "  1 0  0 line_551          "Line AMBROSIA     115.0 to KERMACT      115.0 Circuit 1"   1.000  line "AMBROSIA     115.00"  "KERMACT      115.00"  "1 "  1 0  0 line_552          "Line AMBROSIA     115.0 to TAYLOR_P     115.0 Circuit 1"   1.000  line "AMBROSIA     115.00"  "TAYLOR_P     115.00"  "1 "  1 0  0 line_553          "Line AMBROSIA     230.0 to BISTI        230.0 Circuit 1"   1.000  line "AMBROSIA     230.00"  "BISTI        230.00"  "1 "  1 0  0 line_554          "Line AMBROSIA     230.0 to WESTMESA     230.0 Circuit 1"   1.000  line "AMBROSIA     230.00"  "WESTMESA     230.00"  "1 "  1 0  0 line_555          "Line ARRIBA_T     115.0 to VALENCIA     115.0 Circuit 1"   1.000  line "ARRIBA_T     115.00"  "VALENCIA     115.00"  "1 "  1 0  0 line_556          "Line ARRIBA_T     115.0 to STORRIE      115.0 Circuit 1"   1.000  line "ARRIBA_T     115.00"  "STORRIE      115.00"  "1 "  1 0  0 line_557          "Line ASPEN        115.0 to PRAGER       115.0 Circuit 1"   1.000  line "ASPEN        115.00"  "PRAGER       115.00"  "1 "  1 0  0 line_558          "Line AVILA_T      115.0 to AVILA        115.0 Circuit 1"   1.000  line "AVILA_T      115.00"  "AVILA        115.00"  "1 "  1 0  0 line_559          "Line B‐A          115.0 to BUDAGERS     115.0 Circuit 1"   1.000  line "B‐A          115.00"  "BUDAGERS     115.00"  "1 "  1 0  0 line_560          "Line B‐A          115.0 to NO_BERN      115.0 Circuit 1"   1.000  line "B‐A          115.00"  "NO_BERN      115.00"  "1 "  1 0  0 line_561          "Line B‐A          115.0 to SHELLTAP     115.0 Circuit 1"   1.000  line "B‐A          115.00"  "SHELLTAP     115.00"  "1 "  1 0  0 line_562          "Line B‐A          115.0 to SIGNET_T     115.0 Circuit 1"   1.000  line "B‐A          115.00"  "SIGNET_T     115.00"  "1 "  1 0  0 line_563          "Line B‐A          345.0 to GUADLUPE     345.0 Circuit 1"   1.000 

Page 133: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "B‐A          345.00"  "GUADLUPE     345.00"  "1 "  1 0  0 line_564          "Line B‐A          345.0 to NORTON       345.0 Circuit 1"   1.000  line "B‐A          345.00"  "NORTON       345.00"  "1 "  1 0  0 line_565          "Line B‐A          345.0 to WESTMESA     345.0 Circuit 1"   1.000  line "B‐A          345.00"  "WESTMESA     345.00"  "1 "  1 0  0 line_566          "Line BELAIR_T     115.0 to BEL_AIR      115.0 Circuit 1"   1.000  line "BELAIR_T     115.00"  "BEL_AIR      115.00"  "1 "  1 0  0 line_567          "Line BELAIR_T     115.0 to HW‐CG        115.0 Circuit 1"   1.000  line "BELAIR_T     115.00"  "HW‐CG        115.00"  "1 "  1 0  0 line_568          "Line BELAIR_T     115.0 to SPEDRO_T     115.0 Circuit 1"   1.000  line "BELAIR_T     115.00"  "SPEDRO_T     115.00"  "1 "  1 0  0 line_569          "Line BEV_WOOD     115.0 to HW‐11        115.0 Circuit 1"   1.000  line "BEV_WOOD     115.00"  "HW‐11        115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_570          "Line BISTI        230.0 to PILLAR       230.0 Circuit 1"   1.000  line "BISTI        230.00"  "PILLAR       230.00"  "1 "  1 0  0 line_571          "Line BLCKRA_T     115.0 to BLCKRA       115.0 Circuit 1"   1.000  line "BLCKRA_T     115.00"  "BLCKRA       115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_572          "Line BURNHAM      230.0 to GALLEGOS     230.0 Circuit 1"   1.000  line "BURNHAM      230.00"  "GALLEGOS     230.00"  "1 "  1 0  0 line_573          "Line CB108        115.0 to CORRALB      115.0 Circuit 1"   1.000  line "CB108        115.00"  "CORRALB      115.00"  "1 "  1 0  0 line_574          "Line CB108        115.0 to PANORAMT     115.0 Circuit 1"   1.000  line "CB108        115.00"  "PANORAMT     115.00"  "1 "  1 0  0 line_575          "Line CHURCHRT     115.0 to CHURCH_R     115.0 Circuit 1"   1.000  line "CHURCHRT     115.00"  "CHURCH_R     115.00"  "1 "  1 0  0 line_576          "Line CLAREMNT     115.0 to GIRARD       115.0 Circuit 1"   1.000  line "CLAREMNT     115.00"  "GIRARD       115.00"  "1 "  1 0  0 line_577          "Line COAL_TAP     115.0 to COAL         115.0 Circuit 1"   1.000  line "COAL_TAP     115.00"  "COAL         115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_578          "Line COAL_TAP     115.0 to CORNEL_T     115.0 Circuit 1"   1.000 

Page 134: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "COAL_TAP     115.00"  "CORNEL_T     115.00"  "1 "  1 0  0 line_579          "Line COLINAS      115.0 to ROWE_TAP     115.0 Circuit 1"   1.000  line "COLINAS      115.00"  "ROWE_TAP     115.00"  "1 "  1 0  0 line_580          "Line CORNEL_T     115.0 to CORNELL      115.0 Circuit 1"   1.000  line "CORNEL_T     115.00"  "CORNELL      115.00"  "1 "  1 0  0 line_581          "Line CORNEL_T     115.0 to SP‐HW‐UT     115.0 Circuit 1"   1.000  line "CORNEL_T     115.00"  "SP‐HW‐UT     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_582          "Line CORRALB      115.0 to COTTONWT     115.0 Circuit 1"   1.000  line "CORRALB      115.00"  "COTTONWT     115.00"  "1 "  1 0  0 line_583          "Line CORRALB      115.0 to SARA_CS      115.0 Circuit 1"   1.000  line "CORRALB      115.00"  "SARA_CS      115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_584          "Line CORRALB      115.0 to SARA_CT      115.0 Circuit 1"   1.000  line "CORRALB      115.00"  "SARA_CT      115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_585          "Line COTTONWT     115.0 to COTTONWD     115.0 Circuit 1"   1.000  line "COTTONWT     115.00"  "COTTONWD     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.9957400 0 line_586          "Line COTTONWT     115.0 to IRVING       115.0 Circuit 1"   1.000  line "COTTONWT     115.00"  "IRVING       115.00"  "1 "  1 0  0 line_587          "Line EAST_TAP     115.0 to EASTRDGE     115.0 Circuit 1"   1.000  line "EAST_TAP     115.00"  "EASTRDGE     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.9957400 0 line_588          "Line EB‐HW        115.0 to WINROCK      115.0 Circuit 1"   1.000  line "EB‐HW        115.00"  "WINROCK      115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.9957400 0 line_589          "Line EL_CERRO     115.0 to MANZANO      115.0 Circuit 1"   1.000  line "EL_CERRO     115.00"  "MANZANO      115.00"  "1 "  1 0  0 line_590          "Line ELDRADOT     115.0 to COLINAS      115.0 Circuit 1"   1.000  line "ELDRADOT     115.00"  "COLINAS      115.00"  "1 "  1 0  0 line_591          "Line ELDRADOT     115.0 to ELDORAD#     115.0 Circuit 1"   1.000  line "ELDRADOT     115.00"  "ELDORAD#     115.00"  "1 "  1 0  

Page 135: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_592          "Line EMBUDO       115.0 to EAST_TAP     115.0 Circuit 1"   1.000  line "EMBUDO       115.00"  "EAST_TAP     115.00"  "1 "  1 0  0 line_593          "Line EMBUDO       115.0 to JUANTABO     115.0 Circuit 1"   1.000  line "EMBUDO       115.00"  "JUANTABO     115.00"  "1 "  1 0  0 line_594          "Line EMBUDO       115.0 to TRAMWAY      115.0 Circuit 1"   1.000  line "EMBUDO       115.00"  "TRAMWAY      115.00"  "1 "  1 0  0 line_595          "Line FOURHILL     115.0 to SANDIA_2     115.0 Circuit 1"   1.000  line "FOURHILL     115.00"  "SANDIA_2     115.00"  "1 "  1 0  0 line_596          "Line GAMERCO      115.0 to SUNSHN_T     115.0 Circuit 1"   1.000  line "GAMERCO      115.00"  "SUNSHN_T     115.00"  "1 "  1 0  0 line_597          "Line GIRARD       115.0 to PN‐CG        115.0 Circuit 1"   1.000  line "GIRARD       115.00"  "PN‐CG        115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.9957400 0 line_598          "Line HAMILTON     115.0 to EMBUDO       115.0 Circuit 1"   1.000  line "HAMILTON     115.00"  "EMBUDO       115.00"  "1 "  1 0  0 line_599          "Line HAWKINS#     115.0 to HAMILTON     115.0 Circuit 1"   1.000  line "HAWKINS#     115.00"  "HAMILTON     115.00"  "1 "  1 0  0 line_600          "Line HERMANAS     115.0 to HONDALE      115.0 Circuit 1"   1.000  line "HERMANAS     115.00"  "HONDALE      115.00"  "1 "  1 0  0 line_601          "Line HW‐11        115.0 to WINROCK      115.0 Circuit 1"   1.000  line "HW‐11        115.00"  "WINROCK      115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.9957400 0 line_602          "Line IND_HOSP     115.0 to UNM_T        115.0 Circuit 1"   1.000  line "IND_HOSP     115.00"  "UNM_T        115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_603          "Line INEZ         115.0 to EB‐TL        115.0 Circuit 1"   1.000  line "INEZ         115.00"  "EB‐TL        115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_604          "Line INEZ         115.0 to MENAUL       115.0 Circuit 1"   1.000  line "INEZ         115.00"  "MENAUL       115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_605          "Line ISLETAPA     115.0 to EL_CERRO     115.0 Circuit 1"   1.000  line "ISLETAPA     115.00"  "EL_CERRO     115.00"  "1 "  1 0  

Page 136: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_606          "Line JEFFRSNT     115.0 to JEFFERSN     115.0 Circuit 1"   1.000  line "JEFFRSNT     115.00"  "JEFFERSN     115.00"  "1 "  1 0  0 line_607          "Line JEFFRSNT     115.0 to REEVES_1     115.0 Circuit 1"   1.000  line "JEFFRSNT     115.00"  "REEVES_1     115.00"  "1 "  1 0  0 line_608          "Line KERMACT      115.0 to KERMAC       115.0 Circuit 1"   1.000  line "KERMACT      115.00"  "KERMAC       115.00"  "1 "  1 0  0 line_609          "Line KERMACT      115.0 to RANCHERS     115.0 Circuit 1"   1.000  line "KERMACT      115.00"  "RANCHERS     115.00"  "1 "  1 0  0 line_610          "Line LAWRNCET     115.0 to EAST_TAP     115.0 Circuit 1"   1.000  line "LAWRNCET     115.00"  "EAST_TAP     115.00"  "1 "  1 0  0 line_611          "Line LAWRNCET     115.0 to FOURHILL     115.0 Circuit 1"   1.000  line "LAWRNCET     115.00"  "FOURHILL     115.00"  "1 "  1 0  0 line_612          "Line LAWRNCET     115.0 to LAWRENC#     115.0 Circuit 1"   1.000  line "LAWRNCET     115.00"  "LAWRENC#     115.00"  "1 "  1 0  0 line_613          "Line LENKURT      115.0 to PRINCESS     115.0 Circuit 1"   1.000  line "LENKURT      115.00"  "PRINCESS     115.00"  "1 "  1 0  0 line_614          "Line LEYENDKR     115.0 to TL‐1         115.0 Circuit 1"   1.000  line "LEYENDKR     115.00"  "TL‐1         115.00"  "1 "  1 0  0 line_615          "Line LOSANGEL     115.0 to REEVES_1     115.0 Circuit 1"   1.000  line "LOSANGEL     115.00"  "REEVES_1     115.00"  "1 "  1 0  0 line_616          "Line LUNA         115.0 to MIMBRES      115.0 Circuit 1"   1.000  line "LUNA         115.00"  "MIMBRES      115.00"  "1 "  1 0  0 line_617          "Line MANZANO      115.0 to COLLGE       115.0 Circuit 1"   1.000  line "MANZANO      115.00"  "COLLGE       115.00"  "1 "  1 0  0 line_618          "Line MANZANO      115.0 to TOME         115.0 Circuit 1"   1.000  line "MANZANO      115.00"  "TOME         115.00"  "1 "  1 0  0 line_619          "Line MARQUEZT     115.0 to MARQUEZ      115.0 Circuit 1"   1.000  line "MARQUEZT     115.00"  "MARQUEZ      115.00"  "1 "  1 0  0 line_620          "Line MEJIA_T      115.0 to MEJIA        115.0 Circuit 1"   1.000  line "MEJIA_T      115.00"  "MEJIA        115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_621          "Line MONTANOT     115.0 to CLAREMNT     115.0 Circuit 1"   1.000 

Page 137: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "MONTANOT     115.00"  "CLAREMNT     115.00"  "1 "  1 0   line "CLAREMNT 115.00"  "GIRARD   115.00"  "1 "  1 1   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_622          "Line MONTANOT     115.0 to MONTANO      115.0 Circuit 1"   1.000  line "MONTANOT     115.00"  "MONTANO      115.00"  "1 "  1 0  0 line_623          "Line MORRIS       115.0 to EMBUDO       115.0 Circuit 1"   1.000  line "MORRIS       115.00"  "EMBUDO       115.00"  "1 "  1 0  0 line_624          "Line MPLAZA_T     115.0 to LEYENDKR     115.0 Circuit 1"   1.000  line "MPLAZA_T     115.00"  "LEYENDKR     115.00"  "1 "  1 0  0 line_625          "Line MPLAZA_T     115.0 to M_PLAZA      115.0 Circuit 1"   1.000  line "MPLAZA_T     115.00"  "M_PLAZA      115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_626          "Line NO_BERN      115.0 to AVILA_T      115.0 Circuit 1"   1.000  line "NO_BERN      115.00"  "AVILA_T      115.00"  "1 "  1 0  0 line_627          "Line NOE_TAP      115.0 to NOE          115.0 Circuit 1"   1.000  line "NOE_TAP      115.00"  "NOE          115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_628          "Line NOE_TAP      115.0 to SUNSHIN#     115.0 Circuit 1"   1.000  line "NOE_TAP      115.00"  "SUNSHIN#     115.00"  "1 "  1 0  0 line_629          "Line NORTHPNM     115.0 to MPLAZA_T     115.0 Circuit 1"   1.000  line "NORTHPNM     115.00"  "MPLAZA_T     115.00"  "1 "  1 0  0 line_630          "Line NORTON_1     115.0 to MEJIA_T      115.0 Circuit 1"   1.000  line "NORTON_1     115.00"  "MEJIA_T      115.00"  "1 "  1 0  0 line_631          "Line NORTON_1     115.0 to NORTON_2     115.0 Circuit 1"   1.000  line "NORTON_1     115.00"  "NORTON_2     115.00"  "1 "  1 0  0 line_632          "Line NORTON_1     115.0 to ALGODONE     115.0 Circuit 1"   1.000  line "NORTON_1     115.00"  "ALGODONE     115.00"  "1 "  1 0  0 line_633          "Line NORTON_2     115.0 to BUCKMAN      115.0 Circuit 1"   1.000  line "NORTON_2     115.00"  "BUCKMAN      115.00"  "1 "  1 0  0 line_634          "Line OJO          345.0 to TAOS         345.0 Circuit 1"   1.000  line "OJO          345.00"  "TAOS         345.00"  "1 "  1 0  0 

Page 138: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_635          "Line ORTIZ        115.0 to TRUMAN_T     115.0 Circuit 1"   1.000  line "ORTIZ        115.00"  "TRUMAN_T     115.00"  "1 "  1 0  0 line_636          "Line PANORAMT     115.0 to PANORAMA     115.0 Circuit 1"   1.000  line "PANORAMT     115.00"  "PANORAMA     115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_637          "Line PERSON       115.0 to ANDERSON     115.0 Circuit 1"   1.000  line "PERSON       115.00"  "ANDERSON     115.00"  "1 "  1 0  0 line_638          "Line PERSON       115.0 to ISLETAPA     115.0 Circuit 1"   1.000  line "PERSON       115.00"  "ISLETAPA     115.00"  "1 "  1 0  0 line_639          "Line PERSON       115.0 to SEWER_PL     115.0 Circuit 1"   1.000  line "PERSON       115.00"  "SEWER_PL     115.00"  "1 "  1 0  0 line_640          "Line PERSON       115.0 to WESMECOT     115.0 Circuit 1"   1.000  line "PERSON       115.00"  "WESMECOT     115.00"  "1 "  1 0  0 line_641          "Line PILLAR       230.0 to BURNHAM      230.0 Circuit 1"   1.000  line "PILLAR       230.00"  "BURNHAM      230.00"  "1 "  1 0  0 line_642          "Line PN‐CG        115.0 to CG‐1         115.0 Circuit 1"   1.000  line "PN‐CG        115.00"  "CG‐1         115.00"  "1 "  1 0  0 line_643          "Line PN‐CG        115.0 to NORTHPNM     115.0 Circuit 1"   1.000  line "PN‐CG        115.00"  "NORTHPNM     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_644          "Line PRINCESS     115.0 to EB‐HW        115.0 Circuit 1"   1.000  line "PRINCESS     115.00"  "EB‐HW        115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_645          "Line RANCHERS     115.0 to SLUCAS_T     115.0 Circuit 1"   1.000  line "RANCHERS     115.00"  "SLUCAS_T     115.00"  "1 "  1 0  0 line_646          "Line REEVES_1     115.0 to HAWKINS#     115.0 Circuit 1"   1.000  line "REEVES_1     115.00"  "HAWKINS#     115.00"  "1 "  1 0  0 line_647          "Line REEVES_1     115.0 to NORTHPNM     115.0 Circuit 1"   1.000  line "REEVES_1     115.00"  "NORTHPNM     115.00"  "1 "  1 0  0 line_648          "Line REEVES_2     115.0 to WYOMING      115.0 Circuit 1"   1.000  line "REEVES_2     115.00"  "WYOMING      115.00"  "1 "  1 0  0 line_649          "Line RODEO_T      115.0 to BECKNER      115.0 Circuit 1"   1.000  line "RODEO_T      115.00"  "BECKNER      115.00"  "1 "  1 0  

Page 139: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_650          "Line S.JOSEPH     115.0 to ASPEN        115.0 Circuit 1"   1.000  line "S.JOSEPH     115.00"  "ASPEN        115.00"  "1 "  1 0  0 line_651          "Line SAN_JUAN     345.0 to B‐A          345.0 Circuit 1"   1.000  line "SAN_JUAN     345.00"  "B‐A          345.00"  "1 "  1 0  0 line_652          "Line SAN_JUAN     345.0 to OJO          345.0 Circuit 1"   1.000  line "SAN_JUAN     345.00"  "OJO          345.00"  "1 "  1 0  0 line_653          "Line SAN_JUAN     345.0 to RIOPUERC     345.0 Circuit 1"   1.000  line "SAN_JUAN     345.00"  "RIOPUERC     345.00"  "1 "  1 0  0 line_654          "Line SANDIA_1     115.0 to KAFB         115.0 Circuit 1"   1.000  line "SANDIA_1     115.00"  "KAFB         115.00"  "1 "  1 0  0 line_655          "Line SANDIA_1     115.0 to LENKURT      115.0 Circuit 1"   1.000  line "SANDIA_1     115.00"  "LENKURT      115.00"  "1 "  1 0  0 line_656          "Line SANDIA_1     115.0 to SANDIA_2     115.0 Circuit 1"   1.000  line "SANDIA_1     115.00"  "SANDIA_2     115.00"  "1 "  1 0  0 line_657          "Line SEWER_PL     115.0 to S._COORS     115.0 Circuit 1"   1.000  line "SEWER_PL     115.00"  "S._COORS     115.00"  "1 "  1 0  0 line_658          "Line SHELLTAP     115.0 to CUCHILLA     115.0 Circuit 1"   1.000  line "SHELLTAP     115.00"  "CUCHILLA     115.00"  "1 "  1 0  0 line_659          "Line SHELLTAP     115.0 to STATEPEN     115.0 Circuit 1"   1.000  line "SHELLTAP     115.00"  "STATEPEN     115.00"  "1 "  1 0  0 line_660          "Line SIGNET_T     115.0 to JEFFRSNT     115.0 Circuit 1"   1.000  line "SIGNET_T     115.00"  "JEFFRSNT     115.00"  "1 "  1 0  0 line_661          "Line SIGNET_T     115.0 to SIGNETIC     115.0 Circuit 1"   1.000  line "SIGNET_T     115.00"  "SIGNETIC     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_662          "Line SLUCAS_T     115.0 to SANLUCAS     115.0 Circuit 1"   1.000  line "SLUCAS_T     115.00"  "SANLUCAS     115.00"  "1 "  1 0  0 line_663          "Line SLUCAS_T     115.0 to GULF_PGT     115.0 Circuit 1"   1.000  line "SLUCAS_T     115.00"  "GULF_PGT     115.00"  "1 "  1 0  0 line_664          "Line SP‐83        115.0 to ORTIZ        115.0 Circuit 1"   1.000  line "SP‐83        115.00"  "ORTIZ        115.00"  "1 "  1 0  0 line_665          "Line SP‐HW‐UT     115.0 to IND_HOSP     115.0 Circuit 1"   1.000 

Page 140: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "SP‐HW‐UT     115.00"  "IND_HOSP     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_666          "Line SP‐HW‐UT     115.0 to RITA         115.0 Circuit 1"   1.000  line "SP‐HW‐UT     115.00"  "RITA         115.00"  "1 "  1 0  0 line_667          "Line SPEDRO_T     115.0 to BEV_WOOD     115.0 Circuit 1"   1.000  line "SPEDRO_T     115.00"  "BEV_WOOD     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_668          "Line SPEDRO_T     115.0 to SANPEDRO     115.0 Circuit 1"   1.000  line "SPEDRO_T     115.00"  "SANPEDRO     115.00"  "1 "  1 0  0 line_669          "Line STATEPEN     115.0 to BECKNER      115.0 Circuit 1"   1.000  line "STATEPEN     115.00"  "BECKNER      115.00"  "1 "  1 0  0 line_670          "Line SUNSHN_T     115.0 to CHURCHRT     115.0 Circuit 1"   1.000  line "SUNSHN_T     115.00"  "CHURCHRT     115.00"  "1 "  1 0  0 line_671          "Line SUNSHN_T     115.0 to NOE_TAP      115.0 Circuit 1"   1.000  line "SUNSHN_T     115.00"  "NOE_TAP      115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_672          "Line THOMAS       115.0 to MORRIS       115.0 Circuit 1"   1.000  line "THOMAS       115.00"  "MORRIS       115.00"  "1 "  1 0  0 line_673          "Line TL‐1         115.0 to EB‐TL        115.0 Circuit 1"   1.000  line "TL‐1         115.00"  "EB‐TL        115.00"  "1 "  1 0  0 line_674          "Line TL‐1         115.0 to THOMAS       115.0 Circuit 1"   1.000  line "TL‐1         115.00"  "THOMAS       115.00"  "1 "  1 0  0 line_675          "Line TOME         115.0 to COLLGE       115.0 Circuit 1"   1.000  line "TOME         115.00"  "COLLGE       115.00"  "1 "  1 0  0 line_676          "Line TOME         115.0 to RIO_COMM     115.0 Circuit 1"   1.000  line "TOME         115.00"  "RIO_COMM     115.00"  "1 "  1 0  0 line_677          "Line TOME         115.0 to FIRST_ST     115.0 Circuit 1"   1.000  line "TOME         115.00"  "FIRST_ST     115.00"  "1 "  1 0  0 line_679          "Line TRUMAN_T     115.0 to TRUMAN       115.0 Circuit 1"   1.000  line "TRUMAN_T     115.00"  "TRUMAN       115.00"  "1 "  1 0  0 line_680          "Line UNITED       115.0 to KERMACT      115.0 Circuit 1"   1.000  line "UNITED       115.00"  "KERMACT      115.00"  "1 "  1 0  0 

Page 141: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_681          "Line UNM_T        115.0 to UNM_N        115.0 Circuit 1"   1.000  line "UNM_T        115.00"  "UNM_N        115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_682          "Line WARNER       115.0 to SANTA_FE      46.0 Circuit 1"   1.000  line "WARNER       115.00"  "SANTA_FE      46.00"  "1 "  1 0  0 line_683          "Line WESMECOT     115.0 to WESMECO      115.0 Circuit 1"   1.000  line "WESMECOT     115.00"  "WESMECO      115.00"  "1 "  1 0  0 line_684          "Line WESMECOT     115.0 to RANDLPHT     115.0 Circuit 1"   1.000  line "WESMECOT     115.00"  "RANDLPHT     115.00"  "1 "  1 0  0 line_685          "Line WESTMESA     345.0 to SANDIA       345.0 Circuit 1"   1.000  line "WESTMESA     345.00"  "SANDIA       345.00"  "1 "  1 0  0 line_686          "Line WESTMS_1     115.0 to WESTMS_2     115.0 Circuit 1"   1.000  line "WESTMS_1     115.00"  "WESTMS_2     115.00"  "1 "  1 0  0 line_687          "Line WESTMS_1     115.0 to WESTMS_3     115.0 Circuit 1"   1.000  line "WESTMS_1     115.00"  "WESTMS_3     115.00"  "1 "  1 0  0 line_688          "Line WESTMS_2     115.0 to MARIPOSA     115.0 Circuit 1"   1.000  line "WESTMS_2     115.00"  "MARIPOSA     115.00"  "1 "  1 0  0 line_689          "Line WESTMS_2     115.0 to S.JOSEPH     115.0 Circuit 1"   1.000  line "WESTMS_2     115.00"  "S.JOSEPH     115.00"  "1 "  1 0  0 line_690          "Line WESTMS_2     115.0 to VOLCANOT     115.0 Circuit 1"   1.000  line "WESTMS_2     115.00"  "VOLCANOT     115.00"  "1 "  1 0  0 line_691          "Line WYOMING      115.0 to TRAMWAY      115.0 Circuit 1"   1.000  line "WYOMING      115.00"  "TRAMWAY      115.00"  "1 "  1 0  0 line_692          "Line YAHTAHEY     115.0 to ALLISONT     115.0 Circuit 1"   1.000  line "YAHTAHEY     115.00"  "ALLISONT     115.00"  "1 "  1 0  0 line_693          "Line YAHTAHEY     115.0 to WNDWROCK     115.0 Circuit 1"   1.000  line "YAHTAHEY     115.00"  "WNDWROCK     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_694          "Line YAHTAHEY     115.0 to PITT‐MID     115.0 Circuit 1"   1.000  line "YAHTAHEY     115.00"  "PITT‐MID     115.00"  "1 "  1 0  0 line_695          "Line ZIA_1        115.0 to ELDRADOT     115.0 Circuit 1"   1.000  line "ZIA_1        115.00"  "ELDRADOT     115.00"  "1 "  1 0  0 line_696          "Line ZIA_1        115.0 to RODEO_T      115.0 Circuit 1"   1.000 

Page 142: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "ZIA_1        115.00"  "RODEO_T      115.00"  "1 "  1 0  0 line_697          "Line ZAFARANT     115.0 to AN_TAP       115.0 Circuit 1"   1.000  line "ZAFARANT     115.00"  "AN_TAP       115.00"  "1 "  1 0  0 line_698          "Line ZIA_2        115.0 to MGLLUJAN     115.0 Circuit 1"   1.000  line "ZIA_2        115.00"  "MGLLUJAN     115.00"  "1 "  1 0  0 line_699          "Line RIOPUERC     345.0 to WESTMESA     345.0 Circuit 1"   1.000  line "RIOPUERC     345.00"  "WESTMESA     345.00"  "1 "  1 0  0 line_700          "Line ENCHNTED     115.0 to B‐A          115.0 Circuit 1"   1.000  line "ENCHNTED     115.00"  "B‐A          115.00"  "1 "  1 0  0 line_701          "Line LSTHRZNT     115.0 to LOSTHRZN     115.0 Circuit 1"   1.000  line "LSTHRZNT     115.00"  "LOSTHRZN     115.00"  "1 "  1 0  0 line_702          "Line LSTHRZNT     115.0 to WESTMS_3     115.0 Circuit 1"   1.000  line "LSTHRZNT     115.00"  "WESTMS_3     115.00"  "1 "  1 0  0 line_703          "Line VOLCANOT     115.0 to VOLCANO      115.0 Circuit 1"   1.000  line "VOLCANOT     115.00"  "VOLCANO      115.00"  "1 "  1 0  0 line_704          "Line AN_TAP       115.0 to ALGODONE     115.0 Circuit 1"   1.000  line "AN_TAP       115.00"  "ALGODONE     115.00"  "1 "  1 0  0 line_705          "Line RANDLPHT     115.0 to COAL_TAP     115.0 Circuit 1"   1.000  line "RANDLPHT     115.00"  "COAL_TAP     115.00"  "1 "  1 0  0 line_706          "Line RANDLPHT     115.0 to RANDLPH      115.0 Circuit 1"   1.000  line "RANDLPHT     115.00"  "RANDLPH      115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_707          "Line ALAMOGPG     115.0 to ALAMOGCP     115.0 Circuit 1"   1.000  line "ALAMOGPG     115.00"  "ALAMOGCP     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_708          "Line ALGODONE     115.0 to SNYSIDRO     115.0 Circuit 1"   1.000  line "ALGODONE     115.00"  "SNYSIDRO     115.00"  "1 "  1 0  0 line_709          "Line BELEN_PG     115.0 to WILLARD      115.0 Circuit 1"   1.000  line "BELEN_PG     115.00"  "WILLARD      115.00"  "1 "  1 0  0 line_710          "Line BERNARDO     115.0 to BELEN_PG     115.0 Circuit 1"   1.000  line "BERNARDO 115.00"  "BELEN_PG 115.00"  "1 "  1 0   line "BERNARDO 115.00"  "SOCORROP 115.00"  "1 "  1 0   line "SOCORROP 115.00"  "EL_BUTTE 115.00"  "1 "  1 0  

Page 143: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 epcl "C:\upslf17\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_711          "Line BERNARDO     115.0 to SOCORROP     115.0 Circuit 1"   1.000  line "BERNARDO     115.00"  "SOCORROP     115.00"  "1 "  1 0  0 line_712          "Line BLACKLAK     115.0 to SPRINGER     115.0 Circuit 1"   1.000  line "BLACKLAK     115.00"  "SPRINGER     115.00"  "1 "  1 0  0 line_713          "Line BLUEWATR     115.0 to GRANTS_T     115.0 Circuit 1"   1.000  line "BLUEWATR     115.00"  "GRANTS_T     115.00"  "1 "  1 0  0 line_714          "Line BLUEWATR     115.0 to PEGS         115.0 Circuit 1"   1.000  line "BLUEWATR     115.00"  "PEGS         115.00"  "1 "  1 0  0 line_715          "Line CABALLOT     115.0 to MIMBRES      115.0 Circuit 1"   1.000  line "CABALLOT     115.00"  "MIMBRES      115.00"  "1 "  1 0  0 line_716          "Line CABALLOT     115.0 to HOT_SPRG     115.0 Circuit 1"   1.000  line "CABALLOT     115.00"  "HOT_SPRG     115.00"  "1 "  1 0  0 line_717          "Line CINIZA       115.0 to WINGATE      115.0 Circuit 1"   1.000  line "CINIZA       115.00"  "WINGATE      115.00"  "1 "  1 0  0 line_718          "Line CLAPHAM      115.0 to ROSEBUD      115.0 Circuit 1"   1.000  line "CLAPHAM      115.00"  "ROSEBUD      115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_719          "Line DONA_ANA     115.0 to PICACHO      115.0 Circuit 1"   1.000  line "DONA_ANA     115.00"  "PICACHO      115.00"  "1 "  1 0  0 line_720          "Line DONA_ANA     115.0 to ALAMOGCP     115.0 Circuit 1"   1.000  line "DONA_ANA     115.00"  "ALAMOGCP     115.00"  "1 "  1 0  0 line_721          "Line EL_BUTTE     115.0 to CUCHILLO     115.0 Circuit 1"   1.000  line "EL_BUTTE     115.00"  "CUCHILLO     115.00"  "1 "  1 0  0 line_722          "Line EL_BUTTE     115.0 to PICACHO      115.0 Circuit 1"   1.000  line "EL_BUTTE     115.00"  "PICACHO      115.00"  "1 "  1 0  0 line_723          "Line GALLUPPG     115.0 to YAHTAHEY     115.0 Circuit 1"   1.000  line "GALLUPPG     115.00"  "YAHTAHEY     115.00"  "1 "  1 0  0 line_724          "Line GRANTS_T     115.0 to GRANTS       115.0 Circuit 1"   1.000  line "GRANTS_T     115.00"  "GRANTS       115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_725          "Line GULF_PGT     115.0 to MARQUEZT     115.0 Circuit 1"   1.000 

Page 144: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "GULF_PGT     115.00"  "MARQUEZT     115.00"  "1 "  1 0  0 line_726          "Line HERNANDZ     115.0 to TAOS         115.0 Circuit 1"   1.000  line "HERNANDZ     115.00"  "TAOS         115.00"  "1 "  1 0  0 line_727          "Line HOT_SPRG     115.0 to CUCHILLO     115.0 Circuit 1"   1.000  line "HOT_SPRG     115.00"  "CUCHILLO     115.00"  "1 "  1 0  0 line_728          "Line LAGUNA       115.0 to GRANTS_T     115.0 Circuit 1"   1.000  line "LAGUNA       115.00"  "GRANTS_T     115.00"  "1 "  1 0  0 line_729          "Line LAGUNA       115.0 to PAGUATE      115.0 Circuit 1"   1.000  line "LAGUNA       115.00"  "PAGUATE      115.00"  "1 "  1 0  0 line_730          "Line MORIARTY     115.0 to ALGODONE     115.0 Circuit 1"   1.000  line "MORIARTY     115.00"  "ALGODONE     115.00"  "1 "  1 0  0 line_731          "Line MORIARTY     115.0 to ALGODONE     115.0 Circuit 2"   1.000  line "MORIARTY     115.00"  "ALGODONE     115.00"  "2 "  1 0  0 line_732          "Line OJO          115.0 to HERNANDZ     115.0 Circuit 1"   1.000  line "OJO          115.00"  "HERNANDZ     115.00"  "1 "  1 0  0 line_733          "Line PEGS         115.0 to CINIZA       115.0 Circuit 1"   1.000  line "PEGS         115.00"  "CINIZA       115.00"  "1 "  1 0  0 line_734          "Line PEGS         230.0 to AMBROSIA     230.0 Circuit 1"   1.000  line "PEGS         230.00"  "AMBROSIA     230.00"  "1 "  1 0  0 line_735          "Line PLAYAS       115.0 to PDPLAYAS     115.0 Circuit 1"   1.000  line "PLAYAS       115.00"  "PDPLAYAS     115.00"  "1 "  1 0  0 line_736          "Line ROWE_TAP     115.0 to VALENCIA     115.0 Circuit 1"   1.000  line "ROWE_TAP     115.00"  "VALENCIA     115.00"  "1 "  1 0  0 line_737          "Line SMITHLAK     115.0 to AMBROSIA     115.0 Circuit 1"   1.000  line "SMITHLAK     115.00"  "AMBROSIA     115.00"  "1 "  1 0  0 line_738          "Line SMITHLAK     115.0 to CHURCHRT     115.0 Circuit 1"   1.000  line "SMITHLAK     115.00"  "CHURCHRT     115.00"  "1 "  1 0  0 line_739          "Line SNYSIDRO     115.0 to LA_JARA      115.0 Circuit 1"   1.000  line "SNYSIDRO     115.00"  "LA_JARA      115.00"  "1 "  1 0  0 line_740          "Line SOCORROP     115.0 to EL_BUTTE     115.0 Circuit 1"   1.000  line "SOCORROP     115.00"  "EL_BUTTE     115.00"  "1 "  1 0  0 line_741          "Line SPRINGER     115.0 to CLAPHAM      115.0 Circuit 1"   1.000 

Page 145: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "SPRINGER     115.00"  "CLAPHAM      115.00"  "1 "  1 0  0 line_742          "Line SPRINGER     115.0 to YORKCANY     115.0 Circuit 1"   1.000  line "SPRINGER     115.00"  "YORKCANY     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_743          "Line SPRINGER     115.0 to GLADSTON     115.0 Circuit 1"   1.000  line "SPRINGER     115.00"  "GLADSTON     115.00"  "1 "  1 0  0 line_744          "Line STORRIE      115.0 to SPRINGER     115.0 Circuit 1"   1.000  line "STORRIE      115.00"  "SPRINGER     115.00"  "1 "  1 0  0 line_745          "Line TAOS         115.0 to BLACKLAK     115.0 Circuit 1"   1.000  line "TAOS         115.00"  "BLACKLAK     115.00"  "1 "  1 0  0 line_746          "Line TAYLOR_P     115.0 to BLUEWATR     115.0 Circuit 1"   1.000  line "TAYLOR_P     115.00"  "BLUEWATR     115.00"  "1 "  1 0  0 line_747          "Line GLADSTON     115.0 to CLAPHAM      115.0 Circuit 1"   1.000  line "GLADSTON     115.00"  "CLAPHAM      115.00"  "1 "  1 0  0 line_748          "Line ALAMOGCP     115.0 to HOLLYWO#     115.0 Circuit 1"   1.000  line "ALAMOGCP     115.00"  "HOLLYWO#     115.00"  "1 "  1 0  0 line_749          "Line ALAMOTAP     115.0 to ALAMOGCP     115.0 Circuit 1"   1.000  line "ALAMOTAP     115.00"  "ALAMOGCP     115.00"  "1 "  1 0  0 line_750          "Line MD           115.0 to HURLEY_#     115.0 Circuit 1"   1.000  line "MD           115.00"  "HURLEY_#     115.00"  "1 "  1 0  0 line_751          "Line MD           115.0 to TURQUOIS     115.0 Circuit 1"   1.000  line "MD           115.00"  "TURQUOIS     115.00"  "1 "  1 0  0 line_752          "Line MD           115.0 to IVANHOE      115.0 Circuit 1"   1.000  line "MD           115.00"  "IVANHOE      115.00"  "1 "  1 0  0 line_753          "Line GAVILAN      115.0 to RUIDOSO      115.0 Circuit 1"   1.000  line "GAVILAN      115.00"  "RUIDOSO      115.00"  "1 "  1 0  0 line_754          "Line HURLEY_#     115.0 to LUNA         115.0 Circuit 1"   1.000  line "HURLEY_#     115.00"  "LUNA         115.00"  "1 "  1 0  0 line_755          "Line HURLEY_#     115.0 to CHINO        115.0 Circuit 1"   1.000  line "HURLEY_#     115.00"  "CHINO        115.00"  "1 "  1 0  0 line_756          "Line RUIDOSO      115.0 to HOLLYWO#     115.0 Circuit 1"   1.000  line "RUIDOSO      115.00"  "HOLLYWO#     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 

Page 146: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_757          "Line TURQUOIS     115.0 to HIDALGO      115.0 Circuit 1"   1.000  line "TURQUOIS     115.00"  "HIDALGO      115.00"  "1 "  1 0  0 line_758          "Line TURQUOIS     115.0 to PDTYRONE     115.0 Circuit 1"   1.000  line "TURQUOIS     115.00"  "PDTYRONE     115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_759          "Line BUCKMAN      115.0 to WHITEROK     115.0 Circuit 1"   1.000  line "BUCKMAN      115.00"  "WHITEROK     115.00"  "1 "  1 0  0 line_760          "Line ETA          115.0 to BUDAGERS     115.0 Circuit 1"   1.000  line "ETA          115.00"  "BUDAGERS     115.00"  "1 "  1 0  0 line_761          "Line ETA          115.0 to LA‐MPF       115.0 Circuit 1"   1.000  line "ETA          115.00"  "LA‐MPF       115.00"  "1 "  1 0  0 line_762          "Line ETA          115.0 to WHITEROK     115.0 Circuit 1"   1.000  line "ETA          115.00"  "WHITEROK     115.00"  "1 "  1 0  0 line_763          "Line TA‐3         115.0 to ETA          115.0 Circuit 1"   1.000  line "TA‐3         115.00"  "ETA          115.00"  "1 "  1 0  0 line_764          "Line TA‐3         115.0 to LA‐MPF       115.0 Circuit 1"   1.000  line "TA‐3         115.00"  "LA‐MPF       115.00"  "1 "  1 0  0 line_765          "Line PANORAMT     115.0 to VERANDAT     115.0 Circuit 1"   1.000  line "PANORAMT     115.00"  "VERANDAT     115.00"  "1 "  1 0  0 line_766          "Line RR_TAP       115.0 to PALM_T       115.0 Circuit 1"   1.000  line "RR_TAP       115.00"  "PALM_T       115.00"  "1 "  1 0  0 line_767          "Line PYRTAP1      115.0 to PYRAMID      115.0 Circuit 1"   1.000  line "PYRTAP1      115.00"  "PYRAMID      115.00"  "1 "  1 0  0 line_768          "Line PYRAMID      115.0 to PYRTAP2      115.0 Circuit 1"   1.000  line "PYRAMID      115.00"  "PYRTAP2      115.00"  "1 "  1 0  0 line_769          "Line PYRTAP2      115.0 to PLAYAS       115.0 Circuit 1"   1.000  line "PYRTAP2      115.00"  "PLAYAS       115.00"  "1 "  1 0  0 line_770          "Line HIDALGO      115.0 to PYRTAP1      115.0 Circuit 1"   1.000  line "HIDALGO      115.00"  "PYRTAP1      115.00"  "1 "  1 0  0 line_771          "Line HIDALGO      115.0 to PYRAMID      115.0 Circuit 1"   1.000  line "HIDALGO      115.00"  "PYRAMID      115.00"  "1 "  1 0  0 

Page 147: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_772          "Line B‐A          345.0 to RIOPUERC     345.0 Circuit 1"   1.000  line "B‐A          345.00"  "RIOPUERC     345.00"  "1 "  1 0  0 line_773          "Line REEVES_2     115.0 to ROY          115.0 Circuit 1"   1.000  line "REEVES_2     115.00"  "ROY          115.00"  "1 "  1 0  0 line_774          "Line RIOHONDO     115.0 to IRIS         115.0 Circuit 1"   1.000  line "RIOHONDO     115.00"  "IRIS         115.00"  "1 "  1 0  0 line_775          "Line SAN_JUAN     345.0 to OJ_EAST      345.0 Circuit 1"   1.000  line "SAN_JUAN     345.00"  "OJ_EAST      345.00"  "1 "  1 0  0 line_776          "Line RIOPUERC     345.0 to B‐A          345.0 Circuit 2"   1.000  line "RIOPUERC     345.00"  "B‐A          345.00"  "2 "  1 0  0 line_777          "Line RIOPUERC     345.0 to WESTMESA     345.0 Circuit 2"   1.000  line "RIOPUERC     345.00"  "WESTMESA     345.00"  "2 "  1 0  0 line_778          "Line OJ_EAST      345.0 to OJO          345.0 Circuit 1"   1.000  line "OJ_EAST      345.00"  "OJO          345.00"  "1 "  1 0  0 line_779          "Line OJ_EAST      345.0 to RIOPUERC     345.0 Circuit 1"   1.000  line "OJ_EAST      345.00"  "RIOPUERC     345.00"  "1 "  1 0  0 line_780          "Line ROY          115.0 to AVILA_T      115.0 Circuit 1"   1.000  line "ROY          115.00"  "AVILA_T      115.00"  "1 "  1 0  0 line_781          "Line PACHMANN     115.0 to ENCHNTED     115.0 Circuit 1"   1.000  line "PACHMANN     115.00"  "ENCHNTED     115.00"  "1 "  1 0  0 line_782          "Line PACHMANN     115.0 to PRGRSS       115.0 Circuit 1"   1.000  line "PACHMANN     115.00"  "PRGRSS       115.00"  "1 "  1 0  0 line_783          "Line PACHMANN     115.0 to IRIS         115.0 Circuit 1"   1.000  line "PACHMANN     115.00"  "IRIS         115.00"  "1 "  1 0  0 line_784          "Line CB108A       115.0 to CORRALB      115.0 Circuit 1"   1.000  line "CB108A       115.00"  "CORRALB      115.00"  "1 "  1 0  0 line_785          "Line RIOPUERC     115.0 to RRT_EAST     115.0 Circuit 1"   1.000  line "RIOPUERC     115.00"  "RRT_EAST     115.00"  "1 "  1 0  0 line_786          "Line ARRIBA_T     115.0 to GALLINAT     115.0 Circuit 1"   1.000  line "ARRIBA_T     115.00"  "GALLINAT     115.00"  "1 "  1 0  0 line_787          "Line GALLINAT     115.0 to ARRIBA       115.0 Circuit 1"   1.000  line "GALLINAT     115.00"  "ARRIBA       115.00"  "1 "  1 0  0 

Page 148: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_788          "Line JARALEST     115.0 to JARALES      115.0 Circuit 1"   1.000  line "JARALEST     115.00"  "JARALES      115.00"  "1 "  1 0  0 line_789          "Line JARALEST     115.0 to BELEN_PG     115.0 Circuit 1"   1.000  line "JARALEST     115.00"  "BELEN_PG     115.00"  "1 "  1 0  0 line_790          "Line NORTON_2     115.0 to HERNANDZ     115.0 Circuit 1"   1.000  line "NORTON_2     115.00"  "HERNANDZ     115.00"  "1 "  1 0  0 line_791          "Line WILLARD      115.0 to ESTANCIA     115.0 Circuit 1"   1.000  line "WILLARD      115.00"  "ESTANCIA     115.00"  "1 "  1 0  0 line_792          "Line ESTANCIA     115.0 to MORIARTY     115.0 Circuit 1"   1.000  line "ESTANCIA     115.00"  "MORIARTY     115.00"  "1 "  1 0  0 line_793          "Line HIDALGO      115.0 to LORDSBRG     115.0 Circuit 1"   1.000  line "HIDALGO      115.00"  "LORDSBRG     115.00"  "1 "  1 0  0 line_794          "Line WTA          115.0 to ETA          115.0 Circuit 1"   1.000  line "WTA          115.00"  "ETA          115.00"  "1 "  1 0  0 line_795          "Line TA‐3         115.0 to WTA          115.0 Circuit 1"   1.000  line "TA‐3         115.00"  "WTA          115.00"  "1 "  1 0  0 line_796          "Line NORTON_1     115.0 to STA          115.0 Circuit 1"   1.000  line "NORTON_1     115.00"  "STA          115.00"  "1 "  1 0  0 line_797          "Line STA          115.0 to WTA          115.0 Circuit 1"   1.000  line "STA          115.00"  "WTA          115.00"  "1 "  1 0  0 line_798          "Line STA          115.0 to ETA          115.0 Circuit 1"   1.000  line "STA          115.00"  "ETA          115.00"  "1 "  1 0  0 line_799          "Line LOS_MORR     115.0 to WESTMS_3     115.0 Circuit 1"   1.000  line "LOS_MORR     115.00"  "WESTMS_3     115.00"  "1 "  1 0  0 line_800          "Line BELEN_PG     115.0 to LOS_MORR     115.0 Circuit 1"   1.000  line "BELEN_PG     115.00"  "LOS_MORR     115.00"  "1 "  1 0  0 line_801          "Line GUADLUPE     345.0 to TAIBANMS     345.0 Circuit 1"   1.000  line "GUADLUPE     345.00"  "TAIBANMS     345.00"  "1 "  1 0  0 line_802          "Line TAIBANMS     345.0 to BLACKWTR     345.0 Circuit 1"   1.000  line "TAIBANMS     345.00"  "BLACKWTR     345.00"  "1 "  1 0  0 line_803          "Line BLCKRA_T     115.0 to WESTMS_3     115.0 Circuit 1"   1.000  line "BLCKRA_T     115.00"  "WESTMS_3     115.00"  "1 "  1 0  0 

Page 149: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_804          "Line MARQUEZT     115.0 to WESTMS_1     115.0 Circuit 1"   1.000  line "MARQUEZT     115.00"  "WESTMS_1     115.00"  "1 "  1 0  0 line_805          "Line PRAGER       115.0 to LOMAS        115.0 Circuit 1"   1.000  line "PRAGER       115.00"  "LOMAS        115.00"  "1 "  1 0  0 line_806          "Line PRAGER       115.0 to MONTANOT     115.0 Circuit 1"   1.000  line "PRAGER       115.00"  "MONTANOT     115.00"  "1 "  1 0  0 line_807          "Line RR_TAP       115.0 to BLCKRA_T     115.0 Circuit 1"   1.000  line "RR_TAP       115.00"  "BLCKRA_T     115.00"  "1 "  1 0  0 line_808          "Line ENRON_TS     115.0 to GALLUPPG     115.0 Circuit 1"   1.000  line "ENRON_TS     115.00"  "GALLUPPG     115.00"  "1 "  1 0  0 line_809          "Line ENRON_TS     115.0 to WINGATE      115.0 Circuit 1"   1.000  line "ENRON_TS     115.00"  "WINGATE      115.00"  "1 "  1 0  0 line_810          "Line PERSON       115.0 to KAFB         115.0 Circuit 1"   1.000  line "PERSON       115.00"  "KAFB         115.00"  "1 "  1 0  0 line_811          "Line MSSIONT      115.0 to MSSION       115.0 Circuit 1"   1.000  line "MSSIONT      115.00"  "MSSION       115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_812          "Line MSSIONT      115.0 to NORTHPNM     115.0 Circuit 1"   1.000  line "MSSIONT      115.00"  "NORTHPNM     115.00"  "1 "  1 0  0 line_813          "Line IRVING       115.0 to WAYNE 1      115.0 Circuit 1"   1.000  line "IRVING       115.00"  "WAYNE 1      115.00"  "1 "  1 0  0 line_814          "Line IRVING       115.0 to WAYNE 2      115.0 Circuit 1"   1.000  line "IRVING       115.00"  "WAYNE 2      115.00"  "1 "  1 0  0 line_815          "Line LAGUNAT      115.0 to LSTHRZNT     115.0 Circuit 1"   1.000  line "LAGUNAT      115.00"  "LSTHRZNT     115.00"  "1 "  1 0  0 line_816          "Line MEJIA_T      115.0 to ZIA_2        115.0 Circuit 1"   1.000  line "MEJIA_T      115.00"  "ZIA_2        115.00"  "1 "  1 0  0 line_817          "Line MEJIA_T      115.0 to MGLLUJAN     115.0 Circuit 1"   1.000  line "MEJIA_T      115.00"  "MGLLUJAN     115.00"  "1 "  1 0  0 line_818          "Line NORTON_1     115.0 to CDELRIO      115.0 Circuit 1"   1.000  line "NORTON_1     115.00"  "CDELRIO      115.00"  "1 "  1 0  0 line_819          "Line PARADIS1     115.0 to IRVING       115.0 Circuit 1"   1.000 

Page 150: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "PARADIS1     115.00"  "IRVING       115.00"  "1 "  1 0  0 line_820          "Line REEVES_2     115.0 to MSSIONT      115.0 Circuit 1"   1.000  line "REEVES_2     115.00"  "MSSIONT      115.00"  "1 "  1 0  0 line_821          "Line WESTMS_1     115.0 to PARADIS1     115.0 Circuit 1"   1.000  line "WESTMS_1     115.00"  "PARADIS1     115.00"  "1 "  1 0  0 line_822          "Line RIOPUERC     115.0 to PRGRSS       115.0 Circuit 1"   1.000  line "RIOPUERC     115.00"  "PRGRSS       115.00"  "1 "  1 0  0 line_823          "Line CDELRIO      115.0 to AN_TAP       115.0 Circuit 1"   1.000  line "CDELRIO      115.00"  "AN_TAP       115.00"  "1 "  1 0  0 line_824          "Line ZIA_2        115.0 to SPACHECO     115.0 Circuit 1"   1.000  line "ZIA_2        115.00"  "SPACHECO     115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_825          "Line ZIA_2        115.0 to ZIA_1        115.0 Circuit 1"   1.000  line "ZIA_2        115.00"  "ZIA_1        115.00"  "1 "  1 0  0 line_826          "Line ZIA_1        115.0 to ZAFARANT     115.0 Circuit 1"   1.000  line "ZIA_1        115.00"  "ZAFARANT     115.00"  "1 "  1 0  0 line_827          "Line LAGUNA       115.0 to LAGUNAT      115.0 Circuit 1"   1.000  line "LAGUNA       115.00"  "LAGUNAT      115.00"  "1 "  1 0  0 line_828          "Line PALM_T       115.0 to PACHMANN     115.0 Circuit 1"   1.000  line "PALM_T       115.00"  "PACHMANN     115.00"  "1 "  1 0  0 line_829          "Line MIMBRES      115.0 to HERMANAT     115.0 Circuit 1"   1.000  line "MIMBRES      115.00"  "HERMANAT     115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p"  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_830          "Line MIMBRES      115.0 to DEMTAP1      115.0 Circuit 1"   1.000  line "MIMBRES      115.00"  "DEMTAP1      115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_831          "Line HERMANAT     115.0 to HERMANAS     115.0 Circuit 1"   1.000  line "HERMANAT     115.00"  "HERMANAS     115.00"  "1 "  1 0  0 line_832          "Line HERMANAT     115.0 to KINDRMOR     115.0 Circuit 1"   1.000  line "HERMANAT     115.00"  "KINDRMOR     115.00"  "1 "  1 0  0 line_833          "Line DEMTAP1      115.0 to DEMGOLDT     115.0 Circuit 1"   1.000  line "DEMTAP1      115.00"  "DEMGOLDT     115.00"  "1 "  1 0   epcl "C:\upslf17_80\samples\isld_isol.p" 

Page 151: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 shunt "ADELANTO 500.00" "b " 1 8.5740 0 line_834          "Line DEMGOLDT     115.0 to DEMTAP2      115.0 Circuit 1"   1.000  line "DEMGOLDT     115.00"  "DEMTAP2      115.00"  "1 "  1 0  0 line_835          "Line HIDALGO      115.0 to PLAYAS       115.0 Circuit 1"   1.000  line "HIDALGO      115.00"  "PLAYAS       115.00"  "1 "  1 0  0 line_836          "Line CENTRALP     115.0 to S._COORS     115.0 Circuit 1"   1.000  line "CENTRALP     115.00"  "S._COORS     115.00"  "1 "  1 0  0 line_837          "Line MARIPOSA     115.0 to PARADIS2     115.0 Circuit 1"   1.000  line "MARIPOSA     115.00"  "PARADIS2     115.00"  "1 "  1 0  0 line_838          "Line MARQUEZT     115.0 to KM_SUB       115.0 Circuit 1"   1.000  line "MARQUEZT     115.00"  "KM_SUB       115.00"  "1 "  1 0  0 line_839          "Line MARQUEZT     115.0 to UNSER        115.0 Circuit 1"   1.000  line "MARQUEZT     115.00"  "UNSER        115.00"  "1 "  1 0  0 line_840          "Line MONTANO      115.0 to NORTHPNM     115.0 Circuit 1"   1.000  line "MONTANO      115.00"  "NORTHPNM     115.00"  "1 "  1 0  0 line_841          "Line WESTMS_1     115.0 to CENTRALP     115.0 Circuit 1"   1.000  line "WESTMS_1     115.00"  "CENTRALP     115.00"  "1 "  1 0  0 line_842          "Line VOLCANOT     115.0 to ANDERSON     115.0 Circuit 1"   1.000  line "VOLCANOT     115.00"  "ANDERSON     115.00"  "1 "  1 0  0 line_843          "Line RRT_EAST     115.0 to RR_TAP       115.0 Circuit 1"   1.000  line "RRT_EAST     115.00"  "RR_TAP       115.00"  "1 "  1 0  0 line_844          "Line KM_SUB       115.0 to WESTMS_1     115.0 Circuit 1"   1.000  line "KM_SUB       115.00"  "WESTMS_1     115.00"  "1 "  1 0  0 line_845          "Line MARQUEZT     115.0 to KM_TAP       115.0 Circuit 1"   1.000  line "MARQUEZT     115.00"  "KM_TAP       115.00"  "1 "  1 0  0 line_846          "Line PERSON       115.0 to DWNTOWN      115.0 Circuit 1"   1.000  line "PERSON       115.00"  "DWNTOWN      115.00"  "1 "  1 0  0 line_847          "Line REEVES_2     115.0 to NE_SUB       115.0 Circuit 1"   1.000  line "REEVES_2     115.00"  "NE_SUB       115.00"  "1 "  1 0  0 line_848          "Line RIOPUERC     115.0 to LSTHRZNT     115.0 Circuit 1"   1.000  line "RIOPUERC     115.00"  "LSTHRZNT     115.00"  "1 "  1 0  0 line_849          "Line RIOPUERC     115.0 to KM_TAP       115.0 Circuit 1"   1.000 

Page 152: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "RIOPUERC     115.00"  "KM_TAP       115.00"  "1 "  1 0  0 line_850          "Line KM_SUB       115.0 to KM_TAP       115.0 Circuit 1"   1.000  line "KM_SUB       115.00"  "KM_TAP       115.00"  "1 "  1 0  0 line_851          "Line NE_SUB       115.0 to TRAMWAY      115.0 Circuit 1"   1.000  line "NE_SUB       115.00"  "TRAMWAY      115.00"  "1 "  1 0  0 line_852          "Line DWNTOWN      115.0 to LOMAS        115.0 Circuit 1"   1.000  line "DWNTOWN      115.00"  "LOMAS        115.00"  "1 "  1 0  0 line_853          "Line FRST_STT     115.0 to JARALEST     115.0 Circuit 1"   1.000  line "FRST_STT     115.00"  "JARALEST     115.00"  "1 "  1 0  0 line_854          "Line FIRST_ST     115.0 to FRST_STT     115.0 Circuit 1"   1.000  line "FIRST_ST     115.00"  "FRST_STT     115.00"  "1 "  1 0  0 line_855          "Line MIMBRES      115.0 to AIRPOR_T     115.0 Circuit 1"   1.000  line "MIMBRES      115.00"  "AIRPOR_T     115.00"  "1 "  1 0  0 line_856          "Line AIRPOR_T     115.0 to PICACHO      115.0 Circuit 1"   1.000  line "AIRPOR_T     115.00"  "PICACHO      115.00"  "1 "  1 0  0 line_857          "Line RIOHONDO     115.0 to CB108        115.0 Circuit 1"   1.000  line "RIOHONDO     115.00"  "CB108        115.00"  "1 "  1 0  0 line_858          "Line WAYNE 1      115.0 to REEVES_2     115.0 Circuit 1"   1.000  line "WAYNE 1      115.00"  "REEVES_2     115.00"  "1 "  1 0  0 line_859          "Line WAYNE 2      115.0 to LOSANGEL     115.0 Circuit 1"   1.000  line "WAYNE 2      115.00"  "LOSANGEL     115.00"  "1 "  1 0  0 line_860          "Line ENCHNTED     115.0 to IRIS         115.0 Circuit 1"   1.000  line "ENCHNTED     115.00"  "IRIS         115.00"  "1 "  1 0  0 line_861          "Line PARADIS2     115.0 to WAYNE 1      115.0 Circuit 1"   1.000  line "PARADIS2     115.00"  "WAYNE 1      115.00"  "1 "  1 0  0 line_862          "Line ALGODONE     115.0 to PALM_T       115.0 Circuit 1"   1.000  line "ALGODONE     115.00"  "PALM_T       115.00"  "1 "  1 0  0 line_863          "Line TORRANCE     115.0 to DURAN        115.0 Circuit 1"   1.000  line "TORRANCE     115.00"  "DURAN        115.00"  "1 "  1 0  0 line_864          "Line WILLARD      115.0 to TORRANCE     115.0 Circuit 1"   1.000  line "WILLARD      115.00"  "TORRANCE     115.00"  "1 "  1 0  0 line_867          "Line BUFORD       115.0 to BUFORD_T     115.0 Circuit 1"   1.000 

Page 153: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "BUFORD       115.00"  "BUFORD_T     115.00"  "1 "  1 0  0 line_868          "Line ARGONNE4     138.0 to ARGONNE3     138.0 Circuit 1"   1.000  line "ARGONNE4     138.00"  "ARGONNE3     138.00"  "1 "  1 0  0 line_869          "Line UNSER        115.0 to WESTMS_1     115.0 Circuit 1"   1.000  line "UNSER        115.00"  "WESTMS_1     115.00"  "1 "  1 0  0 line_870          "Line PACHMANN     115.0 to ALGODONE     115.0 Circuit 1"   1.000  line "PACHMANN     115.00"  "ALGODONE     115.00"  "1 "  1 0  0 line_871          "Line SPACHECO     115.0 to WARNER       115.0 Circuit 1"   1.000  line "SPACHECO     115.00"  "WARNER       115.00"  "1 "  1 0  0 line_872          "Line POWRPLNT     115.0 to WARNER       115.0 Circuit 1"   1.000  line "POWRPLNT     115.00"  "WARNER       115.00"  "1 "  1 0  0 line_873          "Line MGLLUJAN     115.0 to POWRPLNT     115.0 Circuit 1"   1.000  line "MGLLUJAN     115.00"  "POWRPLNT     115.00"  "1 "  1 0  0 line_874          "Line B‐A          115.0 to STA          115.0 Circuit 1"   1.000  line "B‐A          115.00"  "STA          115.00"  "1 "  1 0  0 line_875          "Line SANDIA_1     115.0 to TIJERAS      115.0 Circuit 1"   1.000  line "SANDIA_1     115.00"  "TIJERAS      115.00"  "1 "  1 0  0 line_876          "Line TIJERAS      115.0 to ZAMORA       115.0 Circuit 1"   1.000  line "TIJERAS      115.00"  "ZAMORA       115.00"  "1 "  1 0  0 line_877          "Line HIDALGO      345.0 to GREENLEE     345.0 Circuit 1"   1.000  line "HIDALGO      345.00"  "GREENLEE     345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_879          "Line LUNA         345.0 to LEF          345.0 Circuit 1"   1.000  line "LUNA         345.00"  "LEF          345.00"  "1 "  1 0  0 line_880          "Line WESTMESA     345.0 to FT CR PS     345.0 Circuit 1"   1.000  line "WESTMESA     345.00"  "FT CR PS     345.00"  "1 "  1 0  0 line_881          "Line DONA_ANA     115.0 to LAS_CRUC     115.0 Circuit 1"   1.000  line "DONA_ANA     115.00"  "LAS_CRUC     115.00"  "1 "  1 0  0 line_882          "Line AMRAD        115.0 to ALAMOGCP     115.0 Circuit 1"   1.000  line "AMRAD        115.00"  "ALAMOGCP     115.00"  "1 "  1 0  0 line_883          "Line HOLLOMAN     115.0 to ALAMOGCP     115.0 Circuit 1"   1.000  line "HOLLOMAN     115.00"  "ALAMOGCP     115.00"  "1 "  1 0  0 

Page 154: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_884          "Line WESTMESA     345.0 to ARROYO       345.0 Circuit 1"   1.000  line "WESTMESA     345.00"  "ARROYO       345.00"  "1 "  1 0  0 line_885          "Line MEAD S       230.0 to EQUEST       230.0 Circuit 1"   1.000  line "MEAD S       230.00"  "EQUEST       230.00"  "1 "  1 0  0 line_886          "Line MEAD N       230.0 to EQUEST       230.0 Circuit 2"   1.000  line "MEAD N       230.00"  "EQUEST       230.00"  "2 "  1 0  0 line_887          "Line MEAD N       230.0 to NEWPORT      230.0 Circuit 1"   1.000  line "MEAD N       230.00"  "NEWPORT      230.00"  "1 "  1 0  0 line_888          "Line MEAD N       230.0 to EASTSIDE     230.0 Circuit 1"   1.000  line "MEAD N       230.00"  "EASTSIDE     230.00"  "1 "  1 0  0 line_889          "Line MOENKOPI     500.0 to MARKETPL     500.0 Circuit 1"   1.000  line "MOENKOPI     500.00"  "MARKETPL     500.00"  "1 "  1 0  0 line_890          "Line NAVAJO       500.0 to CRYSTAL      500.0 Circuit 1"   1.000  line "NAVAJO       500.00"  "CRYSTAL      500.00"  "1 "  1 0  0 line_891          "Line FOURCORN     345.0 to RIOPUERC     345.0 Circuit 1"   1.000  line "FOURCORN     345.00"  "RIOPUERC     345.00"  "1 "  1 0  0 line_892          "Line FOURCORN     345.0 to SAN_JUAN     345.0 Circuit 1"   1.000  line "FOURCORN     345.00"  "SAN_JUAN     345.00"  "1 "  1 0  0 line_893          "Line FOURCORN     345.0 to WESTMESA     345.0 Circuit 1"   1.000  line "FOURCORN     345.00"  "WESTMESA     345.00"  "1 "  1 0  0 line_894          "Line FOURCORN     230.0 to PILLAR       230.0 Circuit 1"   1.000  line "FOURCORN     230.00"  "PILLAR       230.00"  "1 "  1 0  0 line_895          "Line HENDRSON     230.0 to MEAD N       230.0 Circuit 1"   1.000  line "HENDRSON     230.00"  "MEAD N       230.00"  "1 "  1 0  0 line_896          "Line H ALLEN      500.0 to MEAD         500.0 Circuit 1"   1.000  line "H ALLEN      500.00"  "MEAD         500.00"  "1 "  1 0  0 line_897          "Line BC TAP       230.0 to MEAD N       230.0 Circuit 1"   1.000  line "BC TAP       230.00"  "MEAD N       230.00"  "1 "  1 0  0 line_898          "Line DAVIS        230.0 to MCCULLGH     230.0 Circuit 1"   1.000  line "DAVIS        230.00"  "MCCULLGH     230.00"  "1 "  1 0  0 line_899          "Line MEAD N       230.0 to DECATUR      230.0 Circuit 1"   1.000  line "MEAD N       230.00"  "DECATUR      230.00"  "1 "  1 0  0 

Page 155: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_900          "Line MEAD S       230.0 to PAHRUMP      230.0 Circuit 1"   1.000  line "MEAD S       230.00"  "PAHRUMP      230.00"  "1 "  1 0  0 line_901          "Line MEAD S       230.0 to GREENWAY     230.0 Circuit 1"   1.000  line "MEAD S       230.00"  "GREENWAY     230.00"  "1 "  1 0  0 line_902          "Line MEAD S       230.0 to MCCULLGH     230.0 Circuit 1"   1.000  line "MEAD S       230.00"  "MCCULLGH     230.00"  "1 "  1 0  0 line_903          "Line MEAD S       230.0 to MCCULLGH     230.0 Circuit 2"   1.000  line "MEAD S       230.00"  "MCCULLGH     230.00"  "2 "  1 0  0 line_904          "Line MEAD         500.0 to MARKETPL     500.0 Circuit 1"   1.000  line "MEAD         500.00"  "MARKETPL     500.00"  "1 "  1 0  0 line_905          "Line PINTO PS     345.0 to FOURCORN     345.0 Circuit 1"   1.000  line "PINTO PS     345.00"  "FOURCORN     345.00"  "1 "  1 0  0 line_906          "Line SIGURDPS     230.0 to GLENCANY     230.0 Circuit 1"   1.000  line "SIGURDPS     230.00"  "GLENCANY     230.00"  "1 "  1 0  0 line_907          "Line WALSENBG     230.0 to GLADSTON     230.0 Circuit 1"   1.000  line "WALSENBG     230.00"  "GLADSTON     230.00"  "1 "  1 0  0 line_908          "Line SHIPROCK     345.0 to SAN_JUAN     345.0 Circuit 1"   1.000  line "SHIPROCK     345.00"  "SAN_JUAN     345.00"  "1 "  1 0  0 line_909          "Line SAN_JUAN     345.0 to MCKINLEY     345.0 Circuit 1"   1.000  line "SAN_JUAN     345.00"  "MCKINLEY     345.00"  "1 "  1 0  0 line_910          "Line SAN_JUAN     345.0 to MCKINLEY     345.0 Circuit 2"   1.000  line "SAN_JUAN     345.00"  "MCKINLEY     345.00"  "2 "  1 0  0 line_911          "Line BLYTHE       161.0 to NILAND       161.0 Circuit 1"   1.000  line "BLYTHE       161.00"  "NILAND       161.00"  "1 "  1 0  0 line_912          "Line KNOB         161.0 to PILOTKNB     161.0 Circuit 1"   1.000  line "KNOB         161.00"  "PILOTKNB     161.00"  "1 "  1 0  0 line_913          "Line HASSYAMP     500.0 to N.GILA       500.0 Circuit 1"   1.000  line "HASSYAMP     500.00"  "N.GILA       500.00"  "1 "  1 0  0 line_914          "Line MOENKOPI     500.0 to ELDORDO      500.0 Circuit 1"   1.000  line "MOENKOPI     500.00"  "ELDORDO      500.00"  "1 "  1 0  0 line_915          "Line PALOVRDE     500.0 to DEVERS       500.0 Circuit 1"   1.000  line "PALOVRDE     500.00"  "DEVERS       500.00"  "1 "  1 0  0 

Page 156: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_916          "Line MEAD S       230.0 to ELDORDO      230.0 Circuit 1"   1.000  line "MEAD S       230.00"  "ELDORDO      230.00"  "1 "  1 0  0 line_917          "Line MEAD S       230.0 to ELDORDO      230.0 Circuit 2"   1.000  line "MEAD S       230.00"  "ELDORDO      230.00"  "2 "  1 0  0 line_918          "Line PARKER       230.0 to GENE         230.0 Circuit 1"   1.000  line "PARKER       230.00"  "GENE         230.00"  "1 "  1 0  0 line_919          "Line BLYTHE       161.0 to BLYTHESC     161.0 Circuit 1"   1.000  line "BLYTHE       161.00"  "BLYTHESC     161.00"  "1 "  1 0  0 line_920          "Line CAMINO       230.0 to MEAD S       230.0 Circuit E"   1.000  line "CAMINO       230.00"  "MEAD S       230.00"  "E "  1 0  0 line_921          "Line CAMINO       230.0 to MEAD S       230.0 Circuit W"   1.000  line "CAMINO       230.00"  "MEAD S       230.00"  "W "  1 0  0 line_922          "Line GLADETAP     115.0 to ELPASOTP     115.0 Circuit 1"   1.000  line "GLADETAP     115.00"  "ELPASOTP     115.00"  "1 "  1 0  0 line_923          "Line AIRPOR_T     115.0 to AIRPOR       115.0 Circuit 1"   1.000  line "AIRPOR_T     115.00"  "AIRPOR       115.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_924          "Line AFTON        115.0 to AIRPOR       115.0 Circuit 1"   1.000  line "AFTON        115.00"  "AIRPOR       115.00"  "1 "  1 0  0 line_925          "Line JORNADA      115.0 to AIRPOR       115.0 Circuit 1"   1.000  line "JORNADA      115.00"  "AIRPOR       115.00"  "1 "  1 0  0 line_926          "Line MEAD S       230.0 to DIAMOND      230.0 Circuit 1"   1.000  line "MEAD S       230.00"  "DIAMOND      230.00"  "1 "  1 0  0 line_927          "Line MEAD S       230.0 to DIAMOND      230.0 Circuit 2"   1.000  line "MEAD S       230.00"  "DIAMOND      230.00"  "2 "  1 0  0 line_928          "Line MEAD N       230.0 to MGM‐CC       230.0 Circuit 1"   1.000  line "MEAD N       230.00"  "MGM‐CC       230.00"  "1 "  1 0  0 line_929          "Line MEAD N       230.0 to ARDEN        230.0 Circuit 1"   1.000  line "MEAD N       230.00"  "ARDEN        230.00"  "1 "  1 0  0 line_930          "Line EQUEST N     500.0 to MEAD         500.0 Circuit 1"   1.000  line "EQUEST N     500.00"  "MEAD         500.00"  "1 "  1 0  0 line_931          "Line HARQUAHA     500.0 to DEVERS       500.0 Circuit 1"   1.000  line "HARQUAHA     500.00"  "DEVERS       500.00"  "1 "  1 0  

Page 157: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_932          "Line HARQUAHA     500.0 to IH500        500.0 Circuit 1"   1.000  line "HARQUAHA     500.00"  "IH500        500.00"  "1 "  1 0  0 line_933          "Line CALIENTE     345.0 to PICANTE      345.0 Circuit 1"   1.000  line "CALIENTE     345.00"  "PICANTE      345.00"  "1 "  1 0  0 line_934          "Line NEWMAN       115.0 to PIPELINE     115.0 Circuit 1"   1.000  line "NEWMAN       115.00"  "PIPELINE     115.00"  "1 "  1 0  0 line_935          "Line LEO          115.0 to DYER         115.0 Circuit 1"   1.000  line "LEO          115.00"  "DYER         115.00"  "1 "  1 0  0 line_936          "Line PICANTE      345.0 to NEWMAN       345.0 Circuit 1"   1.000  line "PICANTE      345.00"  "NEWMAN       345.00"  "1 "  1 0  0 line_937          "Line PICANTE      115.0 to BIGGS        115.0 Circuit 1"   1.000  line "PICANTE      115.00"  "BIGGS        115.00"  "1 "  1 0  0 line_938          "Line PICANTE      115.0 to GR           115.0 Circuit 1"   1.000  line "PICANTE      115.00"  "GR           115.00"  "1 "  1 0  0 line_939          "Line ANTHONY      115.0 to NW3          115.0 Circuit 1"   1.000  line "ANTHONY      115.00"  "NW3          115.00"  "1 "  1 0  0 line_940          "Line ARROYO       115.0 to COX          115.0 Circuit 1"   1.000  line "ARROYO       115.00"  "COX          115.00"  "1 "  1 0  0 line_941          "Line APOLLOSS     115.0 to APOLLO       115.0 Circuit 1"   1.000  line "APOLLOSS     115.00"  "APOLLO       115.00"  "1 "  1 0  0 line_942          "Line HATCH        115.0 to LEASBURG     115.0 Circuit 1"   1.000  line "HATCH        115.00"  "LEASBURG     115.00"  "1 "  1 0  0 line_943          "Line LE1          115.0 to APOLLOSS     115.0 Circuit 1"   1.000  line "LE1          115.00"  "APOLLOSS     115.00"  "1 "  1 0  0 line_944          "Line LE1          115.0 to JORNADA      115.0 Circuit 1"   1.000  line "LE1          115.00"  "JORNADA      115.00"  "1 "  1 0  0 line_945          "Line SUNSET_N     115.0 to DURAZNO      115.0 Circuit 1"   1.000  line "SUNSET_N     115.00"  "DURAZNO      115.00"  "1 "  1 0  0 line_946          "Line DURAZNO      115.0 to ASCARATE     115.0 Circuit 1"   1.000  line "DURAZNO      115.00"  "ASCARATE     115.00"  "1 "  1 0  0 line_947          "Line NW3          115.0 to MONTOYA      115.0 Circuit 1"   1.000  line "NW3          115.00"  "MONTOYA      115.00"  "1 "  1 0  

Page 158: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_948          "Line COX          115.0 to APOLLOSS     115.0 Circuit 1"   1.000  line "COX          115.00"  "APOLLOSS     115.00"  "1 "  1 0  0 line_949          "Line APOLLO       115.0 to JORNADA      115.0 Circuit 1"   1.000  line "APOLLO       115.00"  "JORNADA      115.00"  "1 "  1 0  0 line_950          "Line LEASBURG     115.0 to JORNADA      115.0 Circuit 1"   1.000  line "LEASBURG     115.00"  "JORNADA      115.00"  "1 "  1 0  0 line_951          "Line NE1          115.0 to CROMO        115.0 Circuit 1"   1.000  line "NE1          115.00"  "CROMO        115.00"  "1 "  1 0  0 line_952          "Line CABALLOT     115.0 to UVAS         115.0 Circuit 1"   1.000  line "CABALLOT     115.00"  "UVAS         115.00"  "1 "  1 0  0 line_953          "Line ANTHONY      115.0 to COX          115.0 Circuit 1"   1.000  line "ANTHONY      115.00"  "COX          115.00"  "1 "  1 0  0 line_954          "Line COX          115.0 to TALAVERA     115.0 Circuit 1"   1.000  line "COX          115.00"  "TALAVERA     115.00"  "1 "  1 0  0 line_955          "Line ASCARATE     115.0 to COPPER       115.0 Circuit 2"   1.000  line "ASCARATE     115.00"  "COPPER       115.00"  "2 "  1 0  0 line_956          "Line MESA___#     115.0 to RIO_GRAN     115.0 Circuit 2"   1.000  line "MESA___#     115.00"  "RIO_GRAN     115.00"  "2 "  1 0  0 line_957          "Line RIO_GRAN     115.0 to THORN        115.0 Circuit 2"   1.000  line "RIO_GRAN     115.00"  "THORN        115.00"  "2 "  1 0  0 line_958          "Line MESA___#     115.0 to AUSTIN_N     115.0 Circuit 2"   1.000  line "MESA___#     115.00"  "AUSTIN_N     115.00"  "2 "  1 0  0 line_959          "Line GR           115.0 to VISTA__#     115.0 Circuit 2"   1.000  line "GR           115.00"  "VISTA__#     115.00"  "2 "  1 0  0 line_960          "Line SOL          115.0 to VISTA__#     115.0 Circuit 2"   1.000  line "SOL          115.00"  "VISTA__#     115.00"  "2 "  1 0  0 line_961          "Line WSTAP        115.0 to WHITE_SA     115.0 Circuit 1"   1.000  line "WSTAP        115.00"  "WHITE_SA     115.00"  "1 "  1 0  0 line_962          "Line WSTAP        115.0 to ALAMOGCP     115.0 Circuit 1"   1.000  line "WSTAP        115.00"  "ALAMOGCP     115.00"  "1 "  1 0  0 line_963          "Line DONA_ANA     115.0 to WSTAP        115.0 Circuit 1"   1.000  line "DONA_ANA     115.00"  "WSTAP        115.00"  "1 "  1 0  

Page 159: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 line_964          "Line UVAS         115.0 to MIMBRES      115.0 Circuit 1"   1.000  line "UVAS         115.00"  "MIMBRES      115.00"  "1 "  1 0  0 line_965          "Line NEWMAN       115.0 to PICANTE      115.0 Circuit 1"   1.000  line "NEWMAN       115.00"  "PICANTE      115.00"  "1 "  1 0  0 line_966          "Line PIPELINE     115.0 to BIGGS        115.0 Circuit 1"   1.000  line "PIPELINE     115.00"  "BIGGS        115.00"  "1 "  1 0  0 line_967          "Line VL‐TAP       345.0 to LUNA         345.0 Circuit 1"   1.000  line "VL‐TAP       345.00"  "LUNA         345.00"  "1 "  1 0  0 line_968          "Line VL‐TAP       345.0 to SLPOI345     345.0 Circuit 1"   1.000  line "VL‐TAP       345.00"  "SLPOI345     345.00"  "1 "  1 0  0 line_969          "Line FT CRAIG     345.0 to ARROYO       345.0 Circuit 1"   1.000  line "FT CRAIG     345.00"  "ARROYO       345.00"  "1 "  1 0  0 line_970          "Line FT CRAIG     345.0 to Z345         345.0 Circuit 1"   1.000  line "FT CRAIG     345.00"  "Z345         345.00"  "1 "  1 0  0 line_971          "Line FT CRAIG     345.0 to VL‐TAP       345.0 Circuit 1"   1.000  line "FT CRAIG     345.00"  "VL‐TAP       345.00"  "1 "  1 0   shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_972          "Line SL115        115.0 to SLPOI115     115.0 Circuit 1"   1.000  line "SL115        115.00"  "SLPOI115     115.00"  "1 "  1 0  0 line_973          "Line SLPOI345     345.0 to LUNA         345.0 Circuit 1"   1.000  line "SLPOI345     345.00"  "LUNA         345.00"  "1 "  1 0  0 line_974          "Line SPRINGR      345.0 to VL‐TAP       345.0 Circuit 1"   1.000  line "SPRINGR      345.00"  "VL‐TAP       345.00"  "1 "  1 0  0 line_975          "Line AMRAD        345.0 to AA100W       345.0 Circuit 1"   1.000  line "AMRAD        345.00"  "AA100W       345.00"  "1 "  1 0  0 line_976          "Line AA100W       345.0 to ARTESIA      345.0 Circuit 1"   1.000  line "AA100W       345.00"  "ARTESIA      345.00"  "1 "  1 0  0 line_977          "Line AMRAD        345.0 to AA100W       345.0 Circuit 2"   1.000  line "AMRAD        345.00"  "AA100W       345.00"  "2 "  1 0  0 line_978          "Line AA100W       345.0 to ARTESIA      345.0 Circuit 2"   1.000  line "AA100W       345.00"  "ARTESIA      345.00"  "2 "  1 0  0 line_979          "Line ART320W      345.0 to ARTESIA      345.0 Circuit 1"   1.000 

Page 160: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "ART320W      345.00"  "ARTESIA      345.00"  "1 "  1 0  0 line_980          "Line NEWMAN       345.0 to NM805RS1     345.0 Circuit 1"   1.000  line "NEWMAN       345.00"  "NM805RS1     345.00"  "1 "  1 0  0 line_981          "Line NM805RS1     345.0 to NM805RS2     345.0 Circuit 1"   1.000  line "NM805RS1     345.00"  "NM805RS2     345.00"  "1 "  1 0  0 line_982          "Line NM805W       345.0 to NM805RS2     345.0 Circuit 1"   1.000  line "NM805W       345.00"  "NM805RS2     345.00"  "1 "  1 0  0 line_983          "Line HL120WSG     345.0 to HIDALGO      345.0 Circuit 1"   1.000  line "HL120WSG     345.00"  "HIDALGO      345.00"  "1 "  1 0  0 line_984          "Line LUNA         345.0 to HIDALGO      345.0 Circuit 2"   1.000  line "LUNA         345.00"  "HIDALGO      345.00"  "2 "  1 0  0 line_985          "Line LUNA         345.0 to HIDALGO      345.0 Circuit 3"   1.000  line "LUNA         345.00"  "HIDALGO      345.00"  "3 "  1 0  0 line_986          "Line HIDALGO      345.0 to SOUTH        345.0 Circuit 1"   1.000  line "HIDALGO      345.00"  "SOUTH        345.00"  "1 "  1 0  0 line_987          "Line HIDALGO      345.0 to SOUTH        345.0 Circuit 2"   1.000  line "HIDALGO      345.00"  "SOUTH        345.00"  "2 "  1 0  0 tran_988          "Tran CHOLLA       500.00 to CHOLLA       345.00 Circuit 1               0.00"   1.000  tran "CHOLLA       500.00"  "CHOLLA       345.00"  "1 "  0 "               0.00"  0 tran_989          "Tran CHOLLA       500.00 to CHOLLA       345.00 Circuit 2               0.00"   1.000  tran "CHOLLA       500.00"  "CHOLLA       345.00"  "2 "  0 "               0.00"  0 tran_990          "Tran FOURCORN     500.00 to FOURCORN     345.00 Circuit 1               0.00"   1.000  tran "FOURCORN     500.00"  "FOURCORN     345.00"  "1 "  0 "               0.00"  0 tran_991          "Tran SAGUARO      500.00 to SAG.EAST     115.00 Circuit 1               0.00"   1.000  tran "SAGUARO      500.00"  "SAG.EAST     115.00"  "1 "  0 "               0.00"  0 tran_992          "Tran SAGUARO      500.00 to SAG.WEST     115.00 Circuit 1               0.00"   1.000  tran "SAGUARO      500.00"  "SAG.WEST     115.00"  "1 "  0 "               0.00"  0 tran_995          "Tran WESTWING     500.00 to WESTWING     345.00 Circuit 1WESTWING      34.50"   1.000  tran "WESTWING     500.00"  "WESTWING     345.00"  "1 "  0 "WESTWING      34.50"  0 tran_996          "Tran YAVAPAI      500.00 to YAVAPAI      230.00 Circuit 1               0.00"   1.000  tran "YAVAPAI      500.00"  "YAVAPAI      230.00"  "1 "  0 "               0.00"  0 tran_997          "Tran YAVAPAI      500.00 to YAVAPAI      230.00 Circuit 2               0.00"   1.000 

Page 161: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 tran "YAVAPAI      500.00"  "YAVAPAI      230.00"  "2 "  0 "               0.00"  0 tran_999          "Tran TS5          500.00 to TS5          230.00 Circuit 1               0.00"   1.000  tran "TS5          500.00"  "TS5          230.00"  "1 "  0 "               0.00"  0 tran_1000         "Tran TS5          500.00 to TS5          230.00 Circuit 2               0.00"   1.000  tran "TS5          500.00"  "TS5          230.00"  "2 "  0 "               0.00"  0 tran_1001         "Tran RACEWAY      500.00 to RACEWAY      230.00 Circuit 1               0.00"   1.000  tran "RACEWAY      500.00"  "RACEWAY      230.00"  "1 "  0 "               0.00"  0 tran_1002         "Tran RACEWAY      500.00 to RACEWAY      230.00 Circuit 2               0.00"   1.000  tran "RACEWAY      500.00"  "RACEWAY      230.00"  "2 "  0 "               0.00"  0 tran_1003         "Tran CHOLLA       345.00 to CHOLLA       230.00 Circuit 1               0.00"   1.000  tran "CHOLLA       345.00"  "CHOLLA       230.00"  "1 "  0 "               0.00"  0 tran_1004         "Tran CHOLLA       345.00 to CHOLLA       230.00 Circuit 2               0.00"   1.000  tran "CHOLLA       345.00"  "CHOLLA       230.00"  "2 "  0 "               0.00"  0 tran_1005         "Tran FOURCORN     345.00 to FOURCORN     230.00 Circuit 1               0.00"   1.000  tran "FOURCORN     345.00"  "FOURCORN     230.00"  "1 "  0 "               0.00"  0 tran_1006         "Tran FOURCORN     345.00 to FOURCORN     230.00 Circuit 2               0.00"   1.000  tran "FOURCORN     345.00"  "FOURCORN     230.00"  "2 "  0 "               0.00"  0 tran_1010         "Tran PRESCOTT     230.00 to PRESCOTT     115.00 Circuit 1               0.00"   1.000  tran "PRESCOTT     230.00"  "PRESCOTT     115.00"  "1 "  0 "               0.00"  0 tran_1011         "Tran PRESCOTT     230.00 to PRESCOTT     115.00 Circuit 2               0.00"   1.000  tran "PRESCOTT     230.00"  "PRESCOTT     115.00"  "2 "  0 "               0.00"  0 tran_1012         "Tran SAGUARO      230.00 to SAG.EAST     115.00 Circuit 1               0.00"   1.000  tran "SAGUARO      230.00"  "SAG.EAST     115.00"  "1 "  0 "               0.00"  0 tran_1013         "Tran SAGUARO      230.00 to SAG.WEST     115.00 Circuit 1               0.00"   1.000  tran "SAGUARO      230.00"  "SAG.WEST     115.00"  "1 "  0 "               0.00"  0 tran_1014         "Tran CORONADO     500.00 to CORONADO     345.00 Circuit 1               0.00"   1.000  tran "CORONADO     500.00"  "CORONADO     345.00"  "1 "  0 "               0.00"  0 tran_1015         "Tran CORONADO     500.00 to CORONADO     345.00 Circuit 2               0.00"   1.000  tran "CORONADO     500.00"  "CORONADO     345.00"  "2 "  0 "               0.00"  0 tran_1028         "Tran SNTAROSA     500.00 to SNTAROSA     230.00 Circuit 1               0.00"   1.000  tran "SNTAROSA     500.00"  "SNTAROSA     230.00"  "1 "  0 "               0.00"  0 tran_1029         "Tran PINAL_W      500.00 to PINALWES     345.00 Circuit 1               0.00"   1.000 

Page 162: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 tran "PINAL_W      500.00"  "PINALWES     345.00"  "1 "  0 "               0.00"  0 tran_1035         "Tran SOUTH        345.00 to SOUTH        138.00 Circuit 1SOUTH2        13.80"   1.000  tran "SOUTH        345.00"  "SOUTH        138.00"  "1 "  0 "SOUTH2        13.80"  0 tran_1036         "Tran SOUTH        345.00 to SOUTH        138.00 Circuit 2SOUTH2        13.80"   1.000  tran "SOUTH        345.00"  "SOUTH        138.00"  "2 "  0 "SOUTH2        13.80"  0 tran_1037         "Tran VAIL         345.00 to VAIL         138.00 Circuit 1VAIL          13.80"   1.000  tran "VAIL         345.00"  "VAIL         138.00"  "1 "  0 "VAIL          13.80"  0 tran_1038         "Tran VAIL2        345.00 to VAIL         138.00 Circuit 1               0.00"   1.000  tran "VAIL2        345.00"  "VAIL         138.00"  "1 "  0 "               0.00"   shunt "ADELANTO 500.00" "b " 1 9.995740 0 tran_1039         "Tran GATEWAY      345.00 to GATEWAY      115.00 Circuit 1               0.00"   1.000  tran "GATEWAY      345.00"  "GATEWAY      115.00"  "1 "  0 "               0.00"   shunt "ADELANTO 500.00" "b " 1 9.995740 0 tran_1040         "Tran WINCHSTR     345.00 to WINCHSTR     230.00 Circuit 1               0.00"   1.000  tran "WINCHSTR     345.00"  "WINCHSTR     230.00"  "1 "  0 "               0.00"  0 tran_1041         "Tran TORTOLIT     138.00 to SAG.EAST     115.00 Circuit 1               0.00"   1.000  tran "TORTOLIT     138.00"  "SAG.EAST     115.00"  "1 "  0 "               0.00"  0 tran_1042         "Tran TORTOLIT     138.00 to SAG.WEST     115.00 Circuit 1               0.00"   1.000  tran "TORTOLIT     138.00"  "SAG.WEST     115.00"  "1 "  0 "               0.00"  0 tran_1043         "Tran TORTOLIT     138.00 to TORTOLIT     500.00 Circuit 1               0.00"   1.000  tran "TORTOLIT     138.00"  "TORTOLIT     500.00"  "1 "  0 "               0.00"  0 tran_1044         "Tran TORTOLIT     138.00 to TORTLIT2     500.00 Circuit 1               0.00"   1.000  tran "TORTOLIT     138.00"  "TORTLIT2     500.00"  "1 "  0 "               0.00"  0 tran_1045         "Tran COPPERVR     345.00 to COPPERVR     230.00 Circuit 1               0.00"   1.000  tran "COPPERVR     345.00"  "COPPERVR     230.00"  "1 "  0 "               0.00"  0 tran_1046         "Tran APACHE       230.00 to APACHE       115.00 Circuit 1               0.00"   1.000  tran "APACHE       230.00"  "APACHE       115.00"  "1 "  0 "               0.00"  0 tran_1047         "Tran APACHE       230.00 to APACHE       115.00 Circuit 2               0.00"   1.000  tran "APACHE       230.00"  "APACHE       115.00"  "2 "  0 "               0.00"  0 tran_1048         "Tran BICKNELL     230.00 to BICKNELL     115.00 Circuit 1               0.00"   1.000  tran "BICKNELL     230.00"  "BICKNELL     115.00"  "1 "  0 "               0.00"  0 tran_1049         "Tran BICKNELL     345.00 to BICKNELL     230.00 Circuit 1               0.00"   1.000  tran "BICKNELL     345.00"  "BICKNELL     230.00"  "1 "  0 "               0.00"  

Page 163: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

0 tran_1050         "Tran GREEN‐AE     345.00 to GREEN‐AE     230.00 Circuit 1               0.00"   1.000  tran "GREEN‐AE     345.00"  "GREEN‐AE     230.00"  "1 "  0 "               0.00"  0 tran_1078         "Tran TORTOLIT     138.00 to TORTOLIT     500.00 Circuit 3               0.00"   1.000  tran "TORTOLIT     138.00"  "TORTOLIT     500.00"  "3 "  0 "               0.00"  0 tran_1079         "Tran KYRENE       500.00 to KYRENE       230.00 Circuit 8KYRENE8       34.50"   1.000  tran "KYRENE       500.00"  "KYRENE       230.00"  "8 "  0 "KYRENE8       34.50"  0 tran_1080         "Tran BICKNELL     230.00 to BICKNELL     115.00 Circuit 2               0.00"   1.000  tran "BICKNELL     230.00"  "BICKNELL     115.00"  "2 "  0 "               0.00"  0 tran_1081         "Tran AMRAD        115.00 to AMRAD        345.00 Circuit 1AMRAD_A       13.20"   1.000  tran "AMRAD        115.00"  "AMRAD        345.00"  "1 "  0 "AMRAD_A       13.20"  0 tran_1082         "Tran ARROYO       115.00 to ARROYO       345.00 Circuit 1               0.00"   1.000  tran "ARROYO       115.00"  "ARROYO       345.00"  "1 "  0 "               0.00"  0 tran_1083         "Tran ARROYO       115.00 to ARROYO       345.00 Circuit 2               0.00"   1.000  tran "ARROYO       115.00"  "ARROYO       345.00"  "2 "  0 "               0.00"  0 tran_1084         "Tran AFTON        115.00 to AFTON        345.00 Circuit 1               0.00"   1.000  tran "AFTON        115.00"  "AFTON        345.00"  "1 "  0 "               0.00"  0 tran_1085         "Tran CALIENTE     115.00 to CALIENTE     345.00 Circuit 1CALIEN_A      13.80"   1.000  tran "CALIENTE     115.00"  "CALIENTE     345.00"  "1 "  0 "CALIEN_A      13.80"  0 tran_1086         "Tran CALIENTE     115.00 to CALIENTE     345.00 Circuit 2               0.00"   1.000  tran "CALIENTE     115.00"  "CALIENTE     345.00"  "2 "  0 "               0.00"  0 tran_1087         "Tran DIABLO       115.00 to DIABLO       345.00 Circuit 1DIABLO_A      13.80"   1.000  tran "DIABLO       115.00"  "DIABLO       345.00"  "1 "  0 "DIABLO_A      13.80"  0 tran_1088         "Tran DIABLO       115.00 to DIABLO       345.00 Circuit 2               0.00"   1.000  tran "DIABLO       115.00"  "DIABLO       345.00"  "2 "  0 "               0.00"  0 tran_1089         "Tran DIABLO       115.00 to DIABLO       345.00 Circuit 3               0.00"   1.000  tran "DIABLO       115.00"  "DIABLO       345.00"  "3 "  0 "               0.00"  0 tran_1090         "Tran NEWMAN       345.00 to NEWMAN       115.00 Circuit 1NEWMAN_A      13.80"   1.000  tran "NEWMAN       345.00"  "NEWMAN       115.00"  "1 "  0 "NEWMAN_A      13.80"  0 tran_1091         "Tran AMBROSIA     115.00 to AMBROSIA     230.00 Circuit 1               0.00"   1.000  tran "AMBROSIA     115.00"  "AMBROSIA     230.00"  "1 "  0 "               0.00"  0 tran_1092         "Tran B‐A          345.00 to B‐A          115.00 Circuit 1               0.00"   1.000 

Page 164: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 tran "B‐A          345.00"  "B‐A          115.00"  "1 "  0 "               0.00"  0 tran_1093         "Tran NORTON       345.00 to NORTON_1     115.00 Circuit 1               0.00"   1.000  tran "NORTON       345.00"  "NORTON_1     115.00"  "1 "  0 "               0.00"  0 tran_1094         "Tran OJO          345.00 to OJO          115.00 Circuit 1               0.00"   1.000  tran "OJO          345.00"  "OJO          115.00"  "1 "  0 "               0.00"  0 tran_1095         "Tran RIOPUERC     345.00 to RIOPUERC     115.00 Circuit 1               0.00"   1.000  tran "RIOPUERC     345.00"  "RIOPUERC     115.00"  "1 "  0 "               0.00"  0 tran_1096         "Tran SAN_JUAN     345.00 to SAN_JUAN     230.00 Circuit 1               0.00"   1.000  tran "SAN_JUAN     345.00"  "SAN_JUAN     230.00"  "1 "  0 "               0.00"  0 tran_1097         "Tran SANDIA       345.00 to SANDIA_2     115.00 Circuit 1               0.00"   1.000  tran "SANDIA       345.00"  "SANDIA_2     115.00"  "1 "  0 "               0.00"  0 tran_1098         "Tran WESTMESA     230.00 to WESTMS_1     115.00 Circuit 1               0.00"   1.000  tran "WESTMESA     230.00"  "WESTMS_1     115.00"  "1 "  0 "               0.00"  0 tran_1099         "Tran WESTMESA     230.00 to WESTMS_2     115.00 Circuit 1               0.00"   1.000  tran "WESTMESA     230.00"  "WESTMS_2     115.00"  "1 "  0 "               0.00"  0 tran_1100         "Tran WESTMESA     345.00 to WESTMS_1     115.00 Circuit 1               0.00"   1.000  tran "WESTMESA     345.00"  "WESTMS_1     115.00"  "1 "  0 "               0.00"  0 tran_1101         "Tran WESTMESA     345.00 to WESTMS_2     115.00 Circuit 1               0.00"   1.000  tran "WESTMESA     345.00"  "WESTMS_2     115.00"  "1 "  0 "               0.00"  0 tran_1102         "Tran PEGS         230.00 to PEGS         115.00 Circuit 1               0.00"   1.000  tran "PEGS         230.00"  "PEGS         115.00"  "1 "  0 "               0.00"  0 tran_1103         "Tran TAOS         115.00 to TAOS         345.00 Circuit 1               0.00"   1.000  tran "TAOS         115.00"  "TAOS         345.00"  "1 "  0 "               0.00"  0 tran_1104         "Tran GLADSTON     230.00 to GLADSTON     115.00 Circuit 1               0.00"   1.000  tran "GLADSTON     230.00"  "GLADSTON     115.00"  "1 "  0 "               0.00"   shunt "GLADSTON     115.00" "b " 1 0 tran_1105         "Tran GUADLUPE     345.00 to ARGONNE4     138.00 Circuit 1               0.00"   1.000  tran "GUADLUPE     345.00"  "ARGONNE4     138.00"  "1 "  0 "               0.00"  0 tran_1106         "Tran HIDALGO      345.00 to HIDALGO      115.00 Circuit 1               0.00"   1.000  tran "HIDALGO      345.00"  "HIDALGO      115.00"  "1 "  0 "               0.00"  0 tran_1107         "Tran HIDALGO      345.00 to HIDALGO      115.00 Circuit 2               0.00"   1.000  tran "HIDALGO      345.00"  "HIDALGO      115.00"  "2 "  0 "               0.00"  0 

Page 165: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

tran_1108         "Tran LUNA         345.00 to LUNA         115.00 Circuit 1               0.00"   1.000  tran "LUNA         345.00"  "LUNA         115.00"  "1 "  0 "               0.00"  0 tran_1109         "Tran GALLEGOS     230.00 to GALLEGOS     115.00 Circuit 1               0.00"   1.000  tran "GALLEGOS     230.00"  "GALLEGOS     115.00"  "1 "  0 "               0.00"  0 tran_1110         "Tran MEAD S       230.00 to MEAD         287.00 Circuit 1               0.00"   1.000  tran "MEAD S       230.00"  "MEAD         287.00"  "1 "  0 "               0.00"  0 tran_1111         "Tran SANJN PS     345.00 to SAN_JUAN     345.00 Circuit 1               0.00"   1.000  tran "SANJN PS     345.00"  "SAN_JUAN     345.00"  "1 "  0 "               0.00"  0 tran_1112         "Tran MCKINLEY     345.00 to YAHTAHEY     115.00 Circuit 1               0.00"   1.000  tran "MCKINLEY     345.00"  "YAHTAHEY     115.00"  "1 "  0 "               0.00"  0 tran_1113         "Tran SHIP PS      230.00 to SHIPROCK     230.00 Circuit 1               0.00"   1.000  tran "SHIP PS      230.00"  "SHIPROCK     230.00"  "1 "  0 "               0.00"  0 tran_1114         "Tran PICANTE      115.00 to PICANTE      345.00 Circuit 1               0.00"   1.000  tran "PICANTE      115.00"  "PICANTE      345.00"  "1 "  0 "               0.00"  0 tran_1115         "Tran COPPERVR     345.00 to COPPERVR     230.00 Circuit 2               0.00"   1.000  tran "COPPERVR     345.00"  "COPPERVR     230.00"  "2 "  0 "               0.00"  0 tran_1116         "Tran GREEN‐AE     345.00 to GREEN‐AE     230.00 Circuit 2               0.00"   1.000  tran "GREEN‐AE     345.00"  "GREEN‐AE     230.00"  "2 "  0 "               0.00"  0 tran_1117         "Tran FT CR PS     345.00 to FT CRAIG     345.00 Circuit 1               0.00"   1.000  tran "FT CR PS     345.00"  "FT CRAIG     345.00"  "1 "  0 "               0.00"   shunt "ADELANTO 500.00" "b " 1 9.995740 0 tran_1118         "Tran ARROYO       115.00 to ARROYO       345.00 Circuit 3               0.00"   1.000  tran "ARROYO       115.00"  "ARROYO       345.00"  "3 "  0 "               0.00"  0 tran_1119         "Tran SLPOI345     345.00 to SLPOI115     115.00 Circuit 1               0.00"   1.000  tran "SLPOI345     345.00"  "SLPOI115     115.00"  "1 "  0 "               0.00"  0 line_2000 "WM‐FT CR PS  345"  line "WESTMESA 345.0" "FT CR PS 345.0" "1 "  1 0  tran "FT CR PS     345.00"  "FT CRAIG     345.00"  "1 "  0 "               0.00"   shunt "ADELANTO 500.00" "b " 1 9.995740 0 tran_2007 "ASC  115/69 T1"  tran "ASCARATE 115.0" "ASCARATE  69.0" "1 "  1 0 tran_2008 "DYER 115/69"  tran "DYER     115.0" "DYER      69.0" "1 "  1 0 

Page 166: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

tran_2009 "SPRKS 115/69"  tran "SPARKS   115.0" "SPARKS    69.0" "1 "  1 0 tran_2010 "LANE 115/69"  tran "LANE___# 115.0" "LANE      69.0" "1 "  1 0 tran_2011 "MILAGRO 115/69"  tran "MILAGRO  115.0" "MILAGRO   69.0" "1 "  1 0 tran_2012 "RG   115/69 T1"  tran "RIO_GRAN 115.0" "RIO_GRAN  69.0" "1 "  1 0 tran_2013 "SCDL 115/69"  tran "SCOTSDAL 115.0" "SCOTSDAL  69.0" "1 "  1 0 line_2074 "ASARTAP‐RG    69"  line "ASARCO_T  69.0" "RIO_GRAN  69.0" "1 "  1 0 0 line_2075 "AUS‐ASC       69"  line "AUSTIN    69.0" "ASCARATE  69.0" "1 "  1 0 0 line_2076 "BERGST‐RG     69"  line "BERGENST  69.0" "RIO_GRAN  69.0" "1 "  1 0 0 line_2077 "CLINT‐FABENS  69"  line "CLINT     69.0" "FABENS    69.0" "1 "  1 0 0 line_2078 "DYER‐AUSTIN 69 2"  line "DYER      69.0" "AUSTIN    69.0" "2 "  1 0 0 line_2079 "FABENS‐FELIPE 69"  line "FABENS    69.0" "FELIPE    69.0" "1 "  1 0 0 line_2080 "LANE‐AMERICAS 69"  line "LANE      69.0" "AMERICAS  69.0" "1 "  1 0 0 line_2081 "MANN‐LANE     69"  line "MANN      69.0" "LANE      69.0" "1 "  1 0 0 line_2082 "PROLER‐BERGST 69"  line "PROLER    69.0" "BERGENST  69.0" "1 "  1 0 0 line_2083 "PROLER‐BORDER 69"  line "PROLER    69.0" "BORDER_#  69.0" "1 "  1 0 0 line_2084 "RG‐SUNSET69 1"  line "RIO_GRAN  69.0" "SUNSET    69.0" "1 "  1 0 0 

Page 167: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_2085 "RG‐SUNSET69 2"  line "RIO_GRAN  69.0" "SUNSET    69.0" "2 "  1 0 0 line_2086 "SANTAFE‐DALLAS69"  line "SANTA_FE  69.0" "DALLAS    69.0" "1 "  1 0 0 line_2087 "SANTAFE‐SUNSET69"  line "SANTA_FE  69.0" "SUNSET    69.0" "1 "  1 0 0 line_2088 "SCOTSDA‐AUSTIN69"  line "SCOTSDAL  69.0" "AUSTIN    69.0" "1 "  1 0 0 line_2089 "SOCORRO‐VALLEY69"  line "SOCORRO   69.0" "VALLEY    69.0" "1 "  1 0 0 line_2090 "SUNSET‐ASARTAP69"  line "SUNSET    69.0" "ASARCO_T  69.0" "1 "  1 0 0 line_2091 "VALLEY‐AMERICA69"  line "VALLEY    69.0" "AMERICAS  69.0" "1 "  1 0 0 line_2092 "VALLEY‐CLINT69"  line "VALLEY    69.0" "CLINT     69.0" "1 "  1 0 0 line_2093 "RIO_BOS‐ASC  69"  line "RIO_BOS   69.0" "ASCARATE  69.0" "1 "  1 0 0 line_2094 "SOCOR‐RIO_BOS 69"  line "SOCORRO   69.0" "RIO_BOS   69.0" "1 "  1 0 0 line_2095 "SPARKS‐FELIPE69"  line "SPARKS    69.0" "FELIPE    69.0" "1 "  1 0 0 line_2118 "DALLAS‐ASCARATE169"  line "DALLAS    69.0" "ASCARATE  69.0" "1 "  1 0 0 line_2119 "FARAH‐SCOTDAL169"  line "FARAH     69.0" "SCOTSDAL  69.0" "1 "  1 0 0 line_2120 "LEO‐DYER 1    69"  line "LEO       69.0" "DYER      69.0" "1 "  1 0 0 line_2122 "MANN‐SCOTSDALE69"  line "MANN      69.0" "SCOTSDAL  69.0" "1 "  1 0 0 line_2123 "MILAGRO‐LEO   69"  line "MILAGRO   69.0" "LEO       69.0" "1 "  1 0 0 

Page 168: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

line_2124 "PD‐ASCARATE   69" line "PHELPS_D  69.0" "ASCARATE  69.0" "1 "  1 0  0 line_2125 "PD‐VISCOUNT   69"  line "PHELPS_D  69.0" "VISCOUNT  69.0" "1 "  1 0 0 line_2126 "VISCOUNT‐FARAH69"  line "VISCOUNT  69.0" "FARAH     69.0" "1 "  1 0 0 tran_2414 "COX 115/69     "  tran "COX      115.0" "COX       69.0" "1 " 1 0 line_2503 "MD‐LUNA 115"  line "MD       115.0" "HURLEY_# 115.0" "1 "  1 0  line "HURLEY_# 115.0" "LUNA     115.0" "1 "  1 0  line "HURLEY_# 115.0" "CHINO    115.0" "1 "  1 0 0 line_2507 "MIMBRES‐HERM115"  line "HERMANAT 115.0" "KINDRMOR 115.0" "1 "  1 0  line "HERMANAT 115.0" "HERMANAS 115.0" "1 "  1 0  line "HERMANAS 115.0" "HONDALE  115.0" "1 " 1 0  line "MIMBRES  115.0" "HERMANAT 115.0" "1 " 1 0 0 line_2508 "MIM‐PIC 115"  line "MIMBRES  115.0" "AIRPOR_T 115.0" "1 "  1 0  line "AIRPOR_T 115.0" "PICACHO  115.0" "1 "  1 0 0 line_2509 "BELEN‐EL_BUTTE 115"  line "BERNARDO 115.0" "BELEN_PG 115.0" "1 " 1 0  line "BERNARDO 115.0" "SOCORROP 115.0" "1 "  1 0  line "SOCORROP 115.0" "EL_BUTTE 115.0" "1 "  1 0  tran "SOCORROP  69.0" "SOCORROP 115.0" "1 " 1 0  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_2510 "EL BUT‐MIMBRES 115"  line "CABALLOT 115.0" "MIMBRES  115.0" "1 "  1 0  line "CABALLOT 115.0" "HOT_SPRG 115.0" "1 "  1 0  line "EL_BUTTE 115.0" "CUCHILLO 115.0" "1 "  1 0  line "HOT_SPRG 115.0" "CUCHILLO 115.0" "1 "  1 0 0 line_2511 "PIC‐LC 115"  line "DONA_ANA 115.0" "LAS_CRUC 115.0" "1 " 1 0  line "DONA_ANA 115.0" "PICACHO  115.0" "1 " 1 0 0 tran_2512 "DEM‐MIM  69/115"  tran "DEMINGTS  69.0" "DEMTAP1  115.0" "1 "  1 0  line "DEMGOLDT 115.0" "DEMTAP2  115.0" "1 " 1 0  line "DEMTAP1  115.0" "DEMGOLDT 115.0" "1 " 1 0 

Page 169: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "MIMBRES  115.0" "DEMTAP1  115.0" "1 "  1 0  shunt "ADELANTO 500.00" "b " 1 9.995740 0 line_2514 "HID‐PYR 115"  line "HIDALGO  115.0" "PYRTAP1  115.0" "1 "  1 0  line "PYRTAP1  115.0" "PYRAMID  115.0" "1 "  1 0 0 line_2517 "PYR‐PYRTAP2 115"  line "PYRAMID  115.0" "PYRTAP2  115.0" "1 "  1 0  tran "PLAYAS    69.0" "PLAYAS   115.0" "1 "  1 0  line "PYRTAP2  115.0" "PLAYAS   115.0" "1 "  1 0  line "PLAYAS   115.0" "PDPLAYAS 115.0" "1 "  1 0 0 tran_2518 "AFTGS‐AFT   345"  tran "AFTONG    18.0" "AFTON    345.0" "1 "  1  tran "AFTONS    13.8" "AFTON    345.0" "1 "  1 0 tran_2519 "LUNA‐LEF "  tran "LEF      345.0" "LEF_G1    18.0" "1 "  1 0  tran "LEF      345.0" "LEF_G2    18.0" "1 "  1 0  tran "LEF      345.0" "LEF_S1    18.0" "1 " 1 0  line "LUNA     345.0" "LEF      345.0" "1 " 1 0 0 line_2520 "GAVILAN‐ALGCP115"  line "GAVILAN  115.0" "RUIDOSO  115.0" "1 "  1 0  line "RUIDOSO  115.0" "HOLLYWO# 115.0" "1 " 1 0  line "HOLLYWO# 115.0" "ALAMOGCP 115.0" "1 "  1 0  tran "HOLLYWOD  69.0" "HOLLYWO# 115.0" "1 "  1 0  shunt "ADELANTO 500.00" "b " 1 8.5740 0 gen_4201          "Gen  Z345     345.0 Unit ID 1"   gen "Z345     345.00"    "1 "  0  0 gen_4202          "Gen  ZGP1150A   0.7 Unit ID 1"   gen "ZGP1150A   0.69"    "1 "  0  0 gen_4203          "Gen  ZGP2150A   0.7 Unit ID 1"   gen "ZGP2150A   0.69"    "1 "  0  0 gen_4204          "Gen  ZGP3195A   0.7 Unit ID 1"   gen "ZGP3195A   0.69"    "1 "  0  0 gen_4205          "Gen  ART320W_G1    34.5 Unit ID 1"   1.000  gen "ART320W_G1    34.50"    "1 "  0   epcl "redispatch.p"  0 gen_4206            "Gen  ART320W_G2    34.5 Unit ID 1"   1.000  gen "ART320W_G2    34.50"    "1 "  0  

Page 170: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 epcl "redispatch.p"  0 gen_4207            "Gen  ART320W_G_1‐2 34.5 Unit ID 1"   1.000  gen "ART320W_G1    34.50"    "1 "  0  gen "ART320W_G2    34.50"    "1 "  0   epcl "redispatch.p"  0 gen_4336          "Gen  NM805W_G1     34.5 Unit ID 1"   1.000  gen "NM805W_G1     34.50"    "1 "  0   epcl "redispatch.p"  0 gen_4337          "Gen  NM805W_G_1‐2  34.5          "   1.000  gen "NM805W_G1     34.50"    "1 "  0   gen "NM805W_G2     34.50"    "2 "  0   epcl "redispatch.p"  0 gen_4338          "Gen  NM805W_G_1‐3  34.5          "   1.000  gen "NM805W_G1     34.50"    "1 "  0   gen "NM805W_G2     34.50"    "2 "  0   gen "NM805W_G3     34.50"    "3 "  0   epcl "redispatch.p"  0 gen_4339          "Gen  NM805W_G_1‐4  34.5          "   1.000  gen "NM805W_G1     34.50"    "1 "  0   gen "NM805W_G2     34.50"    "2 "  0   gen "NM805W_G3     34.50"    "3 "  0   gen "NM805W_G4     34.50"    "4 "  0  epcl "redispatch.p"  0 gen_4340          "Gen  NM805W_G_1‐5  34.5          "   1.000  gen "NM805W_G1     34.50"    "1 "  0   gen "NM805W_G2     34.50"    "2 "  0   gen "NM805W_G3     34.50"    "3 "  0   gen "NM805W_G4     34.50"    "4 "  0  gen "NM805W_G5     34.50"    "5 "  0   epcl "redispatch.p"  0 gen_4341          "Gen  HL120WSG_G1   34.5 Unit ID 1"   1.000  gen "HL120WSG_G1   34.50"    "1 "  0   epcl "redispatch.p"  0 gen_4342          "Gen  HL120WSG_G1‐2 34.5 Unit ID  "   1.000  gen "HL120WSG_G1   34.50"    "1 "  0   gen "HL120WSG_G1   34.50"    "2 "  0  epcl "redispatch.p"  0 line_5043         "Line SCOTSDAL     115.0 to PICANTE      115.0 Circuit 1"   1.000  line "SCOTSDAL     115.00"  "VISTA_TAP    115.00"  "1 "  1 0  

Page 171: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

 line "PICANTE      115.00"  "VISTA_TAP    115.00"  "1 "  1 0  0 line_5073          "Line PICANTE      115.0 to VISTA__#    115.0 Circuit 1"   1.000  line "PICANTE      115.00"  "VISTA__#     115.00"  "1 "  1 0  0 line_5508         "Line CALIENTE     345.0 to CORONA       345.0 Circuit 1"   1.000  line "CALIENTE     345.00"  "CORONA       345.00"  "1 "  1 0  0 line_5509         "Line CORONA       345.0 to AMRAD        345.0 Circuit 1"   1.000  line "CORONA       345.00"  "AMRAD        345.00"  "1 "  1 0  0 line_5511         "Line CORONA       345.0 to AMRAD        345.0 Circuit 2"   1.000  line "CORONA       345.00"  "AMRAD        345.00"  "2 "  1 0  0 line_5512         "Line CORONA       345.0 to PICANTE      345.0 Circuit 1"   1.000  line "CORONA       345.00"  "PICANTE      345.00"  "1 "  1 0  0 line_5513         "Line CORONA       345.0 to NEWMAN       345.0 Circuit 1"   1.000  line "CORONA       345.00"  "NEWMAN       345.00"  "1 "  1 0  0 line_5515         "Line CORONA       345.0 to ARROYO       345.0 Circuit 1"   1.000  line "CORONA       345.00"  "ARROYO       345.00"  "1 "  1 0  0 line_5516         "Line ARROYO       345.0 to AFTON        345.0 Circuit 1"   1.000  line "ARROYO       345.00"  "AFTON        345.00"  "1 "  1 0  0 line_5998         "Loss of CORONA ‐ NM805W coridor"   1.000  line "CORONA       345.00"  "NM805RS1     345.00"  "1 "  1 0   line "NM805RS1     345.00"  "NM805RS2     345.00"  "1 "  1 0   line "NM805W       345.00"  "NM805RS2     345.00"  "1 "  1 0   line "CORONA       345.00"  "NM805RS1     345.00"  "2 "  1 0   line "NM805RS1     345.00"  "NM805RS2     345.00"  "2 "  1 0   line "NM805W       345.00"  "NM805RS2     345.00"  "2 "  1 0  0 line_5999         "Line CORONA       345.0 to NM805W       345.0 Circuit 1"   1.000  line "CORONA       345.00"  "NM805RS1     345.00"  "1 "  1 0   line "NM805RS1     345.00"  "NM805RS2     345.00"  "1 "  1 0   line "NM805W       345.00"  "NM805RS2     345.00"  "1 "  1 0  0 end # End of Contingency List  

Page 172: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Appendix D

Appendix D Ft. Craig Phase Shifting Transformer – Contingency

Analysis

Page 173: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Appendix E

Appendix E Worst Case Stability Analysis Results

Page 174: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Appendix F

Appendix F

Stability Analysis PDF Plots

Page 175: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

345 kV Cluster System Impact Study TRC November 17, 2010

Appendix H

Appendix H

345 kV Cluster Study Network Upgrades - Project Schedule

Page 176: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

ID Task Name Duration Start Finish Predecessors

1 AMRAD-ARTESIA Transmission Line 1230 days Mon 1/3/11 Fri 9/18/152 Preliminary Engineering 12 wks Mon 1/3/11 Fri 3/25/113 Right of Way/ Permitting 104 wks Mon 3/28/11 Fri 3/22/13 24 Engineering and Procurement 52 wks Mon 3/25/13 Fri 3/21/14 35 Construction and Clean UP 78 wks Mon 3/24/14 Fri 9/18/15 467 Amrad - Corona Transmissiomn Line 690 days Mon 1/3/11 Fri 8/23/138 Preliminary Engineering 4 wks Mon 1/3/11 Fri 1/28/119 Right of Way/ Permitting 52 wks Mon 2/28/11 Fri 2/24/12 810 Engineering and Procurement 52 wks Mon 2/27/12 Fri 2/22/13 911 Construction and Clean UP 26 wks Mon 2/25/13 Fri 8/23/13 101213 Corona - Arroyo Tranmission Line 680 days Mon 1/3/11 Fri 8/9/1314 Preliminary Engineering 6 wks Mon 1/3/11 Fri 2/11/1115 Right of Way/ Permitting 52 wks Mon 2/14/11 Fri 2/10/12 1416 Engineering and Procurement 52 wks Mon 2/13/12 Fri 2/8/13 1517 Construction and Clean UP 26 wks Mon 2/11/13 Fri 8/9/13 161819 Afton - Arroyo Tranmission Line 680 days Mon 1/3/11 Fri 8/9/1320 Preliminary Engineering 6 wks Mon 1/3/11 Fri 2/11/1121 Right of Way/ Permitting 52 wks Mon 2/14/11 Fri 2/10/12 2022 Engineering and Procurement 52 wks Mon 2/13/12 Fri 2/8/13 2123 Construction and Clean UP 26 wks Mon 2/11/13 Fri 8/9/13 222425 Luna - Hidalgo Tranmission Line 730 days Mon 1/3/11 Fri 10/18/1326 Preliminary Engineering 6 wks Mon 1/3/11 Fri 2/11/1127 Right of Way/ Permitting 52 wks Mon 2/14/11 Fri 2/10/12 2628 Engineering and Procurement 52 wks Mon 2/13/12 Fri 2/8/13 2729 Construction and Clean UP 36 wks Mon 2/11/13 Fri 10/18/13 283031 South - Hidalgo Tranmission Line 1280 days Mon 1/3/11 Fri 11/27/1532 Preliminary Engineering 12 wks Mon 1/3/11 Fri 3/25/1133 Right of Way/ Permitting 104 wks Mon 3/28/11 Fri 3/22/13 3234 Engineering and Procurement 52 wks Mon 3/25/13 Fri 3/21/14 3335 Construction and Clean UP 88 wks Mon 3/24/14 Fri 11/27/15 343637 Artesia Eddy County Switching Station 590 days Mon 1/3/11 Fri 4/5/1338 Preliiminary Engineering 4 wks Mon 1/3/11 Fri 1/28/1139 Permitting 26 wks Mon 1/31/11 Fri 7/29/11 3840 Engineering and Procurement 52 wks Mon 8/1/11 Fri 7/27/12 3941 Construction 36 wks Mon 7/30/12 Fri 4/5/13 404243 AA100W Switching Station 540 days Mon 1/3/11 Fri 1/25/1344 Preliiminary Engineering 4 wks Mon 1/3/11 Fri 1/28/1145 Permitting 26 wks Mon 1/31/11 Fri 7/29/11 4446 Engineering and Procurement 52 wks Mon 8/1/11 Fri 7/27/12 4547 Construction 26 wks Mon 7/30/12 Fri 1/25/13 4648

Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half

Task

Task Progress

Critical Task

Critical Task Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: EPE 345 kV Cluster ReinforceDate: Mon 11/15/10

Page 177: SYSTEM IMPACT STUDY FINAL REPORT - El Paso Electric

ID Task Name Duration Start Finish Predecessors

49 Amrad Switching Station 970 days Mon 1/3/11 Fri 9/19/1450 Preliiminary Engineering 4 wks Mon 1/3/11 Fri 1/28/1151 Permitting 26 wks Mon 1/31/11 Fri 7/29/11 5052 Engineering and Procurement 112 wks Mon 8/1/11 Fri 9/20/13 5153 Construction 52 wks Mon 9/23/13 Fri 9/19/14 525455 Corona Switching Station 970 days Mon 1/3/11 Fri 9/19/1456 Preliiminary Engineering 4 wks Mon 1/3/11 Fri 1/28/1157 Permitting 26 wks Mon 1/31/11 Fri 7/29/11 5658 Engineering and Procurement 112 wks Mon 8/1/11 Fri 9/20/13 5759 Construction 52 wks Mon 9/23/13 Fri 9/19/14 586061 Picante Switching Station 640 days Mon 1/3/11 Fri 6/14/1362 Preliiminary Engineering 4 wks Mon 1/3/11 Fri 1/28/1163 Permitting 26 wks Mon 1/31/11 Fri 7/29/11 6264 Engineering and Procurement 62 wks Mon 8/1/11 Fri 10/5/12 6365 Construction 36 wks Mon 10/8/12 Fri 6/14/13 646667 Arroyo Substation 690 days Mon 1/3/11 Fri 8/23/1368 Preliiminary Engineering 8 wks Mon 1/3/11 Fri 2/25/1169 Permitting 26 wks Mon 2/28/11 Fri 8/26/11 6870 Engineering and Procurement 52 wks Mon 8/29/11 Fri 8/24/12 6971 Construction 52 wks Mon 8/27/12 Fri 8/23/13 707273 Afton Switching Station 460 days Mon 1/3/11 Fri 10/5/1274 Preliiminary Engineering 4 wks Mon 1/3/11 Fri 1/28/1175 Permitting 26 wks Mon 1/31/11 Fri 7/29/11 7476 Engineering and Procurement 36 wks Mon 8/1/11 Fri 4/6/12 7577 Construction 26 wks Mon 4/9/12 Fri 10/5/12 767879 Luna Switching Station 690 days Mon 1/3/11 Fri 8/23/1380 Preliiminary Engineering 8 wks Mon 1/3/11 Fri 2/25/1181 Permitting 26 wks Mon 2/28/11 Fri 8/26/11 8082 Engineering and Procurement 52 wks Mon 8/29/11 Fri 8/24/12 8183 Construction 52 wks Mon 8/27/12 Fri 8/23/13 828485 Hidalgo Switching Station 955 days Mon 1/3/11 Fri 8/29/1486 Preliiminary Engineering 1 wk Mon 1/3/11 Fri 1/7/1187 Permitting 26 wks Mon 1/10/11 Fri 7/8/11 8688 Engineering and Procurement 112 wks Mon 7/11/11 Fri 8/30/13 8789 Construction 52 wks Mon 9/2/13 Fri 8/29/14 889091 South Substation 575 days Mon 1/3/11 Fri 3/15/1392 Preliiminary Engineering 1 wk Mon 1/3/11 Fri 1/7/1193 Permitting 26 wks Mon 1/10/11 Fri 7/8/11 9294 Engineering and Procurement 52 wks Mon 7/11/11 Fri 7/6/12 9395 Construction 36 wks Mon 7/9/12 Fri 3/15/13 94

Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half

Task

Task Progress

Critical Task

Critical Task Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline