Symbol: “CWET”

19
Symbol: “CWET”

description

Symbol: “CWET” . Ronald W. Pickett President and CEO CLEAN WIND ENERGY, INC. 1997 Annapolis Exchange Parkway Suite 300 Annapolis, Maryland 21401 410-972-4713. - PowerPoint PPT Presentation

Transcript of Symbol: “CWET”

Page 1: Symbol:  “CWET”

Symbol: “CWET”

Page 2: Symbol:  “CWET”

Ronald W. PickettPresident and CEO CLEAN WIND ENERGY, INC.

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

1997 Annapolis Exchange Parkway Suite 300Annapolis, Maryland 21401410-972-4713

Page 3: Symbol:  “CWET”

Clean Wind Energy, inc. ( the “Company”) believes that some of the statements included in this release may constitute "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, Section 21E of the Securities Exchange Act of 1934, and as that term is defined in the Private Litigation Reform Act of 1995. Such statements involve a number of risks and uncertainties such as competitive factors, technological development, market demand and the Company’s ability to obtain new contracts and accurately estimate net revenues due to variability in size, scope and duration of projects, and internal issues in the sponsoring client. Further information on potential factors that could affect the Company’s financial results, can be found in the Company’s various filings with the Securities and Exchange Commission (SEC).

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Forward Looking Statements

Page 4: Symbol:  “CWET”

Introduction

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

The United States and Other Nations are Aggressively Pursuing Energy Independence

• Clean, sustainable energy solution

• Efficient and cost-effective renewable resources to serve society

• Avoid the adverse effects of fossil and nuclear fuels

• Operate 24/7, steadily outperforming -- Solar Collectors- That produce only when the sun shines Wind Turbines -That produce only when the wind blows

Page 5: Symbol:  “CWET”

The Principle The downdraft tower is a hollow cylinder

with a water spray system at the top. Water is pumped to the top of the tower

and sprayed as a fine mist across the entire opening.

The water evaporates and cools the hot dry air at the top.

The cooled air is more dense and heavier than the outside warmer air and falls through the cylinder at speeds up to and beyond 50 MPH, driving turbines located inside the tower’s base.

The turbines power generators to produce electricity.

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Technology - How the Wind Energy Tower Works

Page 6: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Technology – Innovative Renewable Energy Solution

Patented Technology

• Maximizes the capture and use of available wind tunnel energy.

• Extracts the maximum energy generated by the captured wind, with the least loss of power throughout the transmission cycle from capture to exhaust.

• Produces a consistent level of power output while compensating for the normal differentials in atmospheric conditions over any given period.

• In geographic areas where atmospheric conditions are conducive, Downdraft Tower exterior may be constructed with vertical “wind vanes” that capture the prevailing wind and channel it to produce supplemental electrical power.

This dual renewable energy resource enhances the capability and productivity of the Clean Wind system.

Page 7: Symbol:  “CWET”

Operates with virtually no carbon footprint

Consumes no fuels Produces no waste at the

tower site Generates clean, cost-effective

and efficient electrical power

No damaging effects caused by using fossil or nuclear fuels, and other conventional power sources.

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Environmental Aspects

Clean Wind Energy Tower

Page 8: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Patent Applications

The Company has filed U.S. patent applications to protect its intellectual property, which they believe will further enhance this potential revolutionary technology.

Modified Mobil Base for Large Tower Cranes- A multi-wheeled air ride suspension system with even load distribution on 20 or more wheels, with the ability to keep tower plumb in all working conditions

Improved Wind Energy Power Transmission System - To more effectively transmit energy via a new multi-stage variable hydraulic drive system that operates efficiently through a very broad range of wind and turbine speeds.

Energy Tower Having External Wind Capturing Capacity - To supplement the available energy of an energy tower by capturing existing winds aloft (800 to 4,000 ft).

Page 9: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Site Requirements

The Downdraft Tower location Requirements • Minimum area of 300-400 acres for project , offices and security

• Appropriate climate and atmospheric conditions.

• Hot temperatures

• Dry Air

• Low elevation

• Access to reliable water sources (fresh or salt water)

• Bedrock foundation

• Access to rail service

• Access to the grid

Page 10: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Ideal Global Target Areas For Tower Placement

Page 11: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Abundant, Clean, Affordable Energy Production

As designed, the Company anticipates that each Downdraft Tower could generate enough electricity to power up to 1,600,000 homes

• Each Downdraft Tower capable of generating up to 2,500 megawatts per hour, gross.

• Approx 1/3 will power its operations.

• 1,100 to 1,500 megawatts per hour available for sale to the power grid.

• Prime production periods closely align with electricity demand patterns.

• The annual capacity factor for the downdraft portion of the Energy Tower is predicted at approximately 51%.

Page 12: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Economic Benefits

Economic Growth During Tower Construction Phase

Since the downdraft Towers will be constructed using conventional materials, equipment and techniques, San Luis associated industries will benefit significantly by the creation of 2 Towers.Employment • 2,500 construction and transportation jobs,

• 1,000 manufacturing jobs

Ongoing Economic Stability • 1,000 permanent jobs per Tower, skilled and professional

• Affordable electrical power to the Arizona grid / resale power to California grid

Page 13: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

World Class Participants

CWE is in process of aligning itself with industry leaders for construction:

Kroll Cranes A/S• Built world’s largest crane, K-10,000• Guaranteed ability to construct Downdraft Towers

using self erecting crane technology.

General Electric• International energy conglomerate with substantial expertise• World leader in generator technology

Bosch Rexroth Corp.• Industrial hydraulics group located in Bethlehem, PA• Part of Bosch Group, global supplier of industrial Systems

Page 14: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Investment Highlights

• Favorable market and regulatory environment for renewable wind energy.

• Proven and validated technologies and construction systems.

• Patent applications to perfect and enhance technology.

• Company has selected and is aggressively moving towards building the first Tower site in the U.S.

• In negotiations for a site in Mexico that meets conditions required to host the Tower.

• World class partners to construct first of its kind project.

• Dedicated team of experienced business professionals, consulting engineers and scientists.

Clean Wind Energy’s Single, Large Downdraft Tower Structure Will Produce Abundant, Inexpensive Electricity.

Page 15: Symbol:  “CWET”

• Meets suitable climate requirements• Offers grid access• Provides convenient rail access• Major Employment Opportunities• Potential U.S. Border Security Enhancement• City of San Luis, Public Information Hearing scheduled

for March 29th, 2012 • City of San Luis, Planning and Zoning Commission has

scheduled a hearing for April 10, 2012.

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

San Luis, Arizona First United States Site

Page 16: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

San Luis Tower Site Plan

View From Top of Tower Facing South

Page 17: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

San Luis Tower Site

Page 18: Symbol:  “CWET”

Composite View of U.S. & Mexico Tower Sites

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Page 19: Symbol:  “CWET”

Contents of this document are the property of Clean Wind Energy, Inc. and are privileged and confidential. Any dissemination or use of the contents of this document is strictly prohibited without express written consent.

Thank You

Contact Information

Ronald W. PickettPresident and CEO1997 Annapolis Exchange ParkwaySuite 300Annapolis, Maryland 21401Office 410-972-4713

www.cleanwindenergytower.com

Re-Inventing Renewable EnergyInvesting in Tomorrow…..