RECEPTION BRICK BUILDING TILE ROOF RECORDS ICU PATHOLOGY AWNING BRICK BUILDING TILE ROOF OPERATING SUITE BRICK BUILDING TILE ROOF COMMUNITY HEALTH CENTRE BRICK BUILDING METAL ROOF COMMUNITY HEALTH CENTRE BRICK BUILDING METAL ROOF COMMUNITY HEALTH CENTRE BRICK BUILDING METAL ROOF COMMUNITY HEALTH CENTRE BRICK BUILDING METAL ROOF 5 0.00 651.00 651.00 652.00 652.00 652.00 652.00 652.00 653.00 653.00 8 648.87 TG 652.50 GUTTER FLOOR RIDGE INS CONCRETE ROOF INVERT E.CABLE MARKERS TE GRATE BITUMEN B GRATE VALVE WATER VALVE STOP AWNING POST PLASTIC PIT LID GUTTER GUTTER PIPE METAL CONCRETE TEL TAP GAS REG. GRATE GUTTER INS VALVES WATER GARDEN ROOF METAL EXHAUST STACK HEAD SILL HEAD SILL HEAD SILL HEAD SILL WINDOWS SHUTTERS WITH BITUMEN GRATE TK METAL PIT LID ROOF CONCRETE WALKWAYS CONCRETE STAIRWELL G FLOOR 1ST FLOOR LAMP HOLE EARTH CONCRETE AND LANDING CONCRETE METAL RAMP ELEVATED A.C SLAB GAS CYLINDER STORAGE METAL AWNING CONCRETE RAMP TEL SIGN TK TK TK TK TK STOP VALVE HYDRANT METAL PIT LID METAL PIT LID TK TK PATHWAY KERB ONCRETE GUTTER VEHICLE CROSSING CONCRETE DRIVEWAY GRASS GRASS STORMWATER PITS STORMWATER PITS GRATE TK SEWER PIT STORMWATER PIT STORMWATER PIT GREASE TRAP WATER VALVES DISUSED CONC PIPE 1.0D INVERT RL 646.48 CERAMIC PIPE 0.3D INVERT RL 647.49 CONC PIPE 0.525D INVERT INVERT C PIP E 0D INVERT PVC PIPE 0.375D INVERT RL 647.39 PVC PIPE 0.10D INVERT RL 648.79 PVC PIPE 0.10D INVERT RL 652.15 PVC PIPE 0.14D INVERT RL 651.90 PVC PIPE 0.10D INVERT RL 651.94 PVC PIPE 0.10D INVERT RL 653.05 CONC PIPE 0.15D INVERT RL 652.56 METAL PIPE 0.15D INVERT RL 652.42 C ER AMIC P INVERT R L CERAMIC PIPE 0.15D INVERT RL 652.14 INACCESSIBLE METAL PIPE 0.15D INVERT RL 652.01 CONC PIPE 0.15D INVERT CONC PIPE 0.45D INVERT RL 648.49 CONC PIPE 0.3D INVERT RL 648.60 CONC PIPE 0.45D INVERT RL 650.94 CERAMIC PIPE 0.15D INVERT RL 651.37 CERAMIC PIPE 0.15D INVERT RL 651.36 INACCESSIBLE RL 652.31 64 8. 11 RL 647.19 647.38 651.47 651.54 TK TK BOL SP TG 654.35 GARDEN GARDEN TG 654.39 A/C METAL FENCE TG 654.30 RDG 655.93 TG 654.34 RDG 657.73 PIER PIER TG 654.34 RDG 656.24 TG 654.36 TG 654.34 TG 654.37 TG 6 60 .9 EAVE 658.03 EAVE 658.99 TG 659.75 EAVE 660.10 TG 665.75 TG 664.29 TG 665.76 METAL BALCONY GRATE 653.21 A/C 655.26 ? A/C 656.69 INVERT RL 653.02 0.375D SWP #11 216°27'40" 126°38'45" 210.61 SWP #12 SWP #33 SWP #34 SWP #35 SWP #36 SWP #39 SWP #40 SWP #41 SWP #42 SWP #43 SWP #44 SWP #45 SWP #46 SWP #47 SWP #51 SWP #53 SWP #54 SWP #56 CP #3 CP #4 CP #5 CP #6 CP #7 CP #8 CP #9 CP #12 CP #13 CP #14 SP #4 SP #5 SP #17 SP #18 SP #19 OXYGEN LINES CONFIRMED BY PS CONFIRMED BY PS CONFIRMED BY PS CONFIRMED BY PS CONFIRMED BY PS ED 1ST FLOOR CONFIRMED BY PS E.O.T E.O.T 0.375D 0.375D 0.375D 0.375D 0.375D 0.300D 0.375D 0.150D 1 2 3 4 TOP OF TANK RL 654·11 TOP OF TANK RL 654·10 OXYGEN TANK SPRINKLER TANK PUMP HOUSE DOMESTIC COLD WATER RPZ BOOSTER ASSEMBLY App Project Ref Sheet Scale Drawn Designed Project Director Approved Date COPYRIGHT All rights reserved. These drawings, plans and specifications and the copyright therein are the property of the Bonacci Group and must not be used, reproduced or copied wholly or in part without the written permission of the Bonacci Group. By Date Description Rev North Drawing No Rev Date App By Date Description Rev Project Drawing Name Title File: G:\Job\11294\03 WIP\02 Civil\01 CAD\CV-MW-00-00005.dwg Plotted: 23.10.19 at 5:17 PM By: Shebak Khan BONACCI GROUP ( NSW ) Pty Ltd ABN 29 102 716 352 Consulting Engineers, Structural - Civil - Infrastructure Level 6, 37 York Street, Sydney, NSW 2000 Australia Tel: +61 2 8247 8400 Fax: +61 2 8247 8444 [email protected]www.bonaccigroup.com G SOIL AND WATER MANAGEMENT PLAN CV-MW-00-00005 GOULBURN HOSPITAL AND HOSPITAL SERVICES REDEVELOPMENT FOR CONSTRUCTION CERTIFICATE
EXCAVATION FOR THE OSD TANK CAN BE USED AS SEDIMENT BASIN AREA = 125m³ (REFER DRG 006)
AutoCAD SHX Text
TEMPORARY SHAKER RAMP FOR ENTRY/EXIT. LOCATION TO BE CONFIRMED ON-SITE
AutoCAD SHX Text
INSTALL SEDIMENT FENCE (REFER TO DETAIL)
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL HOARDING/SITE FENCE
AutoCAD SHX Text
INSTALL SEDIMENT FENCE (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
PROVIDE KERB INLET SEDIMENT TRAP (REFER TO DETAIL)
AutoCAD SHX Text
TEMPORARY STOCKPILE WITH SEDIMENT FENCE - LOCATION TO BE DETERMINED BY SITE SUPERINTENDENT
AutoCAD SHX Text
PROVIDE OUTLET PROTECTION TO DISSIPATE FLOWS
AutoCAD SHX Text
0
AutoCAD SHX Text
10
AutoCAD SHX Text
30
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
20
AutoCAD SHX Text
0
AutoCAD SHX Text
10
AutoCAD SHX Text
30
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
20
AutoCAD SHX Text
B1
AutoCAD SHX Text
SK
AutoCAD SHX Text
DV
AutoCAD SHX Text
1:200
AutoCAD SHX Text
MAY 19
AutoCAD SHX Text
THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
0m
AutoCAD SHX Text
2m
AutoCAD SHX Text
1:200
AutoCAD SHX Text
4m
AutoCAD SHX Text
8m
AutoCAD SHX Text
12m
AutoCAD SHX Text
24.50
AutoCAD SHX Text
SITE BOUNDARY
AutoCAD SHX Text
EX SURFACE LEVEL
AutoCAD SHX Text
EX SURFACE CONTOUR
AutoCAD SHX Text
5.00
AutoCAD SHX Text
EX TREE
AutoCAD SHX Text
EXISTING SEWER LINE
AutoCAD SHX Text
EXISTING WATER MAIN
AutoCAD SHX Text
EXISTING GAS LINE
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE
AutoCAD SHX Text
EXISTING ELECTRICAL LINE
AutoCAD SHX Text
EXISTING STORMWATER DRAINAGE LINE
AutoCAD SHX Text
EXISTING UNKNOWN SERVICE
AutoCAD SHX Text
A
AutoCAD SHX Text
ISSUED FOR 50% DD
AutoCAD SHX Text
28.03.19
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
B
AutoCAD SHX Text
ISSUED FOR 80% DD
AutoCAD SHX Text
03.05.19
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
C
AutoCAD SHX Text
ISSUED FOR 100% DD
AutoCAD SHX Text
10.05.19
AutoCAD SHX Text
SK
AutoCAD SHX Text
-
AutoCAD SHX Text
D
AutoCAD SHX Text
ISSUED FOR 100% DD
AutoCAD SHX Text
29.05.19
AutoCAD SHX Text
SK
AutoCAD SHX Text
-
AutoCAD SHX Text
E
AutoCAD SHX Text
ISSUED FOR 100% DD
AutoCAD SHX Text
12.06.19
AutoCAD SHX Text
DV
AutoCAD SHX Text
-
AutoCAD SHX Text
F
AutoCAD SHX Text
FOR 109R SUBMISSION
AutoCAD SHX Text
16.10.19
AutoCAD SHX Text
DS
AutoCAD SHX Text
-
AutoCAD SHX Text
SOIL AND WATER MANAGEMENT NOTES 1. IT HAS BEEN ASSUMED THAT HOARDINGS/SILT FENCING WILL BE PROVIDED TO THE STAGE BOUNDARY IT HAS BEEN ASSUMED THAT HOARDINGS/SILT FENCING WILL BE PROVIDED TO THE STAGE BOUNDARY SUFFICIENT TO PREVENT SEDIMENT RUNOFF FROM LEAVING SITE (EXCEPT IN THE CASE OF ENTRY/EXIT LOCATIONS WHERE TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP ARE PROVIDED). IF THIS IS NOT THE CASE, PROVIDE SEDIMENT FENCE TO STANDARD DETAIL BELOW AS REQUIRED TO PREVENT SEDIMENT FROM LEAVING SITE, DIRECT RUNOFF TO SEDIMENT BASIN. 2. ALL SEDIMENT CONTROL MEASURES TO BE INSTALLED IN ACCORDANCE WITH LANDCOM MANAGING ALL SEDIMENT CONTROL MEASURES TO BE INSTALLED IN ACCORDANCE WITH LANDCOM MANAGING URBAN STORMWATER "BLUE BOOK". 3. SEDIMENT CONTROL FOR LANDSCAPED WORKS DOWNSTREAM OF THE BUILDING TO INCLUDE A SILT SEDIMENT CONTROL FOR LANDSCAPED WORKS DOWNSTREAM OF THE BUILDING TO INCLUDE A SILT FENCE AND SANDBAGS AS REQUIRED. INSTALL BUND TO DIVERT UPSTREAM CATCHMENT AWAY FROM DISTURBED SOIL AREA. TO BE MANAGED AT A RATE OF *** L/S PER HA BY THE CONTRACTOR ON SITE. *** L/S PER HA BY THE CONTRACTOR ON SITE. PER HA BY THE CONTRACTOR ON SITE. SEDIMENT CONTROL CONDITIONS 1. SEDIMENT FENCES WILL BE INSTALLED AS SHOWN AND ELSEWHERE AT THE DISCRETION OF THE SITE SEDIMENT FENCES WILL BE INSTALLED AS SHOWN AND ELSEWHERE AT THE DISCRETION OF THE SITE MANAGER TO CONTAIN COARSER SEDIMENT FRACTIONS INCLUDING AGGREGATED FINES) AS NEAR AS POSSIBLE TO THEIR SOURCE. 2. SEDIMENT REMOVED FROM ANY TRAPPING DEVICE WILL BE RELOCATED WHERE FURTHER POLLUTION TO SEDIMENT REMOVED FROM ANY TRAPPING DEVICE WILL BE RELOCATED WHERE FURTHER POLLUTION TO DOWNSLOPE LANDS & WATERWAYS CANNOT OCCUR. 3. STOCKPILES WILL BE PLACED WHERE SHOWN ON DRAWING OR ELSEWHERE AT THE DISCRETION OF THE STOCKPILES WILL BE PLACED WHERE SHOWN ON DRAWING OR ELSEWHERE AT THE DISCRETION OF THE SITE MANAGER AND NOT WITHIN 5m OF HAZARD AREAS INCLUDING LIKELY AREAS OF HIGH VELOCITY FLOWS SUCH AS WATERWAYS, PAVED AREAS & DRIVEWAYS. 4. WATER WILL BE PREVENTED FROM DIRECTLY ENTERING THE PERMANENT DRAINAGE SYSTEM WITH WATER WILL BE PREVENTED FROM DIRECTLY ENTERING THE PERMANENT DRAINAGE SYSTEM WITH INLET FILTERS (SEE DETAILS) UNLESS IT IS SEDIMENT FREE. 5. TEMPORARY SEDIMENT TRAPS WILL BE RETAINED UNTIL AFTER THE LANDS THEY ARE PROTECTING TEMPORARY SEDIMENT TRAPS WILL BE RETAINED UNTIL AFTER THE LANDS THEY ARE PROTECTING ARE COMPLETELY REHABILITATED. 6. CONTRACTOR TO DESIGN/SIZE/CONSTRUCT TEMPORARY SEDIMENT BASIN, WATER SHOULD BE CONTRACTOR TO DESIGN/SIZE/CONSTRUCT TEMPORARY SEDIMENT BASIN, WATER SHOULD BE ALLOWED TO SETTLE BEFORE DISCHARGE. CONTRACTOR MUST VERIFY THAT WATER QUALITY MEETS AUTHORITIES REQUIREMENTS PRIOR TO DISCHARGE . ACCUMULATED SEDIMENT SHOULD THEN BE REMOVED & DISPOSED OF IN ACCORDANCE WITH ENVIRONMENTAL MANAGEMENT PROCEDURES. SITE INSPECTION & MAINTENANCE CONDITIONS THE SITE MANAGER WILL INSPECT THE SITE AT LEAST WEEKLY AND WILL: 1. ENSURE THAT DRAINS OPERATE PROPERLY & TO EFFECT ANY NECESSARY REPAIRS ENSURE THAT DRAINS OPERATE PROPERLY & TO EFFECT ANY NECESSARY REPAIRS 2. REMOVE SPILLED SAND OR OTHER MATERIALS FROM HAZARD AREAS, INCLUDING LANDS CLOSER THAN REMOVE SPILLED SAND OR OTHER MATERIALS FROM HAZARD AREAS, INCLUDING LANDS CLOSER THAN 5m FROM AREAS OF LIKELY CONCENTRATED OR HIGH VELOCITY FLOWS ESPECIALLY WATERWAYS & PAVED AREAS. 3. REMOVE TRAPPED SEDIMENT WHENEVER LESS THAN DESIGN CAPACITY REMAINS WITHIN THE REMOVE TRAPPED SEDIMENT WHENEVER LESS THAN DESIGN CAPACITY REMAINS WITHIN THE STRUCTURE 4. ENSURE REHABILITATED LANDS HAVE EFFECTIVELY REDUCED THE EROSION HAZARD AND TO INITIATE ENSURE REHABILITATED LANDS HAVE EFFECTIVELY REDUCED THE EROSION HAZARD AND TO INITIATE UPGRADING OR REPAIR AS APPROPRIATE. 5. CONSTRUCT ADDITIONAL EROSION AND/OR SEDIMENT CONTROL WORKS AS MIGHT BECOME NECESSARY CONSTRUCT ADDITIONAL EROSION AND/OR SEDIMENT CONTROL WORKS AS MIGHT BECOME NECESSARY TO ENSURE THE DESIRED PROTECTION IS GIVEN TO DOWNSLOPE LANDS AND WATERWAYS. 6. MAINTAIN EROSION & SEDIMENT CONTROL MEASURES IN A FULLY FUNCTIONING CONDITION UNTIL ALL MAINTAIN EROSION & SEDIMENT CONTROL MEASURES IN A FULLY FUNCTIONING CONDITION UNTIL ALL EARTHWORK ACTIVITIES ARE COMPLETED AND THE SITE IS REHABILITATED. 7. REMOVE TEMPORARY SOIL CONSERVATION STRUCTURES AS THE LAST ACTIVITY IN THE REMOVE TEMPORARY SOIL CONSERVATION STRUCTURES AS THE LAST ACTIVITY IN THE REHABILITATION PROGRAM. AS PART OF THE STATUTORY 'DILIGENCE OF CARE' RESPONSIBILITIES, THE SITE MANAGER WILL KEEP A LOGBOOK MAKING ENTRIES AT LEAST WEEKLY, IMMEDIATELY BEFORE FORECAST RAIN AND AFTER RAINFALL. ENTRIES WILL INCLUDE: 1. THE VOLUME & INTENSITY OF ANY RAINFALL EVENTS THE VOLUME & INTENSITY OF ANY RAINFALL EVENTS 2. THE CONDITION OF ANY SOIL & WATER MANAGEMENT WORKS THE CONDITION OF ANY SOIL & WATER MANAGEMENT WORKS 3. THE CONDITION OF VEGETATION & ANY NEED TO IRRIGATE THE CONDITION OF VEGETATION & ANY NEED TO IRRIGATE 4. THE NEED FOR DUST PREVENTION STRATEGIES THE NEED FOR DUST PREVENTION STRATEGIES 5. ANY REMEDIAL WORKS TO BE UNDERTAKEN ANY REMEDIAL WORKS TO BE UNDERTAKEN THE BOOK WILL BE KEPT ONSITE & MADE AVAILABLE TO ANY AUTHORISED PERSON ON REQUEST. IT WILL BE GIVEN TO THE PROJECT MANAGER AT THE CONCLUSION OF WORKS.
AutoCAD SHX Text
SEDIMENT FENCE
AutoCAD SHX Text
CATCH DRAIN/EARTH BUND
AutoCAD SHX Text
CD
AutoCAD SHX Text
TEMPORARY SHAKER RAMP FOR ENTRY/EXIT. (LOCATION TBC ON-SITE)
AutoCAD SHX Text
TEMPORARY STOCKPILE (LOCATION TBC ON-SITE)
AutoCAD SHX Text
GEOTEXTILE PIT FILTER / FILTER SURROUND INSTALLED ON EXISTING PIT
AutoCAD SHX Text
SANDBAGS INSTALLED ON EXISTING PIT
AutoCAD SHX Text
BARRIER FENCING (HOARDING/SECURITY FENCE)
AutoCAD SHX Text
OVERLAND FLOW
AutoCAD SHX Text
G
AutoCAD SHX Text
FOR CONSTRUCTION CERTIFICATE
AutoCAD SHX Text
23.10.19
AutoCAD SHX Text
DS
AutoCAD SHX Text
-
App
Project Ref
Sheet
Scale
Drawn
Designed
Project Director Approved Date
COPYRIGHT All rights reserved.
These drawings, plans and specifications and the copyright therein are the property of the Bonacci
Group and must not be used, reproduced or copied wholly or in part without the written permission
CATTLE GRID 3.0M NOM WIDTH SET 300MM ABOVE GROUND OR TIMBER SLEEPER 100MM HIGH AT 200 CTS
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
F42 FABRIC TO AS 1304 WHERE GEOFABRIC IS NOT SELF SUPPORTING
AutoCAD SHX Text
ON GRADE KERB INLET SEDIMENT TRAP
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
THREE LAYERS OF SANDBAGS WITH ENDS OVERLAPPED.
AutoCAD SHX Text
BYPASS FLOW TO INLET
AutoCAD SHX Text
600 NOM gap between bags act as spillway
AutoCAD SHX Text
RUNOFF
AutoCAD SHX Text
1500 MIN
AutoCAD SHX Text
SANDBAGS OVERLAP ONTO KERB
AutoCAD SHX Text
4000 MIN
AutoCAD SHX Text
GEOFABRIC FABRIC, BIDUM U34 OR SIMILAR
AutoCAD SHX Text
POSTS OR STEEL PICKETS DRIVEN 600MM INTO GROUND
AutoCAD SHX Text
TEMPORARY CONSTRUCTION VEHICLE ENTRY/EXIT SEDIMENT TRAP
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SEDIMENT FENCE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ENSURE SANDBAGS SURROUND ENTIRE KERB INLET
AutoCAD SHX Text
RUN OFF
AutoCAD SHX Text
SANDBAG KERB INLET SEDIMENT TRAP
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
RUNOFF TO BE DIRECTED TO SEDIMENT TRAP
AutoCAD SHX Text
UNBOUND PAVEMENT MATERIAL (GRAVEL)
AutoCAD SHX Text
200
AutoCAD SHX Text
150
AutoCAD SHX Text
NOM
AutoCAD SHX Text
MIN
AutoCAD SHX Text
300
AutoCAD SHX Text
ALTERNATIVE 1
AutoCAD SHX Text
ALTERNATIVE 2
AutoCAD SHX Text
CRUSHED OR GRANNULAR MATERIAL, GRADING TO TABLE 4 OF QT SPECIFICATION MRS11.03.
AutoCAD SHX Text
50X50 HW STAKE OR STEEL PICKET 1200 MIN LONG
AutoCAD SHX Text
OVERLAND FLOW
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
GEOTEXTILE FABRIC AND F42
AutoCAD SHX Text
FIX TO TOP OF STAKE WITH SHADECLOTH FASTENER OR TIE TO STEEL PICKET.
AutoCAD SHX Text
GEOTEXTILE FABRIC AND F42
AutoCAD SHX Text
FIX TO TOP OF STAKE WITH SHADECLOTH FASTENER OR TIE TO STEEL PICKET.
AutoCAD SHX Text
50X50 HW STAKE OR STEEL PICKET 1200 MIN LONG
AutoCAD SHX Text
OVERLAND FLOW
AutoCAD SHX Text
EXISTING PIT OR GRATE AS SPECIFIED
AutoCAD SHX Text
RUNOFF WATER WITH SEDIMENT
AutoCAD SHX Text
FILTERED WATER
AutoCAD SHX Text
GEOTEXTILE FILTER FABRIC WRAPPED OVER GRATE.
AutoCAD SHX Text
GEOTEXTILE PIT FILTER 2
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
300mm MIN. MOUND
AutoCAD SHX Text
NATURAL SURFACE
AutoCAD SHX Text
300mm MAX. DEPTH
AutoCAD SHX Text
CATCH DRAIN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FALL -1:3 MINIMUM 1:3 MINIMUM 1:6 DESIRABLE
AutoCAD SHX Text
ALTERNATIVE SEDIMENT FENCE
AutoCAD SHX Text
ROCK OR GRAVEL ANCHORING
AutoCAD SHX Text
F82 MESH SUPPORT
AutoCAD SHX Text
JUTE MESH FABRIC OR TO ENVIRONMENTAL CONSULTANTS SPECIFICATIONS
AutoCAD SHX Text
SANDBAG OR ROCK ANCHORING
AutoCAD SHX Text
TRENCH MESH SUPPORTS AT 2m CTRS
AutoCAD SHX Text
ALTERNATIVE SEDIMENT FENCE NOTES 1. INSTALL THIS TYPE OF SEDIMENT FENCE WHEN USE OF SUPPORT POSTS IS NOT DESIRABLE OR NOT POSSIBLE. SUCH CONDITIONS MIGHT APPLY, FOR EXAMPLE, WHERE APPROVAL IS GRANTED FROM THE APPROPRIATE AUTHORITIES TO PLACE THESE FENCES IN HIGHLY SENSITIVE ESTUARINE AREAS. 2. USE BENT TRENCH MESH TO SUPPORT THE F82 WELDED MESH FACING AS SHOWN ON THE DRAWING ABOVE. ATTACH THE JUTE MESH TO THE WELDED MESH FACING USING UV-RESISTANT CABLE TIES. 3. STABILISE THE WHOLE STRUCTURE WITH SANDBAG OR ROCK ANCHORING OVER THE TRENCH MESH AND THE LEADING EDGE OF THE JUTE MESH. THE ANCHORING SHOULD BE SUFFICIENTLY LARGE TO ENSURE STABILITY OF THE STRUCTURE IN THE DESIGN STORM EVENT, USUALLY THE 10 YEAR EVENT.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
GEOTEXTILE PIT FILTER 1
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
GEOTEXTILE FILTER FABRIC EMBEDDED 200 MIN INTO GROUND. REFER TO SEDIMENT FENCE DETAIL
AutoCAD SHX Text
RUNOFF WATER WITH SEDIMENT
AutoCAD SHX Text
FILTERED WATER
AutoCAD SHX Text
STAR PICKETS
AutoCAD SHX Text
GEOTEXTILE FILTER FABRIC
AutoCAD SHX Text
GRATE AS SPECIFIED
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
KERB INLET SEDIMENT TRAP
AutoCAD SHX Text
GRAVEL FILLED FABRIC SILT BAG (SAUSAGE) LENGTH TO SUIT PIT LINTEL LENGTH