Switchgear Instruction Manual 1 Version 1 4 (2)

231

Click here to load reader

description

how to operate various types of switchgear

Transcript of Switchgear Instruction Manual 1 Version 1 4 (2)

  • Issue Date

    4 May 2010Version Number

    Version 1.4

    Networks

    License Grant.Artefact Systems (Australia) Pty Ltd hereby grants Western Power a non-exclusive, non-transferable right to use one copy of this version of the Western Power Switchgear InstructionManual 1 Version 1.4 - Issue Date 4 May 2010. You may install one copy of the CD on one computer / workstation for which the CD was designed.The CD and documentation are protected by copyright law and remain the intellectual property of Artefact Systems (Australia) Pty Ltd.Artefact Systems (Australia) Pty Ltd. is not responsible for any damage to the user's computer system or data and in no event will Artefact Systems (Australia) Pty Ltd., its officers, directors, employees or agents be responsible to the user for any consequential, incidental, or indirect damages (including damages for loss of business profits, business interruption, loss of business information and the like) arising out of the use or inability to use the Artefact Systems (Australia) Pty Ltd. CD.

  • This Document Is Uncontrolled When Printed

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010Doc Ref: WPWorkProcedure1

    NETWORK SWITCHGEAR INSTRUCTION MANUAL 1WORK PROCEDURE INSTRUCTIONS

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    WO

    RK

    PR

    OC

    ED

    UR

    E IN

    ST

    RU

    CT

    ION

    S

    1 of 2

    The following information is the 'Western Power Work Procedure Instructions' for the use of this Network Switchgear Instruction Manual 1

    Please refer to the How To Use This Manual template for further details on how to use this Network Switchgear Instruction Manual 1

    The responsibility for safe working with electrical switchgear rests with the employer, employees, and contractors required to operate the different types of switchgear that exists on the Western Power network.

    The purpose of this manual is to provide a common set of operating instructions for electrical switchgear. The intent is to provide a consistent understanding of switchgear operating requirements and promote the safe and efficient operation of switchgear. This can reduce the likelihood of personal injury, equipment damage and loss of supply.

    This manual is a physical operating guide only, and does not contain all of the technical details, system protection requirements, and operational checks that are required for safe operation of the network. This manual must be used in conjunction with the Western Power's Electrical Safety Code, Switching Operators Manuals, Network Operating Instructions, Field Instructions, the Job Risk Assessment process - and remember to Switch On Mate .

    When access or switching is required on the electrical network for ANY PURPOSE the Control Centre MUST be advised prior to the operation starting, and at the completion of the operation.

    Persons operating the equipment contained in this Manual must be appropriately trained and authorised by Western Power as per NOI 04-13. They should also ensure operating equipment is in good order and wear and use the correct protective apparel.

    The equipment covered in this Manual is not exhaustive and there are items of equipment that have not yet been included. Whilst every effort has been made to ensure accuracy all users are encouraged to report any errors inaccuracies or omissions found while using the manual as a guide. If an amendment is required on an item of equipment or a new template is required for equipment not yet contained in this manual, contact your representative on the Operations Policy and Practices Committee or the Manager Network Operations - Network Operations Control Centre.

    Arrangements will be made for the photography and text to be compiled to enable new templates to be made and distributed. This manual is a controlled document. When there are modifications or additions to this manual the modified or new templates will be replaced and a new index issued and dated accordingly.

    It is the switching operators responsibility to operate only within their authorised levels.Attention

    onsibility for safe working with electrical switchgear rests with th

    Western Power

    Network Switchgear Instruction Manual 1

    Document Number PSC/80/3(78)V1

  • This Document Is Uncontrolled When Printed

    This Document Is Uncontrolled When Printed

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010 Doc Ref: WPWorkProcedure2

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    WO

    RK

    PR

    OC

    ED

    UR

    E IN

    ST

    RU

    CT

    ION

    SNETWORK SWITCHGEAR INSTRUCTION MANUAL 1

    WORK PROCEDURE INSTRUCTIONS

    2 of 2

    'A3' DX & N, Combination of restrictions

    'D' Under Direction

    'DN' Under Direct, EXCL Comm of RMU

    'DX' Under Direct, EXCL Earthing

    'R' Excludes switching on Regulators

    'N' Excludes Commissioning of Ring Main Switchgear

    'NX' Excludes Earthing & Comm of RMU

    'S' Excludes writing and checking of switching programs

    'X' Excludes Earthing

    'Z' Authority Suspended

    'G' Gas Insulated Transmission Switchgear

    Switching Level Levels Include

    1 All LV O/H systems including Distribution HV from drop-outs to transformers

    2 All O/H apparatus including Reclosers, Sectionalisers, Regulators,

    Capacitors and Ground mounted transformers.

    3 Distribution HV O/H to U/G systems (ie. aerial to RMU )

    4 LV underground systems

    5 Distribution HV underground RMU to RMU

    6 Operation of Distribution HV feeders from Zone Substations including

    protection by-pass, transformer paralleling and transfer bus.

    7 Transmission circuits from Zone Substations.

    8 All apparatus within a Zone Substation.

    9 Transmission circuits into Zone Substations.

    10 All Terminal Substation apparatus.

    11 Control Room operations including switching schedule preparation (NOCC).

    12 Control Room operations including switching schedule preparation (SOCC).

    SWITCHING AUTHORITIES AND COMPETENCY (Ref NOI 04-13)

    AUTHORITY RESTRICTIONS

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.

    Note: The transformer fuse switch has a different operating mechanism to the circuit switch.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPAlstomFBX1

    OpeningClosingEarthingHV FusesSpring Charge

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    AlstomFBX630 Amps16 KASF6

    ALSTOMFBX

    AL

    ST

    OM

    FB

    X

    1 of 2

    Voltage KV

    OperationClosing the Circuit Switch

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    Special Notes

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    OperationOpening the Circuit Switch

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    Confirm the circuit switch location and labeling prior to operation.

    Operation

    Closing the Transformer Fuse Switch1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    Caution

    Caution

    C 2 E 2

    F 2

    C 2 E 2

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    1

    1

    1

    2

    2

    22

    Closing

    Opening Earthing Isolate / Misc

    Symbols Colour / Reference Operating Instruction Colour Reference Switchgear Category Colour Reference

    Overhead

    Underground

    LV

    Circuit Breakers

    MiscYesYesNo

    No

    CautionC 2 Main Picture

    Grid ReferenceNote

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010Doc Ref: WPManualInstructions1

    NETWORK SWITCHGEAR INSTRUCTION MANUAL 1DISTRIBUTION - HOW TO USE THIS MANUAL

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    DIS

    TR

    IBU

    TIO

    N - H

    OW

    TO

    US

    E T

    HIS

    MA

    NU

    AL

    1 of 2

    The following is a general guide for the use of this manual. For company specific instructions please refer to the introductory pages. Page 1 of this guide template shows how to interpret data on 'Page 1' of all templates in this manual. Please turn over for a guide on interpreting data on 'Pages 2, 3 and 4' of templates in this manual.

    Document reference name.

    Quote this for updates etc.

    Company logo. Identifies

    the manual issuing

    company.

    Switchgear name. Templates are

    sorted in alphabetical order.

    Switchgear details. Rating is maximum current load rating. If text is red then rating is maximum load

    breaking capacity.

    Operating option icons. Use these as a quick visual reference for

    operating function options on this switchgear.

    Page number icon. Indicates the total number

    of pages used for the switchgear information.

    Date issued.Indicates

    issuing date for switchgear template. This must be the

    same as listed in the manual

    index.

    Red arrows Indicate nominal

    operating voltage (KV) or

    LV where specifically indicated.

    Switchgear photograph. May be one

    shot or a montage showing

    switchgear options.

    Main switchgear

    picture reference grid.Refer to grid

    co-ordinates in top left corner of operating instruction pictures.

    Special notes. General

    precautions / instructions pertinent to switchgear

    type.

    Quick reference legend for mandatory operational

    checks prior to operation

    Mainphotograph grid reference. This

    refers to the section of the

    main photograph

    shown in operating

    instruction.

    Operating instruction

    photographs. In most cases

    the photograph will show

    apparatus as you would find

    it prior to performing the

    operation.

    Switchgear operating

    options. Red arrows indicate

    functions available.

    Operating instruction.

    Step numbers correspond

    with coloured arrows in the

    adjacent photograph.

    Special notes pertinent to the

    particular operating instruction

    Page number within

    switchgear category colour.

    Western Power

    document reference number.

    Switchgear name in large type for quick referencing.

    Switchgear category colour for

    quick referencing.

    Operating instruction arrows. Numbers correspond with step numbers in adjacent operating instructions. Arrows

    are colour coded for the particular operation.

    Operating instruction headings. Headings are colour coded for the particular operating

    instruction.

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPAlstomFBX2

    ALSTOMFBX

    AL

    ST

    OM

    FB

    X

    2 of 2

    Operation

    Opening the Transformer Fuse Switch

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    OperationClosing the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    1. Confirm the circuit / transformer fuse switch is open.2. Test 'Safe to Earth' with the neon indicator as shown.3. Slide the earth switch interlock lever to the right and:4. Unlock if required and insert the operating handle into the earth switch operating mechanism.5. Rotate the operating handle CW to the stop position to close the earth switch. Remove the operating handle.6. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    F 2

    C 2 D 2 F 2

    OperationOpening the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    1. Unlock if required and insert the operating handle into the earth switch operating mechanism.2. Rotate the operating handle ACW to the stop position to open the earth switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    C 2 D 2 F 2

    OperationAccess to the HV Fuses

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Confirm the HV fuse operation via the red mechanical indicator as shown. 3. Insert the supplied HV fuse access panel latch key and rotate ACW. Remove the key.4. Raise the HV fuse access panel interlock and lower the HV fuse access panel.

    Caution

    F 2 F 4

    4

    2

    3

    OperationAccess to the HV Fuses

    Special Notes

    Ensure the HV fuse striker pin is located in the top mounting assembly.

    Exercise caution when removing HV fuses as they may be hot.

    5. Grasp the end cap tabs as shown and withdraw the required HV fuse.6. Replace the required HV fuse(s) with the striker pin(s) facing towards the access cover.7. Raise the HV fuse access panel.8. Insert the supplied HV fuse access panel latch key and rotate CW. Remove the key.

    Caution

    F 4

    5

    5

    1

    52

    34

    1

    2

    2

    Closing

    Opening Earthing Isolate / Misc

    Symbols Colour / Reference Operating Instruction Colour Reference Switchgear Category Colour Reference

    Overhead

    Underground

    LV

    Circuit Breakers

    MiscYesYesNo

    No

    CautionC 2 Main Picture

    Grid ReferenceNote

    Operating option icons. Use these as a quick visual reference for

    operating function options on this switchgear.

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010 Doc Ref: WPManualInstructions2

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    DIS

    TR

    IBU

    TIO

    N -

    HO

    W T

    O U

    SE

    TH

    IS M

    AN

    UA

    LNETWORK SWITCHGEAR INSTRUCTION MANUAL 1

    DISTRIBUTION - HOW TO USE THIS MANUAL

    2 of 2

    Page 2 of this guide template shows how to interpret data on 'Pages 2, 3 and 4' of templates in this manual. In the majority of cases a complete switchgear template will consist of two pages only. If more than two pages are required for a particular switchgear item the total page number will be indicated in the top right hand corner of 'Page 1' of the relevant switchgear template. If a switchgear item has only one page of instructions the reverse side of the template will not have a page reference and will only show the switchgear item name and operation icons. The words 'This page is deliberately left blank' will be printed in the centre of the page.

    Document reference name. Quote this for for

    updates etc.

    Switchgear name. Templates are sorted in

    alphabetical order.

    Page number icon. Indicates the total number of pages used for the switchgear information. If the template has only one

    page nothing will appear here.

    Date issued.Indicates

    issuing date for switchgear template. This must be the

    same as listed in the manual

    index.

    Page number within

    switchgear category colour. If

    template has only one page

    nothing will appear here.

    Operating instruction.

    Step numbers correspond

    with coloured arrows in adjacent

    photograph.

    Operating instruction headings.

    Headings are colour coded

    for the particular operating

    instruction.

    Western Power document

    reference number.

    Switchgear name in large type for quick referencing.

    Switchgear category colour for quick referencing.

    Special notes pertinent to the

    particular operating instruction

    Operating instruction

    photographs. In most cases

    the photograph will show

    apparatus as you would find

    it prior to performing the

    operation.

    Main photograph

    grid reference. This refers to

    section of main photograph

    shown in operating

    instruction.

  • This Document Is Uncontrolled When Printed

    Local Manual OperatingHandle Open / Close

    HV Stick - Close

    Access Cover - Bolted

    Relay / Meter AnalogHV Stick - Open

    Arc Fault Protection

    Air Operated

    Relay Targets - Flag LED

    Local Manual PushButton Close

    Local Electrical Close

    LV Links

    Distance Protection

    Overcurrent Protection Tap ChangerAutomatic

    Isolation

    Differential Protection

    Lock and Tag

    Open

    Oil Level Gauge

    Not ApplicableDo Not Operate

    Remote ElectricalOpen / Close

    Interlock Key

    Auto Reclose

    Closed

    Local Manual PushButton Open / Close

    Remote Electrical Open

    HV Stick - Open / Close

    Assembly Required Local Manual PushButton Open

    Remote Electrical Close

    Local Electrical Open

    Earth Fault Protection

    Tap ChangerManual

    Pilot Wire Protection

    Padlock Open

    Padlock Close

    Local Manual OperatingHandle Close

    Racking In / Out

    Fault Indicators

    Local Manual OperatingHandle Open

    Gas / Oil PressureGauge

    Hand Operated Close

    Hand OperatedClose / Open

    HV fuses

    Racking Trolley - CB

    Local ElectricalClose / open

    Earthing - ManualApplied

    Test Probes

    Plug Box - CB

    LV De-ion / Fuse

    Latching

    Spring Charge

    Solenoid Operated

    Shutters

    Directional Protection

    Local Manual OperatingHandle - Earthing

    Earthing Via CB / Switch

    Hand Operated Open

    Rackable VT

    Viewing Ports

    Two Man operation

    HV Stick - Earthing

    Relay / Meter Digital

    Hydraulic Pump

    LV Fuse

    CW ClockwiseACW Anti-clockwise

    Page 1 0f 1 Page 1 0f 2

    Page 2 0f 2

    Page 1 0f 3

    Page 2 0f 3

    Page 3 0f 3

    Page 1 0f 4

    Page 2 0f 4

    Page 3 0f 4

    Page 4 0f 4Instruction ContinuedFrom Previous PageInstruction Continued

    A

    A

    A

    A

    D

    H

    HC

    LH

    R

    R

    T

    TM

    A

    P

    O

    Manual Open / Close

    Manual Close

    Manual Open

    L

    Linked Templates Visual Confirmation Magnified Image

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010Doc Ref: WPSymbolLegend1

    NETWORK SWITCHGEAR INSTRUCTION MANUAL 1SYMBOL LEGEND

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    SY

    MB

    OL

    LE

    GE

    ND

    1 of 1

    The following information is the Symbol Legend for the Western Power Network Switchgear Instruction Manual 1 .

    Please refer to the How To Use This Manual template for further details on how to use this Network Switchgear Instruction Manual 1 .

    SYMBOL LEGEND

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010 Doc Ref: WPSymbolLegend2

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    SY

    MB

    OL

    LE

    GE

    ND

    NETWORK SWITCHGEAR INSTRUCTION MANUAL 1SYMBOL LEGEND

    This page is deliberately left blank.

  • Switchgear Type Date Issued

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010Doc Ref: WPIndexV141

    NETWORK SWITCHGEAR INSTRUCTION MANUAL 1DISTRIBUTION - VERSION 1.4

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    DIS

    TR

    IBU

    TIO

    N - V

    ER

    SIO

    N 1.4

    1 of 2

    2 March 20062 March 2006

    4 May 20104 May 2010

    2 March 20062 March 2006

    17 February 2009 2 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 20062 March 2006

    27 August 200727 August 2007

    2 March 20062 March 20062 March 2006

    17 February 200917 February 200917 February 200917 February 2009

    27 August 200717 February 2009

    2 March 200627 August 200727 August 2007

    2 March 200617 February 2009

    27 August 20072 March 2006

    17 February 200927 August 2007

    17 February 200917 February 200917 February 200917 February 200917 February 2009

    2 March 20062 March 20062 March 20062 March 2006

    The following is an index of all switchgear templates in this manual.Please note: The Date Issued data on each switchgear template must be the same as in this index. Any additions or reissue of current switchgear templates will be accompanied with a new index template. Templates are listed alphabetically. Please ensure all templates in the manual, including new and reissued, are sorted alphabetically. Denotes new templates issued with this Index - Version 1.4

    Underground Switchgear

    Overhead Switchgear

    Circuit Breakers

    Alstom FBA5 (2 Templates) Alstom FBX Alstom Fluokit M Alstom Fluokit M C10M Motorised Isolator English Electric OLX Felten & Guilleaume GA2K GEC DDFAHazemeyer Magnefix MD (2 Templates) Holec SVS (2 Templates) Long & Crawford ETV3/2 Long & Crawford T4GF3 (2 Templates) Long & Crawford Type GF3 & J4 Long & Crawford Type J Long & Crawford Type J3 Long & Crawford Type R3 Merlin Gerin RM6 Ring Main Isolator - Type 1 Merlin Gerin RM6 Ring Main Isolator - Type 2 Merlin Gerin / Schneider SM6 (2 Templates) Merlin Gerin / Schneider SM6 Circuit Breaker Merlin Gerin Vercors M6 Nebb Brown Boveri RGB12 S & C SML 20 Fuse Element S & C SML 20 Ground Mounted Fuse (2 Templates) Schneider D14 Circuit Switch Siemens 8CK2 Western Power Mechanical Actuator

    ABB NWI-58 Pole Top Capacitor ALM Air Break Switch Falcon Air Break Switch Falcon - Ezybreak Air Break Switch Haycolec Sectionaliser Type 01-04 HV Drop-out (HVDO) Fuses McGraw Edison RV ACR Nulec N24-150 Auto Circuit Recloser Nulec RL Load Break Switch / Sectionaliser Nulec U27 ACR Nulec W Series Single Phase Auto Circuit Recloser Reyrolle OYT Recloser S & C Fault Tamer (2 Templates) S & C SMD20 Boric Acid Drop-out Fuses Stanger In Line Links

    ABB Unigear ZS1 Capacitor Circuit Interlock ABB Unigear ZS1 Circuit Breaker (2 Templates) ABB Unigear ZS1 Earth Switch ABB Unigear ZS1 Transformer Switch / Earth Switch / HV Fuses ABB Unigear ZS1 VT Alstom GL 107 Circuit Breaker Alstom HWX Busbar Earth Switch Alstom HWX Circuit Breaker (2 Templates) Alstom HWX VT

  • Switchgear Type Date Issued

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010 Doc Ref: WPIndexV142

    NE

    TW

    OR

    K S

    WIT

    CH

    GE

    AR

    INS

    TR

    UC

    TIO

    N M

    AN

    UA

    L 1

    DIS

    TR

    IBU

    TIO

    N -

    VE

    RS

    ION

    1.4

    NETWORK SWITCHGEAR INSTRUCTION MANUAL 1DISTRIBUTION - VERSION 1.4

    2 of 2

    ASEA HLC 63-52/1250 Circuit BreakerEmail J18 Solenoid CBEmail J22 Solenoid CBEnglish Electric OKW3 Circuit Breaker GEC Alsthom SBV 24 Circuit Breaker (2 Templates) GEC Alsthom SBV 24 Earth Truck (2 Templates)GEC D4XD Circuit BreakerGEC OX36 Circuit BreakerInoue Denki 30TE0150RS Circuit BreakerMagrini Galileo 38 MGE 1000 BM Circuit BreakerMagrini Galileo 38 MGE 1000 BM20 Circuit BreakerMagrini Scarpa E Magnano MMS24C Circuit BreakerNilsen AEI JB422/OMI Retrofit Circuit Breaker (2 Templates) Nilsen GEC OLX Retrofit Circuit Breaker (2 Templates) Nuovo Magrini Galileo 36 GI-E 25 Type 1Nuovo Magrini Galileo 36 GI-E 25 Type 2Reyrolle 2A9T/X1/MO Circuit Breaker (2 Templates) Reyrolle D16 GFC H VT Reyrolle LMVP X5B / X8 Circuit Breaker (2 Templates) Reyrolle LMVP X5B / X8 CB Earthing Schneider AD4 MC Set Type SF1 CB (2 Templates) Schneider AD4 MC Set Type SF1 Earth Switch Schneider AD4 MC Set Type SF1 VTWestern Power CB Earth Switch - Generic (2 Templates)Westinghouse (Siemens) Retrofit J18 CBYorkshire YSF6 Circuit Breaker (2 Templates)

    Alarm and Fault Relay Flags - Distribution SystemEquipment Label Reading (2 Templates)Horstmann Alpha E Fault Indicator Horstmann Fluid Type Fault Indicator HV - LV Fuse Rating Tables Kyle Form 4C Electronic Recloser Control Nulec CAPM2 Electronic Recloser Control (2 Templates) Nulec CAPM5 Electronic Recloser Control (2 Templates) Nulec Electronic Control Box Operation Flow Chart SEL 351 Protection Relay

    GEC VR-1 Voltage Regulator Control

    ABB SLBM / BSL 3 Phase Gang Isolator Nilsen AB5 / 200 Circuit Breaker Nilsen NAB1 / 20 Circuit Breaker

    2 March 20062 March 20062 March 20062 March 2006

    17 February 200917 February 2009

    2 March 20064 May 2010

    2 March 20062 March 20062 March 20062 March 2006

    27 August 200727 August 2007

    2 March 20062 March 2006

    9 November 20062 March 2006

    17 February 200917 February 200917 February 200917 February 200917 February 2009

    2 March 20062 March 20062 March 2006

    9 November 20064 May 2010

    17 February 20099 November 2006

    4 May 20102 March 2006

    17 February 200917 February 20099 November 20069 November 2006

    17 February 2009

    27 August 20072 March 20062 March 2006

    Miscellaneous Equipment

    Voltage Regulators

    Low Voltage Switchgear

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.Note: The transformer fuse switch has a different operating mechanism to the circuit switch.Note: The earth switch operating handle is different to the circuit switch operating handle.

    Note: This switchgear can have both a local manual and electrical operation option. Confirm the mechanism type prior to operation. Remote electrical operation is always the preferred method of operation.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPAlstomFBA51

    OpeningClosingIsolationRackingSpring Charge

    EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    AlstomFBA5630 Amps16 KASF6

    ALSTOMFBA5

    AL

    ST

    OM

    FB

    A5

    1 of 3

    Voltage KV

    OperationClosing the Circuit Switch

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    Special Notes

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    OperationOpening the Circuit Switch

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    Confirm the circuit switch location and labeling prior to operation.

    Operation

    Closing the Transformer Fuse Switch1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    Caution

    Caution

    D 3

    F 3

    D 3

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    1

    1

    1

    2

    2

    22

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPAlstomFBA52

    ALSTOMFBA5

    AL

    ST

    OM

    FB

    A5

    2 of 3

    Operation

    Opening the Transformer Fuse Switch

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    OperationClosing / Opening the Circuit Switch - Local Elec.

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    At the completion of the electrical operation confirm the circuit switch status via the mechanical indicator.

    1. Confirm the '24 VOLT DC SUPPLY FOR CONTROL' switch is on.2. Plug in the remote operation control switch as shown and stand away from the RMU.3. Rotate the switch CW to the 'ON' position to close the circuit switch.4. Rotate the switch ACW to the 'OFF' position to open the circuit switch.5. If required unplug the remote operation control switch.

    Caution

    F 3

    B 1

    OperationClosing the Remote Circuit Switch - Manually

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    At the completion of the operation confirm the circuit switch status via the mechanical indicator.

    1. Switch the '24 VOLT DC SUPPLY FOR CONTROL' off.2. Unlock if required and insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle CW until the circuit switch closes.4. Remove the operating handle. Lock if required.5. If required switch the '24 VOLT DC SUPPLY FOR CONTROL' on.

    Caution

    B 2

    OperationOpening the Remote Circuit Switch - Manually

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    At the completion of the operation confirm the circuit switch status via the mechanical indicator.

    1. Switch the '24 VOLT DC SUPPLY FOR CONTROL' off.2. Unlock if required and insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle CW until the circuit switch opens.4. Remove the operating handle. Lock if required.5. If required switch the '24 VOLT DC SUPPLY FOR CONTROL' on.

    Caution

    B 2

    1

    1

    2

    3

    3

    2

    2

    2

    34

    OperationClosing the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    1. Confirm the circuit / transformer fuse switch is open.2. Test 'Safe to Earth' with the neon indicator as shown.3. Slide the earth switch interlock lever to the left and:4. Unlock if required and insert the earth switch operating handle into the earth switch operating mechanism.5. Rotate the operating handle CW to the stop position to close the earth switch. Remove the operating handle.6. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    C 3 E 3 G 3

    5

    23

    4

  • Date Issued: 2 March 2006Doc Ref: WPAlstomFBA53

    3 of 3Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    ALSTOMFBA5A

    LS

    TO

    M F

    BA

    5

    OperationOpening the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    1. Unlock if required and insert the earth switch operating handle into the earth switch operating mechanism.2. Rotate the operating handle ACW to the stop position to open the earth switch.3. Remove the earth switch operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    C 3 E 3 G 3

    OperationAccess to the HV Fuses

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Confirm the HV fuse operation via the red indicator as shown. 3. Insert the supplied HV fuse access panel latch key and rotate ACW. Remove the key.4. Remove the HV fuse access panel.

    Caution

    F 7 G 5

    2

    3

    OperationAccess to the HV Fuses

    Special Notes

    Ensure the HV fuse striker pin is located in the top mounting assembly.

    Exercise caution when removing HV fuses as they may be hot.

    5. Grasp the end cap tabs as shown and withdraw the required HV fuse.6. Replace the required HV fuse(s) with the striker pin(s) facing towards the access panel.7. Replace the HV fuse access panel.8. Insert the supplied HV fuse access cover latch key and rotate CW. Remove the key.

    Caution

    F 5

    4

    4

    12

  • This page is deliberately left blank.

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPAlstomFBA54

    AL

    ST

    OM

    FB

    A5

    ALSTOMFBA5

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.

    Note: The transformer fuse switch has a different operating mechanism to the circuit switch.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPAlstomFBX1

    OpeningClosingIsolationRackingSpring Charge

    EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    AlstomFBX630 Amps16 KASF6

    ALSTOMFBX

    AL

    ST

    OM

    FB

    X

    1 of 2

    Voltage KV

    OperationClosing the Circuit Switch

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    Special Notes

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    OperationOpening the Circuit Switch

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    Confirm the circuit switch location and labeling prior to operation.

    Operation

    Closing the Transformer Fuse Switch1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    Caution

    Caution

    C 2 E 2

    F 2

    C 2 E 2

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    1

    1

    1

    2

    2

    22

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPAlstomFBX2

    ALSTOMFBX

    AL

    ST

    OM

    FB

    X

    2 of 2

    Operation

    Opening the Transformer Fuse Switch

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    OperationClosing the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    1. Confirm the circuit / transformer fuse switch is open.2. Test 'Safe to Earth' with the neon indicator as shown.3. Slide the earth switch interlock lever to the right and:4. Unlock if required and insert the operating handle into the earth switch operating mechanism.5. Rotate the operating handle CW to the stop position to close the earth switch. Remove the operating handle.6. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    F 2

    C 2 D 2 F 2

    OperationOpening the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    1. Unlock if required and insert the operating handle into the earth switch operating mechanism.2. Rotate the operating handle ACW to the stop position to open the earth switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    C 2 D 2 F 2

    OperationAccess to the HV Fuses

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Confirm the HV fuse operation via the red mechanical indicator as shown. 3. Insert the supplied HV fuse access panel latch key and rotate ACW. Remove the key.4. Raise the HV fuse access panel interlock and lower the HV fuse access panel.

    Caution

    F 2 F 4

    4

    2

    3

    OperationAccess to the HV Fuses

    Special Notes

    Ensure the HV fuse striker pin is located in the top mounting assembly.

    Exercise caution when removing HV fuses as they may be hot.

    5. Grasp the end cap tabs as shown and withdraw the required HV fuse.6. Replace the required HV fuse(s) with the striker pin(s) facing towards the access cover.7. Raise the HV fuse access panel.8. Insert the supplied HV fuse access panel latch key and rotate CW. Remove the key.

    Caution

    F 4

    5

    5

    1

    52

    34

    1

    2

    2

  • 33

    2

    2

    3

    3

    1

    1

    2

    1

    Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.

    Note: The transformer fuse switch has a different operating mechanism to the circuit switch. The main picture shows a transformer fuse switch.

    Note: There is a motorised version of this switchgear. Refer to the ALSTOM FLUOKIT M C10M MOTORISED ISOLATOR template in this manual if required.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010Doc Ref: WPAlstomFluokitM1

    OpeningClosingSpring Charge

    EarthingHV Fuses

    33 22 11 6.6

    330 220 132 66

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    Alstom FluokitM630 Amps630 AmpsSF6

    ALSTOM FLUOKIT MA

    LS

    TO

    M F

    LU

    OK

    IT M

    1 of 2

    Voltage KV

    Operation Closing the Circuit Switch

    Special Notes

    Confirm the circuit switch location and labeling prior to any operation.

    Special Notes

    1. Unlock if required and slide out the operating handle interlock bar.2. Insert the operating handle into the operating mechanism as shown.3. Rotate the operating handle ACW to the stop position to close the circuit switch.4. Remove the operating handle.5. Confirm the mechanical indicator shows

    Operation Opening the Circuit Switch 1. Unlock if required and slide out the operating handle interlock bar.2. Insert the operating handle into the operating mechanism as shown.3. Rotate the operating handle CW to the stop position to open the circuit switch.4. Remove the operating handle.5. Confirm the mechanical indicator shows

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to any operation.

    Confirm the circuit switch location and labeling prior to any operation.

    Operation

    Closing the Transformer Fuse Switch 1. Unlock if required and slide out the operating handle interlock bar.2. Insert the operating handle into the operating mechanism as shown.3. Rotate the operating handle ACW to the stop position to close the transformer fuse switch then rotate the handle CW to charge the tripping mechanism spring.4. Confirm the mechanical indicator shows

    Caution

    Caution

    Caution

    D 4

    D 4 F 4

    D 4

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010 Doc Ref: WPAlstomFluokitM2

    ALSTOM FLUOKIT M A

    LS

    TO

    M F

    LU

    OK

    IT M

    2 of 2

    Operation

    Opening the Transformer Fuse Switch

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to any operation.

    1. Slide out the operating mechanism interlock bar as shown.2. Raise the trip lever to open the transformer fuse switch.3. Confirm the mechanical indicator shows

    Caution

    Operation Closing the HV Earth Switch

    Special Notes

    Confirm the HV earth switch location and labeling prior to any operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    1. Slide out the operating mechanism interlock bar. 2. Confirm the relevant HV switch is open.3. Perform a 'Safe To Earth' test using the neon indicators.4. Insert the operating handle into the earth switch operating mechanism as shown.5. Rotate the operating handle CW to the stop position to close the earth switch.6. Confirm the mechanical indicator shows

    Caution

    F 2

    F 4

    Operation Opening the HV Earth Switch

    Special Notes

    Confirm the HV earth switch location and labeling prior to any operation.

    1. Slide out the operating mechanism interlock bar. 2. Insert the operating handle into the earth switch operating mechanism as shown.3. Shift the earth switch interlock lever to the right (as shown) and gently rotate the operating handle ACW to the first stop position. Release the interlock lever.4. Rotate the operating handle ACW to the stop position to open the HV earth switch.5. Confirm the mechanical indicator shows

    Caution

    F 4

    Operation Access to the HV Fuses

    Special Notes

    HV fuse striker pins must be located on the top of the HV fuse.

    Exercise caution when handling HV fuses as they may be hot.

    1. Confirm the relevant HV transformer HV earth switch is closed.2. Rotate the HV fuse access cover handle ACW and remove the access cover.

    Caution

    D 8

    1

    2

    1

    5

    4

    4

    3

    3

    23

    2

  • 31

    3

    2

    6

    74

    Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.

    Note: For operation of the earth switch and access to the HV fuses refer to the ALSTOM FLUOKIT M template in this manual.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010Doc Ref: WPAlstomFluokitMC10m1

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    Alstom FluokitM C10m Motorised Isolator630 Amps630 AmpsSF6

    ALSTOM FLUOKIT MC10M MOTORISED ISOLATOR

    AL

    ST

    OM

    FL

    UO

    KIT

    M C

    10M M

    OT

    OR

    ISE

    D IS

    OL

    AT

    OR

    1 of 2

    Voltage KV

    OperationClosing / Opening the Circuit Switch - Local Elec.

    Closing / Opening the Circuit Switch - Local Elec.

    Closing / Opening the Circuit Switch - Local Elec.

    Special Notes

    Confirm the circuit switch location and labeling prior to any operation.

    Special Notes

    1. Rotate the 'LOCAL REMOTE' switch on the RTU ACW to the 'LOCAL' position.

    Operation

    2. Confirm the 'ISOLATION SWITCH' on the panel directly above the switch unit is in the 'I' (on) position as shown.3. Confirm the key locking switch on the switchgear panel is in the 'I' (on) position as shown.

    Special Notes

    Confirm the remote operating switch is in the neutral (vertical) position before plugging the control cable into the socket.

    Confirm the circuit switch location and labeling prior to any operation.

    Operation

    4. Plug the remote operating switch control cable connector into the socket on the panel directly above the switch unit as shown.5. With the operating switch in hand move a safe distance from the switch unit.To Close:6. Rotate the remote operating switch CW to the 'ON' position and release to close the switch.7. Confirm the mechanical indicator shows

    Caution

    Caution

    Caution

    N/A

    G 3

    F 2 E 4

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    Opening / Closing - RemoteOpening / Closing - Local ElectricalOpening / Closing - ManualEarth Switch Opening / Closing - Manual

  • 83

    2

    910

    4

    4

    5

    76

    9

    1113

    13

    8

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 4 May 2010 Doc Ref: WPAlstomFluokitMC10m2

    ALSTOM FLUOKIT MC10M MOTORISED ISOLATOR

    AL

    ST

    OM

    FL

    UO

    KIT

    M C

    10M

    MO

    TO

    RIS

    ED

    ISO

    LA

    TO

    R

    2 of 2

    Operation Special Notes

    Confirm the circuit switch location and labeling prior to any operation.

    1. Rotate the 'LOCAL REMOTE' switch on the RTU ACW to the 'LOCAL' position.2. Rotate the 'ISOLATION SWITCH' on the panel directly above the switch unit ACW to the 'O' (off) position.3. Rotate the key locking switch on the switchgear panel CW to the 'O' (off) position.

    Caution

    F 2 E 4

    Operation Special Notes

    Confirm the circuit switch location and labeling prior to any operation.

    4. Rotate the manual control knob on the switchgear panel ACW until the notches align with the black indicators.5. Unlock and remove the padlock then slide out the operating mechanism interlock bar.

    Caution

    C 6

    Operation Special Notes

    Confirm the circuit switch location and labeling prior to any operation.

    To Close: 6. Insert the operating handle into the operating mechanism as shown.7. Rotate the operating handle ACW to the stop position to close the switch.8. Confirm the mechanical indicator showsTo Open:9. Rotate the operating handle CW to the stop position to open the switch.

    Caution

    C 6

    Closing / Opening the Circuit Switch - Manually

    Closing / Opening the Circuit Switch - Manually

    Closing / Opening the Circuit Switch - Manually

    Special Notes

    Confirm the circuit switch location and labeling prior to any operation.

    Operation

    To Open:8. Rotate the remote operating switch ACW to the 'OFF' position and release to open the switch.9. Confirm the mechanical indicator shows10. At the completion of the operation remove the remote operating switch cable connector from the socket.11. Rotate the 'LOCAL REMOTE' switch on the RTU CW to the 'REMOTE' position.

    Caution

    G 3

    Operation Special Notes

    Confirm the circuit switch location and labeling prior to any operation.

    10. Remove the operating handle.11. Confirm the mechanical indicator shows12. Replace the operating mechanism interlock bar and padlock.13. Rotate the manual control knob on the switchgear panel CW until the notches are clear of the black indicators.14. Rotate the key locking switch CW to the 'O' (on) position.15. Rotate the 'ISOLATION SWITCH' CW to the 'I' (on) position.16. Rotate the 'LOCAL REMOTE' switch on the RTU CW to the 'REMOTE' position.

    Caution

    C 6

    Closing / Opening the Circuit Switch - Manually

    Closing / Opening the Circuit Switch - Local Elec.

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.

    Note: This switchgear is not spring assisted. All operations must be done in a firm and continuous motion to the stop position.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPEnglishElectricOLX1

    OpeningClosingIsolationRackingSpring Charge

    EarthingAuto RecloseTest ProbesO/C ProtectionE/F Protection

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    English ElectricOLX800 Amps800 AmpsOil

    ENGLISH ELECTRIC OLX

    EN

    GL

    ISH

    EL

    EC

    TR

    IC O

    LX

    1 of 2

    Voltage KV

    OperationClosing the Circuit Switch

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    The operation is not spring assisted. Move the operating handle in a firm and continuous motion.

    Special Notes

    1. Unlock if required and rotate the circuit interlock ACW.2. Withdraw the circuit interlock pin.3. Move the operating handle CW in a firm and continuous motion to the stop position to close the circuit switch. 4. Confirm the operating handle aligns with the 'ON' indicator.5. Push in the circuit interlock pin.6. Rotate the circuit interlock CW and lock if required.

    OperationOpening the Circuit / Transformer Fuse Switch

    1. Unlock if required and rotate the circuit interlock ACW.2. Withdraw the circuit interlock pin.3. Move the operating handle ACW in a firm and continuous motion to the stop position to open the circuit switch. 4. Confirm the operating handle aligns with the 'OFF' indicator.5. Push in the circuit interlock pin.6. Rotate the circuit interlock CW and lock if required.

    Special Notes

    Confirm the remote end of the circuit is isolated prior to closing the earth switch.

    The operation is not spring assisted. Move the operating handle in a firm and continuous motion.

    Confirm the circuit switch location and labeling prior to operation.

    The operation is not spring assisted. Move the operating handle in a firm and continuous motion.

    Operation

    Closing the Circuit Earth Switch1. Confirm the relevant circuit switch is open.2. Confirm the circuit interlock is rotated CW to the stop position as shown. Lock if required.3. Unlock if required and rotate the earth interlock CW.4. Withdraw the earth interlock pin.

    Caution

    Caution

    Caution

    G 2 G 3

    C 2

    G 6 F 7

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    3

    3

    3

    4

    2

    2

    2

    1

    2

    1

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPEnglishElectricOLX2

    ENGLISH ELECTRICOLX

    EN

    GL

    ISH

    EL

    EC

    TR

    IC O

    LX

    2 of 2

    Operation

    Closing the Circuit Earth Switch

    Special Notes

    Confirm the remote end of the circuit is isolated prior to closing the earth switch.

    The operation is not spring assisted. Move the operating handle in a firm and continuous motion.

    5. Move the operating handle ACW in a firm and continuous motion to the stop position to close the earth switch.6. Push in the earth interlock pin.7. Rotate the earth interlock ACW and lock if required.

    Caution

    OperationOpening the Circuit Earth Switch

    Special Notes

    Confirm the circuit earth switch location and labeling prior to operation.

    1. Unlock if required and rotate the earth interlock CW.2. Withdraw the earth interlock pin.3. Move the operating handle CW to the stop position to open the earth switch. 4. Confirm the operating handle aligns with the 'OFF' indicator.5. Push in the earth interlock pin.6. Rotate the circuit interlock ACW and lock if required.

    Caution

    C 2

    C 2

    E 7 OperationAccess to the Test Probes

    Special Notes

    Confirm the circuit earth switch location and labeling prior to operation.

    1. Confirm the relevant circuit earth switch is closed.2. Unscrew the two (2) access cover retaining bolts.3. Lower the access cover.

    Caution

    A 7

    6

    2

    1

    7

    5

    3

    OperationAccess to the Test Probes

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    4. Insert the appropriate probes to the stop position.5. Open the circuit earth switch. Perform tests as required.6. Close the circuit earth switch.7. Withdraw the probes.8. Close the access cover.9. Tighten the two (2) access cover retaining bolts.

    Caution

    A 7 E 7

    2

    4 4 4

    1

    OperationChecking the Switchgear Oil Level

    Special Notes

    Note: The oil level dipstick must be screwed home prior to checking oil levels.

    1. Unscrew the oil level dipstick at the rear of the switchgear unit to confirm correct oil levels. At the completion of the check ensure the dipstick is screwed home correctly.

    Caution

    N/A

    2

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation. Note: The transformer fuse switch has a different operating mechanism to the circuit switch.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPF&GGA2K1

    Opening Closing Isolation Racking Spring Charge

    Earthing Auto Reclose HV Fuses O/C Protection E/F Protection

    33 22 11 6.6

    330 220 132 66

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    Felten & Guilleaume GA2K 630 Amps 630 Amps SF6

    FELTEN & GUILLEAUMEGA2K

    FE

    LTE

    N &

    GU

    ILL

    EA

    UM

    E G

    A2K

    1 of 2

    Voltage KV

    Operation Closing the Circuit Switch

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    Special Notes

    1. Open the circuit switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle CW to the stop position to close the circuit switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the circuit switch status.

    Operation Opening the Circuit Switch 1. Open the circuit switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle ACW to the stop position to open the circuit switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the circuit switch status.

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    Confirm the circuit switch location and labeling prior to operation.

    Operation

    Closing the Transformer Fuse Switch 1. Open the transformer fuse switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle ACW to the stop position then CW to the stop position to close the transformer fuse switch. Remove the handle.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    Caution

    Caution

    C 2 D 2

    F 2

    C 2 D 2

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    2

    2

    2

    3

    3

    3

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPF&GGA2K2

    FELTEN & GUILLEAUMEGA2K

    FE

    LTE

    N &

    GU

    ILL

    EA

    UM

    E G

    A2K

    2 of 2

    Operation

    Opening the Transformer Fuse Switch

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Open the transformer fuse switch open / close operating mechanism access flap.2. Insert the operating handle into the open / close operating mechanism.3. Push in and rotate the operating handle ACW marginally to the stop position to open the transformer fuse switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    Operation Closing the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    1. Confirm the circuit / transformer fuse switch is open.2. Unlock if required and open the earth switch open / close operating mechanism access flap.3. Insert the operating handle into the earth switch operating mechanism.4. Push in and rotate the operating handle CW to the stop position to close the earth switch.5. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    F 2

    B 2 D 2 F 2

    OperationOpening the Earth Switch

    Special Notes

    Confirm the earth switch location and labeling prior to operation.

    1. Unlock if required and open the earth switch open / close operating mechanism access flap.2. Insert the operating handle into the earth switch operating mechanism.3. Push in and rotate the operating handle ACW to the stop position to open the earth switch. Remove the operating handle.4. Confirm the mechanical indicator agrees with the earth switch status.

    Caution

    B 2 D 2 F 2

    OperationAccess to the HV Fuses

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    Exercise caution when removing HV fuses as they may be hot.

    1. Confirm the transformer fuse switch is open and the transformer earth switch is closed.2. Insert the supplied HV fuse access cover latch key and rotate ACW. Raise and remove the HV fuse access cover.3. Raise the retaining bale of the HV fuse(s) to be replaced.4. Withdraw the HV fuse top mounting assembly.

    Caution

    F 3

    3

    2

    OperationAccess to the HV Fuses

    Special Notes

    Ensure the HV fuse striker pin is located in the top mounting assembly.

    Exercise caution when removing HV fuses as they may be hot.

    5. Remove the required HV fuse from the lower mounting assembly.6. Replace the required HV fuse(s) with the striker pin(s) pointing to the top.7. Clean and lubricate all contact fittings prior to restoration of the HV fuse mounting assemblies.8. Lower the HV fuse retaining bale.9. Replace the HV fuse access cover and latch using the supplied latch key.

    Caution

    F 3

    5

    8

    2

    3

    3

    32

    4

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after any operation.

    Note: The rotation direction of the operating handle for the required function - open / close - will depend on the switch location on the switchgear unit. Confirm the required direction before operating.

    Note: Placing the 'FUSE ISOLATOR' in the 'ISOLATED' position earths the HV fuses.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 17 February 2009Doc Ref: WPGECDDFA1

    OpeningClosingSpring Charge

    EarthingTest ProbesHV Fuses

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    GECDDFA400 Amps-Oil

    GECDDFA

    GE

    C D

    DFA

    1 of 2

    Voltage KV

    OperationClosing the Circuit / Transformer Fuse Switch

    Special Notes

    Confirm the circuit / transformer fuse switch location and labeling prior to any operation.

    Special Notes

    1. Confirm the rotating interlock selector is in the circuit switch position as shown.2. Insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle in the required direction to the stop position to close the circuit / transformer fuse switch.4. Remove the operating handle.5. Confirm the mechanical indicator points to 'ON'.

    OperationOpening the Circuit Switch1. Confirm the rotating interlock selector is in the circuit switch position as shown.2. Insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle in the required direction to the stop position to open the circuit switch.4. Remove the operating handle.5. Confirm the mechanical indicator points to 'OFF'.

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to any operation.

    Confirm the circuit switch location and labeling prior to operation.

    Operation

    Opening the Transformer Fuse Switch1. Push the 'TRIP' lever to the left to open the transformer fuse switch.2. Confirm the mechanical indicator points to 'OFF'.

    Caution

    Caution

    Caution

    B 2 F 2 G 2

    D 2

    F 2 G 2

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    1

    2

    1

    3

    3

    1

    2

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 17 February 2009 Doc Ref: WPGECDDFA2

    GECDDFA

    GE

    C D

    DFA

    2 of 2

    Operation

    Closing the Earth Switch

    Special Notes

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    Confirm the mechanical indicator points to 'EARTH' at the completion of the operation.

    1. Confirm the relevant circuit / transformer fuse switch is open.2. Unlock if required and rotate the interlock selector to the earth position as shown.3. Insert the operating handle into the open / close operating mechanism as shown.4. Rotate the operating handle in the required direction to the stop position to close the earth switch.5. Remove the operating handle.

    Caution

    Operation

    Closing the Earth SwitchSpecial Notes

    Confirm the circuit earth switch location and labeling prior to any operation.

    6. Confirm the mechanical indicator points to 'EARTH'7. If required rotate the interlock and lock in the 'Earth Switch On' position as shown.

    Caution

    B 2 F 2 G 2

    B 2 F 2 G 2

    OperationAccess to the HV Fuses

    Special Notes

    Exercise caution when removing HV fuses as they may be hot.

    When replacing the HV fuse ensure the striker pin points upwards.

    1. Confirm the transformer fuse switch is open.2. Confirm the HV fuse operation via the red target indicator as shown. 3. Insert the operating handle into the Fuse Isolator mechanism as shown and rotate CW to the 'ISOLATED' position. The HV fuses are now earthed.4. Raise the HV fuse access panel. Remove and replace the relevant HV fuse. Close the access panel.5. Rotate the Fuse Isolator to the 'SERVICE' position.

    Caution

    D 25

    33

    OperationAccess to the Circuit Test Probes

    Special Notes

    When restoring the after test ensure the earthing bar is pushed home firmly to the stop position.

    1. Confirm the relevant circuit / transformer fuse switch is open and the circuit / transformer earth switch is closed.2. Unscrew the circuit test probes access cover retaining bolt.3. Lower the test probe access cover.4. Lower the earthing bar. Perform the required tests.Note: To restore, reverse the above instructions.

    Caution

    B 6

    2

    34

    2

    7

    3

    4

    Operation

    Opening the Earth SwitchSpecial Notes

    Confirm the circuit earth switch location and labeling prior to any operation.

    Confirm the mechanical indicator points to 'OFF' at the completion of the operation.

    1. Unlock if required and rotate the interlock selector to the earth position as shown.2. Insert the operating handle into the open / close operating mechanism as shown.3. Rotate the operating handle in the required direction to the stop position to open the earth switch.4. Remove the operating handle.5. If required rotate the interlock selector to the circuit switch position. Lock if required.

    Caution

    B 2 F 2 G 2

    2

    31

    3

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.

    Note: The three (3) phase operating handle is to be used for the closing function only.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPHazemeyerMD1

    OpeningClosingIsolationRackingSpring Charge

    EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    HazemeyerMagnefix MD250 / 400 Amps400 AmpsAir

    HAZEMEYERMAGNEFIX MD

    HA

    ZE

    ME

    YE

    R M

    AG

    NE

    FIX

    MD

    1 of 3

    Voltage KV

    OperationClosing the Single Phase Circuit Switch Link

    Special Notes

    Confirm the circuit switch link location and labeling prior to operation.

    Special Notes

    1. Attach the switch link operating handle onto the switch link as shown.

    OperationClosing the Single Phase Circuit Switch Link

    2. Insert the switch link carefully in the desired position.3. Push the switch link with a firm and continuous motion to the stop position to close the link.4. Slide up the operating handle and remove from the switch link.5. Repeat this operation for all three (3) phases.

    Special Notes

    Confirm the circuit switch link location and labeling prior to operation.

    Ensure all three (3) phases are opened and removed correctly.

    Confirm the circuit switch link location and labeling prior to operation.

    Ensure all three (3) phases are closed correctly.

    Operation

    Opening the Single Phase Circuit Switch Link1. Attach the switch link operating handle to the required switch link as shown.2. Grasp the operating handle and withdraw the switch link in a firm and continuous motion.3. Remove the switch link from the operating handle and stow correctly.4. Repeat this operation for all three (3) phases.5. If required place switch link spout covers onto the switch link spouts as shown.

    Caution

    Caution

    Caution

    N/A

    C 2

    C 2

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    1

    32

    4

    1

    5

    2

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPHazemeyerMD2

    HAZEMEYERMAGNEFIX MD

    HA

    ZE

    ME

    YE

    R M

    AG

    NE

    FIX

    MD

    2 of 3

    Operation

    Closing the Three Phase Circuit Switch Link

    Special Notes

    Confirm the circuit three phase switch link location and labeling prior to operation.

    Engage the switch link three phase operating handle by:

    1. Place the operating handle in a vertical position on the ground as shown. Secure in this position by placing the foot through the handle.2. Using both hands, raise the attachment cylinder until a 'click' is heard thereby latching the cylinder mechanism.

    Caution

    Operation

    Closing the Three Phase Circuit Switch LinkSpecial Notes

    Confirm the circuit three phase switch link location and labeling prior to operation.

    3. Insert the three phase switch carefully into position ready to be closed.4. Attach the operating handle to the three phase switch link with the long tongue on the LH side as shown.5. Unlock the cylinder closing mechanism by depressing the latches as shown.6. Push in the operating handle in a firm and continuous motion to the stop position to close the three phase switch link. Remove the operating handle.

    Caution

    N/A

    B 4

    OperationOpening the Three Phase Circuit Switch Link

    Special Notes

    Confirm the circuit three phase switch link location and labeling prior to operation.

    1. Grasp the three phase switch link by the two handles as shown.2. Withdraw the three phase switch link in a firm and continuous motion and stow correctly.3. If required place switch link spout covers onto the switch link spouts.

    Caution

    B 4

    1

    4

    65

    5

    1

    1

    2

    2

    OperationEarthing the Circuit

    Special Notes

    Confirm the circuit location and labeling prior to operation.

    Confirm the earthing lead is firmly attached to the earthing link.

    1. Attach the earthing handle to the earthing link as shown.

    Caution

    N/A

    1

    OperationEarthing the Circuit

    Special Notes

    Confirm the circuit / earth switch location and labeling prior to operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    2. Place the earthing link carefully on the relevant circuit spout.3. Grasp the earthing handle above the red limit ring and push the earthing link in to the stop position in a firm and continuous motion to earth the circuit.4. Remove the earthing handle.5. Repeat this operation for all three (3) phases.Note: To remove the circuit earth reverse the above instructions.

    Caution

    F 2

    2

    3

  • Date Issued: 2 March 2006Doc Ref: WPHazemeyerMD3

    3 of 3Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    HAZEMEYERMAGNEFIX MDH

    AZ

    EM

    EY

    ER

    MA

    GN

    EF

    IX M

    D

    Operation

    Access to the HV Fuses

    Special Notes

    Confirm the transformer fuse circuit location and labeling prior to operation.

    1. Confirm the transformer fuse circuit switch links have been removed.2. If required, confirm the transformer fuse circuit is earthed via the earthing links.3. Rotate the HV fuse interlock ACW as shown.

    Caution

    G 2

    OperationAccess to the HV Fuses

    Special Notes

    Exercise caution when removing HV fuses as they may be hot.

    4. Grasp the required HV fuse extraction handle and withdraw the HV fuse.5. Remove the HV fuse from the end cap and replace with a new HV fuse.

    Caution

    G 24

    5

    31

    1

    1

    OperationAccess to the HV Fuses

    Special Notes

    Note: The circuit switch links cannot be replaced unless the HV fuse interlock is in the correct position - rotated CW.

    6. Insert the HV fuse into the HV fuse chamber ensuring the end cap seats home correctly.7. Rotate the HV fuse interlock CW to the stop position.

    Caution

    A 2

    6

  • This page is deliberately left blank.

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPHazemeyerMD4

    HA

    ZE

    ME

    YE

    R M

    AG

    NE

    FIX

    MD

    HAZEMEYERMAGNEFIX MD

  • Operation Options

    Special Notes

    Ensure the switchgear is fit for service prior to and after operation.

    Note: The transformer fuse switch has a different operating mechanism to the circuit switch.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPHolecSVS1

    OpeningClosingIsolationRackingSpring Charge

    EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    HolecSVS630 Amps630 AmpsSF6

    HOLECSVS

    HO

    LE

    C S

    VS

    1 of 3

    Voltage KV

    OperationClosing the Circuit Switch

    Special Notes

    Confirm the circuit switch location and labeling prior to operation.

    Special Notes

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle CW to the stop position to close the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    OperationOpening the Circuit Switch

    1. Unlock if required and insert the operating handle into the open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the circuit switch status.

    Confirm the circuit switch location and labeling prior to operation.

    Caution

    Caution

    F 2

    F 2

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Status Indicators

    1

    1

    2

    2

    Operation

    Closing the Transformer Fuse Switch

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Unlock if required and insert the operating handle into the transformer fuse switch open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to charge the operating spring then CW to the stop position to close the transformer fuse switch.3. Remove the operating handle. Lock if required.4. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    A 2

    1

    2

    2

  • Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPHolecSVS2

    HOLECSVS

    HO

    LE

    C S

    VS

    2 of 3

    OperationOpening the Transformer Fuse Switch

    Special Notes

    Confirm the transformer fuse switch location and labeling prior to operation.

    1. Press the red 'O' button to open the transformer fuse switch.2. Confirm the mechanical indicator agrees with the transformer fuse switch status.

    Caution

    A 2

    OperationClosing the Earth Switch

    Special Notes

    Confirm the earth selector switch location and labeling prior to operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    1. Confirm the circuit / transformer fuse switch is open.2. Confirm 'Safe to Earth' with the LED indicators if fitted.3. Unlock if required and slide the earth switch interlock lever to the right and:4. Unlock if required and insert the operating handle into the earth switch selector mechanism.5. Rotate the operating handle CW to the stop position to select the earthing option.6. Confirm the mechanical indicator shows earthed.

    Caution

    F 2

    OperationClosing the Earth Switch

    Special Notes

    Confirm the circuit / earth switch location and labeling prior to operation.

    Ensure the remote end of the circuit / transformer to be earthed is isolated.

    7. Remove the operating handle from the earth switch selector mechanism and insert into the circuit switch open / close mechanism as shown.8. Rotate the operating handle CW to the stop position to close the circuit switch thereby earthing the circuit.9. Confirm the mechanical indicator agrees with the circuit / earth switch status.

    Caution

    F 2

    1

    5

    8

    3

    4

    7

    2

    OperationOpening the Earth Switch

    Special Notes

    Confirm the circuit / earth switch location and labeling prior to operation.

    1. Unlock if required and insert the operating handle into the circuit / earth switch open / close operating mechanism.2. Rotate the operating handle ACW to the stop position to open the circuit switch thereby de-earthing the circuit.3. Remove the operating handle.

    Caution

    F 2

    2

    1

    OperationOpening the Earth Switch

    Special Notes

    Confirm the circuit / earth switch location and labeling prior to operation.

    4. Unlock if required and slide the earth switch interlock lever to the right and:5. Unlock if required and insert the operating handle into the earth switch selector mechanism.6. Rotate the operating handle ACW to the stop position to de-select the earthing option.7. Confirm the mechanical indicator shows normal circuit.8. Remove the operating handle and lock if required.

    Caution

    F 2

    5

    6

  • Date Issued: 2 March 2006Doc Ref: WPHolecSVS3

    3 of 3Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    HOLECSVSH

    OL

    EC

    SV

    S

    OperationAccess to the HV Fuses

    Special Notes

    Ensure the HV fuse striker pin is located in the top mounting assembly.

    Exercise caution when removing HV fuses as they may be hot.

    1. Confirm the transformer fuse switch is closed with the selector switch in the earth position.2. Slide the earth switch interlock across to the right and up.3. Insert the supplied HV fuse access panel latch key and rotate ACW.4. Remove the HV fuse access panel.5. Replace HV fuses as required.

    Caution

    A 2

    2

    3

  • This page is deliberately left blank.

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPHolecSVS4

    HO

    LE

    C S

    VS

    HOLECSVS

  • Operation Options

    Special Notes

    Ensure the circuit switch is fit for service prior to and after operation.

    Note: This switchgear does not have an earthing switch.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPLong&CrawfordETV3-21

    OpeningClosingIsolationRackingLatching

    EarthingAuto RecloseHV FusesO/C ProtectionE/F Protection

    3322116.6

    33022013266

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    Long & CrawfordETV3/2200 Amps250 MVAOil

    LONG & CRAWFORDETV3/2 L

    ON

    G &

    CR

    AW

    FO

    RD

    ET

    V3/2

    1 of 1

    Voltage KV

    OperationClosing the Circuit / Transformer Fuse Switch

    Special Notes

    Confirm the circuit / transformer fuse switch location and labeling prior to operation.

    Special Notes

    Confirm the circuit / transformer fuse switch location and labeling prior to operation.

    1. Unlock if required and raise the operating handle to the stop position to close the switch. Lock if required.2. Confirm the mechanical indicator agrees with the switch status.

    OperationOpening the Circuit / Transformer Fuse Switch

    1. Unlock if required and lower the operating handle to the stop position to open the switch. Lock if required.2. Confirm the mechanical indicator agrees with the switch status.

    Special Notes

    Confirm the circuit / transformer fuse switch location and labeling prior to operation.

    Ensure the remote end of the fused circuit is isolated prior to accessing the HV fuses.

    Operation

    Access to the HV Fuses1. Confirm the relevant transformer fuse switch is open.2. Unlock the HV fuse access lid interlock bar and remove.3. Unscrew the two (2) HV fuse access lid retaining wing nuts and lower the retaining bolts.4. Raise the HV fuse access lid to the stop position.

    Caution

    Caution

    Caution

    F 3

    C 2

    F 3

    1

    1

    1

    2

    33

    1

    Prior To Any Local Operation Check / Confirm Oil Levels Gas Pressure Labeling Correct Latching

  • This Page Is Deliberately Left Blank

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006 Doc Ref: WPLong&CrawfordETV3-22

    LONG & CRAWFORDETV3/2

    LO

    NG

    & C

    RA

    WF

    OR

    D E

    TV

    3/2

  • Operation Options

    Special Notes

    Ensure the ring main isolator is fit for service prior to and after operation.

    Note: The transformer fuse switch and earth switch have different operating mechanisms to the circuit switches.

    Note: In some cases this switchgear may be fitted with a Western Power Mechanical A ctuator. Refer to the 'WESTERN POWER MECHANICAL ACTUATOR' template in this manual for further details if required.

    Caution

    Document Number PSC/80/3(78)V1 Network Switchgear Instruction Manual Design Artefact Systems Pty Ltd.

    Date Issued: 2 March 2006Doc Ref: WPLong&CrawfordT4GF31

    Opening Closing Isolation Racking Spring Charge

    Earthing Auto Reclose HV Fuses O/C Protection E/F Protection

    33 22 11 6.6

    330 220 132 66

    Manufacturer:Model:Rating:

    Break Rating:Insulant:

    Long & Crawford T4GF3 Ring Main Isolator 630 Amps 630 Amps Oil

    LONG & CRAWFORDT4GF3 RING MAIN ISOLATOR

    LO

    NG

    & C

    RA

    WF

    OR

    D T

    4GF

    3 RIN

    G M

    AIN

    ISO

    LA

    TO

    R

    1 of 3

    Voltage KV

    Operation Configuring the Ring Main Isolator Operating Handle

    Special Notes

    The operating handle will 'spin free' if the ratchet cam is not set to the correct position.

    Special Notes

    1. Determine the required direction of the operating handle rotation - clockwise or anticlockwise. 2. Rotate the operating handle ratchet cam to the required position ,A or B, (as shown). The operating handle will only function in the direction of the ratchet cam.

    Operation Closing the Circuit Switch

    1. Attach the operating handle to the circuit switch operating mechanism as shown. 2. Rotate the operating handle in the direction of the indicating arrow (adjacent to the operating mechanism) to the stop position to close the switch. 3. Confirm the mechanical indicator agrees with the switch status.

    Special Notes

    Confirm the circuit switch location and labeling prior to operation. Ensure the operating handle ratchet cam is set to the correct position prior to operating.

    Confirm the circuit switch location and labeling prior to operation. Ensure the operating handle ratchet cam is set to the correct position prior to operating.

    Operation

    Opening the Circuit Switch 1. Attach the operatin