swas

download swas

If you can't read please download the document

description

water anylasis

Transcript of swas

Basic function of Boiler feed water pump is to produce sufficient amount of pressure required to turbine inlet with added amount of pressure drop of flow path of boiler components.Pressure required to develop through bfp = Turbine inlet pressure + Pressure drop of boiler componentsand also its a prime important in case of develop more than saturation pressure in case of supercritical boiler segments concernBoiler feed pump is used to feed water to steam generator boiler drum at desired pressure and temperature.Need of boiler feed pump?As the water is fed to the steam generator it has to be at the temperature & Pressure that of the steam generator.Boiler feed pumpProcess of water flow?Boiler feed pump extract water from de-aerator and feed it to the boiler drum via H.P heaters and economizer.General configuration of Boiler feed pump?Generally 2 Turbine driven boiler feed pumps (1 Working & 1 Standby) & 1 Motor driven boiler feed pump is used for 1 unit.Turbine driven boiler feed pump: It works with the steam extraction from Intermediate Pressure (I.P.) turbine exhaust.Motor driven boiler feed pump: It works with a motor as the name specifies.Swas roomSteam Water Analyzer System Room, it is used to analyze boiler steam and water.The following parameter are therei) Spec Conductivity (insertion type)on both side5.08.03 Cond. Pump(CEP) Dischargei) Cat Conductivityii) pHiii) Dissolved Oxygeniv) Specific Conductivityv) Silicavi) Sodium5.08.04 Condenser Cooling Wateri) pHii) Specific Conductivity5.08.05 Deaerator Inleti) PHii) Dissolved Oxygeniii) Specific Conductivity5.05.06 Deaerator Outleti) Dissolved Oxygen5.08.07 Feed Water at ECO I/Li) Hydrazineii) Specific Conductivityiii) Phosphateiv) pHv)Dissolved Oxygenvi)cat conductivity5.08.08 Drum Wateri) Specific Conductivityii) pHiii) Sodiumiv) Silicav) Phosphatevi) chloride5.08.09 Saturated Steam (SH out)i) Specific Conductivityii) Cat Conductivityiii) pH5.08.10 Main Steam (after attemperation)i) Specific Conductivityii) PHiii) Silicaiv) Cat conductivityv) Sodiumvi) chloride5.08.11 HRH Steami) Specific Conductivityii) pH5.08.12 CBD i)Phosphate5.08.13 ECW pump dischargei)PH5.08.14 Cond discharge after CPUi) sp conductivityii)cat conductivityiii)pHIV) Sodiumv) Silica5.08.15 DMCW wateri)pHLiVariable Frequency DriveWhy VFD is required?Variable frequency drives allow reducing power consumption up to 30% or more and obtaining a payback time on the investments often lower than 1 2 years. Moreover, the quality of the equipments and the lower mechanical stress on the installed machinery guarantee it a longer life time and a substantial cut on its maintenance costs. The present document aims to examine the energy benefits of a viable technology change on the existing motorized systems at Lanco. Changes may include replacements of motors with low efficiency and / or system upgrade through the retrofit of variable speed drives to the existing motors. The energy consumption analysis also leads to an economical estimation of the savings and a balance to the possible investment.What is VFD?A variable frequency drive (VFD) is an electrical variable speed drive that is added to motor-driven systems to help save energy. Motor-driven systems are designed to handle peak loads. When these operating systems work for extended periods of time at a reduced load, it wastes energy. Adding a VFD allows you to adjust the motor-speed capability and match it with motor-output load. This is how it saves energy. The motor-driven system is connected to the VFD and allows us to have speed control by changing the frequency of the motor-supply voltage.How VFD functions?A motor-driven system is controlled by the frequency of the supply voltage and rotates on a fixed speed. An alternating current that is applied produces a magnetic field that rotates at synchronous speed. The only way to alternate synchronous speed is through a VFD, which converts the power in three stages. In the rectifier stage, the power is converted to a higher adjustable DC voltage. In the inverter stage, the power transistors in the rectified DC are switched off and on. This produces a voltage waveform at the frequency you want. In the control system, the voltage wave form receives information from the motor-driven system and will adjust the output voltage to the selected value.CURRICULUM VITAE :ASHISH SHARMAE-mail :- ashishsharma1100 AT gmail.com , ashishsharma.ritee AT yahoo.com CAREER OBJECTIVE : -Intend to a build a career a with leading corporate of hi-tech and environment with committed & dedicated people which will help me to explore myself fully & realizemy potential, willing to work as a key player challenging & creative environment.CAREER PATH : -WORKING EXPERIENCE: - Total 2 Years 1 Month experience in power plant operation and maintenance. Presently associated with Operation Team of 30 MW Thermal Power Plant in NECO GROUP OF COMPANY at Raipur dist. Since May 15 as an Engineer.- Designation : Engineer (O & M)- Post : Engineer- Company Profile : NECO GROUP OF COMPANY (POWER PLANT) Jayaswal Neco Industries Limited which started in 1976 as a small scale iron foundry unit at Nagpur is the flagship company of Neco Group of Industries which has now become an integrated steel plant of 1 Million Tonne capacity through Blast Furnace route, Sinter Plant, Oxygen Plant, Coke Oven, Power Generation with one of the finest infrastructural facilities at its Siltara, Raipur Plant. It produces alloy steel bars and rods from 5 mm in coils to 60 mm bars. Another Unit at Siltara produces narrow width HR Coils.Now it also has its own Coal and Iron Ore mines in the State of Chhattisgarh and Jharkhand and has undertaken setting up of Thermal Power Stations of 3240 MW in the State of Chhattisgarh and 500 MW in Jharkhand in the next few years.JOB PROFILE& RESPONSIBILITY : -- Presently working As an Engineer in Operation of Power Plant.- O&M of 40 TPH AFBC fired BOILER, 3*30TPH Oil fired Boiler and its auxiliaries, 65 MW condensing Turbine and its auxiliaries.- Performance monitoring and maintain the require parameter forsmooth and efficient operation.- Planning of effective maintenance schedule of boiler, turbine and their auxiliaries like condenser, ejector, cooling tower, air compressor etc.- Synchronizing the TG Set with Grid Power.- Coordinating the different department and working people.- Emergency handling of Boiler as well as turbine.- Involved in Smooth Desk Operation and Mechanical Maintenance of Thermal Power Plant & its auxiliaries. Monitoring the performance and maintaining the required parameter for running the operation smoothly and efficiently.Having Sound knowledge of Steam Turbine, Various Type of BOILER (AFBC, BLAST FURNACE GAS OIL Fired & WHRB) , ASH HANDLING PLANT, Fuel Handling like(Furnace Oil, HSD Oil) COAL HANDLING PLANT, DM PLANT, SCREW COMPRESSOR etc. Involved in checking field Boiler and TG water report analysis and instruct the DM plant operator to fulfill the desired requirement of water.Plant Start up : Boiler Light up & Turbine Rolling in Various Conditions. Supervision of all the equipments for their functioning and attending to all the problems encountered. Planned Shutdown of unit for Maintenance activities etc.To Look after Maintenance of High Pressure Boilers & Turbine and their auxiliaries. Plan and Execute Breakdown and preventive maintenance on all rotating and static equipments.Guide & lead a team of skilled and unskilled technicians to perform Proper Lubrications and equipments checks in shift as per schedule and instructions. Expertise on Troubleshooting of Rotating equipment and fault diagnosis.Shift routine daily entries in the control room log sheet, Prepare daily, weekly and monthly reports as required, Provides on the job training for Lead Field Operators.For six months in Mech. Maintenance department with planned preventive Maintenance schedules.- Handling all the activities during unit shut down.- Manpower handling & proper utilization.PROFESSIONAL QUALIFICATION : B.E. (Hons) in Mechanical Engineering from Raipur Institute of technology, Raigarh(C.G.) Aggregate 73.86% year 2011.EDUCATIONAL QUALIFICATION : -Passed High School Certificate Examination in the year 2005 with 80% from Chhattisgarh Board, Raipur- Passed Higher Secondary School certificate Examination in the year 2007 with 83.64% from C.G. Board, Raipur.Sponsored Links: STRENGTH : - Basic knowledge and operating incomputer.- Negotiation, strategic thinking.- Hard work & sincerity is my key element.- Team sprit & fun loving.- Comfortable in any environment.- Effective communication and interpersonal skills with strong analytical, problem solving & organizational abilities.- Self confidence, target orientation, time management and quality consciousness.PERSONAL INFORMATION : -Date of Birth : 11 October 1989Nationality : IndianLanguage Known : Hindi & EnglishHobby : Listen Music & Play CricketMarital status : UnmarriedDECLARATION : - I hereby declare that all the information furnished in this curriculum vitae is true & correct to the knowledge & belief.Place : - Raipur (C.G.)(Ashish Sharma)