Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859...
Transcript of Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859...
![Page 1: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/1.jpg)
CONNECTICUT D.E.P.
Sean West
Environment, Health & Safety
GHG Program Manager
March 11, 2010
![Page 2: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/2.jpg)
1
Agenda
UTC at a glance
Essential Elements of Energy Management Plan
• Data Management
• Policy & Goals
• Project Identification
• Energy Management Guidebook
• Project Implementation
![Page 3: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/3.jpg)
2
$52.9 billion
UTC AT A GLANCE
2009
12%
24%
22%
10%
Commercial
refrigeration
PurePower™
Engine
Gen2®
Aircraft systems
UH60M
Electronic
Security
F135 CTOL Engine
InfinityTM
22%
10%
![Page 4: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/4.jpg)
3
UTC BUILDINGS PORTFOLIO
4,859 Global locations
96.7 million ft2
61.5 MSF Owned 35.2 MSF Leased
Reporting Sites Non-Reporting Sites
Manufacturing sites + all sites >$100K annual
energy spend<$100K annual energy spend
327 sites
66.7 million ft2
1.885 million* metric tons CO2e* Approximately 360K metric tons reported is direct process
emissions, fleet and business travel.
4,532 sites
~30 million ft2
286K metric tons CO2e
![Page 5: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/5.jpg)
4
SUSTAINABILITY
Social, environmental and economic performance
“My predecessor, George David, had a vision 15 years ago…that
UTC would be an environmental leader, both in our own operations
and with our products. This was not a choice between financial and
environmental performance. Rather, it was a steadfast commitment
to the belief that profitability and environmental responsibility go
hand-in-hand.”
George David
UTC Chairman
Louis Chênevert,
UTC President and CEO
“Sustainability is doing things efficiently to preserve
resources and minimize environmental impacts. Not everyone
broadens the definition to include human capital but I would….”
![Page 6: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/6.jpg)
5
(revenues, $ billions)
GREENHOUSE GAS EMISSIONSCO2 equivalents worldwide
(metric tons of CO2e, millions)
![Page 7: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/7.jpg)
ENERGY & GHG MANAGEMENT, where do I start?
![Page 8: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/8.jpg)
7
ENERGY & GHG MANAGEMENT
Started by doing
energy audits
![Page 9: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/9.jpg)
8
ENERGY MANAGEMENT GUIDEBOOK
Developed
“Standard Work”
Guidebook
![Page 10: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/10.jpg)
9
5 ESSENTIAL ELEMENTS of GHG PROGRAM
UTC has developed a world class energy management
program that works for our organization,
1. Environmental data management system
2. Established corporate policy and goals
3. Developed an in-house energy audit program
(including training, awareness)
4. Developed an Energy Management Guidebook
5. Use an online project tracking system
![Page 11: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/11.jpg)
10
CENTRAL EH&S REPORTING SYSTEM
9. Air Emissions
11. Waste Generated
12. Energy (GHG) & Water
13. Motor Vehicles
Step 1
![Page 12: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/12.jpg)
11
• Carbon Dioxide (CO2): Emitted mainly from the burning of fossil fuels
• Methane (CH4), Nitrous Oxide (N20), Hydrofluorocarbons (HFCs), Perfluorocarbons
(PFCs), and Sulphur Hexafluoride (SF6): Emitted mainly from waste disposal, air
conditioning and refrigeration, and specific industrial processes.
GREENHOUSE GAS PROTOCOLStep 1
WRI/WBCSD GHG Protocol
Corporate Accounting and Reporting Standard
![Page 13: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/13.jpg)
12
ENERGY and GHG REDUCTION PLAN
“SP-017 outlines the elements necessary to manage
energy and reduce GHG emissions.”
“This standard applies to all UTC business units
worldwide.”
“The minimum expectation is that each site has a
documented plan that demonstrates
identification, assessment, an actionable
implementation plan and completed project list.”
EH&S Standard Practice SP-017*
Step 2
* ANSI / MSE 2000:2005
![Page 14: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/14.jpg)
13
Environment
10%
Total Industrial
Process Waste
30%
Non-Recycled
Waste
10%
Water
Consumption
100%meet UTC
EH&Sexpectations
Critical
Suppliers
20%
Non-Greenhouse Gas (Air)Emissions
12%
Greenhouse Gas Emissions
(CO2-equiv.)
3.57 million lbs.
2.51million metric
tons
393.9million lbs.
96.3million lbs.
2.18billion
gallons
1339lbs.
-62% -23% -36% -41% -24% -34%
2006 baseline
Absolute Reductions
10%
in productpackaging
Packaging
10%from baseline
product
Energy
Efficiency
100%eliminated in new products
Materials of
Concern
1124Key suppliers
meeting goal
(100%)
77%meeting goal
73%meeting goal
51%MOC
elimination
10%
Chemicals
Discharged to
Water
2009
Performance
Supplier Product
2009
Performance
2010 GOAL STATUS Environment, supplier, and product metrics
Step 2
![Page 15: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/15.jpg)
14
GHG Mgt. TRAINING AND AUDITS
Training: over 200 employees trained worldwide
2006 Energy Workshops held in Charlotte and Paris
2007 Energy Workshops held in Atlantic City,
Villasanta (Italy), and Singapore
Audits of Top 60 sites worldwide
Financially sound
investment and
CO2 reductions
Step 3
![Page 16: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/16.jpg)
15
UTC Energy Team - Tools• Energy Team Guidebook
• Energy Management Handbook
• Sullair Compressed Air Guidelines
• UTC Lighting Guidelines
• Workshops
• Audits
• Self Assessment Tools
• Standard Work Documents
Steam Trap Maintenance
Shut it Off
Compressed Air Leak Management
Rate Management
ENERGY MANAGEMENT GUIDEBOOKStep 4
![Page 17: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/17.jpg)
16
UTC ENERGY MANAGEMENT GUIDEBOOK
1. Energy Data Management
2. Utility Rate Review
3. Load Management
4. Energy Procurement
5. Shut it Off
6. Lighting
7. Compressed Air
8. Boilers and Steam
9. HVAC
10. Cogeneration
11. Building Envelope
12. Self Assessment
13. Rules of Thumb
14. Conversion Factors
15. Recommended Toolkit
Table of Contents
Low Cost – No Cost
![Page 18: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/18.jpg)
17
1. Energy Data Management
UT500 ENERGY TEAM
Peak Day
Average weekday
Average weekend
Daily Electric Profile
Calculate Load Factor
![Page 19: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/19.jpg)
18
5. Shut-it-Off program
UT500 ENERGY TEAM
Typical weekend 8250 kw
Holiday weekend 7250 kw
![Page 20: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/20.jpg)
19
3. Load Management
UT500 ENERGY TEAM
Heating
7%
Paint line
9%
Chiller
10%
Comp. Air
9%
Heat treat
10%
Eniv. Labs
13%
Lighting
16%
Production
19%Fans
7%
Identify top energy users
![Page 21: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/21.jpg)
Web based EH&S reporting system
Project
Implementation &
Performance Tracking
Step 5
![Page 22: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/22.jpg)
21
GHG DATA COLLECTIONProject Tracking
Step 5
![Page 23: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/23.jpg)
22
EXAMPLE PROJECTSStep 5
![Page 24: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/24.jpg)
23
PW LIGHTING PROJECT Light levels Up – Costs Down
• Lighting projects approved for 2 PW facilities
• GHG reduction ~ 9,000 metric tons (12%)
• Buildings – L, J, K in EH, Building 150, 220 and 220M in Middletown
Typical Lighting Fixtures
Step 5
![Page 25: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/25.jpg)
24
HS CHILLER REPLACEMENT
Original Chiller
Consumption
2,000,000 KWH
Emission
1128 MT CO2e
Replacement
Consumption
800,000 KWH
Emission
451 MT CO2e
800 ton, energy
efficient Carrier, w/VFD1100 ton, 1967
vintage Carrier unit
Energy and GHG Reductions
1,200,000 KWH
677 Metric Tons CO2e
3 year payback
Step 5
![Page 26: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/26.jpg)
Sustainability - Factories
Shanghai Engine Center – LEED Platinum
Turkish Engine Center – LEED Gold
Power Systems Headquarters – LEED Silver
Middletown Engine Center – Cogeneration
25
Step 5
![Page 27: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/27.jpg)
26
FIVE ESSENTIAL ELEMENTS of GHG PROGRAM
1. Environmental data management system
2. Established corporate policy and goals
3. Developed an in-house cross-divisional Energy Team
(audits, provide training, build awareness)
4. Developed an Energy Management Guidebook
5. Use an online project tracking system
Summary, must do all five
![Page 28: Sustainable International Business Conference Presentation€¦ · 3 UTC BUILDINGS PORTFOLIO 4,859 Global locations 96.7 million ft2 61.5 MSF Owned 35.2 MSF Leased Reporting Sites](https://reader033.fdocuments.net/reader033/viewer/2022060223/5f07d7977e708231d41f0664/html5/thumbnails/28.jpg)
27
Q&A