Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information...

22
Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: SuWa 277 Susitna-Watana Dam Project (Project # P-14241-000), Independent Board of Consultants and Advisors Meeting No. 4 - April 2-4, 2014, Bellevue, WA Author(s) – Personal: Author(s) – Corporate: Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (4th : 2014 April : Bellevue, Wash.) AEA-identified category, if specified: Board of Consultant meeting AEA-identified series, if specified: Series (ARLIS-assigned report number): Existing numbers on document: Susitna-Watana Hydroelectric Project document number 277 Published by: Date published: [Anchorage, Alaska] : Alaska Energy Authority, [2014] April 4, 2014 Published for: Date or date range of report: Bryan Carey Volume and/or Part numbers: Final or Draft status, as indicated: Attachment Document type: Pagination: 19 p. in various pagings Related work(s): Pages added/changed by ARLIS: Cover letter: Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK. (SuWa 276) Two additional attachments (SuWa 278-279) Added cover letter (2 pages) Notes: All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS- produced cover page and an ARLIS-assigned number for uniformity and citability. All reports are posted online at http://www.arlis.org/resources/susitna-watana/

Transcript of Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information...

Page 1: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:

Alaska Resources Library & Information Services

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Title:

SuWa 277 Susitna-Watana Dam Project (Project # P-14241-000), Independent Board of Consultants and Advisors Meeting No. 4 - April 2-4, 2014, Bellevue, WA

Author(s) – Personal: Author(s) – Corporate: Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (4th : 2014 April : Bellevue, Wash.) AEA-identified category, if specified: Board of Consultant meeting AEA-identified series, if specified: Series (ARLIS-assigned report number): Existing numbers on document:

Susitna-Watana Hydroelectric Project document number 277

Published by: Date published: [Anchorage, Alaska] : Alaska Energy Authority, [2014] April 4, 2014

Published for: Date or date range of report: Bryan Carey

Volume and/or Part numbers:

Final or Draft status, as indicated: Attachment

Document type: Pagination:

19 p. in various pagings Related work(s): Pages added/changed by ARLIS: Cover letter: Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK. (SuWa 276) Two additional attachments (SuWa 278-279)

Added cover letter (2 pages)

Notes:

All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-produced cover page and an ARLIS-assigned number for uniformity and citability. All reports are posted online at http://www.arlis.org/resources/susitna-watana/

Page 2: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 3: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 4: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:

Joseph Ehasz URS Corporation 1632 San Pablo Drive San Marcos, CA 92078 [email protected]

Brian Forbes GPO Box 668 Brisbane 4001, Australia

[email protected]

Apri14, 2014

Mr. Bryan Carey Engineering Manager Alaska Energy Authority 813 West Northern Lights Anchorage, Alaska 99503

Yusof Ghanaat 3 Altarinda Road Suite 203 Orinda, CA 94563

[email protected]

George Taylor 5478 SW Philomath Blvd Corvallis, OR 97333

~~ENERGY AUTHORITY

Alfred J. Hendron, Jr. P.O. Box 125 4 College Park Court Savoy, IL 61874

Ellen Faulkner 3433 Oakwood Hills Pkwy Eau Claire, WI 54701

[email protected]

Subject: Susitna-Watana Dam Project (Project# P-14241-000) Independent Board of Consultants and Advisors Meeting No.4- April2 - 4, 2014 - Bellevue, WA

Dear Mr. Carey:

Introduction

The Fourth Meetin~ ofthe Independent Board of Consultants (BOC) was held in Bellevue, Washington during April 2nd, 3r and 41b, 2014 at the offices ofMWH. William Lettis ofLettis Consultants International was added to the Project as the seismic geology expert and advisor to the BOC. The purpose of the meeting was to update the BOC on the status of the PMP and PMF studies, the Site Specific Seismic Hazards Analysis studies, as well as the 2014 geotechnical investigation program plans. The progress of the RCC dam configuration feasibility and design studies was presented and discussed in detail. The following Report responds to the AEA Questions posed to the Board as well as presents additional considerations regarding seismic geology, fault rupture hazards and ground motions for the site.

Materials were distributed to the Board in advance for their review. The meeting was conducted in general accordance with the attached agenda as Attachment A. The list of attendees that attended the meetings is attached as Attachment B.

The ABA Susitna BOC Comment Log that was distributed to the Board was discussed briefly at the Meeting. The BOC reviewed the Comment Log in detail and will submit comments to ABA.

Page 1 of 11

Page 5: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 6: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 7: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 8: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 9: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 10: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 11: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 12: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 13: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 14: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 15: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 16: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 17: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:
Page 18: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:

~~ SUSITNA~WATANA HYDRO

Clean, reliable energy for the next 700 years.

BOARD OF CONSULTANTS MEETING #4 APRIL 2-4, 2014

BELLEVUE, WA

SIGN-IN-SHEET DAY ONE- WEDNESDAY, APRIL 2N° (Am) ~u.'OI:1L

Please Print

Page 1

Page 19: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:

~~

SUSITNA~WATANA HYDRO Clean, rel iable energy for the next 700 years .

BOARD OF CONSULTANTS MEETING #4 APRIL 2-4, 2014

BELLEVUE, WA

SIGN-IN-SHEET DAY ONE- WEDNESDAY, APRIL 2N° (.Prrn) PLA'o\ .1C

Page2 /~, ALASKA ....... · ENI!~GY AUIHOFIITY

Page 20: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:

~~

SUSITNA~WATANA HYDRO Clean, reliable energy for the next 700 years.

BOARD OF CONSULTANTS MEETING #4 APRIL 2-4, 2014

BELLEVUE, WA

SIGN-IN-SHEET DAY ONE- WEDNESDAY, APRIL 2No (PMP) \)\Y'\ Pv..b \1c_

Page 1

Page 21: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:

~-­SUSITNA~WATANA HYDRO

Clean, rel iable energy for the next 700 years.

SIGN·IN·SHEET DAY ONE- WEDNESDAY, APRIL 2N° {CEll)

Page 1

BOARD OF CONSULTANTS MEETING #4 APRIL 2-4, 2014

BELLEVUE, WA

Page 22: Susitna-Watana Hydroelectric Project Document ARLIS ... · Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title:

~~ SUSITNA--WATANA HYDRO

Clea n, reliable energy for the next 100 years .

SIGN-IN-SHEET DAY ONE- WEDNESDAY, APRIL 2N°

Please Print Name Company

Pe...-t e.v-- .D ( elL.~ &v\.. MW+t- (by ~~e..) I f -

BOARD OF CONSULTANTS MEETING #4 APRIL 2-4, 2014

BELLEVUE, WA

;4 M 5 e!.S~ I CV\

Email Phone

Page 2 ~~ ~bA§J~~