Sustainable Urban Drainage Systems (SUDS) and the Draft Flood and
SURFACE WATER DRAINAGE TO MEET SUDS … · surface water drainage to meet suds requirments....
Transcript of SURFACE WATER DRAINAGE TO MEET SUDS … · surface water drainage to meet suds requirments....
MONUMENT
WOODLAND WALK
MEADOW
PATHWAY
UPGRADED PATHWAY
NEW TREE BELT AND WALK
BURIAL PLOTSSPORTS CLUB
WOODLAND
A
155500
71000
136945
99440
ACCESSWAY
A
5
4
3
2
6
7
8
910
1112
HALL 1
HALL 2
B
B
8000
26500
41425
166845
17500
53430
35800
30260
31510
SURFACE WATER DRAINAGETO MEET SUDS REQUIRMENTS.
PROPOSED LOCATION OFWASTE WATER TREATMENTSYSTEM
MHCL 24.50
MH
MH
MH
MH
MH
MH
1. CREMATOR2. CONFERENCE3. STAFF WC + CHANGE4. STAFF WC + CHANGE5. KITCHEN6. URN + GENERAL STORE7. DIRECTORS OFFICE8. RECEPTION9. WC10. WC11. DISABLED WC12. COMFORT ROOM
COLUMBARIUM WALL AND HEDGE BOUNDARY
Vehicle
access
FORM NEW CONNECTIONTO EXISTING WATER MAIN.
to be confirmed shortlymains extends to here.
1
Do not scale from this Drawing, use figured dimensions only. Check all dimensions on site before commencing work. Report anydiscrepancies to Architect before proceeding. This Drawing and Designs thereon are copyright of the County Council. © 07/04/2016
Architects Department
County Hall, Marine Road, Dun Laoghaire, Co. Dublin.
Phone (01) 2054700 Fax (01) 2300391
1:500 PART 8Job Scale -
Date -
Job No -
Chd.
Drawing No -
CAD Ref -
Status -
Rev
Drg
DRAINAGE PLAN
Comhairle Contae County Council
dlr
© - Ordnance Survey Ireland. All rights reserved.
Licence number 2009/25/CCMA/
Dun Laoghaire-Rathdown County Council.
1785
PROPOSED NEW CREMATORIUM ANDASSOCIATED WORKS AT SHANGANAGHCEMETERY
1785/P/006