Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface...

53
PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created by: Dieter Velte, Oberflächenschutz Elbe GmbH Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH

Transcript of Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface...

Page 1: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Surface Preparationof Steel

Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH

Created by: Dieter Velte, Oberflächenschutz Elbe GmbHDipl.Ing. Bernd Dietz, REMA TIP TOP GmbH

Page 2: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

�Steel Design� Construction Details� Welding Seams� Metallic components

�Preparation of Substrate�Imperfections�Preparation method

TOPICS

Page 3: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Requirements on steel design

An excellent corrosion protection requires suitable steel objects

Page 4: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Why do we need Regulations and Standards for the construction and surface preparation of steel?

Do avoid things like that ………………………. And that!!

Requirements on steel design

Page 5: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

European Standard

EN 14879-1 (part 1)

Requirements on steel design

Page 6: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Requirements on the steel design

Requirements on steel design

�Design of metallic components� Dimensions

� Surface� Accessibility� Rigidity

�Design components�Rotating components�Nozzles & Outlets�Edges, Fillets and Corners�Welding attachments�Transition areas

�Joints (welded or bolted)�Flanged connections�Pipe components

Page 7: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Acceptable Deflection of steel:

For rigid coatings and ebonite materials:

l/300

Which means on 1 m

length the steel deflection should be less than 3 mm

Requirements on steel design

Deflection

NO REQUIREMENT FOR POLYUREA AND SOFTRUBBER

Page 8: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Minimum Radii

Requirements on steel design

Edge

Fillets

Page 9: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Pipe Components

Requirements on steel design

Page 10: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Requirements on steel design

Pipe Components

Page 11: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Welded Joints

Requirements on weld design

Page 12: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Inside of Vessel

Inside of Vessel Grind smooth

Continuous

Fillet Weld

Butt Welding should be used whenever Possible

Requirements on steel design

Weld Design

Page 13: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Weld Design

Inside of Vessel

Correct Incorrect

All welds should be continuous

Requirements on steel design

Page 14: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

•All Welds must be re-inspected

after grit blasting according to

DIN EN 14879-1

Requirements on steel design

Weld Design

Page 15: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Flanged designs

Requirements on steel design

Page 16: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Nozzles & Outlets

Requirements on steel design

Page 17: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Nozzles & Outlets

Requirements on steel design

Page 18: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Edges and Fillets

Requirements on steel design

Page 19: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Fillets

Requirements on steel design

Page 20: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Imperfections

Steel surface after grit blasting Grinding positions

Requirements on steel surfaces

Page 21: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Expansion of Air

Law of Gay-Lussac:

V = Vo (1 + УУУУ∙∆∙∆∙∆∙∆t)

Vo = Volume @ ambient temperature

V = Volume @ process temperature

УУУУ = Coefficient of thermal expansion of air

УУУУ = 0,0036611/grd = __1___ 1/grd

273,15

Requirements on steel surfaces

Page 22: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Example:

Air expansion of 100 mm³ air @ 80°°°°C process temperature

V = Vo (1 + УУУУ∙∆∙∆∙∆∙∆t)

V = 100 (1 + 0,003661∙∙∙∙60)

V =121, 97 mm³

The air in a pinhole is expanding while spraying of around 22%.

Requirements on steel surfaces

Expansion of Air

Page 23: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Coatings > 1 mmType of imperfections

Requirements on steel surface

Page 24: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

�Regelmäßige oder/und un-regelmäßige Vertiefungen oder Spuren mit relativ scharfen Kanten, einzeln, sich kreuzend oder gleichgerichtet als Schar auftretend. Entstehungsursachen sind z. B. sachgemäß angewandte Bearbeitungsverfahren wie Drehen, Schleifen, Hobeln

�GROOVES�1

Imperfections of Surface

Requirements on steel surface

Permitted where Rz

> 160 µm

Page 25: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Shallow pits are permitted

Requirements on steel surface

Imperfections of Surface

Page 26: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Requirements on steel surface

Imperfections of Surface

Page 27: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of Surface

Requirements on steel surface

Page 28: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of Surface

Requirements on steel surface

Page 29: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Imperfections of Surface

Requirements on steel surface

Permitted where Rz> 160 µm

Page 30: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Permitted for flat

sections, where

d/h ≥≥≥≥ 10

Imperfections of Surface

Requirements on steel surface

Page 31: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of Surface

Requirements on steel surface

Page 32: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Imperfections of Surface

Requirements on steel surface

Page 33: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of Surface

Requirements on steel surface

Page 34: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of Surface

Requirements on steel surface

Page 35: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Permitted where b/h ≥≥≥≥ 4

Imperfections of weld seams

Requirements on steel surface

Page 36: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Permitted if channel is not to deep, if edges are

rounded and b/h > 4

Imperfections of weld seams

Requirements on steel surface

Page 37: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Permitted if edges can be

smoothed by blast cleaning

Imperfections of weld seams

Requirements on steel surface

Page 38: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of weld seams

Requirements on steel surface

Page 39: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of weld seams

Requirements on steel surface

Page 40: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Requirements on steel surface

Imperfections of weld seams

Page 41: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Not permitted

Imperfections of weld seams

Requirements on steel surface

Page 42: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Permitted where

l/h ≥≥≥≥ 4

Imperfections of weld seams

Requirements on steel surface

Page 43: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Weld Seam – Not permitted

Imperfections of weld seams

Requirements on steel surface

Page 44: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Requirements on steel surface

Page 45: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

�Environment Conditions� Dew Point Restriction� Flush Rust

�Surface contamination�Soluble Salts: Chlorides, Sulphates, Nitrates�Acid deposits�Oil and Grease

Additional Requirements

Page 46: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Surface Preparation

ABRASIV BLASTING

Page 47: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Abrasive Blasting

� Quality of Blasting ( DIN EN ISO 12944-4 )

� Roughness ( DIN EN ISO 8503-2 )

Page 48: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Surface Preparation

SA 1 SA 2

Surface comparisonpictures according to

EN ISO 8501-1

Page 49: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Surface Preparation

SA 3SA 2 ½

Surface comparisonpictures according to

EN ISO 8501-1

Page 50: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Surface Preparation

Reinheitsgrad SSPC STD. NACE STD. ISO 8501-1 White Metal Blast SSPC-SP 5 NACE No. 1 SA-3 Near White Metal Blast SSPC-SP 10 NACE No. 2 SA-2½ Commercial Blast SSPC-SP 6 NACE No. 3 SA-2 Brush-Off Blast SSPC-SP 7 NACE No. 4 SA-1

Comparison ISO / NACE / SSPC

Page 51: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Surface Preparation

•Roughness Value Medium“G“ (Grit) According to ISO 8503-2 Standardminimal profile: 60 µm

Page 52: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Time from the Start of Blasting to the Application of Primer or Polyurea System

If the distance from the dew point is 3 K, the waiting time is:

1 hour at a relative air humidity of 90%2 hours at a relative air humidity of 85% 4 hours at a relative air humidity of 80%

10 hours at a relative air humidity of 70%24 hours at a relative air humidity of 60%Unlimited at a relative air humidity of 40%

Page 53: Surface Preparation of Steel - PDA Europepda-europe.org/documents/7Rema_B.Dietz.pdf · Surface Preparation of Steel Presented by: Dipl.Ing. Bernd Dietz, REMA TIP TOP GmbH Created

PDA Europe 2009 Annual Conference – Displaying the Phantastic World of Polyurea – Phantasialand, 16-18 November

Many Thanks for your attention !

For further questions please contact:

Bernd Dietz

REMA TIP TOP GmbHBusiness Unit IndustrieGruber Straße 6385586 Poing / GermanyPhone: +49 8121 707 255Fax: +49 8121 707 222Mobil: +49 160 5847486