Supply Chain Alignment Module 5.2 Kevin Lennox, LFM ‘06 Dave Penake, LFM ‘06 Presentation for: Summer 2004 i Chris Schechter, LFM ‘98 – Axcelis Technologies ESD.60 – Lean/Six Sigma Systems MIT Leaders for Manufacturing Program (LFM) These materials were developed as part of MIT's ESD.60 course on "Lean/Six Sigma Systems." In some cases, the materials were produced by the lead instructor, Joel Cutcher-Gershenfeld, and in some cases by student teams working with LFM alumni/ae. Where the materials were developed by student teams, additional nputs from the faculty and from the technical instructor, Chris Musso, are reflected in some of the text or in an appendix

Transcript of Supply Chain Alignment

Page 1: Supply Chain Alignment

Supply Chain Alignment Module 5.2

Kevin Lennox, LFM ‘06 Dave Penake, LFM ‘06

Presentation for:

Summer 2004

i

Chris Schechter, LFM ‘98 – Axcelis Technologies

ESD.60 – Lean/Six Sigma Systems MIT Leaders for Manufacturing Program (LFM)

These materials were developed as part of MIT's ESD.60 course on "Lean/Six Sigma Systems." In some cases, the materials were produced by the lead instructor, Joel Cutcher-Gershenfeld, and in some cases by student teams

working with LFM alumni/ae. Where the materials were developed by student teams, additional nputs from the faculty and from the technical instructor, Chris Musso, are reflected in some of the text or in an appendix

Page 2: Supply Chain Alignment

6/ 2© [ /

Overview ¾ Learning Objectives ¾

¾ Identify common disconnects within organizations

¾ Learn methods of evaluating

¾ Session Design (20-30 min.) ¾ Part I: Introduction and Learning

Objectives (1-2 min.) ¾ Part II: Key Concept or Principle

Defined and Explained (3-5 min.) ¾ Part III: Exercise or Activity

Based on Field Data that Illustrates the Concept or Principle (7-10 min.)

¾ Part IV: Common “Disconnects,” Relevant Measures of Success, and Potential Action Assignment(s) to Apply Lessons Learned (7-10 min.)

¾ Part V: Evaluation and Concluding Comments (2-3 min.)

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Understand basic concepts of Supply Chain Management

supply chain effectiveness

Part I: Introduction Part II: Concepts Part III: Application Part IV: Disconnects Part V: Conclusion

Page 3: Supply Chain Alignment

6/ 3© [ /

Questions to Address

¾ What are the benefits of a healthy supply chain?

¾

¾ How can a corporation overcome SCM hurdles?

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

What factors are important in supply chain evaluation?

Page 4: Supply Chain Alignment

6/ 4© [ /

Supply Chain Management ¾

collaborative effort of multiple channel members to design, implement, and manage seamless value-added processes to meet the real needs of the end customer.

Motivation for SCM: ¾ Need to meet customer requirements ¾ Desire to reduce costs

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Definition – Supply Chain Management (SCM) is the

Part I: Introduction Part II: Concepts Part III: Application Part IV: Disconnects Part V: Conclusion

Page 5: Supply Chain Alignment

6/ 5© [ /

Benefits of SCM ¾ Improved customer responsiveness

¾ Higher product quality

¾ Faster product innovation

¾ Reduced inventory costs

¾ More consistent on-time delivery

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Page 6: Supply Chain Alignment

6/ 6© [ /

Supply Chain Integration Ladder

Understanding

Position Organization

Build Customer/Supplier Infrastructure

Create and Communicate a Common Vision

Mechanisms

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Develop Overall SC

within SC

Cultivate Integrative

Constantly Re-evaluate Know your Customer

Page 7: Supply Chain Alignment

6/ 7© [ /

Characteristics of Effective Supply Chains ¾ Customer focus ¾ Open avenues of communication within and between

corporations ¾ Investment in technology that enables supply chain

management ¾ Performance measurement and competitive

benchmarking

As the economy changes, as competition becomes more global,

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

it’s no longer company vs. company but supply chain vs. supply chain.

Harold Sirkin, VP Boston Consulting Group

Page 8: Supply Chain Alignment

6/ 8© [ /

Common Disconnects Technical Factors

¾ Inadequate information systems

¾ Constrained resources ¾ Technical ¾ Financial

Social Factors

¾ Ineffective and irregularcommunication

¾ Inconsistent operating goals

¾ Organizational culture andstructure

¾ Resistance to change – lack of trust

¾ Lack of managerialcommitment

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Part I: Introduction Part II: Concepts Part III: Application Part IV: Disconnects Part V: Conclusion

Page 9: Supply Chain Alignment

6/ 9© [ /

Disconnect Situations ¾ Within Organization

Design vs. Manufacturing –Conflicting Priorities Background: Production engine fanflow starts to trend downward. A root cause investigation identifies fanblade twist angle as the key driver.

Disconnect: Design engineer needs to obtain and evaluate twist angledata from the supplier (internally owned). The manufacturer is focused on meeting production schedule and is unwilling to sacrificethe time and resources to generate the data.

Impact: Upper management getsinvolved and the investigation suffers significant delays.

¾ Outside of Organization Revenue Sharing Partners –

Background: Company Apurchases engine sub-assemblies from company B. Co. B discovers a design flaw in one of their own models.

Disconnect: Co. B engineeringteam introduces a new design to address original flaw. Co. B contacts Co. A to offer redesign only to find out that Co. A had alreadydiscovered and resolved the same issue without collaborating.

Impact: Redundant work done. Lost time and money associated with redesign.

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Inadequate Information Sharing

Page 10: Supply Chain Alignment

6/ 10© [ /

Supply Chain Evaluation ¾ Corporations can rate their supply chain effectiveness

through 4 criteria using the SCOR (Supply ChainOperation Reference) Model ¾ Plan ¾ Processes and information that enable supply chain

communication ¾ Source ¾

action to enable raw material transfer ¾ Make ¾

demands and manufacture material ¾ Deliver ¾

requirements

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Management of information, relationships, and courses of

Establishment of courses of action to meet production

Execution of courses of action to meet customer delivery

Page 11: Supply Chain Alignment
Page 12: Supply Chain Alignment

6/ 12© [ /

Concluding Comments ¾ Supply chain management has become increasingly

important in a global economy.

¾ There are many barriers that prevent corporations fromproperly aligning entities within and betweenorganizations.

¾ Advancements in IT have significantly improved SCM butthere continues to be enormous potential for furtherdevelopment.

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Part I: Introduction Part II: Concepts Part III: Application Part IV: Disconnects Part V: Conclusion

Page 13: Supply Chain Alignment

6/ 13© [ /

Appendix: Instructor’s Comments and Class Discussion on 5.2

¾ Supplier Certification Systems ¾ ISO 9000/9001, ISO 14000, other systems relate to six sigma,

and often force similar discipline to the system.

¾ Long term v. Short Term Suppliers in the ExtendedEnterprise ¾ How does a long term supply relationship relate to six sigma? ¾ Does it enhance or hurt the six sigma program?

¾ What are the advantages and disadvantages of short-termsuppliers?

¾ The SCOR model may be too generic for six sigma

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

Page 14: Supply Chain Alignment

6/ 14© [ /

Appendix: Instructor’s Guide

• Focus on the plan arrow. As you will notice, it willMeasurables2-3 minTBD

•1-2 minTBD

•Disconnects5-7 minTBD

• presentation.

Exercises/ActivitiesTBD

3

1-2

Slide

• represents.

Key Concepts3-5 min

• learning objectives

2-3 min

Additional Talking PointsTopicTime

9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

grow as a company moves toward alignment of the supply chain.

Highlight the customer Concluding comments

Go through the examples to illustrate problems

Use notes page on exercise slide within 7-10 min

Describe the ladder and what each of the rungs Talk about each of them individually.

Introduction, overview and

Part I: Introduction Part II: Concepts Part III: Application Part IV: Disconnects Part V: Conclusion

Page 15: Supply Chain Alignment

15© [ /

Bibliography “Achieving World-Class

A Plain-Language Guide Productivity Press:

New York, 2002.

Applications”.

www.viewlocity.com

6/9/04 --LFM Students] – ESD.60 Lean Six Sigma Systems, LFM, MIT

1) Fawcett, Stanley E. and Magnan, Gregory M. Supply Chain Alignment: Benefits, Barriers, and Bridges”.

2) Pascal, Dennis. “Lean Production Simplified: to the World’s Most Powerful Production System”.

3) PRTM Management Consultants.

4) Steenstrup, K. “Strategic Planning; CIO Risk Monitor for Business

Websites:

www.valdero.com