The information contained in this document is highly confidential and privileged. No part of this document may be copied or circulated without express written permission from Anantara Solutions Pvt. Ltd. This document is for discussion purposes only. SUPPLIER COLLABORATION PORTAL Anantara Solutions Private Limited the power of the continuum Case Study

description

Supplier

Transcript of Supplier Collaboration Portal Case Study SAP 20Feb12

  • Project driversProject ObjectivesSupplier Collaboration Portal : FunctionalitySolution Architecturebenefits for Client and Suppliers

    Table of Contents

    Anantara Solutions Private Limited 2012. All rights reserved

    Anantara Solutions Private Limited 2012. All rights reserved

  • External Suppliers of FG were treated at arms lengthSuppliers had little visibility of clients supply chainClient had little visibility of Suppliers suppliesSupply was largely on a Made-To-Order (MTO) basisLong lead timesLittle room for flexibilityClient purchased very little FG from Suppliers. i.e. If client do not make, they do not sell !Supply chain is not optimumHigh levels of stocks and yet poor availabilityLack of supplier collaboration is a root cause

    Project drivers

    Anantara Solutions Private Limited 2012. All rights reserved

    Turning the Finished Goods Suppliers to Supply Chain Partners

    Supplier Collaboration

    Anantara Solutions Private Limited 2012. All rights reserved

  • Improved forecast accuracySignificantly improved supply chainReduced lead time from FG suppliersReduced lot sizeFlexibility - ability to react to short term changes in demandCreate a tool and process that will enable launch and marketing of new products successfully sourced from external SuppliersBuild a tool and process to collaborate with external SuppliersReal time visibility (daily) of our net requirementMother stock concept (FG, SFGs like Died Threads, Grey Threads)Real time visibility of fulfilment from suppliersAutomatic changes to purchase order due datesAdvanced Shipping notifications creating inbound deliveries.Capturing of stocks at supplier (at all levels)Maintaining history. Auditing suppliers adherence to medium term plan

    Project Objectives

    Anantara Solutions Private Limited 2012. All rights reserved

    Anantara Solutions Private Limited 2012. All rights reserved

  • Supplier Collaboration Portal is a proven tool for online and real-time collaboration between OEMs and their suppliers on Planning and Purchasing processes.

    It provides a platform for to integrate all the collaborative processes like Planning, Order Acknowledgement, Reporting Schedule Delays, Advance Shipment Notifications, and is integrated seamlessly with the backend SAP ERP and SCM systems.

    Supplier Collaboration Portal

    Anantara Solutions Private Limited 2012. All rights reserved

    Control , Visibility and Flexibility in the Supply Chain

    Anantara Solutions Private Limited 2012. All rights reserved

  • Planning processSuppliers can view and download the Demand Forecast from Client Suppliers can send the FG and SFG stock details to clientManually enter the stock detailsUpload the stock details from Excel filePurchasing processPO AcknowledgementsConfirm PO without changesConfirm PO with changes in Quantity and Ship dateConfirm PO with changes via Excel file (Mass changes)Report delays on committed datesEnter changes in quantity/ship date manuallyUpload the changes via Excel file (Mass changes)Shipments processSupplier can view PO lines ready for shipmentSupplier can send ASN detailsEnter ASN manuallyUpload ASN from Excel fileSuppliers can request for PO closure

    Supplier Collaboration Portal : Functionality

    Anantara Solutions Private Limited 2012. All rights reserved

    Anantara Solutions Private Limited 2012. All rights reserved

  • Solution Architecture

    Anantara Solutions Private Limited 2012. All rights reserved

    SAP APO

    SAP ECC

    Shipments

    Stocks snapshot

    Rolling demand forecast

    Supply plan for next 6 months

    Stocks for next planning cycle

    Order Acknowledgment

    Order changes

    ASN and Packing lists

    Order confirmations

    Order updates

    Inbound Delivery

    Supplier

    Supplier Portal

    Order Acknowledgment

    Report Schedule Delays

    Review PO Changes

    Planning

    Claims

    PO Reports

    Anantara Solutions Private Limited 2012. All rights reserved

  • Planning

    Anantara Solutions Private Limited 2012. All rights reserved

    SAP APO

    Order Acknowledgment

    SAP ECC

    Shipments

    Supplier Portal

    Report Schedule Delays

    Review PO Changes

    Planning

    Claims

    PO Reports

    Supplier

    Publish Procurement Forecast from Planning Cycle 1

    3a

    View Demand Forecast

    3b

    Enter Stock snapshot

    4a

    Update Stock snapshot for Planning Cycle 2

    4b

    Master Planning

    2

    Master data

    Open SO, Open PO, Stocks

    1a

    1b

    Procurement Proposals

    3c

    Anantara Solutions Private Limited 2012. All rights reserved

  • Purchasing Process: Different dates involved

    Anantara Solutions Private Limited 2012. All rights reserved

    DateDescriptionEventsOriginal Ship DateOriginal ship date (calculated) based on the Original Delivery Date expected by OEM and Transport lead timePO generationOriginal Delivery DateOriginal delivery date expected by OEMPO generationConfirmed Expected Ship DateShipment date confirmed by the Supplier at the time of order acknowledgmentOrder AcknowledgementConfirmed Expected Delivery DateExpected delivery date (calculated) at OEM warehouse based on the Confirmed Expected Delivery Date from Supplier and Transport lead time Order AcknowledgementCurrent Expected Ship DateLatest shipment date from the Supplier based on the work progressReporting delaysCurrent Expected Delivery DateLatest delivery date (calculated) at OEM warehouse based on the Confirmed Expected Delivery Date from Supplier and Transport lead timeReporting delaysActual Ship DateActual shipment date from the SupplierASNExpected Receipt DateExpected receipt date (calculated) at OEM warehouse based on the Actual Ship Date and Transport lead timeASN

    Anantara Solutions Private Limited 2012. All rights reserved

  • Order Acknowledgment

    Anantara Solutions Private Limited 2012. All rights reserved

    SAP APO

    SAP ECC

    Order Acknowledgment

    Shipments

    Supplier Portal

    Report Schedule Delays

    Review PO Changes

    Planning

    Claims

    PO Reports

    Supplier

    PO Generation

    5

    PO Confirmations

    8

    Quantity and/or Ship date changes

    7b

    Order Confirmations

    7a

    View Po lines pending OA

    6b

    Review PO Changes

    Update PO confirmation

    7c

    Publish Open PO details

    6a

    Anantara Solutions Private Limited 2012. All rights reserved

  • Report Schedule Delays

    Anantara Solutions Private Limited 2012. All rights reserved

    SAP APO

    SAP ECC

    Order Acknowledgment

    Shipments

    Supplier

    PO updates

    10

    Reports ship dates changes

    9a

    Report split delivery schedule

    9b

    Supplier Portal

    Report Schedule Delays

    Review PO Changes

    Planning

    Claims

    PO Reports

    Review PO Changes

    Update changes to PO lines

    9c

    Anantara Solutions Private Limited 2012. All rights reserved

  • Shipments

    Anantara Solutions Private Limited 2012. All rights reserved

    SAP APO

    SAP ECC

    Order Acknowledgment

    Supplier

    Inbound Delivery

    10

    Supplier Portal

    Report Schedule Delays

    Review PO Changes

    Planning

    Shipments

    Claims

    PO Reports

    Review PO Changes

    Advance Shipment Notification

    9a

    PO marked for closure

    12

    Request for PO short closure

    11a

    Create Inbound Delivery

    9b

    Update PO closure flag

    11b

    Anantara Solutions Private Limited 2012. All rights reserved

  • Overall benefits for Client and Suppliers

    Anantara Solutions Private Limited 2012. All rights reserved

    Improved responsiveness to consumer demand.

    Greater forecast accuracy with single shared forecast.

    Improved relationship between trading partners.

    Increase in sales

    Inventory reduction

    Cost reduction

    Improved production capacity utilisation

    Reliable and shorter lead times

    Smaller lot sizes