C – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Waiting Lines Waiting Lines C For For Operations Management, Operations Management, 9e 9e by by Krajewski/Ritzman/Malhotr Krajewski/Ritzman/Malhotr a a PowerPoint PowerPoint Slides by Jeff Slides by Jeff Heyl Heyl

description

iy

Transcript of Supp C

Waiting Lines© 2010 Pearson Education
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Can develop even if processing time is constant
No waiting line if both demand and service rates are constant and service rate > than demand
Affects process design, capacity planning, process performance, and ultimately, supply chain performance
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
Relating arrival and service-system processing characteristics to output
Service is the act of processing a customer
Hair cutting in a hair salon
Satisfying customer complaints
Processing production orders
Trucks waiting to be unloaded at a warehouse
Patients waiting to be examined by a physician
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
A waiting line of customers
The service facility, consisting of a person (or crew), a machine (or group of machines), or both necessary to perform the service for the customer
A priority rule, which selects the next customer to be served by the service facility
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Customer population
Service system
Waiting line
Priority rule
Service facilities
Served customers
C – *
Impatient customer either balk or join the line and renege
Finite or infinite source
Customers from a finite source reduce the chance of new arrivals
Customers from an infinite source do not affect the probability of another arrival
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
The Service System
Number of lines
A single-line keeps servers uniformly busy and levels waiting times among customers
A multiple-line arrangement is favored when servers provide a limited set of services
Arrangement of service facilities
*
C – *
Figure C.3 – Examples of Service Facility Arrangements
Service facility
C – *
The Service System
Figure C.3 – Examples of Service Facility Arrangements
Service facility 1
Service facility 2
Service facility 3
Service facility 4
Service facility 1
Service facility 2
C – *
Routing for : 1–2–4
Routing for : 2–4–3
Routing for : 3–2–1–4
Service facility 1
Service facility 4
Service facility 3
Service facility 2
C – *
First-come, first-served (FCFS)—used by most service systems
Preemptive discipline—allows a higher priority customer to interrupt the service of another customer or be served ahead of another who would have been served first
Other rules
C – *
Probability Distributions
The sources of variation in waiting-line problems come from the random arrivals of customers and the variation of service times
Arrival distribution
Customer arrivals can often be described by the Poisson distribution with mean = T and variance also = T
Arrival distribution is the probability of n arrivals in T time periods
Interarrival times are the average time between arrivals
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
= Average numbers of customer arrivals per period
e = 2.7183
(T)n
n!
*
EXAMPLE C.1
Management is redesigning the customer service process in a large department store. Accommodating four customers is important. Customers arrive at the desk at the rate of two customers per hour. What is the probability that four customers will arrive during any hour?
SOLUTION
In this case customers per hour, T = 1 hour, and n = 4 customers. The probability that four customers will arrive in any hour is
P4 =
16
24
C – *
where
t = service time of the customer
T = target service time
Service Time
Service time distribution can be described by an exponential distribution with mean = 1/ and variance = (1/ )2
Service time distribution: The probability that the service time will be no more than T time periods can be described by the exponential distribution
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
EXAMPLE C.2
The management of the large department store in Example C.1 must determine whether more training is needed for the customer service clerk. The clerk at the customer service desk can serve an average of three customers per hour. What is the probability that a customer will require less than 10 minutes of service?
SOLUTION
We must have all the data in the same time units. Because
= 3 customers per hour, we convert minutes of time to hours, or T = 10 minutes = 10/60 hour = 0.167 hour. Then
P(t ≤ T) = 1 – e–T
P(t ≤ 0.167 hour) = 1 – e–3(0.167) = 1 – 0.61 = 0.39
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Waiting time in line
Total time in system
*
Assumptions are
Customer population is infinite and patient
Customers arrive according to a Poisson distribution, with a mean arrival rate of
Service distribution is exponential with a mean service rate of
Mean service rate exceeds mean arrival rate
Customers are served FCFS
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
= L
= W
= (1 – r )r n
l
=
=
*
EXAMPLE C.3
The manager of a grocery store in the retirement community of Sunnyville is interested in providing good service to the senior citizens who shop in her store. Currently, the store has a separate checkout counter for senior citizens. On average, 30 senior citizens per hour arrive at the counter, according to a Poisson distribution, and are served at an average rate of 35 customers per hour, with exponential service times. Find the following operating characteristics:
a. Probability of zero customers in the system
b. Average utilization of the checkout clerk
c. Average number of customers in the system
d. Average number of customers in line
e. Average time spent in the system
f. Average waiting time in line
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
SOLUTION
The checkout counter can be modeled as a single-channel, single-phase system. Figure C.4 shows the results from the Waiting-Lines Solver from OM Explorer.
Figure C.4 – Waiting-Lines Solver for Single-Channel, Single-Phase System
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
Calculating the Operating Characteristics
Both the average waiting time in the system (W) and the average time spent waiting in line (Wq) are expressed in hours. To convert the results to minutes, simply multiply by 60 minutes/ hour. For example, W = 0.20(60) minutes, and Wq = 0.1714(60) = 10.28 minutes.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
Application C.1
Customers arrive at a checkout counter at an average 20 per hour, according to a Poisson distribution. They are served at an average rate of 25 per hour, with exponential service times. Use the single-server model to estimate the operating characteristics of this system.
= 20 customer arrival rate per hour
= 25 customer service rate per hour
SOLUTION
l
m
C – *
Lq = L
Wq = W
= 0.8(4) = 3.2
5. Average waiting time in line
= 0.8(0.2) = 0.16
C – *
EXAMPLE C.4
The manager of the Sunnyville grocery in Example C.3 wants answers to the following questions:
a. What service rate would be required so that customers average only 8 minutes in the system?
b. For that service rate, what is the probability of having more than four customers in the system?
c. What service rate would be required to have only a 10 percent chance of exceeding four customers in the system?
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
SOLUTION
The Waiting-Lines Solver from OM Explorer could be used iteratively to answer the questions. Here we show how to solve the problem manually.
a. We use the equation for the average time in the system and solve for
0.133 – 0.133(30) = 1
*
Analyzing Service Rates
b. The probability of more than four customers in the system equals 1 minus the probability of four or fewer customers in the system.
and
Then,
= 1 – 0.672 = 0.328
Therefore, there is a nearly 33 percent chance that more than four customers will be in the system.
P = 1 – Pn
*
Analyzing Service Rates
c. We use the same logic as in part (b), except that is now a decision variable. The easiest way to proceed is to find the correct average utilization first, and then solve for the service rate.
P = 1 – (1 – )(1 + + 2 + 3 + 4)
= 1 – (1 – )(1 + + 2 + 3 + 4) + (1 + + 2 + 3 + 4)
= 1 – 1 – – 2 – 3 – 4 + + 2 + 3 + 4 + 5 = 5
= P1/5
or
*
Analyzing Service Rates
Therefore, for a utilization rate of 63 percent, the probability of more than four customers in the system is 10 percent.
For = 30, the mean service rate must be
= 47.62 customers/hour
*
Application C.2
In the checkout counter example, what service rate is required to have customers average only 10 minutes in the system?
SOLUTION
0.17( – ) = 1, where = 20 customers arrival rate per hour
=
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Assumptions (in addition to single-server model)
There are s identical servers
The service distribution for each server is exponential
The mean service time is 1/
s should always exceed
C – *
=
= Average utilization of the system =
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Wq = Average waiting time of customers in line =
=
= W
C – *
EXAMPLE C.5
The management of the American Parcel Service terminal in Verona, Wisconsin, is concerned about the amount of time the company’s trucks are idle (not delivering on the road), which the company defines as waiting to be unloaded and being unloaded at the terminal. The terminal operates with four unloading bays. Each bay requires a crew of two employees, and each crew costs $30 per hour. The estimated cost of an idle truck is $50 per hour. Trucks arrive at an average rate of three per hour, according to a Poisson distribution. On average, a crew can unload a semitrailer rig in one hour, with exponential service times. What is the total hourly cost of operating the system?
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
SOLUTION
The multiple-server model is appropriate. To find the total cost of labor and idle trucks, we must calculate the average number of trucks in the system.
Figure C.5 shows the results for the American Parcel Service problem using the Waiting-Lines Solver from OM Explorer. Manual calculations using the equations for the multiple-server model are demonstrated in Solved Problem 2 at the end of this supplement. The results show that the four-bay design will be utilized 75 percent of the time and that the average number of trucks either being serviced or waiting in line is 4.53 trucks. That is, on average at any point in time, we have 4.53 idle trucks. We can now calculate the hourly costs of labor and idle trucks:
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Figure C.5 – Waiting-Lines Solver for Multiple-Server Model
Labor cost:
$30(s) = $30(4)
C – *
Application C.3
Suppose the manager of the checkout system decides to add another counter. The arrival rate is still 20 customers per hour, but now each checkout counter will be designed to service customers at the rate of 12.5 per hour. What is the waiting time in line of the new system?
s = 2, = 12.5 customers per hour, = 20 customers per hour
SOLUTION
=
C – *
P0 =
C – *
4. Average waiting time of customers in line
Wq =
Lq =
= = 1.408
C – *
Little’s Law
Relates the number of customers in a waiting line system to the waiting time of customers
Using the notation from the single-server and multiple-server models it is expressed as L = W or Lq = Wq
Holds for a wide variety of arrival processes, service time distributions, and numbers of servers
Only need to know two of the parameters
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
Work-in-process = L = W
L customers
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
Provides basis for measuring the effects of process improvements
Is not applicable to situations where the customer population is finite
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
Assumptions
Follows the assumption of the single-server, except that the customer population is finite
Having only N potential customers
If N > 30, then the single-server model with the assumption of infinite customer population is adequate
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
=
=
C – *
Wq = Average waiting time in line =
=
C – *
Application C.4
DBT Bank has 8 copy machines located in various offices throughout the building. Each machine is used continuously and has an average time between failures of 50 hours. Once failed, it takes 4 hours for the service company to send a repair person to have it fixed. What is the average number of copy machines in repair or waiting to be repaired?
= 1/50 = 0.02 copiers per hour
= 1/4 = 0.25 copiers per hour
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
= 0.44
= 1 – P0
P0 =
C – *
EXAMPLE C.6
The Worthington Gear Company installed a bank of 10 robots about 3 years ago. The robots greatly increased the firm’s labor productivity, but recently attention has focused on maintenance. The firm does no preventive maintenance on the robots because of the variability in the breakdown distribution. Each machine has an exponential breakdown (or interarrival) distribution with an average time between failures of 200 hours. Each machine hour lost to downtime costs $30, which means that the firm has to react quickly to machine failure. The firm employs one maintenance person, who needs 10 hours on average to fix a robot. Actual maintenance times are exponentially distributed. The wage rate is $10 per hour for the maintenance person, who can be put to work productively elsewhere when not fixing robots. Determine the daily cost of labor and robot downtime.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
SOLUTION
The finite-source model is appropriate for this analysis because the customer population consists of only 10 machines and the other assumptions are satisfied. Here, = 1/200, or 0.005 break-down per hour, and = 1/10 = 0.10 robot per hour. To calculate the cost of labor and robot downtime, we need to estimate the average utilization of the maintenance person and L, the average number of robots in the maintenance system at any time. Figure C.6 shows the results for the Worthington Gear Problem using the Waiting-Lines Solver from OM Explorer.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
Analyzing Maintenance Costs
Manual computations using the equations for the finite-source model are demonstrated in Solved Problem 3 at the end of this supplement. The results show that the maintenance person is utilized only 46.2 percent of the time, and the average number of robots waiting in line or being repaired is 0.76 robot. However, a failed robot will spend an average of 16.43 hours in the repair system, of which 6.43 hours of that time is spent waiting for service. While an individual robot may spend more than two days with the maintenance person, the maintenance person has a lot of idle time with a utilization rate of only 42.6 percent. That is why there is only an average of 0.76 robot being maintained at any point of time.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
The daily cost of labor and robot downtime is
Labor cost:
*
Application C.5
The Hilltop Produce store is staffed by one checkout clerk. The average checkout time is exponentially distributed around an average of two minutes per customer. An average of 20 customers arrive per hour.
What is the average utilization rate?
SOLUTION
l
m
C – *
Application C.5
What is the probability that three or more customers will be in the checkout area?
First calculate 0, 1, and 2 customers will be in the checkout area:
Rn = (1 – r )r 0
= (0.333)(0.667)0 = 0.333
= (0.333)(0.667)1 = 0.222
= (0.333)(0.667)2 = 0.111
Then calculate 3 or more customers will be in the checkout area:
1 – P0 – P1 – P2 =
0.333 – 0.222 – 0.111 = 0.334
C – *
Application C.5
What is the average number of customers in the waiting line?
What is the average time customers spend in the store?
l
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Server efficiency
Priority rule
Line arrangement
*
Solved Problem 1
A photographer takes passport pictures at an average rate of 20 pictures per hour. The photographer must wait until the customer smiles, so the time to take a picture is exponentially distributed. Customers arrive at a Poisson-distributed average rate of 19 customers per hour.
a. What is the utilization of the photographer?
b. How much time will the average customer spend with the photographer?
SOLUTION
a. The assumptions in the problem statement are consistent with a single-server model. Utilization is
l
m
*
b. The average customer time spent with the photographer is
1
*
Solved Problem 2
The Mega Multiplex Movie Theater has three concession clerks serving customers on a first come, first-served basis. The service time per customer is exponentially distributed with an average of 2 minutes per customer. Concession customers wait in a single line in a large lobby, and arrivals are Poisson distributed with an average of 81 customers per hour. Previews run for 10 minutes before the start of each show. If the average time in the concession area exceeds 10 minutes, customers become dissatisfied.
a. What is the average utilization of the concession clerks?
b. What is the average time spent in the concession area?
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
*
The concession clerks are busy 90 percent of the time.
=
=
C – *
b. The average time spent in the system, W, is
Here,
We must solve for P0, Lq, and Wq, in that order, before we can solve for W:
W
C – *
= 7.45 minutes
With three concession clerks, customers will spend an average of 7.45 minutes in the concession area.
Lq =
C – *
Solved Problem 3
The Severance Coal Mine serves six trains having exponentially distributed interarrival times averaging 30 hours. The time required to fill a train with coal varies with the number of cars, weather-related delays, and equipment breakdowns. The time to fill a train can be approximated by an exponential distribution with a mean of 6 hours 40 minutes. The railroad requires the coal mine to pay large demurrage charges in the event that a train spends more than 24 hours at the mine. What is the average time a train will spend at the mine?
SOLUTION
The problem statement describes a finite-source model, with N = 6. The average time spent at the mine is W = L[(N – L)]–1, with 1/ = 30 hours/train, = 0.8 train/day, and = 3.6 trains/day. In this case,
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
C – *
Solved Problem 3
Arriving trains will spend an average of 0.72 day at the coal mine.
P0 =
C – *
m
l
s