Superintendent’s Report
August 19, 2013
![Page 2: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/2.jpg)
Very successful LEGO League Camp here at MLT in July.
Held three 1-week sessions with 10 or so students in each session.
Kids built and programmed robots to perform various tasks, and even worked on face recognition.
![Page 3: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/3.jpg)
Very successful pre-school and summer school program here at MLT, also. Mr. Jim, one of the traveling teachers from the Maritime Aquarium in Norwalk, visited with the Preschool Touch Tank.
![Page 4: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/4.jpg)
Timeline Action
March 20th Bond Passed
June 17th Turkey Hill Review w/ CT Inspectors
July 8th Race Brook Review w/ CT Inspectors
Factors:• Projects approved in July… HOWEVER• Roofs are hot tar & hot stone application – difficult odor to endure for kids
and teachers.• Boilers need abatement, which involves sealing the area; no persons under
18 can be on the premises. Thus, abatement needs to take place in the summer
• After contract is awarded, the boilers could take 10 – 12 weeks to come in… if we took the old boilers out in August, would the new ones be in by October?
• Summer Bond projects
![Page 5: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/5.jpg)
New playground edging and bark mulch at Turkey Hill. Manufactured edging is safer and more durable than landscaping timbers.
![Page 6: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/6.jpg)
New white tile entrance at Peck Place; lighter and brighter; new carpet installed in the library, beyond the new ‘classroom’ area.
![Page 7: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/7.jpg)
New drainage site-work at Peck Place was professionally done.
![Page 8: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/8.jpg)
Rebuilt the sumps; installed 6” drainage lines.
![Page 9: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/9.jpg)
New drainage at Peck Place – building to side-yard; from side-yard to parking lot.
![Page 10: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/10.jpg)
ALL SCHOOLS:ID Badge Reader – opens the door for employees with badges; enables us to lock exterior doors at all times.
![Page 11: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/11.jpg)
ALL SCHOOLS:High-quality camera enables office to ask an unknown visitor to hold up ID for the camera – 100% readable!
![Page 12: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/12.jpg)
Professional Development:This group of 13 teachers is preparing to pilot the PowerSchool grade book!
![Page 13: Superintendent's Report to BOE 8.19.2013](https://reader035.fdocuments.net/reader035/viewer/2022062709/559032861a28ab551e8b459b/html5/thumbnails/13.jpg)
Additionally:
• AA’s and Central Office trained in PowerSchool!
• The Admins spent 5 days on the Teacher Evaluation Plan!
• Admins will spend another day in TalentEd!
• I spent 3 days in Admin evaluation at CAS (CT Assoc. of Schools)!
• Security Monitors training coming up!
• Teachers will spend a full-day with their Principals – reviewing the rubrics for effective teaching.