Sunway Construction Group BerhadQ4 2015 Results Review Pack25 February 2016
2015 maiden dividend to exceed 90% post listing profit
2
� Proposed first maiden interim dividend of 20% per ordinary share of RM0.20 each (4 cents). � FYE2015 PAT of RM127.8 exceeds FYE 2014’s of RM124.8 (as per prospectus’s
combined financial information)� Strong Track Record. Order Book of RM 3.7 billion. New YTD 2015 Order Book
of RM 2.6billion.� Preferred Contractor : Positive outlook for construction sector in 2016 and pre-
qualified for several infrastructure projects (MRT2, Pan Borneo, DASH, SUKE and etc).� Commendable ROE of 28%.� Precast Concrete segment in Singapore result continue to shine with overall YTD
2015 margin of 30.5% from finalization of accounts and favorable exchange rate.
Overview of Key Performance Highlights
Balance Sheet and Gearing
4* Reclassified to conform with the current quarter’s presentation where SCG has adopted the Merger Method of Accounting
Construction Segmental Review
Review of Performance• Q4 2015 and Q3 2015 revenue is quite consistent. Slightly higher revenue was due to commencement
of Parcel F, Putrajaya and Coastal Highway Southern Link Project, Johor which is beginning to peak in itsconstruction activities.
• The PBT in Q4 and Q3 are comparable. 1H 2015 margins are higher due to finalization of accounts.
Afiniti Medini - Johor BRT – Sunway Line MRT Package V4
Precast Concrete Segmental Review
Review of Performance• Both Q4 2015 and Q3 2015 results have no significant fluctuation. Precast division overall margin
continue to exceed our expectation as the results were boasted by favorable exchange rate andfinalization of accounts.
Sembawang N1C7 & C8 Avant Parc @ SembawangPrecast Yard in Singapore
Note : PBT Margin 2014 : 39%, 2013: 22%, 2012 : 15%
Construction Order Book @ 31 Dec 2015 – RM3.7 bil
New Order Book 2015 Secured YTD
New order 2014 : 0.8b, 2013 : 2.9b, 2012 : 1.9b
Note : For Feb 2016, new order book amounts to RM142m (60m from Precast in Singapore, 62m Sunway Geotechnics, 20m from Velocity Link Bridge)
Thank YouSUNWAY CONSTRUCTION GROUP BERHAD (Company No. 1108506-W)
(Incorporated in Malaysia under the Companies Act, 1965)
Level 8, Menara SunwayJalan Lagoon Timur
Bandar Sunway 47500 Subang Jaya
Selangor Darul EhsanMalaysia
Tel. No.: (603) 5639 9333 Fax. No.: (603) 5639 9530
Email: [email protected]: www.sunwayconstruction.com.my
This presentation may contain certain forward looking statements due to a number of risks, uncertainties and assumptions. Representativeexamples of these factors include (without limitation) general industry and economic conditions; interest rate trends; cost of capital andcapital availability including availability of financing in the amounts and the terms necessary to support future business; competition fromother companies, changes in operating expenses including employee wages, benefits, government and public policy changes. You arecautioned not to place undue reliance on these forward looking statements which are based on Management's current view of future events.Past performance is not necessarily indicative of its future performance
Next quarter announcement on 26 May 2016