Agenda
1• Energy Potential of Our Region
2• Energy Investments in our Region
3• Problems with Energy Legislation
4
• Industry Competition Analysis of Konya
Our Energy Politics
Our Mission
Evaluating theEnergy Potential
of Region
Solar Plants
Thermic Plant
Building up an energy industrial
at the region
Solar PowerIndustry
Wind PowerIndustry
Nuclear PowerIndustry
Energy Potential of Region
HighRenewable
EnergyPotential
Ready InvestmentLands and
Infrastructure
EnergyIncentives
StrongIndustry
HighestCapacity
Permission
Energy Potential of Region
Konya %5,53, Karapınar %6,82, Karaman %8,92
are more efficiency than Turkey’s avarage
January February March April May June July August September October November December Average
Global Radiation (kWh/m2-day) Turkey 1,79 2,5 3,87 4,93 6,14 6,57 6,5 5,81 4,81 3,46 2,14 1,59 4,18
Global Radiation (kWh/m2-day) Konya 1,98 2,56 4,23 5,2 6,3 6,78 6,81 6,05 5,12 3,73 2,35 1,77 4,41
Global Radiation (kWh/m2-day) Karaman 2,16 2,69 4,38 5,35 6,45 6,98 6,91 6,15 5,22 3,86 2,52 1,91 4,55
Global Radiation (kWh/m2-day) Karapınar 2,06 2,59 4,33 5,25 6,31 6,85 6,8 6,07 5,2 3,8 2,46 1,81 4,46
0
1
2
3
4
5
6
7
8
kWH
/m2-
day
Global Radiation (kWh/m2-day)
Energy Potential of Region
Konya %5,66, Karapınar %8,12, Karaman %9,88
are more efficiency than Turkey’s avarage
January February March April May June July AugustSeptembe
rOctober November December Average
Sunshine Duration ( Hour ) Turkey 4,11 5,22 6,27 7,46 9,1 10,81 11,31 10,7 9,23 6,87 5,15 3,75 7,50
Sunshine Duration ( Hour ) Konya 4,19 5,51 6,68 8,03 9,46 11,28 11,97 11,35 9,79 7,35 5,53 3,93 7,92
Sunshine Duration ( Hour ) Karaman 4,46 5,85 7,14 8,44 9,84 11,51 12,02 11,47 10,11 7,77 5,95 4,31 8,24
Sunshine Duration ( Hour ) Karapınar 4,18 5,65 6,91 8,25 9,58 11,53 12,22 11,6 10,05 7,6 5,74 3,98 8,11
0
2
4
6
8
10
12
14
Saat
Sunshine Duration ( Hour )
Energy Potential of RegionMONTHS
Global Radiation (kWh/m2-day) Sunshine Duration ( Hour )
Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar
January 1,79 1,98 2,16 2,06 4,11 4,19 4,46 4,18February 2,5 2,56 2,69 2,59 5,22 5,51 5,85 5,65
March 3,87 4,23 4,38 4,33 6,27 6,68 7,14 6,91April 4,93 5,2 5,35 5,25 7,46 8,03 8,44 8,25May 6,14 6,3 6,45 6,31 9,1 9,46 9,84 9,58June 6,57 6,78 6,98 6,85 10,81 11,28 11,51 11,53July 6,5 6,81 6,91 6,8 11,31 11,97 12,02 12,22
August 5,81 6,05 6,15 6,07 10,7 11,35 11,47 11,6September 4,81 5,12 5,22 5,2 9,23 9,79 10,11 10,05
October 3,46 3,73 3,86 3,8 6,87 7,35 7,77 7,6November 2,14 2,35 2,52 2,46 5,15 5,53 5,95 5,74December 1,59 1,77 1,91 1,81 3,75 3,93 4,31 3,98
Average 4,18 4,41 4,55 4,46 2.741,07 2.896,01 3.011,41 2.963,47
Konya %5,66, Karapınar %8,12,Karaman %9,88
are more
efficiency than
Turkey’s
avarage
2.741,07
2.896,01
3.011,412.963,47
2.600,00
2.700,00
2.800,00
2.900,00
3.000,00
3.100,00
Turkey Konya Karaman Karapınar
Annual Average Sunshine Duration ( Hour )
AnnualAverageSunshineDuration( Hour )
Energy Potential of Region
Energy Potential of Region
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
0,00
50,00
100,00
150,00
200,00
250,00
0,00
5.000,00
10.000,00
15.000,00
20.000,00
25.000,00
30.000,00
35.000,00
40.000,00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
(kW
h/m
2)
kWh
Avarage Montly Electricity Production
Paris Konya Paris Konya
Konya is
%49,61 more efficiency than Paris’s avarage for Avarage Montly Electricity Production
Konya is
%51,45 more efficiency than Paris’s avarage for Avarage Montly Irradiation persquare meter
Paris Case
Energy Potential of Region
Konya is
%49,61 more efficiency than Paris’sYearly Elecricity Production
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Tariffs taken from CRE site. http://www.cre.fr/documents/deliberations/communication/coefficients-s11-et-v11
The Power Plant inKonya is
%97,07more efficiency than Paris’sAnnual Revenue
0,00 EUR
5.000,00 EUR
10.000,00 EUR
15.000,00 EUR
20.000,00 EUR
25.000,00 EUR
30.000,00 EUR
35.000,00 EUR
0,00
50.000,00
100.000,00
150.000,00
200.000,00
250.000,00
300.000,00
350.000,00
Paris Konya
Euro
kWh
Annual Elecricity Production and Revenue
Yearly Electricity Production (kWh) Annual Revenue (Euro)
Paris
Month
Average daily electricity
productionEd
(kWh)
Average monthly electricity
productionEm
(kWh)
Average daily sum of global irradiation per square meter
Hd
(kWh/m2)
Average sum of global irradiation per square meter
Hm
(kWh/m2)
Yearly average
580,08 17.666,67 3,77 114,96
Total for year
212.000,00 1.379,50
Annual Revenue
15.603,20 EUR 0,0736 Euro / kWh
Konya
Month
Average daily electricity
productionEd
(kWh)
Average monthly
electricity production
Em
(kWh)
Average daily sum of global
irradiation per square meter
Hd
(kWh/m2)
Average sum of global
irradiation per square meter
Hm
(kWh/m2)
Yearly average
867,92 26.416,67 5,71 173,92
Total for year
317.000,00 2.087,00
Annual Revenue
30.749,00 EUR 0,097 Euro / kWh
Paris Case
Energy Potential of Region
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Konya is
%81,15 more efficiency than Berlin’s avarage for Avarage Montly Electricity Production
Konya is
%82,45 more efficiency than Berlin’s avarage for Avarage Montly Irradiation persquare meter
Berlin Case
0,00
50,00
100,00
150,00
200,00
250,00
0,00
5.000,00
10.000,00
15.000,00
20.000,00
25.000,00
30.000,00
35.000,00
40.000,00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
(kW
h/m
2)
kWh
Avarage Montly Electricity Production
Berlin Konya Berlin Konya
Energy Potential of Region
Konya is
%81,15 more efficiency thanBerlin’s Yearly ElecricityProduction
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Tariffs taken from Bundesnetzagentur site. http://www.bundesnetzagentur.de/cln_1432/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/ErneuerbareEnergien/Photovoltaik/DatenMeldgn
_EEG-VergSaetze/DatenMeldgn_EEG-VergSaetze_node.html;jsessionid=5579EEAD06F7DC40B17FF710F2BE5806#doc405794bodyText4
The Power Plant inKonya is
%69,61more efficiency thanBerlin’s Annual Revenue
Berlin
Month
Average daily electricity
productionEd
(kWh)
Average monthly electricity
productionEm
(kWh)
Average daily sum of global irradiation per square meter
Hd
(kWh/m2)
Average sum of global irradiation per square meter
Hm
(kWh/m2)
Yearly average
478,50 14.582,50 3,13 95,36
Total for year
174.990,00 1.144,30
Annual Revenue
18.128,96 EUR0,1153 Euro / kWh (Av. 0,1036 E)
Monthly %1,48 Decline
Konya
Month
Average daily electricity
productionEd
(kWh)
Average monthly
electricity production
Em
(kWh)
Average daily sum of global
irradiation per square meter
Hd
(kWh/m2)
Average sum of global
irradiation per square meter
Hm
(kWh/m2)
Yearly average
867,92 26.416,67 5,71 173,92
Total for year
317.000,00 2.087,00
Annual Revenue
30.749,00 EUR 0,097 Euro / kWh
Berlin Case
0,00 EUR
5.000,00 EUR
10.000,00 EUR
15.000,00 EUR
20.000,00 EUR
25.000,00 EUR
30.000,00 EUR
35.000,00 EUR
0,00
50.000,00
100.000,00
150.000,00
200.000,00
250.000,00
300.000,00
350.000,00
Berlin Konya
Euro
kWh
Annual Elecricity Production and Revenue
Yearly Electricity Production (kWh) Annual Revenue (Euro)
Energy Potential of Region
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Konya is
%10,05 more efficiency than Malaga’s avarage for Avarage Montly Electricity Production
Konya is
%6,72more efficiency than Malaga’s avarage for Avarage Montly Irradiation per squaremeter
Malaga Case
0,00
50,00
100,00
150,00
200,00
250,00
0,00
5.000,00
10.000,00
15.000,00
20.000,00
25.000,00
30.000,00
35.000,00
40.000,00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
(kW
h/m
2)
kWh
Avarage Montly Electricity Production
Malaga Konya Malaga Konya
Energy Potential of Region
Konya is
%10,05 more efficiency thanMalaga’s Yearly ElecricityProduction
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Tariffs taken from El Ministro de Industria, Turismo y Comerciohttp://www.boe.es/boe/dias/2010/11/23/pdfs/BOE-A-2010-17976.pdf
The Power Plant inKonya is
%20,91less efficiency thanMalaga’s Annual Revenue
Malaga
Month
Average daily electricity
productionEd
(kWh)
Average monthly electricity
productionEm
(kWh)
Average daily sum of global irradiation per square meter
Hd
(kWh/m2)
Average sum of global irradiation per square meter
Hm
(kWh/m2)
Yearly average
788,17 24.000,00 5,35 162,92
Total for year
288.000,00 1.955,00
Annual Revenue
38.880,00 EUR 0,135 Euro / kWh
Konya
Month
Average daily electricity
productionEd
(kWh)
Average monthly
electricity production
Em
(kWh)
Average daily sum of global
irradiation per square meter
Hd
(kWh/m2)
Average sum of global
irradiation per square meter
Hm
(kWh/m2)
Yearly average
867,92 26.416,67 5,71 173,92
Total for year
317.000,00 2.087,00
Annual Revenue
30.749,00 EUR 0,097 Euro / kWh
Malaga Case
0,00 EUR
5.000,00 EUR
10.000,00 EUR
15.000,00 EUR
20.000,00 EUR
25.000,00 EUR
30.000,00 EUR
35.000,00 EUR
40.000,00 EUR
45.000,00 EUR
0,00
40.000,00
80.000,00
120.000,00
160.000,00
200.000,00
240.000,00
280.000,00
320.000,00
Malaga Konya
Euro
kWh
Annual Elecricity Production and Revenue
Yearly Electricity Production (kWh) Annual Revenue (Euro)
Energy Potential of RegionKonya, %8,39
Regarding average
montly energy
production Konya’s
actual value is more
efficient than
calculated.
Month
PVGISAverage monthly
electricity productionEm
(kWh)
MEDAS Power PlantEelectricity production
Em
(kWh)
Efficiency of Generated to
Calculated
Annual Revenue of MEDAS Power Plant
Jan 17.400,00 16.660,00 -4,25 1.616,02 EUR
Feb 19.700,00 20.800,00 5,58 2.017,60 EUR
Mar 26.400,00 27.450,00 3,98 2.662,65 EUR
Apr 27.500,00 30.790,00 11,96 2.986,63 EUR
May 30.400,00 36.570,00 20,30 3.547,29 EUR
Jun 30.800,00 37.900,00 23,05 3.676,30 EUR
Jul 32.900,00 40.630,00 23,50 3.941,11 EUR
Aug 33.700,00 40.190,00 19,26 3.898,43 EUR
Sep 31.600,00 34.850,00 10,28 3.380,45 EUR
Oct 27.600,00 31.740,00 15,00 3.078,78 EUR
Nov 22.400,00 20.150,00 -10,04 1.954,55 EUR
Dec 16.600,00 13.620,00 -17,95 1.321,14 EUR
Total 317.000,00 351.350,00 8,39 34.080,95 EUR
10.000,00 EUR
15.000,00 EUR
20.000,00 EUR
25.000,00 EUR
30.000,00 EUR
35.000,00 EUR
40.000,00 EUR
0,00
50.000,00
100.000,00
150.000,00
200.000,00
250.000,00
300.000,00
350.000,00
Malaga(Calculated)
Konya(Calculated)
Berlin(Calculated)
Paris(Calculated)
Konya(Produced)
Euro
kWh
Annual Elecricity Production and Revenue
Yearly Electricity Production (kWh) Annual Revenue (Euro)
Energy Potential of RegionTurkey has %6,65Avarage Annual
Electricity
compsumption
growth
4,45 4,07 3,74 3,58 4,23 4,47 4,53 4,46 4,13 3,91 4,51
49,04 49,30 49,17 47,82 47,55 47,57 46,22 44,92 46,11 47,28 47,35
10,56 11,52 12,92 14,24 14,16 14,92 14,76 15,95 16,12 16,40 16,33
22,88 22,54 22,80 23,75 24,09 23,51 24,44 24,95 24,07 23,79 23,28
2,67 2,54 2,60 2,49 2,45 2,65 2,92 2,33 2,53 2,05 2,3310,40 10,03 8,77 8,13 7,53 6,88 7,12 7,40 7,04 6,58 6,20
0,00
10,00
20,00
30,00
40,00
50,00
60,00
70,00
80,00
90,00
100,00
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Electricity Compsumption of Turkey
State Offices Consumption (MWh) Industrial Consumption ( MWh) Commercial Comsuption (MWh)
Residental Comsupmtion (MWh) Agricultural irrigation (MWh) Loss or Leak or Other Compsumptions
0
50.000.000
100.000.000
150.000.000
200.000.000
250.000.000
2000 2002 2004 2006 2008 2010 2012 2014
Total Electricity Cunsumption(MWh)
Energy Potential of RegionKonya has %13,09Avarage Annual
Electricity
compsumption
growth
1,68 1,10 2,11 2,15 2,37 3,81 4,51 5,67 5,05 2,86 3,37
31,96
55,50 55,5151,06
55,06 54,0547,80 43,45
49,7545,10
39,51
10,06
6,75 6,547,47
7,62 8,318,77
10,39
10,1015,73
13,80
26,30
17,14 16,8119,06
15,90 15,8517,40 20,61
18,19 21,42
18,30
15,64
11,19 11,95 13,45 11,5913,89 16,87 15,52 13,24
3,88
11,85
14,378,32 7,09 6,80 7,46 4,09 4,64 4,35 3,67
11,02 13,17
0,00
10,00
20,00
30,00
40,00
50,00
60,00
70,00
80,00
90,00
100,00
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Electricity Compsumption of Konya
State Offices Consumption (MWh) Industrial Consumption ( MWh) Commercial Comsuption (MWh)
Residental Comsupmtion (MWh) Agricultural irrigation (MWh) Loss or Leak or Other Compsumptions
0
2.000.000
4.000.000
6.000.000
2000 2002 2004 2006 2008 2010 2012 2014
Total Electricity Cunsumption(MWh)
Energy Potential of RegionKaraman has %9,40Avarage Annual
Electricity
compsumption
growth
3,41 3,39 5,74 2,99 3,79 5,87 5,43 5,38 2,06 2,41 2,68
29,77 30,6031,39
30,78 29,31
33,99 33,08 34,7632,63
38,07 37,63
5,577,71
6,33 9,75 8,02
6,66 6,97 7,1511,38
12,55 9,61
22,4321,76 20,53 19,80
19,16
18,46 18,7519,87 20,09
19,0919,05
25,9213,09
29,4225,88
25,28
28,74 30,84 27,1823,81 12,18 18,20
12,90
23,44
6,5810,79
14,446,28 4,93 5,65
10,0215,70 12,83
0,00
10,00
20,00
30,00
40,00
50,00
60,00
70,00
80,00
90,00
100,00
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Electricity Compsumption of Karaman
State Offices Consumption (MWh) Industrial Consumption ( MWh) Commercial Comsuption (MWh)
Residental Comsupmtion (MWh) Agricultural irrigation (MWh) Loss or Leak or Other Compsumptions
0
200000
400000
600000
2000 2002 2004 2006 2008 2010 2012 2014
Total Electricity Cunsumption(MWh)
Energy Potential of Region
Konya has a 2,77% annual average in Turkey's electricity consumption
0,00
0,50
1,00
1,50
2,00
2,50
3,00
3,50
2000 2002 2004 2006 2008 2010 2012 2014
%
Ratio of Electricity Cunsumption to Turkey
Konya Karaman TR52
Karaman has a 0,27% annual average in Turkey's electricity consumption
Energy Investments in Region
Total Application Approved Application Evaluating Application
Türkiye (Others) 1251 750 219
Karaman 65 12 53
Konya 394 114 280
23,0413,01
50,723,80
1,37
9,60
73,16
85,62
39,67
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
%
Applications of Unlicensed Energy
Energy Investments in Region
Number of ApprovedApplication
Number ofApplication for
Project
Number of ApprovedProject
Number ofApplication for
TemporaryAcceptance
Number of ApprovedTemporaryAcceptance
Türkiye (Others) 449 179 100 41 21
Karaman 11 6 0 0 0
Konya 107 22 7 2 1
18,8710,63 6,54 4,65 4,65
1,94
2,90
79,1986,47
93,46 95,35 95,45
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
%
Applications of Unlicensed Solar Energy
Energy Investments in Region
72,78
27,72
0
50
100
150
200
250
300
350
400
450
Total Applications
Konya Unlicensed Solar Applications
Number ofApprovedApplication
Number ofEvaluatingApplications
20,56
6,54
72,90
0
20
40
60
80
100
120
Approved Applications
Konya Unlicensed Solar Applications
Number ofNonpractisingApplications
Number ofApproved Project
Number ofApplication forProject
28,57
14,29
57,14
0
1
2
3
4
5
6
7
Total Aproved Projects
Konya Unlicensed Solar Applications
Number ofUnappliedProjects
Number ofApprovedTemporaryAcceptance
Number ofApplication forTemporaryAcceptance
Energy Investments in Region
Konya Karaman TR-52 Turkey
Number 120 78 198 496
Percentage 24,19 15,73 39,92 100,00
0,00
20,00
40,00
60,00
80,00
100,00
120,00
0
100
200
300
400
500
600
%
Nu
mb
er
Total Applications for Licensed Solar Energy
For the number of Licensed Applications Konya-Karaman is % 39,92
Energy Investments in Region
For the number of Unlicensed Applications Konya-Karaman is % 20,81
Konya Karaman TR-52 Turkey
Number 107 11 118 567
Percentage 18,87 1,94 20,81 100
0,00
20,00
40,00
60,00
80,00
100,00
0
100
200
300
400
500
600
%Nu
mb
er
Total Applications for Unlicensed Solar Energy
Energy Investments in Region
For the installed capacity of Licensed Applications Konya-Karaman is % 33,34;
For the Allowed Licensed Capacity Konya-Karaman is % 21,66; ( 130 MW / 600 MW )
Konya Karaman TR-52 Turkey
Installed Capacity 1850 1117 2967 8900
Percentage 20,79 12,55 33,34 100,00
0,00
20,00
40,00
60,00
80,00
100,00
0
1500
3000
4500
6000
7500
9000
%
MW
Total Applications for Licensed Solar Energy
Energy Investments in Region
For the installed capacity of Approved Unlicensed Applications Konya-Karaman is % 23,07
Konya Karaman TR-52 Turkey
Installed Capacity 42,18 4,80 46,98 203,60
Percentage 20,72 2,36 23,07 100
0,00
20,00
40,00
60,00
80,00
100,00
0,00
50,00
100,00
150,00
200,00
250,00
%
MW
Approved Applications for Unlicensed Solar Energy
Energy Investments in Region
2013 (From April) 2014 ( From March )
Online Instaled Capacity 0 700
Evaluating Installed Capacity 38.748 302.385
Approved Installed Capacity 0 46.278
Number of Approved Applications 0 116
Number of Evaluating Applications 100 332
Number of Online Applications 0 2
0
50
100
150
200
250
300
350
0
50.000
100.000
150.000
200.000
250.000
300.000
350.000
400.000
Nu
mb
er o
f P
lan
ts
kW
TR52 Region Unlicensed Solar Applications by Years
Approved Installed Capacity Evaluating Installed Capacity Online Instaled Capacity
Number of Approved Applications Number of Evaluating Applications Number of Online Applications
Energy Investments in Region
0
20
40
60
80
100
120
140
160
180
0,00
20.000,00
40.000,00
60.000,00
80.000,00
100.000,00
120.000,00
140.000,00
160.000,00
Nu
mb
er
kW
Power Stations
The Unlicensed Solar Applications by Power Stations
Total Installed Capacity Total Numbers
Energy Investments in RegionNUMBER POWER STATION CITY
NOMINAL POWER(MVA)
Unlicensed Application
Installed Capacity (kW) *
Unlicensed Application Number
*
Maximum Demand for 2013 Year (MW)
*
1 AKŞEHİR KONYA 25+25 6.500 10 20,548
2 ALAKOVA(GEÇİCİ) KONYA 25 7,88
3 ALİBEYHÜYÜĞÜ KONYA 50,(10+10) 9.997 13 4,196
4 ALTINEKİN KONYA 100+16 8.500 10 4,412
5 BEYŞEHİR KONYA 50+16 700 2 27,1
6 CİHANBEYLİ KONYA 25+25 9.500 10 14,284
7 ÇUMRA KONYA 50+50 4.000 6 18,656
8 DARAN(GEÇİCİ) KARAMAN 50
9 EREĞLİ KONYA OTO TR(150), POWER TR(50+25) 3.500 7 35,412
10 ERMENEK(GEÇİCİ) KARAMAN 125 500 1 7,964
11 GÜNEYSINIR KONYA 100,(10+10) 44.250 52 7,7
12 ILGIN KONYA 50 1.060 3 16,792
13 KARAMAN KARAMAN 50+50 8.590 11 37,092
14 KARAMAN OSB. KARAMAN 25+50 22.290 29 39,052
15 KARAPINAR KONYA 50+50 18.924 45 16,464
16 KEPEZKAYA-HAVZA KARAMAN 25 5.000 5 1,64
17 KIZÖREN KONYA 100+50 9.508 11 6,368
18 KOLUKISA(GEÇİCİ) KONYA 50 6.000 6 2,8
19 KONYA-1 KONYA 100+100+25 2.004 4 154,904
20 KONYA-2 KONYA 100+100 7.959 12 141,652
21 KONYA-3 KONYA 100+100 297 1 72,26
22 KONYA-4 KONYAOTO TR(2*250+250+150),
GÜÇ TR (100+50)6.560 15 38,592
23 KULU KONYA 50 6.500 7 9,98
24 LADİK KONYA 25+25 13.850 18 15,112
25 SEYDİŞEHİR KONYAOTO TR(180+180), POWER
TR(25+25)2.000 4 20,164
26 YUNAK KONYA 50+25 13.200 14 5,776
27 EVALUATED CONNECTION POINT 142.733 162
28 TOTAL 353.922 458 727
The Electrification and
Energy Generation Map of
TR52 Region
Energy Investments in Region
Karapınar EnergyIndustry Zone
• Total Area 59.710.000 m² ( 5971 ha)
• 3.500 MW Installed Power Capacity ( 1 MW = 1,7 ha)
• 200 MW Energy Infrastructure ( Karapınar TM )
Characteristics20 lt /sec using of process water,Number 1 Zone has a distance to Karapınar – Konya Road 1,5 Km, Number 3 Zone is 18,5 Km,Responsibility to waste-water plant,Both of two area have %1 gradient value,Both of two area are on 5. seismic zone
Energy Investments in Region
Karapınar EnergyIndustry Zone
• Total Area 59.710.000 m² ( 5971 ha)
• 3.500 MW Installed Power Capacity ( 1 MW = 1,7 ha)
• 200 MW Energy Infrastructure ( Karapınar TM )
- There are 55 firms which have constracted measurement station for 60 licensed solarpower plant application.- 45 company / person has applied for unlicensed solar power plants.- Totally 90 firm has applied for 880 MW licensed or unlicensed solar power capacityat KARAPINAR Energy Industry Zone
Energy Investments in Region
Karapınar EnergyIndustry Zone
Investment Criteria Parameter Karapınar
Location of Area Annual Total Sunshine Duration 2.964 hour / year
Annual Solar Radiation 2.100 kWh/m2year
ClimateCharecteristics
Low atmospheric density Open (02 okta)
Distance to Riverbeds There is not river
Low air polution Very low
Low wind potential 5,5 meter/sec/year
Arid climate Semi arid, Cold
Low Humidity %21
Distance to Sea 265 km/Akdeniz
Low air temperature 11,83 C°
Spatial Features of the site
Inclined terrain 1,5 °
Land without the risk of earthquakes
5. Degree
Land has not been protected by law
Yes
Non forest land Yes
Non agriculture land Yes
Non pasture land Yes
Railway, highway land not exceeding
Yes
Not close to the airport land 110 km
Energy Investments in Region
Karapınar EnergyIndustry Zone
Investment Criteria Parameter Karapınar
Spatial Features of the site
Military exercises in the field, away from the land
Enough distance
Away from the urban area of land Enough distance
Away from the main roads and the coastal strip of land
Yes
Land is not lookup field for miningor oil
Yes
Distance to Altitudes Yes
The land away from the direction of bird migration
Enough Distance
Others Obstacle to investment license There is no obstacle to invesmentlicense
Transformers and TransmissionConstraints
100 MVA Transformer and200 MW Transmission Capacity
Incentives Customs Duty Exemption,VAT Exemption, Land Allocation, Social Security Premium Support(Employee’s Share) ,Tax Reduction
Tax Incentives ın Industrial Zones Working
Qualified Human Resources 52 person/m2,
Energy Investments in Region
Council of ministersdecision
Removingattribute of
pasture
Transfer of land to the Ministry
of Industry
GeologicalStudies
ParcelizationStudies
InfrastructureStudies
Transfer of Land to
Investors
Karapınar EnergyIndustry Zone
Energy Investments in Region
Briefly Energy Law in Turkey
Law
Secondary
Regulation
EMRA Board Decisions
Announcementsof EnergyMinistry
Renewable Energy Law, Law no 5346
Energy Market Law, Law no 4628
Regulation for Solar Power Plants (19.06.2011/27969)
Competition for Grid Connection Rights Regulation
(29.05.2012/28307)
Pre-licence Measurement Regulation (22.02.2012/28212)
Support Mechanism (YEKDEM) Regulation
(21.07.2011/28001)
Regulation for Local Equipment Bonus (19.06.2012/27969)
Unlicenced Generation Regulation (21.07.2011/28001)
Licence Regulation (4.8.2002/24836)
Announcement on Grid connection
capacities
Announcement on licence applications
acceptance dates
Briefly Energy Law in TurkeyRenewable Energy Production
For Commercial
Sell to YEKDEM-EPIAS-Own Costumer
Unlicensed
< 1 MW
Sell to YEKDEM
Solar PP
0,133 USD/kWh
Wind PP
0,073 USD/kWh
Biogas PP
0,133 USD/kWh
Hydroelectric PP
0,073 USD/kWh
Jeotermal PP
0,105 USD/kWh
Licensed
> 1 MW
Sell to YEKDEM-EPIAS-Own Costumer
Solar PP
0,133 USD/kWh
Wind PP
0,073 USD/kWh
Biogas PP
0,133 USD/kWh
Hydroelectric PP
0,073 USD/kWh
Jeotermal PP
0,105 USD/kWh
For Own Using
Unlicensed
No Limit
For Own Using
Solar PP
Wind PP
Biogas PP
Co-generation or
Tri-generation PP
21,67
12,83
9,67
5,834,504,33
4,33
4,17
3,67
3,50
3,33
3,00
3,00
2,67
1,83
1,83 1,50
1,501,50
1,50
1,33
1,17
0,83
0,50
The Ratios of License Capacity
Konya, KaramanVan, AğrıAntalya 1,2MersinK.Maraş, AdıyamanBurdurNiğde, Nevşehir, AksarayKayseriMalatya, AdıyamanHakkariMuğla, AydınIsparta, AfyonDenizliBitlisBingöl, TunceliŞırnakAdana, OsmaniyeMuşSiirt, Batman, MardinSivasElazığŞanlıurfa, DiyarbakırErzurumErzincan
100.000
MW
•Electrical Energy Markets and Supply Security Strategy Paper target installed capacity of 100,000 MW by the year 2023,
30.000
MW
•The document in question at least 30% of total installed capacity in 2023, renewable energy,
•Target of 20,000 MW of installed wind power in 2023, the installed capacity target of 600 MW of geothermal,
4.700
MW
•Solar and geothermal energy target for 2023, a total of 9,400 MW,
•When Solar and Geothermal sharing is made of 50% for 2023, the solar power target is 4,700 MW
When based on the percentage of capacity, it is supposed to be given license to
888 MW according to 2023 energy
projection in our region
Briefly Energy Law in Turkey
Briefly Energy Law in Turkey
Locally Produced ComponentBonus
(USDcent/kWh)Bonus
(EUROcent/kWh)
Solar PVThe Base Tariff 13,3 9,67
PV Panel Integration and Production of Structural solar mechanics
0,8 0,58
PV Modules 1,3 0,95
PV Module Cells 3,5 2,55
Invertor 0,6 0,44
Metarial that focuses radiation on the PV Module 0,5 0,36
TOTAL Bonus 6,7 4,87
TOTAL Tariff 20 14,54
Concentrated SolarThe Base Tariff 13,3 9,67
Radiation collector tube 2,4 1,75
Reflective surface 0,6 0,44
Sun tracking system 0,6 0,44
Mechanical components of heat 1,3 0,95
Mechanical components of the steam generation system 2,4 1,75
Stirling engine 1,3 0,95
Panel integration and production of structural solar mechanics 0,6 0,44
TOTAL Bonus 9,2 6,69
TOTAL Tariff 22,5 16,36
Briefly Energy Law in Turkey
Before Application Phase The absence of differences between the procedure of 1 KW and 1MW
On Application Phase
The Approvals of Distribution Companies are not on time
Alternative Connection Points Are not Showing
There is not a standart application procedure between Distribution Companies
Differences in practice between Distribution Companies
On Project Phase
GES compliance letter
Modification of Construction Plan
Static Project Approval
Some Problems for Invesments
Solar Industry
Total Import 80.676.918 $ Import Average Growth %49,84
Total Export 19.731.232 $ Export Average Growth %76,99
2009 2010 2011 2012 2013 2014
Import Value ($) 7.136.612 10.794.090 13.633.989 12.051.407 30.428.232 6.632.588
Export Value ($) 1.160.439 5.444.858 8.477.984 2.334.409 1.842.029 471.513
Trade Balance ($) -5.976.173 -5.349.232 -5.156.005 -9.716.998 -28.586.203 -6.161.075
Import Annual Growth (%) 51,25 26,31 -11,61 152,49 30,78
-20,00
0,00
20,00
40,00
60,00
80,00
100,00
120,00
140,00
160,00
180,00
-$30.000.000
-$25.000.000
-$20.000.000
-$15.000.000
-$10.000.000
-$5.000.000
$0
$5.000.000
$10.000.000
$15.000.000
$20.000.000
$25.000.000
$30.000.000
PV Panel and Components Trade of Turkey
Solar Industry37,00
23,61
15,23 14,86
4,89 4,41
0,00
5,00
10,00
15,00
20,00
25,00
30,00
35,00
40,00
China Germany USA Others India Spain
Top 5 Exporter Countries to Turkey, 2009
24,57 24,19
15,86 15,71
11,068,60
0,00
5,00
10,00
15,00
20,00
25,00
30,00
China Greece Taiwan Germany Others USA
Top 5 Exporter Countries to Turkey, 2010
31,9828,57
21,87
8,745,83
3,01
0,00
5,00
10,00
15,00
20,00
25,00
30,00
35,00
China Taiwan Germany Others USA India
Top 5 Exporter Countries to Turkey, 2011
53,65
17,3410,14 9,82
4,62 4,43
0,00
10,00
20,00
30,00
40,00
50,00
60,00
China Germany Taiwan Others USA Japan
Top 5 Exporter Countries to Turkey,2012
62,85
16,418,16 5,42 4,10 3,06
0,00
10,00
20,00
30,00
40,00
50,00
60,00
70,00
China Germany Others Taiwan SouthKorea
Italy
Top 5 Exporter Countries to Turkey,2013
68,96
15,076,62 5,84 3,33 0,18
0,00
20,00
40,00
60,00
80,00
China Singapore Malaysia Germany Others Italy
Top 5 Exporter Countries to Turkey,2014
Solar Industry
YearsNumber of
PanelCapacity (KW)
Price for 250 W($)
Price per Watt ($)
Price per Watt (Euro)
2009 10.746 2.687 664 2,66 1,92
2010 10.942 2.736 986 3,95 2,85
2011 23.523 5.881 580 2,32 1,68
2012 54.744 13.686 220 0,88 0,64
2013 139.729 34.932 218 0,87 0,63
2014 27.953 6.988 237 0,95 0,69
TOTAL 267.637 66.909 301 1,21 0,87
For China Price per Watt 0,62 EuroFor Germany Price per Watt 0,84 Euro
Industry Competation AnalysisCriteria
Number of Workplaces
Employment Endorsement Salary+Charge Investments
Main Sectors TR TR52 TR TR52 TR TR52 TR TR52 TR TR52
Agriculture, Forestry, Fishing 0,01 0,09 0,02 0,03 0,01 0,12 0,02 0,04 0,03 0,00
Mining 0,14 0,14 1,09 0,99 0,82 0,57 2,06 1,15 1,83 1,53
Manufacturing 13,08 14,26 27,11 29,15 27,34 27,71 34,93 38,85 35,14 43,32
Electricity, Gas, Steam 0,03 0,01 0,65 0,33 4,63 2,56 2,20 2,28 5,20 2,30
Water, Sewer 0,12 0,30 0,72 1,26 0,46 0,59 1,48 3,33 1,46 5,23
Construction 4,49 2,81 7,16 4,40 6,03 2,74 5,62 4,23 5,46 5,28
Trade And Repair 42,87 49,25 29,23 38,14 46,13 56,29 19,89 25,83 15,86 20,55
Transport, Storage And Communication 15,86 15,39 9,71 8,80 5,84 5,94 9,10 7,20 15,38 15,30
Hotels, Restaurants, Etc. 8,17 5,89 6,53 3,75 1,64 0,70 4,11 1,98 2,82 0,55
Information And Communication 1,06 1,15 1,51 0,90 2,14 0,43 4,41 2,70 11,68 0,93
Real Estate, Renting And Business
Activities 0,78 0,43 0,41 0,19 0,20 0,22 0,31 0,08 0,34 0,00
Professional, Scientific, Technical
Operations 5,04 3,63 3,72 2,55 1,98 0,53 3,87 1,66 1,35 0,65
Administrative And Support Services 0,97 0,50 5,90 3,67 1,40 0,60 5,83 5,00 1,11 0,32
Education 0,44 0,47 1,77 2,04 0,37 0,26 2,53 2,49 0,90 1,12
Health And Social Services 1,27 0,61 1,99 1,59 0,65 0,52 2,79 2,91 1,19 2,78
Culture, Arts, Sports, Entertainment 0,57 0,27 0,36 0,12 0,16 0,01 0,36 0,02 0,15 0,01
Other Services 5,11 4,79 2,11 2,10 0,19 0,20 0,48 0,24 0,10 0,06
Other / Unallocated 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,06
Total 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00
Distribution of the main industry in our region, 2009
Industry Competation AnalysisCriteria
Number of Workplaces
Employment Endorsement Salary+Charge Investments
Sectors TR TR52 TR TR52 TR TR52 TR TR52 TR TR52
10-Food 12,96 11,27 13,03 30,26 15,10 53,94 12,60 44,26 10,36 30,20
11-Drink 0,18 0,06 0,46 0,30 1,08 0,41 0,80 0,88 1,11 0,00
13-Textile 5,82 4,65 10,98 1,65 7,68 0,99 8,48 0,81 6,38 1,47
14-Wearing Apparel 16,05 7,64 14,70 5,30 6,64 1,75 8,93 3,55 3,45 0,94
15-Leather And Products 2,33 5,41 1,69 2,24 0,85 0,69 0,95 0,83 0,46 0,12
16-Wood, Wood Products 8,14 6,93 2,63 2,57 1,41 0,56 1,08 1,17 1,21 0,82
17-Paper And Paper Products 0,72 0,33 1,55 1,31 2,00 2,19 1,94 1,55 1,75 1,83
18-Printed Publication 3,97 1,87 2,08 0,93 1,09 0,29 1,49 0,49 0,66 0,35
20-Chemical Products 1,19 1,12 2,21 1,66 5,37 1,97 4,16 1,60 3,62 0,00
21-Basic Pharmaceutical 0,12 0,10 1,14 0,49 2,03 0,40 4,09 2,19 0,99 0,36
22-Rubber & Plastic 5,81 11,11 5,61 7,91 5,01 6,07 5,34 5,48 4,99 19,29
23-Mineral Products 4,14 4,23 6,07 3,86 5,67 4,60 6,56 4,18 8,14 5,51
24-Base Metal 0,76 1,78 3,67 5,18 10,07 5,84 6,40 5,94 31,12 8,67
25-Metal Furniture 14,86 18,64 8,79 9,05 5,14 4,25 6,53 5,20 4,24 5,41
27-Electrical Equipment 2,31 0,77 3,96 0,73 5,99 0,56 6,01 0,52 3,27 0,82
28-Machinery And Equipment 3,98 5,84 5,15 10,14 3,63 7,73 4,96 10,03 3,84 10,95
29-Manufacture Of Motor
Vehicles, Etc. 1,41 7,10 4,84 11,10 8,37 5,96 7,95 8,57 5,42 10,37
30-Other Transport
Equipment 0,35 0,05 1,42 0,04 1,39 0,02 2,37 0,02 1,84 0,00
31-Furniture 10,53 8,36 5,16 3,96 1,99 1,23 2,61 2,02 1,09 1,53
32-Other Manufacturing 2,41 1,22 1,79 0,97 2,11 0,38 1,24 0,59 0,60 0,00
33-Installation, Repair 1,71 1,49 1,28 0,28 0,54 0,04 1,43 0,05 0,63 0,00
Other / Unallocated 0,27 0,04 1,80 0,08 6,85 0,11 4,07 0,06 4,83 1,33
Manufacturing Industry 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00
Distribution of Manufacturing Industry in our region,2009
Industry Competation Analysis
Period 2003 2009
Main Sectors / Regions TR TR52 TR TR52
Mining 0,8 0,3 1,5 0,6
Manufacturing 41,7 65,5 35,7 47,9
Electricity 13,6 4,7 8,3 12,8
Construction 3,3 1,3 7,2 3,7
Trade And Repair 10,8 14,7 16,0 18,6
Hotels, Restaurants, Etc. 4,3 1,9 3,2 0,6
Transport, Storage And Communication 15,4 5,6 21,2 9,4
Real Estate, Renting And Business Activities 4,0 1,1 3,6 3,7
Education 3,0 0,5 1,0 0,6
Other / Unallocated 3,1 4,3 2,2 2,0
Total 100,0 100,0 100,0 100,0
Sectoral Distribution of Investments
Industry Competation AnalysisTR52 Relative Shares Index,2009 – ( For Turkey 100 )
NACE SectorsNumber of
WorkplaceEmployment Endorsement Salary+Charge Investments
10-Food 87 232,3 357,2 351,3 291,6
11-Drink 31,2 65,9 37,7 108,9 0
13-Textile 80 15 13 9,6 23,1
14-Wearing Apparel 47,6 36,1 26,4 39,7 27,4
15-Leather and Products 232,2 132,2 81,7 87,3 25,8
16-Wood, wood products 85 97,4 39,9 108,3 68,3
17-Paper and Paper Products 46 84,1 109,3 79,7 104,6
18-Printed Publication 47,1 44,9 26,8 33 53,2
20-Chemical Products 94 75 36,7 38,4 0
21-Basic Pharmaceutical 87,2 42,7 19,6 53,7 36,2
22-Rubber & Plastic 191,3 140,8 121,2 102,8 386,8
23-Mineral Products 102,1 63,6 81,2 63,7 67,7
24-Base Metal 234,8 141,3 58 92,8 27,9
25-Metal Furniture 125,5 103 82,9 79,6 127,7
27-Electrical Equipment 33,3 18,4 9,4 8,7 25,1
28-Machinery and Equipment 146,9 196,9 213,2 202,1 285,4
29-Manufacture of motor vehicles, etc. 503,8 229,2 71,2 107,7 191,3
30-Other Transport Equipment 13,3 2,7 1,4 1 0,2
31-Furniture 79,4 76,7 61,7 77,4 140,5
32-Other Manufacturing 50,7 54,1 17,8 48 0
33-Installation, Repair 87 22,3 6,8 3,1 0,7
Industry Competation Analysis
Number of
Workplace
Low Technology Sectors 62,46 54,12 41,88 37,32 27,99
Low-Middle Technology Sectors 25,03 23,44 24,79 34,24 40,76
Middle-High Technology Sectors 12,38 21,71 31,91 26,97 30,49
High Technology Sectors 0,12 0,7 1,4 1,32 0,72
Number of
Workplace
Low Technology Sectors 44,7 47,2 55,9 57,2 43,3
Low-Middle Technology Sectors 34,8 26,8 20,5 22,7 39,9
Middle-High Technology Sectors 20,5 25,7 23,3 19,5 16,6
High Technology Sectors 0 0 0 0 0
Turkey Salary&Charge Investments
TR52 Salary&Charge Investments
Employment Endorsement
Employment Endorsement
Levels and Distribution of Technology in Manufacturing Industry (%)
Industry Competation AnalysisTR52 Region Foreign Trade Breakdown by Sectors, 2012
Thousand USD Export Export Share (%) Import Import Share (%) X-M
Agriculture (Agriculture, Livestock, Fisheries and Forestry) 91.646,00 5,90 230.841,00 18,10 -139,20
Mining, Quarrying 9.024,00 0,60 2.858,00 0,20 6,17
Manufacturing Industry 1.450.168,00 93,30 995.804,00 78,00 454,36
Other (Junk, Entertainment, Sports activities) 3.777,00 0,20 47.600,00 3,70 -43,82
TR52 Konya-Karaman 1.554.615 100 1.277.103 100 277.512
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
TR3
3
TR4
1
Ko
nya
TR5
2
TR
TR8
3
TRA
1
TRA
2
TRC
2
TR2
1
TR2
2
TR3
2
TR8
2
TRC
1
Kar
aman
Technology Scores of Exports by Regions, 2012
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
TR3
3
TR8
2
TR4
2
TR7
1
TR1
0
Ko
nya
TR5
2
TR8
3
TR6
1
TR9
0
TR7
2
TRC
3
TR2
2
TRB
2
TRA
2
Technology Scores of Imports by Regions, 2012
Industry Competation Analysis
0,0
2,0
4,0
6,0
15
-Gıd
a ve
İçec
ek
29
-Mak
ine
ve
Teçh
izat
1-T
arım
ve
Hay
van
cılık
34
-Mo
torl
u K
ara
Taşı
tı
28
-Me
tal E
şya
2-O
rman
cılık
25
-Pla
stik
&K
auçu
k
26
-Min
era
l Ürü
nle
r
24
-Kim
yasa
l Ürü
nle
r
10
-Mad
en
Kö
mü
rü
21
-Kağ
ıt
36
-Mo
bily
a
33
-Tıb
bi A
letl
er
13
-Me
tal C
evh
erl
eri
20
-Ağa
ç ve
Man
tar
14
-Taş
oca
kçılı
ğı
27
-An
a M
eta
l
32
-Rad
yo, T
V, H
abe
r. T
eç.
31
-Ele
ktri
kli M
ekin
a ve
…
30
-Bü
ro,B
ilgi İ
şlem
…
22
-Bas
ım v
e Y
ayım
17
-Te
ksti
l
19
-De
ri ü
rün
leri
35
-Diğ
er
Ula
şım
Ara
çlar
ı
18
-Giy
im
23
-Ko
k K
öm
ürü
, Raf
ine
…
Specialization of Exports for TR52, 2012
0,0
1,0
2,0
3,0
4,0
5,0
6,0
7,0
8,0
29
-Mak
ine
ve
Teçh
izat
15
-Gıd
a ve
İçec
ek
34
-Mo
torl
u K
ara
Taşı
tı
1-T
arım
ve
Hay
van
cılık
28
-Me
tal E
şya
2-O
rman
cılık
25
-Pla
stik
&K
auçu
k
26
-Min
era
l Ürü
nle
r
24
-Kim
yasa
l Ürü
nle
r
10
-Mad
en
Kö
mü
rü
21
-Kağ
ıt
36
-Mo
bily
a
33
-Tıb
bi A
letl
er
13
-Me
tal C
evh
erl
eri
14
-Taş
oca
kçılı
ğı
27
-An
a M
eta
l
20
-Ağa
ç ve
Man
tar
32
-Rad
yo, T
V, H
abe
r. T
eç.
31
-Ele
ktri
kli M
ekin
a ve
…
30
-Bü
ro,B
ilgi İ
şlem
…
17
-Te
ksti
l
22
-Bas
ım v
e Y
ayım
19
-De
ri ü
rün
leri
35
-Diğ
er
Ula
şım
Ara
çlar
ı
18
-Giy
im
23
-Ko
k K
öm
ürü
, Raf
ine
…
Specialization of Imports for Konya, 2012
The firms which can be work about solar industry
Photovoltaic Panel
• Solimpeks
• Derya Güneş Kollektör
• Bağdaş Alüminyum
• EEM Mühendislik
• Heray Güneş
• Kamer Elektrik
• Sunstrip
• Anıtcam
• Akdeniz Cam
• Çıraylar Cam
• AYD
• Endüstriyel Elektronik
EVA
• Derya Güneş Kolektörü
Energy Industry in our Region
The firms which can be work about solar industry
Metal Support
• Acar MPG Makine
• Hidrokon
• Has Pompa
• Betokav
• AYD
• Isıl Çelik Döküm
• Telefoncular
• Derya Güneş Kolektör
• Kondöksan
• Üçel Paslanmaz Çelik
• Gülmez Makine
• Bağdaş Alüminyum
• AF Enerji
Glass
• Derya Güneş Kolektör
• Akdeniz Cam
• Çıraylar Cam
• Konkar Cam
Energy Industry in our Region
Solar TrackingSystem
• Erdirenler Dişli
• OSR Robotics
• Hidrokon
• Has Pompa
• Anka Kalıp
• AYD
• Hidrosur
• Telefoncular
• Derya Güneş Kolektör
• Yasinoğulları
• Tavşan Saç
• Solimpeks
• Hantaş
• Zafer Dişli
• Şalt Otomasyon
• Samur Elektrik
• Özsamur Elektronik
• EEM Mühendislik
• Endüstriyel Elektrik Elektronik
• Konya Enerji
Energy Industry in our RegionThe firms which can be work about solar industry
Battery and
The Gel
• Has Pompa
• Makkon Mühendislik
• Derman Akü
• Aktif Akü
• Öztürk Akü
ConnectionEquipments
• EEM Mühendislik
• Samur Elektrik
• BAF Enerji
• Atiker Metal
• Şalt Otomasyon
Energy Industry in our RegionThe firms which can be work about solar industry
Electronic ControlSystems
• Erdirenler Dişli
• OSR Robotics
• Hidrokon
• Has Pompa
• Anka Kalıp
• AYD
• Hidrosur
• Telefoncular
• Derya Güneş Kolektör
• Yasinoğulları
• Tavşan Saç
• Solimpeks
• Hantaş
• Zafer Dişli
• Şalt Otomasyon
• Samur Elektrik
• Özsamur Elektronik
• EEM Mühendislik
• Endüstriyel Elektrik Elektronik
• Konya Enerji
Energy Industry in our RegionThe firms which can be work about solar industry
Charge Control
• EEM Mühendislik
• Samur Elektronik
• Konya Enerji
• BAF Enerji
• Atiker Metal
• Has Pompa
• Şalt Otomasyon
Electric Metering• Samur Elektronik
• EEM Mühendislik
Energy Industry in our RegionThe firms which can be work about solar industry
ConnectedEquipments
• ACAR MPG Makine
• Konya Metalurji
• AYD
• Telefoncular
• Derya Güneş Kolektör
• Akkaya Isı
• Bilir Metalurji
• Yıldız Pul
• Üçel Paslanmaz Çelik
• Gülmez Makine
• Bağdaş Alüminyum
• BAF Enerji
• Hidrosan
• Samur Elektronik
• Kamer Elektrik
• Heray Güneş
• Solimpeks
• Konya Enerji
• Montaş
• Mor Çelik
Energy Industry in our RegionThe firms which can be work about solar industry
Cables
• Lukas
• Derya Güneş
• Nirvana Elektronik
• Üçel Paslanmaz
• Bağdaş Alüminyum
• Hidrosan
• Samur Elektronik
• Solimpeks
• BAF Enerji
• Kamer Elektrik
• Heray Güneş
• Konya Enerji
Energy Industry in our RegionThe firms which can be work about solar industry
What MEVKA made
97,46 98,31 97,24 94,37100,00
87,13
2,54 1,69 2,76 5,630,00
12,87
0,00
20,00
40,00
60,00
80,00
100,00
120,00
2008 2009 2010 2011 2012 2013 2014
%
Energy Sector Ratio for Applications to MEVKA Grants
Other Sector Applications Energy Sector Applications
96,55 98,39 97,0391,24
100,00
3,45 1,61 2,978,76
0,00
0,00
20,00
40,00
60,00
80,00
100,00
120,00
2008 2009 2010 2011 2012 2013
%
The Ratio of Energy Sector for Granted Project Numbers
Granted Projects for Other Sectors Granted Projects for Energy Sector
What MEVKA made
Total ProjectApplications
Granted Projects
Other Sectors 97,53 96,61
Energy Sector 2,47 3,39
2,47 3,39
97,53 96,61
0,00
20,00
40,00
60,00
80,00
100,00
120,00
%
The Ratio of Energy Sector Projects
23,65
17,67
0,00
5,00
10,00
15,00
20,00
25,00
Energy Sector Other Sectors
%
Requested/Granted Ratios by Sectors
TOTAL
Total Project Application Number 2.594
Energy Sector Project Application Number 64
Granted Project Number 738
Granted Energy Sector Project Number 25
Requested Amount for Total Applications ( TL ) 391.586.971,93 TL
Requested Amount for Energy Applications ( TL ) 16.796.189,37 TL
Total Granted Amount 70.209.512,55 TL
Granted Amount for Energy Sector 3.972.598,31 TL
Investment Consultancy Support
Sectoral Database
• To make data up to date
• Coordination with sectoral institutions(TEİAŞ, MEDAŞ )
FeasibilityStudies
• PV Panel Production Feasibility Studies
• Nuclear Industry Feasibility Studies
What MEVKA planning to do?
Call for Proposals
• In our call for proposal we willprioritize increasing EnergyEfficiency in enterprises
• In social projects projects on increasing awareness forenergy efficiency will be prioritized.
Energy efficiency
What MEVKA planning to do?
Call for Proposals
• Using Renewable EnergySources,
• Production andexportation of renewableand nuclear energytechnologies on R&D basis
Renewable and Nuclear Energy
What MEVKA planning to do?
Specialist of Energy
Mücahit Yasir KINALI
Electric-Electronic Engineer
90 554 551 62 76
Konya Investment SupportOffice
Tel : 90332 236 32 90
Medrese Mahallesi Ulaşbaba Caddesi No:28 Selçuklu/KONYA Türkiye 42060
Karaman Investment SupportOffice
Tel : 90338 213 00 20
İmaret Mahallesi Atatürk Bulvarı No:2 Merkez/KARAMAN Türkiye 70100
Contact