SunEdison Origination and Power Marketing Standard Pitch...
-
Upload
vuongthien -
Category
Documents
-
view
218 -
download
2
Transcript of SunEdison Origination and Power Marketing Standard Pitch...
![Page 1: SunEdison Origination and Power Marketing Standard Pitch ...prdrse4all.spc.int/system/files/d1_10._sunedison_-_wescoatt.pdf · • Acquired First Wind in 2015, becoming the world’s](https://reader036.fdocuments.net/reader036/viewer/2022062907/5a9dc0d47f8b9a85318c2c66/html5/thumbnails/1.jpg)
July 2015
![Page 2: SunEdison Origination and Power Marketing Standard Pitch ...prdrse4all.spc.int/system/files/d1_10._sunedison_-_wescoatt.pdf · • Acquired First Wind in 2015, becoming the world’s](https://reader036.fdocuments.net/reader036/viewer/2022062907/5a9dc0d47f8b9a85318c2c66/html5/thumbnails/2.jpg)
SunEdison
Global and Local Clean Energy
• Acquired First Wind in 2015, becoming the world’s largest renewable energy development company.
• Operates 4 wind energy project (150 MW), Hawai‘i’s largest renewable energy producer
![Page 3: SunEdison Origination and Power Marketing Standard Pitch ...prdrse4all.spc.int/system/files/d1_10._sunedison_-_wescoatt.pdf · • Acquired First Wind in 2015, becoming the world’s](https://reader036.fdocuments.net/reader036/viewer/2022062907/5a9dc0d47f8b9a85318c2c66/html5/thumbnails/3.jpg)
P. 3 | SunEdison Confidential
$400M saving over 27
years on electricity.
$200M in fed tax credits
Flat price locks in rate vs.
volatile price of oil.
$500M investment & local
construction jobs
Big step toward Hawaii’s
100% clean energy target
New Solar Projects – Cleaner and Cheaper
Sheep graze under PV panels at Kaua‘i
solar project.
SunEdison is planning 4 solar project sites (182 MW):
* Derived with regional details from EPA’s e-GRID 2012 and EIA and based on average
operational projections for generation.
Saves 30 million gallons of oil from being burned/year*
Combining agriculture with solar by grazing sheep
![Page 4: SunEdison Origination and Power Marketing Standard Pitch ...prdrse4all.spc.int/system/files/d1_10._sunedison_-_wescoatt.pdf · • Acquired First Wind in 2015, becoming the world’s](https://reader036.fdocuments.net/reader036/viewer/2022062907/5a9dc0d47f8b9a85318c2c66/html5/thumbnails/4.jpg)
P. 4 | SunEdison Confidential
O‘ahu Solar Projects
![Page 5: SunEdison Origination and Power Marketing Standard Pitch ...prdrse4all.spc.int/system/files/d1_10._sunedison_-_wescoatt.pdf · • Acquired First Wind in 2015, becoming the world’s](https://reader036.fdocuments.net/reader036/viewer/2022062907/5a9dc0d47f8b9a85318c2c66/html5/thumbnails/5.jpg)
P. 5 | SunEdison Confidential
Progress to Date
5
• Purchase/Lease Land
• Site Studies
• Community Support
• Executed Contract
(PPA)
• Approved Permits
• Initial Tree Clearing
• Engaged Lenders
• Next Steps?
Simulation of Waiawa Solar project, as
seen from Ka Uka Blvd overpass
![Page 6: SunEdison Origination and Power Marketing Standard Pitch ...prdrse4all.spc.int/system/files/d1_10._sunedison_-_wescoatt.pdf · • Acquired First Wind in 2015, becoming the world’s](https://reader036.fdocuments.net/reader036/viewer/2022062907/5a9dc0d47f8b9a85318c2c66/html5/thumbnails/6.jpg)
P. 6 | SunEdison Confidential
Next Steps
6
• PUC approval of ALL
projects by July
• Financing (Aug. 2015)
• Start Construction
(Sep.2015)
• Finish by 12/31/2016
Mahalo to the Mililani Neighborhood Board for continuing
support of clean energy!
SunEdison solar project MA
![Page 7: SunEdison Origination and Power Marketing Standard Pitch ...prdrse4all.spc.int/system/files/d1_10._sunedison_-_wescoatt.pdf · • Acquired First Wind in 2015, becoming the world’s](https://reader036.fdocuments.net/reader036/viewer/2022062907/5a9dc0d47f8b9a85318c2c66/html5/thumbnails/7.jpg)