Core Business
1
Available Resource
3
Only 20% of world reserves
available for development by
public companies
55% of reserves available
to public companies
found in the oil sands
Crude Oil Life Cycle
4
Satellite View of Suncor’s Base Mining & Upgrading Operations
5 Pipeline connections to
Edmonton and Hardisty
Tailings Reclamation
facilities
Suncor Base Operations
6
Fort Hills Operations- Paraffinic Froth Treatment Replaces Upgrading
7
8
Mining Prep - Tree Clearing Mine Preparation: Clearing the Forest, Sequestering Muskeg and Draining
the Surface
9
Mine Preparation: Building Access Roads and Utilities
10
Overburden Mining Mine Preparation: Removal of Overburden
11
Mine Face
muskeg
overburden
oilsand
limestone
12
Mining – Delivering Ore to Extraction Delivering Ore to the Processing Plant
Delivering Ore to the Dump Pocket
13
Ore Processing Plant – Primary Extraction
14
Delivery point
Secondary extraction
15
Primary
extraction
Secondary
extraction
Oil Sands Processing- Separation
16
Photo courtesy of Syncrude
Oil Sands Processing- Separation
17
18
Primary Extraction – Hot Water Flotation Bitumen froth secondary extraction
Bitumen is Sent to Storage Tanks - Material Settles Before Being Upgraded
19
Secondary
extraction
tanks &
upgrading
20
Tailings is Sent to Tailings Ponds
Tailings Reduction and Remediation
• Tails are the leftovers after the oil is removed
• Sand (coarse tails), clays (fine tails, mature fine tails), trace oils & kerogens
• The sand is received in sands dumps
• Fine tails become clay suspensions
• Water must be removed to reclaim land
21
22
Step 1: Native Seed Collection Step 2: Soil Salvage & Placement
Step 3: Barley Nurse Crop Step 4: Tree & Shrub Planting
Reclamation Preparing for Reclamation
23
• Suncor is the first oil sands company to complete surface reclamation of a tailings pond.
• This 220-hectare site was Suncor’s first settling pond for oil sands tailings in 1967.
Wapisiw Lookout: First reclaimed tailings pond