Sun Mig2 Aix

2
Cross platform migration of Oracle application R12 on Solaris 10 to AIX 6.1  Note: This document out lines the general procedu re for migrating oracle appl ication R12.1.0 from Solaris 10 to AIX 6.1 Assumptions: 1. Oracl e appl icati ons R1 2.1.0 is installed on Sol aris 10 ( 64-b it) 2. Datab ase is RDBMS 11 .1.0.7 (whic h comes a s stan dard p ackag ed ERP su ite) 3. Targe t system is AIX power 7 serie s 6.1 with a ll lates t os util ities an d packa ges installed as per the requisites of Apps R12 installation manual. High level steps 1. Prepa re sour ce system for migra tion (2 days: patching + backu p takes time) 2. Perfo rm datab ase migr ation (2 days : Rman issu es if any ) 3. Perfo rm appli catio n tier migra tion (2 days: copyi ng take s time and so does patching ) 4. Perf or m fi nishing t as ks 5. Test the newl y migra ted syst em (1 Day step 4 and step 5 toge ther) Detailed steps 1. Pre par e sourc e sy ste m for mi gra tio n a. Veri fy Source an d Tar get n odes software versi ons and o.s. requirements  b. Apply latest autoco nfig, rapidclone and mi gration patches to so urce system Solaris 10 in our case. c. Run autoconf ig a nd p reclone d. Iden tify t ech st ack u pdate s if an y on s ource so tha t same has t o be applied to target during/after migration 2. Perf or m database mig ration a. Ch ec k pre re quis it es  b. Prepare for the platform migratio n c. Start the d ata bas e in READ ONLY mode d. Ver ify t he data bas e is re ady f or mi gra tion e. Run the RMAN CONVE RT DATABASE co mma nd f. Mov e ne ces sar y fi les to t he t arg et s yst em g. Comple te th e migrati on h. Perform fi ni shing t as ks

Transcript of Sun Mig2 Aix

Page 1: Sun Mig2 Aix

7/28/2019 Sun Mig2 Aix

http://slidepdf.com/reader/full/sun-mig2-aix 1/2

Cross platform migration of Oracle application R12 on Solaris 10 to AIX 6.1

 Note: This document outlines the general procedure for migrating oracle application R12.1.0

from Solaris 10 to AIX 6.1

Assumptions:

1. Oracle applications R12.1.0 is installed on Solaris 10 (64-bit)

2. Database is RDBMS 11.1.0.7 (which comes as standard packaged ERP suite)

3. Target system is AIX power7 series 6.1 with all latest os utilities and packagesinstalled as per the requisites of Apps R12 installation manual.

High level steps

1. Prepare source system for migration (2 days: patching + backup takes

time)

2. Perform database migration (2 days: Rman issues if any )

3. Perform application tier migration (2 days: copying takes time and so

does patching )

4. Perform finishing tasks

5. Test the newly migrated system (1 Day step 4 and step 5 together)

Detailed steps

1. Prepare source system for migration

a. Verify Source and Target nodes software versions and o.s.requirements

 b. Apply latest autoconfig, rapidclone and migration patches to source

system Solaris 10 in our case.

c. Run autoconfig and preclone

d. Identify tech stack updates if any on source so that same has to be

applied to target during/after migration

2. Perform database migration

a. Check prerequisites

 b. Prepare for the platform migrationc. Start the database in READ ONLY moded. Verify the database is ready for migration

e. Run the RMAN CONVERT DATABASE command

f. Move necessary files to the target system

g. Complete the migration

h. Perform finishing tasks

Page 2: Sun Mig2 Aix

7/28/2019 Sun Mig2 Aix

http://slidepdf.com/reader/full/sun-mig2-aix 2/2

3. Perform application tier migration

a. Generate and upload the manifest of customer-specific files b. Copy source system to target

c. Install jdk,infozip etc on targetd. Clone application context file

e. Install application tier Technology stack.( it should be same as that

of source system)

f. Run AutoConfig setup phase on the Target System

g. Download and apply the customer-specific update with AutoPatch

4. Perform finishing tasksa. Generate objects for new target application tier.

 b. Run autoconfig and other finishing tasks if any

c. Cross verify new domain named. Maintain snapshot info

5. Test the newly migrated system

a. Perform general DBA tests to confirm availability of instance to

users.

References:

• General Notes For E-Business Suite Release 12 [ID 986673.1]

• Application Tier Platform Migration with Oracle E-Business Suite Release 12

[ID 438086.1]

•  Platform Migration Using Transportable Database Oracle Database 11g and 10g

Release 2 An Oracle White Paper August 2008