DIVERSIFYING YOUR SOLAR BUSINESS THROUGH
INNOVATIVE ROOF-TOP SOLUTIONS
Manu KaranDistributed Generation Biz. Dev. Head
2
Top: 25 MW, Solar Park, Charanka, Gujarat Bottom: Narmada Canal 1 MW, Gujarat, India
Top: 72 MW Plant in Italy Bottom: 350 kWs Kohls Rooftop Installation
SunEdison
First Private Solar Rooftop PPA in India – 100 kW at StanC
� First Rooftop Solar Private PPA in India (Standard Chartered Bank, Chennai)
� Thin Film PV Modules with Fixed Tilt
� Elevated Structures were used to ensure roof usage is not curtailed
� Central Inverter
SunEdison
Education Institutes – 50kW at Shivalik Public School
� Rooftop Installation at Shivalik Public School, Punjab
� MonoCrystalline Modules
� Fixed Tilt
� String Inverters
Distributed Solar Energy is a Key Feature of Developed Solar Markets
SunEdison
Source: Federal Network Agency, BSW-Solar (2011)
Solar Energy Generation Peak Coincides with Afternoon Demand Peak
SunEdison
Solar Energy Generation Vs. Office Demand
Energy Demand
Solar Energy Generation
SunEdison
Actual Peak Load Shavings from one of our solar power plants
Plant Size – 1.16 MWp in California, US
Peak Load Shaving, A Case in Point
Grid / Diesel Genset 1
Diesel Genset 2
Hurdles to Adoption
� Subsidy turn-around time / uncertainty
� Upfront Large Capital Investment
� Roof-top usage for other purposes
� Limited free Roof-top Space
Roof-top Solar Solution Innovation
� Business Model Innovation
• Non-subsidy System Sale
• Energy Sale
• Multiple Customer Energy Sale
� Mounting Structural Innovation
• Car Park roofing
• Elevated Semi-Roofing on terrace
Business Model Innovation
Subsidy & Non-Subsidy business models
SunEdison
Economics of a System Sale
SunEdison
* Depends on parameters such as level of irradiation, tilt & type of installation
COMMERCIAL SUMMARY : 100 kW SPV POWER PLANT
Description With Subsidy Without Subsidy
Cost of 100kW System Rs 130 Lakhs Rs 117 Lakhs
Effective Cost to Customer Rs 61.47 Lakhs Rs 79.03 Lakhs
Operation & Maintenance cost Rs 2.5 Lakhs (5% YoY increase) Rs 2.5 Lakhs (5% YoY increase)
System Life 25 Years 25 Years
Calculated Cost per unit
of electricity generated~ Rs 7.5* ~ Rs 8.5*
Rs. 13 - 16
Diesel Genset
Cost Comparison : Solar V/s Diesel Generator
SunEdison
Payback Summary
Diesel Price Rs40 / litre (5% yoy inflation)
Liters of Diesel required to produce equivalent units (kWh) 53333 litres
Payback Period3 Years (with capital subsidy)
5 Years (without capital subsidy)
Investment in Solar PV will result in Payback in 5 Years and almost Free Electricity for 20 More Years !!!
Economics of Energy Sale
SunEdison
With SubsidyWithout
Subsidy
System Sale
(Energy Cost)~ Rs 7.5 ~ Rs 8.5
Energy Sale ~ Rs 8.5 ~ Rs 9.5
16%
Investor
IRR
Multiple Customer Energy Sale
Apartment Block
Apartment #2
Apartment #4
Apartment # 1
Apartment #3
PV Panels
• Owner: Builder
• Location: Rooftop
Inverter, Battery
• Owner: Resident
• Location: Apartment
15
Structural Innovation
Parking Lot Canopy
SunEdison
Yet low cost
SunEdison
Commercial & Residential Building structures
SunEdison
(Not a SunEdison installation)
SunEdison
Think Different
Think Big
Manu KaranDistributed Generation Biz. Dev. Head
HT Customers : Pain Points
TNEB’s New Regulations on HT Customers:
� Reduction in sanctioned load by 40%– 60%
• Eg. 1000kVA sanctioned load, reduced to
400kVA quota
� 2 days of power holiday per week
� Restricted usage between 6PM to 10PM
(unless purchased from power exchange)
� Significant cutback of total number of units
(kWh) to be consumed
� Heavy Penalties for non compliance
SunEdison