Summary of week 11 Machine Checkout Beam Commissioning R. Giachino, M. Albert, G. Arduini, J....

download Summary of week 11 Machine Checkout Beam Commissioning R. Giachino, M. Albert, G. Arduini, J. Wenninger.

If you can't read please download the document

description

LHC machine check-out Main targets:  Close the beam interlock loop,  Test the beam dump,  Test the injection kickers,  Run the LHC through a full machine cycle,  Check the control system. 3/19/ LHC 8:30 meeting