Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
-
Upload
kenneth-phelps -
Category
Documents
-
view
214 -
download
1
Transcript of Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
Summary of instrument review
National Research Coordinators Meeting Windsor, June 2008
NRCMeetingWindsor
June 2008
Instrument revision
• The main survey instruments will be further revised based on:– Feedback from Project Advisory
Committee– Feedback from NRCs at this meeting
• We welcome any further written feedback from countries but it needs to be sent within the next two weeks!
NRCMeetingWindsor
June 2008
Cognitive test
• Generally, we will be able to keep most of the field trial items
• For a 45-minute test with seven booklets/clusters also some items with marginally satisfactory scaling properties will have to be deleted
NRCMeetingWindsor
June 2008
Student questionnaire
• No fundamental format changes will be done and no new items should be added
• There was some interest in keeping some of the material proposed for deletion– Further revision will take country feedback into
account– Some further items for single-item reporting may
be retained
• The overall length of the questionnaire will have to be considered in the final revision
NRCMeetingWindsor
June 2008
Teacher questionnaire
• Some further changes to be applied based on PAC and NRC feedback
• Attempt to make wording consistent between teacher and school questionnaire
• Teacher survey design– No change in target population definition
(teaching in target grade)– 15 teachers per school
• International option of oversampling CCE teachers
NRCMeetingWindsor
June 2008
School questionnaire
• Some further changes to be applied based on PAC and NRC feedback
• Few comments received
NRCMeetingWindsor
June 2008
Final instruments
• After NRC meeting further round of revisions
• Internal review of next version of instruments
• Final instruments with notes to be sent on 11 July 2008
• Sample instruments (with final layout and assembly instructions) will be sent with manuals (Unit 2) on 28 July 2008
NRCMeetingWindsor
June 2008
Questions or comments?